ER26-3380-000 · 2026-09-29 · FERC

Order accepting PJM's Reliability Backstop Procurement, suspending it to February 28, 2027, and establishing further procedures

FERC accepts PJM's Reliability Backstop Procurement for filing, suspends it five months to February 28, 2027 subject to refund, and sets a paper hearing on cost allocation, transmission owner exit rules and LSE collateral. It opens section 206 docket EL26-108.

Decides PJM's separate ER26-3380 backstop capacity filing. Its cost allocation and collateral findings apply the cost-causation reasoning behind the E-7 order, and the E-7 adequacy report addresses the same shortfall.

E-7 PJM: 30-day report on serving large loads with adequate generation (p. 8) E-7 PJM: Cost-recovery agreement (P 77, p. 28)

Key points

  1. FERC accepts PJM's one-time procurement, suspends it to February 28, 2027, and opens a paper hearing plus a section 206 proceeding.
    we accept the proposed RBP for filing, suspend it for five months, effective February 28, 2027, subject to refund, and establish a paper hearing. PDF p. 1
  2. FERC encourages PJM to file a new section 205 proposal quickly, which could make the paper hearing unnecessary.
    we encourage PJM to swiftly submit a new FPA section 205 filing without delay. PDF p. 2
  3. The 2027/2028 auction cleared 6,623 MW short of the reliability requirement, the first time a BRA cleared significantly below it.
    The 2027/2028 BRA cleared 6,623 MW PDF p. 2
  4. PJM's target is the 6,831 MW 2028/2029 shortfall, procured under commitments of up to 15 years.
    PJM states that the RBP aims to procure capacity equal to the 6,831 MW shortfall in the 2028/2029 BRA (Initial RBP Target) PDF p. 7
  5. Three issues go to paper hearing: cost allocation, transmission owner exit rules and LSE collateral. Other aspects are found just and reasonable.
    cost allocation, Transmission Owner exit rules, and LSE collateral requirements PDF p. 9
  6. FERC declines to require locational constraints, citing the 6,831 MW size against 149 GW of existing PJM supply.
    the volume of capacity that PJM will procure through the RBP auction—up to 6,831 MW—is relatively small compared with total existing supply in PJM (149 GW) PDF p. 38
  7. FERC says PJM's Load Adjustment method may miss new large loads that were already in the initial forecast.
    it appears some large loads may never have been accounted for as Load Adjustments because PJM accounted for them when calculating the initial load forecast. PDF p. 63
  8. FERC finds the exit provisions may be unjust because they charge exiting transmission owners instead of the LSEs that benefit.
    we find that PJM’s proposed exit provisions may be unjust and unreasonable because they would assess RBP Charges to exiting Transmission Owners, rather than the LSEs in the relevant Transmission Owner’s zone. PDF p. 73
  9. FERC finds the LSE collateral rule may be unjust and unreasonable and asks parties to address the $1.5 million per MW credit rate.
    PJM proposed an initial credit rate of $1.5 million per committed RBP MW because it would collateralize approximately 50% of the estimated contractual value associated with RBP commitments. PDF p. 82
Contents · 6 sections
  1. I. Background p. 2
  2. II. Filing p. 7
  3. III. Notice of Filing and Responsive Pleadings p. 8
  4. IV. Discussion p. 9
  5. A. Procedural Matters p. 9
  6. B. Substantive Matters p. 9

Read topic-matched comments in ER26-3380

Topics in the text: Cost allocation · Credit and exit · Reliability and curtailment

What the document says

PDF p. 1

FERC accepts the backstop, suspends it to February 28, 2027, and sets a paper hearing.

we accept the proposed RBP for filing, suspend it for five months, effective February 28, 2027, subject to refund, and establish a paper hearing PDF p. 1

PDF p. 9

Only cost allocation, TO exit rules and LSE collateral go to hearing; the rest stands.

Aside from the three issues discussed directly below, we find that the other aspects of PJM’s RBP proposal are just and reasonable PDF p. 9

PDF p. 7

The backstop buys 6,831 MW, the 2028/29 auction shortfall, less offsets and opt-outs.

the RBP aims to procure capacity equal to the 6,831 MW shortfall in the 2028/2029 BRA (Initial RBP Target) PDF p. 7

PDF p. 7

Winning resources get fixed terms of up to 15 years, from 2028/29 through 2042/43.

for a fixed term of up to 15 years, starting with the 2028/2029 delivery year at the earliest and ending no later than the 2042/2043 delivery year PDF p. 7

PDF p. 31

Winning resources get fixed terms of up to 15 years, from 2028/29 through 2042/43.

we disagree with JCA that PJM unreasonably requires commitment terms ending no earlier than 2042/2043 PDF p. 31

PDF p. 29

FERC approves the $555/MW-day price cap and the pay-as-bid selection process.

we find that PJM has shown that its proposed $555/MW-day maximum willingness to pay and process for selecting RBP Resources in the RBP auction are just and reasonable PDF p. 29

PDF p. 30

FERC approves the $555/MW-day price cap and the pay-as-bid selection process.

We agree with PJM that the proposed pay-as-bid structure for the RBP auction is reasonable. PDF p. 30

PDF p. 20

FERC accepts a 120% UCAP quantity cap, 20% shortfall charge, for up to three years.

We agree with PJM that the proposed cap represents a reasonable balance between providing sellers with flexibility and managing UCAP risk for load. PDF p. 20

PDF p. 33

FERC accepts a 120% UCAP quantity cap, 20% shortfall charge, for up to three years.

