AD26-7-000 · 2026-07-15 · American Municipal Power Inc

Pre-filed Statement of Steven Lieberman, Vice President of Transmission & Regulatory Affairs for American Municipal Power, Inc., for Panel 2 for the PJM…

Text extracted from the eLibrary original (SHA-256 656cbd0d1be44ea6…). Download the original from the official source.

Contents · 2 sections
  1. I. INTRODUCTION p. 1
  2. II. COMMENTS p. 3

Read topic-matched comments in AD26-7

Topics in the text: Reliability and curtailment · Registry access

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Governance and Stakeholder Reforms ) Docket No.
Read this passage

I. INTRODUCTION

printed heading · Topic match: Reliability and curtailment

Accordingly, better issue prioritization is needed, rather than changes to stakeholder representation or governance. 3 PJM’s most significant challenge remains resource adequacy and reliability, but the existing governance framework, with the adjustments proposed below, is sufficient to address…
Read this passage Filed comments: Reliability and curtailment

II. COMMENTS

printed heading · Topic match: Registry access

“The ISAC is an independent committee that shall not be controlled or directed by PJM or the PJM Board of Managers.”4 The ISAC provides “PJM with input to inform the assumptions, scenarios, and studies developed as part of PJM’s Regional Transmission Expansion Planning Protocol as well as to…
Read this passage Filed comments: Registry access