Motion to Intervene and Protest of Eolian, L.P. et al. to PJM Interconnection, L.L.C.’s proposed revisions to the PJM Open Access Transmission Tariff
Text extracted from the eLibrary original (SHA-256 3231a05538c61676…). Download the original from the official source.
Contents · 5 sections
Read topic-matched comments in ER26-1479
Topics in the text: Connecting load and generation · Filing procedure · Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Connecting load and generation
PJM must allow loads served by behind-the-meter generation (BTMG) to access the Commission’s new transmission services in order to ensure that loads with similar willingness and ability to limit withdrawals from the grid have access to similar service opportunities, and that therefore the proposed…Read this passage Filed comments: Connecting load and generation
I. MOTION TO INTERVENE
printed heading
MOTION TO INTERVENE Eolian develops energy generation and storage assets throughout the United States and has originated 27 GW of operating capacity to date.Read this passage
II. LIMITED PROTEST
printed heading
II.Read this passage
A. PJM should be required to clarify that an existing interconnection customer
printed heading · Topic match: Connecting load and generation
P 225. 8 Load.”14 The Co-Location Order aims to minimize infrastructure needs based on interconnection customer capabilities including the Co-Located Load’s characteristics, specifying that “[t]his revision will clarify that an Interconnection Customer seeking to use a new generating facility to…Read this passage Filed comments: Connecting load and generation
B. The Commission should reject PJM’s proposed Tariff revisions that preclude
printed heading · Topic match: Connecting load and generation
These customers are also excluded from new transmission service options by PJM’s proposal to define Co-Located Load as “end-use customer load that is physically connected to the facilities of an existing or planned Generating Facility on the Project Developer’s side of the Point of Change in…Read this passage Filed comments: Connecting load and generation
III. CONCLUSION
printed heading · Topic match: Connecting load and generation
CONCLUSION For the foregoing reasons, the Commission should reject PJM’s compliance filing and require PJM to: (1) clarify that, in any generator interconnection study process in which PJM studies the Co-Located Load’s withdrawals from the grid for purposes of identifying network upgrades,…Read this passage Filed comments: Connecting load and generation
CERTIFICATE OF SERVICE
printed heading
Dated: March 16, 2026 /s/ Nathan Lobel Nathan Lobel Roselle LLP 300 New Jersey Ave.Read this passage