EL26-67-000 · 2026-07-15 · Relentless Energy Systems LLC
GPI_Composite_Dashboard.pdf
PDF page 1
GPI Transient Analysis: Internal vs. Grid Current
Motor Current (Internal)
Capacitor Current (Internal)
Grid Current (Source)
Current (A)
2
-8 •
2.90
2.92
2.94
2.96
2.98
Time (s)
Data Source: Plotted directly from raw Xyce transient simulation output: GP_Master_Netlist.txt.csv (Interval: 2.90s to 3.00s).
3.00
Motor Workload Stability Across +20% Capacitor Degradation 5.2750
5.2745 -
Internal Motor Current (A)
Min: 5.2724 A
-- Max: 5.2741 A
5.2740 -
Motor RMS Current (A)
5.2735 -
5.2730 -
5.27251_-
5.2720 -
5.2715 -
Total Variance: 0.032%
(1.68 mA delta)
5.2710 -
90
100
110
Manifold Capacitance Drift (uF)
130
PDF page 2
VAR Virtualization Efficiency vs. Component Degradation --- 80% Efficiency Threshold
99.74%
100
90.23%
89.72%
80.21%
VAR Offloading Efficiency (%)
80
20
-20%
-10%
Master (0%)
Capacitance Degradation State
*10%
The Resonance V-Curve: System Response to Capacitance Drift Upstream Grid Current (A)
1.2
110
Capacitance (uF)
79.69%
+20%
- 640
- 620
• 600
• 560
VARS Offloaded from Grid
• 540