EL26-67-000 · 2026-07-08 · Individual No Affiliation

Motion of L.M. Marlowe for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement Judge

An individual intervenor filing as L.M. Marlowe moves FERC to open settlement procedures or appoint a settlement judge across the six show cause dockets, starting with shared technical questions on large-load observability and cost causation.

Asks FERC to: Establish settlement procedures and convene a settlement conference under Rule 601, or alternatively appoint a settlement judge under Rule 603.

Motion in the EL26-67 to EL26-72 dockets proposing settlement talks in parallel with the 60-day show cause responses the June orders require.

E-7 PJM: Show cause or propose tariff changes in 60 days (p. 7)

Key points

  1. Marlowe asks for a settlement conference, or a settlement judge as an alternative, in the show cause dockets.
    establish settlement procedures and convene a settlement conference of the participants pursuant to Rule 601 PDF p. 1
  2. She would start with shared technical questions on observability, cost causation, curtailment priority and boundary verification.
    large-load observability, cost-allocation and cost- causation, curtailment priority, and boundary-verification methodology PDF p. 1
  3. She says the rules allow settlement procedures at any time and that they can run alongside the directed responses.
    Settlement procedures may run in parallel with the responses the Commission has directed and need not await their conclusion PDF p. 2
Contents · 5 sections
  1. I. Introduction and Relief Requested p. 1
  2. II. The Commission’s Authority to Convene Settlement at Any Time p. 2
  3. III. Settlement Is Timely, Not Premature p. 2
  4. IV. Settlement Serves the Public Interest and Commission Policy p. 2
  5. V. Conclusion p. 3

Read topic-matched comments in EL26-67

Topics in the text: Cost allocation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Cost allocation

It is offered for the public benefit — to improve grid reliability, transparency in large-load cost allocation, and the protection of ratepayers from systemic waste and undue cost- shifting — and seeks a timely and durable resolution of the matters presented.
Read this passage Filed comments: Cost allocation

I. Introduction and Relief Requested

printed heading · Topic match: Reliability and curtailment

Movant proposes that any such settlement procedures be directed, in the first instance, to the discrete and shared technical questions common to these dockets — large-load observability, cost-allocation and cost- causation, curtailment priority, and boundary-verification methodology — rather than…
Read this passage Filed comments: Reliability and curtailment

II. The Commission’s Authority to Convene Settlement at Any Time

printed heading

The Commission’s Authority to Convene Settlement at Any Time Rule 601 provides that the Commission or other decisional authority “may convene a conference of the participants in a proceeding at any time for any purpose related to the conduct or disposition of the proceeding, including … the…
Read this passage

III. Settlement Is Timely, Not Premature

printed heading · Topic match: Reliability and curtailment

Settlement Is Timely, Not Premature Any suggestion that a movement toward resolution is premature is not consistent with the documented condition of the system at issue.
Read this passage Filed comments: Reliability and curtailment

IV. Settlement Serves the Public Interest and Commission Policy

printed heading · Topic match: Cost allocation

Settlement in these proceedings would allow the participants — the RTO/ISOs, transmission owners, large-load and generation interests, State representatives, ratepayer advocates, and intervenors such as Movant — to work toward mutually acceptable reliability, observability, and cost-allocation…
Read this passage Filed comments: Cost allocation

V. Conclusion

printed heading

Conclusion For the foregoing reasons, Movant respectfully requests that the Commission establish settlement procedures and convene a settlement conference pursuant to Rule 601, or, in the alternative, appoint a settlement judge pursuant to Rule 603, to facilitate the resolution of these proceedings.
Read this passage