Combined Notice of Filings #1, November 2, 2026: ER27-330-000 and -001 comment date 5 pm ET November 30, 2026
Word notes use stable document IDs, such as [fn:8], which can differ from printed footnote numbers.
Document text
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION COMBINED NOTICE OF FILINGS #1 (November 2, 2026) Take notice that the Commission received the following Electric Corporate filings: Docket Numbers: EC27-11-000 Applicants: Campbell County Wind Farm, LLC Description: Application for Authorization Under Section 203 of the Federal Power Act of Campbell County Wind Farm, LLC. Filed Date: 10/28/26 Accession Number: 20261028-5235 Comment Date: 5 pm ET 11/18/26 Take notice that the Commission received the following Exempt Wholesale Generator filings: Docket Numbers: EG27-28-000 Applicants: YUMA bn, LLC Description: YUMA bn, LLC submits Notice of Self–Certification of Exempt Wholesale Generator Status. Filed Date: 10/30/26 Accession Number: 20261030-5335 Comment Date: 5 pm ET 11/20/26 Take notice that the Commission received the following Electric Rate filings: Docket Numbers: ER10-2475-043; ER10-2474-042; ER10-3246-038; ER26-2531-003; ER26-2533-003; ER26-2536-003; ER24-1587-016; ER22-1385-026; ER26-2535-002; ER23-674-022; ER13-1266-066; ER15-2211-063; ER10-1520-032; ER10-1521-032 Applicants: Occidental Power Marketing, L.P., Occidental Power Services, Inc., MidAmerican Energy Services, LLC, CalEnergy, LLC, BHE Wind Watch, LLC, Power Watch, LLC, BHER Market Operations, LLC., AlbertaEx, L.P., Rim Rock Wind, LLC, Glacier Wind 2, LLC, Glacier Wind 1, LLC, PacifiCorp, Sierra Pacific Power Company, Nevada Power Company Description: Notice of Non-Material Change in Status of Nevada Power Company, et al. Filed Date: 10/28/26 Accession Number: 20261028-5230 Comment Date: 5 pm ET 11/18/26 Docket Numbers: ER11-2154-015 Applicants: Twin Eagle Resource Management, LLC Description: Notice of Change in Status of Twin Eagle Resource Management, LLC. Filed Date: 10/28/26 Accession Number: 20261028-5226 Comment Date: 5 pm ET 11/18/26 Docket Numbers: ER17-242-024 Applicants: Gavin Power, LLC Description: Notice of Non-Material Change in Status of Gavin Power, LLC. Filed Date: 10/28/26 Accession Number: 20261028-5228 Comment Date: 5 pm ET 11/18/26 Docket Numbers: ER17-1329-010; ER26-210-002; ER26-211-002 Applicants: Pierpont Energy Prepay 10, LLC, Pierpont Energy Prepay 9, LLC, J.P. Morgan Ventures Energy Corporation Description: Notice of Change in Status of J.P. Morgan Ventures Energy Corporation, et al. Filed Date: 10/28/26 Accession Number: 20261028-5225 Comment Date: 5 pm ET 11/18/26 Docket Numbers: ER19-1411-008; ER21-573-009; ER21-574-009; ER12-1436-023; ER22-48-008; ER21-575-009; ER18-534-011; ER18-537-011; ER18-536-011; ER11-4266-021; ER18-538-012; ER18-535-011; Applicants: Yankee Street, LLC, Sidney, LLC, Richland-Stryker Generation LLC, O.H. Hutchings CT, LLC, Monument Generating Station, LLC, Montpelier Generating Station, LLC, Lanyard Power Marketing, LLC, Gridflex Generation, LLC, Eagle Point Power Generation LLC, Dickerson Power, LLC, Chalk Point Power, LLC, GenOn Bowline, LLC Description: Notice of Non-Material Change in Status and Market Based Rate Tariff Changes of GenOn Bowline, LLC. Filed Date: 10/22/26 Accession Number: 20261022-5227 Comment Date: 5 pm ET 11/12/26 Docket Numbers: ER19-1865-007; ER19-2142-008; ER19-2143-008; ER19-1866-007; ER19-2148-009; ER19-2147-008; ER19-2141-008; ER19-1868-007; ER19-1869-007; ER19-2145-008; ER19-2144-008; ER19-1870-007; ER19-2140-008; ER19-1871-007; ER19-1872-007; ER19-2146-008 