AD24-11 Stu Bresler Statement (Exh B)
Text extracted from the eLibrary original (SHA-256 5a89f96eb488a121…). Download the original from the official source.
Read topic-matched comments in EL25-49
Topics in the text: Connecting load and generation · Reliability and curtailment · Cost allocation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Connecting load and generation
Filed in the Co-Located Load Technical Conference Docket No.Read this passage Filed comments: Connecting load and generation
Introduction
printed heading · Topic match: Connecting load and generation
In PJM, load has traditionally been added by the local transmission owner/electric distribution company on an annual basis as Network Load.6 This load is provision in Appendix 2, section 3.1 of the interconnection service agreement “is inapplicable to requests to interconnect end-use load…Read this passage Filed comments: Connecting load and generation