ER27-454-000 · 2026-11-09 · PJM

Attachment B- Clean Tariff Revisions

Contents · 128 sections
  1. Attachment B p. 1
  2. Definitions – O – P - Q p. 2
  3. Offer Data: p. 2
  4. Office of the Interconnection: p. 2
  5. Office of the Interconnection Control Center: p. 2
  6. On-Site Generators: p. 2
  7. Open Access Same-Time Information System (OASIS) or PJM Open Access Same-Time Information System: p. 2
  8. Open-Loop Hybrid Resource: p. 3
  9. “Open-Loop Hybrid Resource” shall mean a Hybrid Resource with a storage component that operates by charging its storage component from the grid. p. 3
  10. Operating Agreement of the PJM Interconnection, L.L.C., Operating Agreement or PJM Operating Agreement: p. 3
  11. Operating Day: p. 3
  12. Operating Margin: p. 3
  13. Operating Margin Customer: p. 3
  14. Option to Build: p. 4
  15. Optional Interconnection Study: p. 4
  16. Optional Interconnection Study Agreement: p. 4
  17. Part I: p. 4
  18. Part II: p. 5
  19. Part III: p. 5
  20. Part IV: p. 5
  21. Part V: p. 5
  22. Part VI: p. 5
  23. “Participant” shall mean a Market Participant and/or Transmission Customer and/or Applicant requesting to be an active Market Participant and/or Transmission Customer. p. 5
  24. Parties: p. 5
  25. PJM Administrative Service: p. 7
  26. PJM Control Area: p. 7
  27. PJM Interchange: p. 8
  28. PJM Interchange Energy Market: p. 8
  29. PJM Interchange Export: p. 8
  30. PJM Interchange Import: p. 8
  31. PJM Manuals: p. 9
  32. PJM Region: p. 9
  33. Planning Period Balance: p. 11
  34. Planning Period Quarter: p. 11
  35. Point(s) of Delivery: p. 11
  36. Point of Interconnection: p. 11
  37. Point(s) of Receipt: p. 11
  38. Point-To-Point Transmission Service: p. 11
  39. Power Purchaser: p. 12
  40. Pre-Confirmed Application: p. 12
  41. Pre-Expansion PJM Zones: p. 12
  42. Project Financing: p. 14
  43. Project Finance Entity: p. 15
  44. “Public Policy Requirements” shall have the same meaning provided in the Operating Agreement. p. 16
  45. Qualifying RBP Offset UCAP MW: p. 16
  46. Queue Position: p. 16
  47. Definitions – R - S p. 17
  48. Ramping Capability: p. 17
  49. Real-time Congestion Price: p. 18
  50. Real-time Loss Price: p. 18
  51. Real-time Energy Market: p. 18
  52. Real-time Offer: p. 18
  53. “Real-time Offer” shall mean a new offer or an update to a Market Seller’s existing cost-based or market-based offer for a clock hour, submitted for use after the close of the Day-ahead Energy Market. p. 18
  54. Real-time Prices: p. 18
  55. Real-time Settlement Interval: p. 18
  56. “Real-time Settlement Interval” shall mean the interval used by settlements, which shall be every five minutes. p. 19
  57. Real-time State of Charge: p. 19
  58. “Real-time State of Charge” shall mean the current State of Charge of an Energy Storage Resource Model Participant, measured in units of megawatt-hours. p. 19
  59. Real-time System Energy Price: p. 19
  60. Reasonable Efforts: p. 19
  61. Receiving Party: p. 19
  62. “Regional Network Integration Transmission Service” shall mean firm transmission service taken by Network Customers that involves the delivery of energy and/or capacity from Network Resources physically interconnected to the Transmission Provider’s transmission system to Network Load physically interconnected to the Transmission Provider’s transmission system. p. 20
  63. Regional Transmission Expansion Plan: p. 20
  64. Regional Transmission Group (RTG): p. 20
  65. Regulation: p. 20
  66. Regulation Zone: p. 20
  67. Relevant Electric Retail Regulatory Authority: p. 20
  68. Reliability Assurance Agreement or PJM Reliability Assurance Agreement: p. 21
  69. Required Transmission Enhancements: p. 21
  70. Reserved Capacity: p. 21
  71. Reserve Penalty Factor: p. 21
  72. “Reserve Penalty Factor” shall mean the cost, in $/MWh, associated with being unable to meet a specific reserve requirement in a Reserve Zone or Reserve Sub-zone. A Reserve Penalty Factor will be defined for each reserve requirement in a Reserve Zone or Reserve Sub-zone. p. 21
  73. Residual Auction Revenue Rights: p. 22
  74. Residual Metered Load: p. 22
  75. “Residual Metered Load” shall mean all load remaining in an electric distribution company’s fully metered franchise area(s) or service territory(ies) after all nodally priced load of entities serving load in such area(s) or territory(ies) has been carved out. p. 22
  76. Restricted Collateral: p. 22
  77. “Restricted Collateral” shall mean Collateral, held by PJM or PJMSettlement, which cannot be used, netted, credited or spent by the Participant to satisfy any other obligations. p. 22
  78. Revenue Data for Settlements: p. 22
  79. “Revenue Data for Settlements” shall mean energy quantities used in accounting and billing as determined pursuant to Tariff, Attachment K-Appendix and the corresponding provisions of Operating Agreement, Schedule 1. p. 23
  80. Schedule of Work: p. 23
  81. Scope of Work: p. 23
  82. Seasonal Capacity Performance Resource: p. 23
