Comments of Southern Maryland Electric Cooperative, Inc. re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing
Text extracted from the eLibrary original (SHA-256 efd4eb7e2497d8f1…). Download the original from the official source.
Contents · 6 sections
Read topic-matched comments in ER26-3380
Topics in the text: Credit and exit · Cost allocation · Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Cost allocation
Pursuant to the Combined Notice of Filings #1 issued by the Federal Energy Regulatory Commission (“Commission”) on August 3, 2026, Southern Maryland Electric Cooperative, Inc. (“SMECO”)1 respectfully submits these comments regarding the filing that PJM Interconnection, L.L.C. (“PJM”) submitted in…Read this passage Filed comments: Cost allocation
I. INTRODUCTION AND SUMMARY
printed heading · Topic match: Credit and exit
Second, as to RBP credit, PJM proposes vastly different RBP collateral requirements as between RBP load versus RBP supply.Read this passage Filed comments: Credit and exit
II. BACKGROUND
printed heading · Topic match: Credit and exit
BACKGROUND PJM filed the RBP Filing on July 31, 2026, requesting that the Commission act by September 29, 2026 -- sixty days after filing -- so that PJM may commence the RBP on September 30, 2026.4 PJM proposes to set an “Initial RBP Target” equal to the 6,831.3 MW UCAP shortfall reflected in the…Read this passage Filed comments: Credit and exit
III. COMMENTS
printed heading
III.Read this passage
A. PJM’s RBP Filing Assigns Electric Distributors a Role Inconsistent with Their
printed heading · Topic match: Cost allocation
A zone/area of an Electric Distributor that qualifies for one of the opt-outs set forth in proposed Tariff, Attachment DD, section 18.1(d), would also have RBP Charges reduced by the MW quantity of the opt-out.” (citing proposed Tariff, Attachment DD, section 18.2(c)). 26RBP Filing at 75: “the…Read this passage Filed comments: Cost allocation
B. RBP Credit and Collateral Issues.
printed heading · Topic match: Credit and exit
PJM proposes that the Electric Distributor’s RBO allocation be reported at no later than sixty days before the start of the DY; PJM proposes to require the affected LSE to post the resulting collateral just fifteen days later, at forty-five days before the DY begins.30 That leaves just a…Read this passage Filed comments: Credit and exit
IV. CONCLUSION
printed heading
CONCLUSION SMECO respectfully requests that the Commission consider SMECO’s comments on PJM’s RBP Filing.Read this passage
CERTIFICATE OF SERVICE
printed heading
Dated: August 21, 2026. /s/ _____ John S.Read this passage