Motion for Leave to Answer and Answer of Eastman Chemical Company in response to the Indicated PJM Transmission Owners' 04/24/2026 Answer
Text extracted from the eLibrary original (SHA-256 10d8f57732ad0cf5…). Download the original from the official source.
Contents · 3 sections
Read topic-matched comments in ER26-1479
Topics in the text: Reliability and curtailment · Cost allocation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
1 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, LLC ) Docket No.Read this passage
A. PJM TOs Ignore Operational Realities of Industrial BTMG Facilities
printed heading · Topic match: Reliability and curtailment
ER26-1479-000, at 6 (filed Mar. 16, 2026) (Protest). 6 Id. at 5. 7 Id. 8 Id.; Order at P 83. 3 The Commission directed PJM to propose a threshold that would “reduce the reliability and resource adequacy risks that large or increasing BTMG may pose,” while allowing Network Customers to continue…Read this passage Filed comments: Reliability and curtailment
B. PJM TOs Fail to Defend the PJM All-or-Nothing Netting Structure
printed heading · Topic match: Cost allocation
PJM TOs Fail to Defend the PJM All-or-Nothing Netting Structure Second, the Commission directed PJM to establish a threshold for the load that Network Customers may net using BTMG.11 However, PJM has created a standard that eliminates all netting for any facility that exceeds the 50 MW threshold by…Read this passage Filed comments: Cost allocation
C. The PJM TOs Justification of 50 MW Threshold is Arbitrary
printed heading · Topic match: Reliability and curtailment
For the foregoing reasons, Eastman requests that the Commission accept this answer and grant the relief requested in the Protest or establish an evidentiary hearing with full rights of discovery to explore the issues of material fact that are in dispute.Read this passage Filed comments: Reliability and curtailment
CERTIFICATE OF SERVICE
printed heading
Dated at Arlington, Virginia, this 12th day of May 2026.Read this passage