EL25-49-000 · 2025-04-23 · Constellation Energy Generation, LLC

Exhibit 1 (Stockton)

Text extracted from the eLibrary original (SHA-256 0d1661b3206fb56a…). Download the original from the official source.

Contents · 10 sections
  1. I. ARGUMENT SUMMARY p. 4
  2. II. AI AND THE TRANSFORMATION OF NATIONAL DEFENSE p. 5
  3. A. Peacetime Defense Support p. 6
  4. B. Combat Support in Future Conflicts p. 7
  5. C. Countering China’s Drive for Primacy p. 9
  6. D. The Need for Speed p. 11
  7. III. POWER RESILIENCE p. 12
  8. A. Intensifying Threats and US Resilience Initiatives p. 13
  9. B. Uri, Elliott, and Power Resilience for Defense-Critical Data Centers p. 14
  10. IV. CONCLUSION: ALTERNATIVE PATHS TO POWER RESILIENCE p. 15

Read the parent filing

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword. Pages with no text layer: 17.

Opening text

opening text

This Declaration finds that given the extensive and accelerating dependence of US security on AI data centers, FERC must ensure that rules enable the quickest and most resilient options to connect and serve those data center loads, including rules that enable co-location arrangements, or other…
Read this passage

I. ARGUMENT SUMMARY

printed heading

In conflict, the US Intelligence Community assesses that China could conduct cyberattacks and potentially physical attacks against the US energy sector and other critical infrastructure systems.4 Given DOD’s dependence on AI data centers for combat support, those centers must have power supplies…
Read this passage

II. AI AND THE TRANSFORMATION OF NATIONAL DEFENSE

printed heading

AI AND THE TRANSFORMATION OF NATIONAL DEFENSE Secretary of Defense Pete Hegseth emphasizes that AI capabilities are disruptive and vital to DOD’s success in the future, and is prioritizing its use for monitoring cyberspace, countering transnational criminal organizations, testing and evaluating…
Read this passage

A. Peacetime Defense Support

printed heading

Peacetime Defense Support AI is now crucial for DOD efforts to help America prevail in future conflicts – and, even better, deter Chinese and other attacks on the US and its security partners in Asia and beyond.
Read this passage

B. Combat Support in Future Conflicts

printed heading

These commanders must continuously ‘observe, orient, decide, and act’ on a fast-paced and multidimensional battlefield where decisions are life-and-death.”20 To meet these needs, Palantir, Scale AI, Anduril, and other AI companies and their associated commercial data centers are rapidly scaling up…
Read this passage

C. Countering China’s Drive for Primacy

printed heading

The imperative for the energy sector to serve these growing loads is magnified by an 22 Cotton also stated that as the Command adopts AI tools, “we must always maintain a human decision in the loop to maximize the adoption of these capabilities and maintain our edge over our adversaries.” Greg…
Read this passage

D. The Need for Speed

printed heading · Topic match: Connecting load and generation

Moreover, DOD’s utilization of private sector data centers is rapidly growing, including highly classified AI support functions.40 Rules to facilitate the rapid connection of data centers must enable options that meet all such urgent requirements for power.
Read this passage Filed comments: Connecting load and generation

III. POWER RESILIENCE

printed heading

However, given the importance of data centers to support US warfighting, and the risk that China will attack the grid and natural gas infrastructure in future conflicts, connections to data centers must also be resilient: that is, be able to “prepare for and adapt to changing conditions and recover…
Read this passage

A. Intensifying Threats and US Resilience Initiatives

printed heading

Given this disparity between these standards for the grid versus natural gas systems, the US must continue to account for the risk that China will adopt an indirect strategy to disrupt electric service to data centers and other critical customers, by striking the flow of natural gas on which 43% US…
Read this passage

B. Uri, Elliott, and Power Resilience for Defense-Critical Data Centers

printed heading

Uri, Elliott, and Power Resilience for Defense-Critical Data Centers Extreme weather events provide “real world” examples of how disruptions of natural gas supplies for generation can degrade electric service, even when transmission systems are largely unaffected.
Read this passage

IV. CONCLUSION: ALTERNATIVE PATHS TO POWER RESILIENCE

printed heading

Defeating Coercive Information Operations in Future Crises (2021) analyzes these threats and proposes strategies to defeat them.
Read this passage