  83. “Seasonal Capacity Performance Resource” shall have the same meaning specified in Tariff, Attachment DD, section 5.5A. p. 23
  84. Secondary Reserve: p. 23
  85. “Secondary Reserve” shall mean the reserve capability of generation resources that can be converted fully into energy or Economic Load Response Participant resources whose demand can be reduced within 30 minutes (less the capability of such resources to provide Primary Reserve), from the request of the Office of the Interconnection, regardless of whether the equipment providing the reserve is electrically synchronized to the Transmission System or not. p. 23
  86. Secondary Systems: p. 23
  87. “Second Incremental Auction” shall mean an Incremental Auction conducted ten months before the Delivery Year to which it relates. p. 24
  88. Security: p. 24
  89. Segment: p. 24
  90. Service Agreement: p. 25
  91. Service Commencement Date: p. 25
  92. Short-Term Firm Point-To-Point Transmission Service: p. 25
  93. “Short-term Project” shall have the same meaning provided in the Operating Agreement. p. 25
  94. Site: p. 25
  95. Small Inverter Facility: p. 26
  96. Small Inverter ISA: p. 26
  97. Special Member: p. 26
  98. Spot Market Backup: p. 26
  99. Spot Market Energy: p. 26
  100. Start Fuel: p. 27
  101. For units without a soak process, “Start Fuel” shall consist of fuel consumed from first fire of the start process to first breaker closing, plus any fuel expended from last breaker opening to shutdown. p. 27
  102. For units with a soak process, “Start Fuel” is fuel consumed from first fire of the start process (initial reactor criticality for nuclear units) to dispatchable output (including auxiliary boiler fuel), plus any fuel expended from last breaker opening to shutdown, excluding normal plant heating/auxiliary equipment fuel requirements. Start Fuel included for each temperature state from breaker closure to dispatchable output shall not exceed the unit specific soak time period reviewed and approved as part of the unit-specific parameter process detailed in Tariff, Attachment K-Appendix, section 6.6(c) or the defaults below: p. 27
  103. Attachment K-Appendix, section 6.6(c) or the defaults below: p. 27
  104. Start-Up Costs: p. 27
  105. State: p. 27
  106. State Estimator: p. 28
  107. State of Charge: p. 28
  108. “State of Charge” shall mean the operating parameter that represents the quantity of physical energy stored (measured in units of megawatt-hours) in an Energy Storage Resource Model Participant or in a storage component of a Hybrid Resource in proportion to its maximum State of Charge capability. State of Charge is quantified as defined in the PJM Manuals. p. 28
  109. State of Charge Management: p. 28
  110. “State of Charge Management” shall mean the control of State of Charge of an Energy Storage Resource Market Participant or a storage component of a Hybrid Resource using Charge and Discharge Economic Minimum and Maximum Megawatts (and, as applicable, charge) limits, changes in operating mode (as applicable), discharging (and, as applicable, charging) offer curves, and self-scheduling of non-dispatchable sales (and, as applicable, purchases) of energy in the PJM markets. State of Charge Management shall not interfere with the obligation of a Market Seller of an Energy Storage Resource Model Participant or of a Hybrid Resource to follow PJM dispatch, consistent with all other resources. p. 28
  111. Station Power: p. 29
  112. Summer-Period Capacity Performance Resource: p. 30
  113. “Summer-Period Capacity Performance Resource” shall have the same meaning specified in Tariff, Attachment DD, section 5.5A. p. 30
  114. Surplus Interconnection Customer: p. 30
  115. “Surplus Interconnection Customer” shall mean either an Interconnection Customer whose Generating Facility is already interconnected to the PJM Transmission System or one of its affiliates, or an unaffiliated entity that submits a Surplus Interconnection Request to utilize Surplus Interconnection Service within the Transmission System in the PJM Region. A Surplus Interconnection Customer is not a New Service Customer. p. 30
  116. Surplus Interconnection Request: p. 30
  117. “Surplus Interconnection Request” shall mean a request submitted by a Surplus Interconnection Customer, pursuant to Tariff, Attachment RR, to utilize Surplus Interconnection Service within the Transmission System in the PJM Region. A Surplus Interconnection Request is not a New Service Request. p. 30
  118. Surplus Interconnection Service: p. 30
  119. Switching and Tagging Rules: p. 30
  120. Synchronized Reserve: p. 31
  121. Synchronized Reserve Event: p. 31
  122. System Condition: p. 31
  123. System Energy Price: p. 31
  124. System Impact Study: p. 31
  125. System Protection Facilities: p. 32
  126. A. It has a documented plan in place to retire the resource prior to or during the Delivery p. 36
  127. B. Significant physical operational restrictions cause long term or permanent changes to the p. 36
  128. C. The Capacity Market Seller is involved in an ongoing regulatory proceeding (e.g. – p. 36

