EL25-49-000 · 2025-12-10 · American Electric Power Service Corporation

Comments of American Electric Power Service Corporation on the Motion of Constellation Energy Generation, LLC

Text extracted from the eLibrary original (SHA-256 9062144e0cefd8da…). Download the original from the official source.

Read topic-matched comments in EL25-49

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C., et al. ) Docket No.
Read this passage

I. Comments

printed heading

If structured properly, this configuration can provide a viable option to address the needs of certain customers, while ensuring other customers are treated fairly in the process.
Read this passage

CERTIFICATE OF SERVICE

printed heading

Dated this 10th day of December, 2025. /s/ LaChon Turner LaChon Turner Paralegal American Electric Power Service Corporation 801 Pennsylvania Ave NW Suite 735 Washington, DC 20004 (202) 383-3465 lturner@aep.com