ER26-3515-000 · 2026-09-03 · Buckeye Power, Inc.

Limited Comments of Buckeye Power, Inc. on PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026

Text extracted from the eLibrary original (SHA-256 cac0aa5a8e482956…). Download the original from the official source.

Contents · 3 sections
  1. I. Introduction p. 2
  2. II. PJM Should Clarify How IRAS MW Quantity is Determined in Real- p. 4
  3. CONCLUSION p. 8

Read topic-matched comments in ER26-3515

Topics in the text: Reliability and curtailment · Registry access · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Reliability and curtailment

Pursuant to Rule 211 of the Federal Energy Regulatory Commission’s (“Commission”) Rules of Practice and Procedure,1 Buckeye Power, Inc. (“Buckeye”)2 respectfully submits these limited comments on PJM Interconnection, L.L.C.’s (“PJM”) proposed revisions to its Open Access Transmission Tariff…
Read this passage Filed comments: Reliability and curtailment

I. Introduction

printed heading · Topic match: Reliability and curtailment

C, Affidavit of Christopher Pilong on Behalf of PJM Interconnection, L.L.C., P 19 (“Pilong Aff.”). - 3 - Operating Limits within prescribed limits and prevent cascading outages.”5 PJM has added the IRAS Action early in the emergency action process, prior to calling on Demand Response and Deploying…
Read this passage Filed comments: Reliability and curtailment

II. PJM Should Clarify How IRAS MW Quantity is Determined in Real-

printed heading · Topic match: Registry access

DD-4 § V(b) (“A New Large Load’s Eligible New Large Load Amount shall be determined as follows: (New Large Load’s registered peak load (in MW), as provided in the Large Load Registry) minus (the sum of all BYONC arrangements with the New Large Load in accordance with Tariff, Attachment DD-4,…
Read this passage Filed comments: Registry access

CONCLUSION

printed heading

CONCLUSION For the reasons stated above, the Commission should (to the extent PJM does not do so on its own) require PJM to clarify how it will calculate the IRAS Action reduction quantity in real-time, including whether that amount could exceed New Large Load in real-time such that an Electric…