Read the parent filing

Topics in the text: Credit and exit · Cost allocation · Connecting load and generation

What the document says

Cost allocation · PDF pp. 1–32

Definitions: charges, collateral and obligations

The clean definitions distinguish daily RBP Charges from RBP Obligation, the retail regulator's allocation of unforced capacity MW among suppliers. Both settlement credits and charges may change sign.

the $/day value of the total RBP Settlement Credits, positive or negative PDF p. 17

Seller obligations · PDF pp. 33–43

§5.5, §6.6, §6.6A: auction participation

The auction provisions place committed backstop capacity into PJM's existing auction system. The offer obligation runs through the term of the commitment and is subject to the stated exceptions.

all of the RBP UCAP MW that is committed in the Reliability Backstop Procurement through the term of the commitment PDF p. 34

Procurement target · PDF pp. 44–45

§18, §18.1: procurement size

The proposed one-time procurement begins in 2027. Its initial target cannot exceed either the updated 2028/29 auction shortfall or the reported large-load quantity expressed in unforced capacity.

the UCAP equivalent of the aggregate region-wide Large Load MW quantity reported by the Electric Distributor PDF p. 45

Demand flexibility · PDF pp. 46–47

§18.2: qualifying bilateral offsets

A qualifying new capacity resource must meet the tariff's eligibility requirements. The tariff allows several kinds of supporting evidence: a bilateral contract for at least five delivery years, qualifying self-supply, or a signed commitment for demand response or distributed generation.

signed bilateral contracts for Qualifying RBP Offset UCAP MW PDF p. 47

Retail jurisdiction · PDF pp. 48–49

§18.3: cost allocation and credits

Zonal shares reflect load growth and eligible offsets. If a distributor reports an allocation from its retail regulator, PJM uses those MW to bill suppliers. If it does not, capacity obligations supply the default shares.

Electric Distributors may report updated RBO MW to the Office of the Interconnection after the initial allocation is reported PDF p. 49

Registry reporting · PDF p. 50

§18.3A: the distributor's report

At least seven days before the procurement, each distributor outside a Fixed Resource Requirement service area must report the identity and quantity of incremental large load supported by an agreement. This report establishes backstop exposure, not registry membership.

the quantity and identity of incremental Large Load that is supported by an electric service obligation, construction commitment, or similar agreement PDF p. 50

Reliability and timing · PDF p. 51

§18.4: offer and selection windows

The proposed tariff gives sellers four weeks to submit offers and allows six weeks after that for clearing and selection. These intervals are counted from the procurement itself.

The Reliability Backstop Procurement offer submission window for RBP Sell Offers shall open for four weeks PDF p. 51

Seller eligibility · PDF pp. 52–58

§18.5: eligibility, selection and settlement

PJM sets eligibility and evidence requirements by resource type, then ranks offers by levelized cost. The $555/MW-day ceiling applies to the MW-weighted average levelized cost of the selected offers, not a guaranteed price for each resource.

The MW-weighted average of the levelized procurement cost of all selected RBP Sell Offers shall not exceed $555/MW-day UCAP PDF p. 57

Seller obligations · PDF pp. 59–60

§18.6: delivery and shortfall charges

Committed capacity has an auction offer obligation. Undelivered MW lose daily backstop settlement credits and can incur shortfall charges during the fixed 15-year period.

will not be compensated for the undelivered megawatts via RBP Settlement Credits PDF p. 60

Exit liability · PDF p. 61

§18.7: exiting suppliers

A supplier leaving PJM would still owe its allocated charges, even if another entity's departure caused the exit. A FERC rate filing must specify the terms and the amount.

subject to a rate filing with the Federal Energy Regulatory Commission that details the specific terms and amounts owed PDF p. 61

Credit and default · PDF pp. 62–66

§18.8: collateral on both sides of the auction

Sellers post security before offering; losing sellers get it back within five business days after clearing. Suppliers assigned charges secure their share under a separate formula. A transfer does not release the original supplier's collateral until the successor posts and unpaid invoices are settled.

Any RBP Collateral posted by transferor shall be returned once Transferee has posted the RBP Collateral PDF p. 66