EL26-68-000 · 2026-07-15 · Southwest Power Pool Transmission Owner Group

Answer of Southwest Power Pool Transmission Owner Group to L.M. Marlowe's 07/08/2026 Motion for Settlement Procedures

PDF page 1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

)
Southwest Power Pool, Inc.

)
Docket No. EL26-68

)

 No. RM26-4

)
ANSWER OF THE
SOUTHWEST POWER POOL TRANSMISSION OWNER GROUP
Pursuant to Rule 213 of the Federal Energy Regulatory Commission’s Rules and Regulations,1 American Electric Power Service Corporation, as agent for Public Service Company of Oklahoma and Southwestern Electric Power Company, the Evergy Companies, Oklahoma Gas and Electric Company, and Xcel Energy Services Inc. on behalf of Southwestern Public Service Company (collectively, the SPP TO Group) submit the following answer to the July 8, 2026 Motion of L.M. Marlowe for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement Judge (Motion). The Commission should deny the Motion because it is premature and would profoundly disrupt the Commission’s well-reasoned decision to address the challenge of large load additions on a regional basis through show-cause orders directed to Southwest Power Pool, Inc. and its Transmission Owners2 and in parallel proceedings simultaneously directed at other regions (collectively, Show Cause Orders).3

1 18 C.F.R. § 385.213.
2 Sw. Power Pool, Inc., 195 FERC ¶ 61,213 (2026) (SPP Show Cause Order).
3 See, e.g., PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 (2026); N.Y. Indep. Sys. Operator, Inc., 195 FERC ¶ 61,216 (2026); Midcontinent Indep. Sys. Operator, Inc., 195 FERC ¶ 61,212 (2026).

PDF page 2

2
The Motion is premature, and Movant’s attempts to preempt arguments to the contrary fail. Movant cites several items involving “Federal action on the reliability of large-load integration” as the basis for its position that settlement procedures are necessary, claiming that “[a] proceeding addressing an active and recurring reliability emergency—one already the subject of the highest tier of reliability alert and of federal emergency orders—is not one in which movement toward resolution can reasonably be characterized as premature.”4  Among those federal actions, Movant cites the Show Cause Orders.  But Movant’s request for a nationwide settlement proceeding in lieu of regional Show Cause Order proceedings is not “movement toward resolution.”5  Rather, it is a rejection of the Commission’s pointed choice to address large load issues on a regional basis, rather than impose a rigid nationwide rule, and to allow regional stakeholders the opportunity to develop consensus solutions through a transparent stakeholder process.6  A nationwide settlement proceeding would actively distract from resolution of the issues, and, as discussed below, would be both less transparent and substantially more burdensome on stakeholders than regional proceedings.  The Commission should deny the Motion and should not consider alternatives to the nascent Show Cause Order proceedings at this time.

There is also no basis to grant the Motion.  The Commission has discretion whether to establish settlement procedures, hold a settlement conference, or appoint a settlement judge.  The Commission “may convene a conference of the participants in a proceeding at any time for any purpose related to the conduct or disposition of the proceeding,” 7 but nothing in the Commission’s rules require that action, especially where settlement procedures would be counterproductive.

4 Motion at 2.
5 Id.
6 See, e.g., SPP Show Cause Order at P 33. 7 18 C.F.R. § 385.601(a) (emphasis added).

PDF page 3

3
Likewise, Rule 603 states that the Commission may order the Chief Administrative Law Judge to appoint a settlement judge, but is not obligated to do so.8

Movant fails to mention the material burdens that a nationwide settlement proceeding would present.  Hundreds of parties have submitted comments in response to the ANOPR, the overwhelming majority of whom are located outside of Washington, D.C.  Movant’s request would require those parties to undertake the costly process of hiring local counsel to participate in settlement proceedings at the Commission.9  It would also be impracticable, if not impossible, to effectively manage settlement proceedings involving the hundreds of parties that participated in the ANOPR proceedings.  Besides presenting physical difficulties, it would be extremely time consuming to manage confidentiality requirements, information presentations, roll-taking, etc. Movant’s proposal almost certainly would create a procedural headache and would not address the region-specific concerns that are the focal point of these proceedings.

