ER26-3380-000 · 2026-08-17 · Individual No AffiliationPERSISTENCE ANALYTICS GROUP LLC
Motion to Intervene and Comments of Neil P. Osnato o/b/o Persistence Analytics Group LLC in response to PJM Interconnection, L.L.C.'s 07/31/2026 filing…
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
Docket No. ER26-3380-000
MOTION TO INTERVENE OF PERSISTENCE ANALYTICS GROUP LLC
Pursuant to Rule 214 of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.214, Persistence Analytics Group LLC ("PAG") respectfully moves to intervene in the above- captioned proceeding.
I. INTEREST
PAG is a New Jersey-based small business focused on infrastructure risk analytics, including infrastructure assumption verification, decision assurance, demand durability, grid stress, load integrity, and large-load development. This proceeding concerns PJM's proposed Reliability Backstop Procurement and presents issues directly relevant to PAG's work, including the evidentiary basis for modeled resource-adequacy needs, the maturity and durability of forecast large-load demand, and the relationship between projected need and long-duration procurement commitments. PAG's participation may assist the Commission, and no other party can adequately represent PAG's particular interests and perspective.
II. POSITION
PAG does not take a position on the ultimate disposition of PJM's filing through this motion. PAG seeks intervention so that it may address whether material assumptions supporting the proposed procurement are sufficiently evidenced and subject to appropriate revalidation before long-duration contractual obligations are created.
III. COMMUNICATIONS
All communications and service should be directed to Neil P. Osnato, Founder, Persistence Analytics Group LLC, neil@persistenceanalyticsgroup.com, 609-464-9055.
IV. CONCLUSION
For the foregoing reasons, PAG respectfully requests that the Commission grant this Motion to Intervene in Docket No. ER26-3380-000.
Respectfully submitted,
Neil P. Osnato
Founder
Persistence Analytics Group LLC | United Grid
82 Spring Lake Blvd, Waretown, NJ 08758
neil@persistenceanalyticsgroup.com | 609-464-9055
Dated: August 17, 2026