ER26-3552-000 · 2026-09-08 · Solar Energy Industries Association

Comments of the Solar Energy Industries Association in Support of Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish…

Text extracted from the eLibrary original (SHA-256 ecca38f59dd9a7e9…). Download the original from the official source.

Contents · 5 sections
  1. I. INTRODUCTION p. 2
  2. II. COMMENTS p. 3
  3. A. The ZGIA Proposal Appropriately Limits Zero Injection Generation p. 3
  4. B. The ZGIA Proposal Supports Speed to Reliable Power While Preserving p. 5
  5. III. CONCLUSION p. 6

Read topic-matched comments in ER26-3552

Topics in the text: Connecting load and generation · Reliability and curtailment · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Reliability and curtailment

MISO’s proposal represents a just and reasonable step toward addressing the resource adequacy issues posed by the rapid addition of large loads.
Read this passage Filed comments: Reliability and curtailment

I. INTRODUCTION

printed heading · Topic match: Connecting load and generation

EL26-70-000, which raised concerns about, among other things, the absence of generator interconnection service and study processes tailored to generation serving co-located or electrically proximate large load.6 The ZGIA Proposal is the first in a series of filings MISO intends to make to address…
Read this passage Filed comments: Connecting load and generation

II. COMMENTS

printed heading

II.
Read this passage

A. The ZGIA Proposal Appropriately Limits Zero Injection Generation

printed heading · Topic match: Connecting load and generation

Because the ZG Resource would not inject onto the broader Transmission System, the co-location design would avoid the need for a deliverability analysis.11 Under the ZGIA Proposal, ZG Interconnection Service would not grant injection rights or deliverability, and MISO would require that no Network…
Read this passage Filed comments: Connecting load and generation

B. The ZGIA Proposal Supports Speed to Reliable Power While Preserving

printed heading · Topic match: Connecting load and generation

Under the ZGIA Proposal, ZG Interconnection Service would be available only where the Generating Facility and the ZG Associated Load are at the same substation and voltage level.18 MISO considered and rejected broader scopes, including electrically proximate configurations, based on stakeholder…
Read this passage Filed comments: Connecting load and generation

III. CONCLUSION

printed heading · Topic match: Reliability and curtailment

CONCLUSION MISO’s ZGIA proposal represents a just and reasonable step toward addressing the resource adequacy issues posed by the rapid addition of large loads.
Read this passage Filed comments: Reliability and curtailment

CERTIFICATE OF SERVICE

printed heading

Dated at Washington, DC, this 8th day of September, 2026. /s/ Melissa Alfano Melissa Alfano