EL25-49-000 · 2025-04-23 · Consumers' Research

Comments of Consumers' Research re the large loads co-located at generation facilities

Text extracted from the eLibrary original (SHA-256 af0f088111c4843e…). Download the original from the official source.

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation · Cost allocation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Connecting load and generation

In consideration of this, a co-located load’s access to, dependence on, and use of grid-supplied energy must be thoroughly accounted for when forming the co-located load’s rate structure.
Read this passage Filed comments: Connecting load and generation

CERTIFICATE OF SERVICE

printed heading

Dated: April 23, 2025.
Read this passage