EL25-49-000 · 2025-12-10 · American Electric Power Service Corporation
Comments of American Electric Power Service Corporation on the Motion of Constellation Energy Generation, LLC
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C., et al.
)
Docket No. EL25-49-000
Large Loads Co-Located at Generating
Facilities
)
Docket No. AD24-11-000
Constellation Energy Generation, LLC
v.
PJM Interconnection, L.L.C.
)
)
)
Docket No. EL25-20-000
(consolidated)
COMMENTS OF AMERICAN ELECTRIC POWER SERVICE CORPORATION ON
THE MOTION OF
CONSTELLATION ENERGY GENERATION, LLC
Pursuant to Rules 212 and 2131 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (“FERC” or “Commission”), American Electric Power Service Corporation, on behalf of its affiliates Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company,
Wheeling Power Company, AEP Appalachian Transmission Company, Inc., AEP Indiana
Michigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and AEP West Virginia Transmission Company, Inc. (collectively, “AEP”), submits these comments on the Motion to file Supplemental Comments that was filed by Constellation Energy Generation, LLC (“Constellation”) on December 5, 2025 and in support of the Answers filed by the Indicated PJM Transmission Owners and PJM Interconnection, LLC (“PJM”).2
1 See 18 C.F.R. §§ 385.212, 385.213.
2 The Indicated PJM Transmission Owners filed an Answer on December 8, 2025, and PJM submitted its Answer on December 5, 2025. AEP respectfully moves for leave to file these comments out-of-time. The Commission accepts late filings when they will aid the Commission in its decision-making process, which is the case here. See e.g., Am. Transmission Co. LLC, 105 FERC ¶61,388 at P 12 (2003) (accepting late-filed comments because the comments (cont'd)
PDF page 2
2
AEP has experienced first-hand the rapid growth of large loads in our service territory and recognizes the importance of enabling this development. AEP is committed to providing reliable service, supporting economic growth, and working with all customers to determine how to best meet their energy needs. AEP supports co-location and is cognizant of the importance of data centers to our national security. AEP is committed to working with the Department of Energy, the Commission, and state and regional partners to identify and implement further actions to ensure that our nation has the energy resources and infrastructure to support America’s next generation of innovation and industrial growth.
Collectively, AEP is one of the largest electric utilities in the United States. We serve approximately 5.6 million customers across our 11-state footprint, and we develop, own, operate, and maintain the largest transmission system in North America. AEP participates in four RTOs (PJM, SPP, MISO, and ERCOT). Our transmission system serves as the backbone in three of the RTOs–PJM, SPP and ERCOT–and directly serves approximately 10 percent of the electricity demand in the Eastern Interconnection, and approximately 11 percent of the electricity demand in ERCOT. The Columbus, Ohio metropolitan area has become a major hub for data center development and is one of the top 10 data center regions in the country.
I. Comments
AEP supports co-location. If structured properly, this configuration can provide a viable option to address the needs of certain customers, while ensuring other customers are treated fairly in the process. Given the pace of change, every option needs to remain on the table to meet this
provide information that assists the Commission in its decision-making process). Furthermore, the comments are being filed only a few days out-of-time, which does not cause undue prejudice or delay. See e.g., North American Electric Reliability Corporation, 182 FERC ¶ 61094 at P 33 (2023) (granting leave to file late-filed reply comments given interest in the proceeding and the absence of undue prejudice or delay).
PDF page 3
3
unprecedented demand. However, we cannot forget core principles—every customer needs to pay for the transmission system if they are receiving service.
The Commission should reject Constellation’s motion, which if granted would result in affordability concerns for customers. Furthermore, this issue is already being addressed by the Commission’s actions in other proceedings. In fact, the Motion recognizes that the subject matter of the captioned proceedings overlaps the issues in the recently-initiated, industry-wide ANOPR proceeding.3 A national resolution of co-location is consistent with the President’s Executive Order which focuses on the need for development of AI infrastructure as a national, not regional, imperative. The Commission is actively working to complete the ANOPR process by the April 30, 2026, date the Secretary of Energy has directed, and this process should drive consistent change across the nation. For these reasons, the ANOPR proceeding is the appropriate forum to address co-location issues.
For the reasons stated above, FERC should reject Constellation’s Motions in this proceeding.
Respectfully submitted,
/s/ Stacey Burbure
Stacey Burbure
Senior Vice President, Transmission
Development & Joint Ventures
American Electric Power Service Corporation
8500 Smiths Mill Road
New Albany, OH 43054
Telephone: 614-933-2334
Email: slburbure@aep.com
/s/ John C. Crespo
John C. Crespo
Deputy General Counsel – Regulatory &
Nuclear
Carrie L. Bumgarner
Senior Counsel
American Electric Power Service Corporation
1 Riverside Plaza
Columbus, OH 43215
Telephone: (614) 716-3727
E-mail: jccrespo@aep.com
3 Secretary Chris Wright, DOE, Ensuring the Timely and Orderly Interconnection of Large Loads: Advance Notice of Proposed Rulemaking (“ANOPR”), Docket No. RM26-4-000 (Oct. 27, 2025)(“DOE ANOPR Filing”).
PDF page 4
4
Telephone: (614) 716-2941
E-mail: clbumgarner@aep.com
On behalf of American Electric Power Service Corporation
December 10, 2025
PDF page 5
CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document upon each person designated on the official service list in the above captioned dockets. Dated this 10th day of December, 2025.
/s/ LaChon Turner
LaChon Turner
Paralegal
American Electric Power Service Corporation
801 Pennsylvania Ave NW
Suite 735
Washington, DC 20004
(202) 383-3465
lturner@aep.com