Movant also claims that settlement here “would allow the participants—the RTO/ISOs, transmission owners, large-load and generation interests, State representatives, ratepayer advocates, and intervenors such as Movant—to work toward mutually acceptable reliability, observability, and cost-allocation methodologies.”10  However, Movant ignores that the Show Cause Orders grant Transmission Owners and the relevant RTO/ISO the opportunity to seek a 90- day abeyance to provide time to “work through the stakeholder processes to develop FPA section 205 filings to revise the Tariff to address the issues raised in this order.”11  Thus, the Show Cause

8 Id. § 385.603(d).
9 See 18 C.F.R. § 385.601(b)(3) (“If any party fails to attend the conference such failure will constitute a waiver of all objections to any order or ruling arising out of, or any agreement reached at, the conference.”).
10 Motion at 2. 11E.g., Sw. Power Pool, Inc., 195 FERC ¶ 61,213, at P 33.

PDF page 4

4
Orders already provide for the exact cooperation Movant claims to seek, without the extra administrative burden.

Finally, the Movant’s particular interest in the proposed settlement procedures appears to be based in some vague claim to intellectual property rights.12  As Movant states, “Movant is the author and rights-holder of a framework responsive to these questions, and seeks its consideration.”13  That is no basis for Movant to request the mandatory participation of the entire utility industry in her self-centered, proposed settlement proceeding.  Every Transmission Owner and System Operator has its own preferred “framework responsive to these questions.”  There will be plenty of regional stakeholder proceedings for the Movant to present her views without imposing substantial direct costs and administrative burdens on others.  The Movant alleges no cognizable, concrete, or particularized injury from the Commission’s interlocutory Show Cause Orders that distinguishes the Movant from any other person or entity with a policy preference.  By contrast, the public utilities that the Commission has actually directed to respond to the Show Cause Orders are responsible for developing and implementing solutions to the directives in the Show Cause Orders.

For the reasons set forth above, the SPP TO Group respectfully requests the Commission deny the Motion.

12 See Motion at 1; accord Supplemental Technical Comment and Reservation of Rights of L.M. Marlowe at 1-2 (July 8, 2026) (“Commenter is an independent author and developer of a published, timestamped analytical framework addressing deterministic reliability invariants, real-time observability of computational load behavior, dependency mapping, and the allocation of reliability and capacity burdens created by large computational loads. Commenter’s published work — including the Architecture of Dependency and Autonomy™, the MARLOWE™ Invariant-Based Diagnostic Framework, Intent-Aware Telemetry™, Continuous Invariant Validation™, Execution Sovereignty™, and the associated Ghost Load™ dependency analysis — bears directly on the reliability and cost-causation questions presented in these dockets.”).
13 Motion at 2.

PDF page 5

5

John Crespo
Deputy General Counsel
American Electric Power Service Corporation 1 Riverside Plaza

Columbus, OH 43215
(614) 205-2678
jccrespo@aep.com
On behalf of American Electric Power Service Corporation

Denise Buffington
Senior Director Federal Regulatory Affairs Evergy, Inc.

1200 Main Street
Kansas City, MO 64105
(816) 556-2683
denise.buffington@evergy.com
On behalf of the Evergy Companies
Chase Snodgrass
Senior Regulatory Attorney
OGE Energy Corp.
321 N. Harvey Ave.
Oklahoma City, OK 73101
(405) 553-3129
snodgrcc@oge.com
On behalf of Oklahoma Gas and Electric Company Respectfully submitted,

/s/ John Lee Shepherd, Jr.
John Lee Shepherd, Jr.
Blake Grow
Hunton Andrews Kurth LLP
2200 Pennsylvania Avenue, NW
Washington, DC 20037
(202) 419-2135
(202) 955-1991
jshepherd@hunton.com
bgrow@hunton.com
Counsel for American Electric Power Service Corporation, the Evergy Companies,

Oklahoma Gas and Electric Company, and
Southwestern Public Service Company

Timothy T. Mastrogiacomo
Vice President, Federal Regulatory, Legal, and Policy Xcel Energy Services Inc.

701 Pennsylvania Avenue, NW, Ste. 250
Washington, DC 20006
(202) 661-4481
tim.t.mastrogiacomo@xcelenergy.com
On behalf of Southwestern Public Service Company July 15, 2026

PDF page 6

CERTIFICATE OF SERVICE
I hereby certify that I have on this day caused to be served a copy of the foregoing comments upon all parties on the service list in these proceedings in accordance with the requirements of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.2010 (2025).

/s/ Blake Grow

Blake Grow
Hunton Andrews Kurth LLP
2200 Pennsylvania Avenue, NW
Washington, DC 20037
(202) 955-1991
bgrow@hunton.com
July 15, 2026