Applicants: Warren Generation, LLC, Tolna Power, LLC, Titus Power, LLC, Shawville Power, LLC, Shawnee Power, LLC, Sayreville Power, LLC, Portland Power, LLC, Orrtanna Power, LLC, Niles Power, LLC, New Castle Power, LLC, Mountain Power, LLC, Heritage Power Marketing, LLC, Hamilton Power, LLC, Gilbert Power, LLC, Brunot Island Power, LLC, Blossburg Power, LLC Description: Notice of Change in Status of Blossburg Power, LLC, et al. Filed Date: 10/27/26 Accession Number: 20261027-5202 Comment Date: 5 pm ET 11/17/26 Docket Numbers: ER25-2883-004; ER26-1873-002 Applicants: Hollis Creek PV I, LLC, Redfield PV I, LLC Description: Notice of Non-Material Change in Status of Redfield PV I, LLC, et al. Filed Date: 10/28/26 Accession Number: 20261028-5227 Comment Date: 5 pm ET 11/18/26 Docket Numbers: ER25-3475-007; ER10-1292-021; ER10-1319-023; ER10-1276-023; ER10-1353-023; ER10-1287-022; ER10-1303-021; ER25-3172-005; ER26-2521-002; ER24-3028-005; ER24-3029-005; ER26-1987-002; ER23-1411-008; ER25-1962-007 Applicants: Century Oaks Energy Storage, LLC, Newport Solar LLC, Lake Iris Solar, LLC, Livingston Generating Station, LLC, Kalamazoo Generating Station, LLC, Hart Solar Partners, LLC, Genesee Solar Energy, LLC, Genesee Power Station Limited Partnership, Grayling Generation Station Limited Partnership, Dearborn Industrial Generation, L.L.C., Consumers Energy Company, CMS Generation Michigan Power, LLC, CMS Energy Resource Management Company, Branch Solar, LLC Description: Notice of Change in Status of Branch Solar, LLC, et al. Filed Date: 10/28/26 Accession Number: 20261028-5231 Comment Date: 5 pm ET 11/18/26 Docket Numbers: ER27-153-001 Applicants: Citizens Sunrise Transmission LLC Description: Tariff Amendment: Correction to Annual TRBAA Filing to be effective 1/1/2027. Filed Date: 11/2/26 Accession Number: 20261102-5186 Comment Date: 5 pm ET 11/23/26 Docket Numbers: ER27-154-001 Applicants: Citizens Sycamore-Penasquitos Transmission LLC Description: Tariff Amendment: Correction to Annual TRBAA Filing to be effective 1/1/2027. Filed Date: 11/2/26 Accession Number: 20261102-5193 Comment Date: 5 pm ET 11/23/26 Docket Numbers: ER27-155-001 Applicants: Citizens S-Line Transmission LLC Description: Tariff Amendment: Correction to Annual TRBAA Filing to be effective 1/1/2027. Filed Date: 11/2/26 Accession Number: 20261102-5197 Comment Date: 5 pm ET 11/23/26 Docket Numbers: ER27-320-000 Applicants: Southwest Power Pool Inc. Description: Notice of Cancellation of Generator Interconnection Agreement of Southwest Power Pool, Inc. Filed Date: 10/23/26 Accession Number: 20261023-5230 Comment Date: 5 pm ET 11/13/26 Docket Numbers: ER27-330-000 Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Proposed Amendments to the Reliability Backstop Procurement in ER26-3380 to be effective 1/15/2027. Filed Date: 10/29/26 Accession Number: 20261029-5227 Comment Date: 5 pm ET 11/30/26 Docket Numbers: ER27-330-001 Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Errata to Correct Metadata and Waiver Request in RBP Compliance Filing to be effective 1/29/2027. Filed Date: 10/30/26 Accession Number: 20261030-5172 Comment Date: 5 pm ET 11/30/26 The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 pm Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202) 502-6595 or OPP@ferc.gov. Carlos D. Clay, Deputy Secretary. header1 (Word template) CNF1102261