Motion to Intervene and Comments of Neil P. Osnato o/b/o Persistence Analytics Group LLC in response to PJM Interconnection, L.L.C.'s 07/31/2026 filing…
Text extracted from the eLibrary original (SHA-256 20865ba46d966d22…). Download the original from the official source.
Contents · 4 sections
Read topic-matched comments in ER26-3380
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C.Read this passage
I. INTEREST
printed heading
INTEREST PAG is a New Jersey-based small business focused on infrastructure risk analytics, including infrastructure assumption verification, decision assurance, demand durability, grid stress, load integrity, and large-load development.Read this passage
II. POSITION
printed heading
POSITION PAG does not take a position on the ultimate disposition of PJM's filing through this motion.Read this passage
III. COMMUNICATIONS
printed heading
COMMUNICATIONS All communications and service should be directed to Neil P.Read this passage
IV. CONCLUSION
printed heading
CONCLUSION For the foregoing reasons, PAG respectfully requests that the Commission grant this Motion to Intervene in Docket No.Read this passage