RBP shortfall charges are equal to the product of the RBP Resource’s committed RBP UCAP MW shortfall and 20% of the RBP price. PDF p. 33

PDF p. 63

A zonal growth snapshot may be fine; measuring growth with Load Adjustments may not be.

we agree with concerns in the record that relying on Load Adjustments to measure load growth may be inconsistent or not reasonably capture forecasted load growth or actual large load growth PDF p. 63

PDF p. 63

A zonal growth snapshot may be fine; measuring growth with Load Adjustments may not be.

it appears some large loads may never have been accounted for as Load Adjustments because PJM accounted for them when calculating the initial load forecast PDF p. 63

PDF p. 64

FERC floats 2026/27 actual load against the latest 2028/29 forecast as the allocation basis.

PJM could base the RBP allocation on the difference between the actual load for 2026/2027 delivery year in each Electric Distributor zone/area with the most recent 2028/2029 delivery year load forecast PDF p. 64

PDF p. 62

The co-op and municipal opt-out may discriminate, since their large loads are similarly situated.

We find that PJM’s proposed opt-out for qualifying cooperatives and municipal utilities may be unjust, unreasonable, and unduly discriminatory. PDF p. 62

PDF p. 62

The co-op and municipal opt-out may discriminate, since their large loads are similarly situated.

Because cooperatives and municipal utilities serve large loads that are similarly situated to large loads served by other LSEs PDF p. 62

PDF p. 62

FERC keeps FRR entities out of the backstop because they never contributed to the gap.

we find that FRR Entities have not contributed towards the resource adequacy gap that the RBP will address PDF p. 62
Filed comments: Reliability and curtailment

PDF p. 65

FERC leaves charging data centers at retail to the states and the Ratepayer Protection Pledge.

states determine how Commission-approved rates are collected among the relevant retail consumers along with the rates for state-jurisdictional matters PDF p. 65

PDF p. 65

FERC leaves charging data centers at retail to the states and the Ratepayer Protection Pledge.

Our partners in the states are more than capable of ensuring that these promises reach fruition. PDF p. 65

PDF p. 73

Exit fees on departing Transmission Owners may be unjust; LSEs are the buyers and beneficiaries.

we find that PJM’s proposed exit provisions may be unjust and unreasonable because they would assess RBP Charges to exiting Transmission Owners, rather than the LSEs in the relevant Transmission Owner’s zone PDF p. 73
Filed comments: Cost allocation

PDF p. 82

The $1.5 million per MW buyer collateral rate lacks quantitative support and may be unjust.

PJM does not support its 50% estimate with any quantitative measures, including an expected probability of default PDF p. 82

PDF p. 81

The $1.5 million per MW buyer collateral rate lacks quantitative support and may be unjust.

we find PJM’s proposed collateral requirements for RBP Sellers just and reasonable PDF p. 81
Filed comments: Credit and exit

PDF p. 12

The existing reliability backstop auction tariff may itself be unjust, so FERC opens EL26-108.

We therefore conclude on a preliminary basis that the existing Reliability Backstop Auction Tariff provisions may be unjust and unreasonable. PDF p. 12

PDF p. 9

FERC invites a 205 refiling within 30 days and says it would expect to grant abeyance.

we anticipate that the Commission would grant a motion to hold that briefing in this proceeding in abeyance if PJM submitted a new section 205 filing within 30 days from the date of this order PDF p. 9
Filed comments: Filing procedure

PDF p. 10

FERC invites a 205 refiling within 30 days and says it would expect to grant abeyance.

We anticipate that, following the paper hearing, the Commission may need to direct significant modifications to certain aspects of PJM’s proposal PDF p. 10

PDF p. 3

The 2027/28 auction cleared at the $333.44 cap, a third straight historically high result.

The 2027/2028 BRA, which cleared at the temporary price cap of $333.44/MW-day, was the third BRA in a row to clear at historically high prices. PDF p. 3

Elsewhere in the record

Other parties on the same questions, in their own documents.

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Reliability and curtailment

The RBP is a one-time procurement of new capacity to address significant resource adequacy challenges primarily driven by an influx of large loads.3 As discussed below, we accept the proposed RBP for filing, suspend it for five months, effective February 28, 2027, subject to refund, and establish a…
Read this passage Filed comments: Reliability and curtailment

I. Background

printed heading · Topic match: Cost allocation

Despite these differences, many of the core components of the two proposals were the same, including resource commitments up to the 2042/2043 delivery year, requiring a resource in-service date by the 2032/2033 delivery year, a must-offer RPM requirement with contracts for differences, and similar…
Read this passage Filed comments: Cost allocation

II. Filing

printed heading · Topic match: Cost allocation

Pursuant to the proposed Tariff provisions, new load is load that has an executed electric service agreement or transmission service agreement indicating that the load will come online during the 2027/2028 or 2028/2029 delivery year.28 To avoid double procurement, PJM proposes to require all…
Read this passage Filed comments: Cost allocation

III. Notice of Filing and Responsive Pleadings

printed heading

Notice of Filing and Responsive Pleadings Notice of PJM’s filing was published in the Federal Register, 91 Fed.
Read this passage

IV. Discussion

printed heading

IV.
Read this passage

A. Procedural Matters

printed heading

We accept the answers filed by AEP, the Kentucky Attorney General, EKPC, the Market Monitor, NJBPU, NOVEC, Voltus, PJM, P3, Constellation, PPL, Indicated PJM TOs, and FirstEnergy because they have provided information that assisted us in our decision-making process.
Read this passage

B. Substantive Matters

printed heading · Topic match: Cost allocation

In response, NOVEC maintains PJM’s proposal does require suppliers to provide duplicative collateral because PJM proposes to determine RBP collateral obligations as if suppliers were paying the entire RBP Charge—which means suppliers are providing collateral for the cost of capacity of their RBP MW…
Read this passage Filed comments: Cost allocation