ER26-3380-000 · 2026-08-21 · Northern Virginia Electric Cooperative, Inc.

Affidavit of Rollins_NOVEC Protest ER26-3380

Text extracted from the eLibrary original (SHA-256 c81c0d6df2caead1…). Download the original from the official source.

Contents · 12 sections
  1. I. INTRODUCTION p. 2
  2. A. My name is Wilbur Rollins. My business address is 10323 Lomond Dr., Manassas, VA, p. 2
  3. II. PURPOSE OF THIS AFFIDAVIT p. 2
  4. III. PJM RELIABILITY BACKSTOP PROCUREMENT PROPOSAL p. 2
  5. A. NOVEC is a not-for-profit electric distribution cooperative organized and existing under p. 2
  6. A. PJM’s proposed section 18.5(b)(i)(B)(1), would require Load Serving Entities to post RBP p. 3
  7. A. Assuming no offsets and using the table provided in paragraph 46 of Ms. Croop’s affidavit, p. 3
  8. A. It is shockingly unreasonable. Putting aside the fact that PJM is designating a select few to p. 3
  9. A. NOVEC has an investment-grade credit rating. Further, to my knowledge, NOVEC has p. 4
  10. A. Yes. To give an idea of the relative impact on NOVEC, the RBP collateral amount exceeds p. 4
  11. A. NOVEC may not be able to borrow additional money for constructing infrastructure to p. 4
  12. A. Yes. p. 5

Read the parent filing

Read topic-matched comments in ER26-3380

Topics in the text: Credit and exit · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

ER26-3380-000 PJM Reliability Backstop Procurement Proposal NOVEC Protest Affidavit of Wilbur Rollins Northern Virginia Electric Cooperative, Inc.
Read this passage

I. INTRODUCTION

printed heading

I.
Read this passage

A. My name is Wilbur Rollins. My business address is 10323 Lomond Dr., Manassas, VA,

printed heading

My business address is 10323 Lomond Dr., Manassas, VA, 3 20109. 4 Q.
Read this passage

II. PURPOSE OF THIS AFFIDAVIT

printed heading · Topic match: Credit and exit

I am providing information about the impact on NOVEC of the proposed collateral 13 requirements associated with PJM’s proposed Reliability Backstop Procurement (“RBP”). 14
Read this passage Filed comments: Credit and exit

III. PJM RELIABILITY BACKSTOP PROCUREMENT PROPOSAL

printed heading

PJM RELIABILITY BACKSTOP PROCUREMENT PROPOSAL 15 Q.
Read this passage

A. NOVEC is a not-for-profit electric distribution cooperative organized and existing under

printed heading · Topic match: Credit and exit

WHAT IS YOUR UNDERSTANDING OF THE RBP COLLATERAL 6 OBLIGATIONS? 7
Read this passage Filed comments: Credit and exit

A. PJM’s proposed section 18.5(b)(i)(B)(1), would require Load Serving Entities to post RBP

printed heading · Topic match: Credit and exit

RBP 11 Collateral must be in the form of a cash deposit or a letter of credit. 12 Q.
Read this passage Filed comments: Credit and exit

A. Assuming no offsets and using the table provided in paragraph 46 of Ms. Croop’s affidavit,

printed heading · Topic match: Credit and exit

Croop’s affidavit, 15 I estimate that NOVEC’s RBP Collateral will be $1.95 billion ($1.5 million * 1,302.6 16 MW). 17 Q.
Read this passage Filed comments: Credit and exit

A. It is shockingly unreasonable. Putting aside the fact that PJM is designating a select few to

printed heading · Topic match: Credit and exit

Putting aside the fact that PJM is designating a select few to 20 cure a PJM-wide problem, suddenly requiring NOVEC to post nearly $2 billion of 21 collateral is a tremendous burden that NOVEC may not even be able to meet, and is not 22 necessary to ensure NOVEC fulfills its obligations. 23…
Read this passage Filed comments: Credit and exit

A. NOVEC has an investment-grade credit rating. Further, to my knowledge, NOVEC has

printed heading · Topic match: Credit and exit

CAN YOU EXPLAIN WHY THE RBP COLLATERAL REQUIREMENT IS A 5 BURDEN TO NOVEC? 6
Read this passage Filed comments: Credit and exit

A. Yes. To give an idea of the relative impact on NOVEC, the RBP collateral amount exceeds

printed heading · Topic match: Credit and exit

To give an idea of the relative impact on NOVEC, the RBP collateral amount exceeds 7 the $1.8 billion of assets on NOVEC’s balance sheets.
Read this passage Filed comments: Credit and exit

A. NOVEC may not be able to borrow additional money for constructing infrastructure to

printed heading · Topic match: Cost allocation

NOVEC spends approximately $70 to $90 million annually on both 19 “end of life” replacements and necessary expansions, which would have to be curtailed. 20 Even if NOVEC could procure a letter of credit, the collateral obligation would come with 21 a minimum of $20 million in annual carrying costs…
Read this passage Filed comments: Cost allocation

A. Yes.

printed heading

Yes. 4 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C.
Read this passage