Combined Notice of Filings #1
Word notes use stable document IDs, such as [fn:8], which can differ from printed footnote numbers.
Document text
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION COMBINED NOTICE OF FILINGS #1 (November 10, 2026) Take notice that the Commission received the following Electric Rate filings: Docket Numbers: ER17-1394-017; ER22-1627-013; ER14-1964-029; ER17-482-023; ER19-1074-033; ER10-1427-026; ER20-1447-019; ER19-1075-033; ER19-529-033; ER22-2412-005; ER10-2460-027; ER10-2461-028; ER23-2933-005; ER12-1504-015; ER19-2584-003; ER10-2920-030; ER12-682-028; ER22-192-022; ER20-1487-010; ER17-2-012; ER22-497-005; ER26-137-004; ER26-131-004; ER13-1139-033; ER12-1502-015; ER22-398-012; ER24-672-007; ER13-17-026; ER19-89-010; ER25-3235-002; ER22-2411-005; ER22-2413-005; ER23-2934-005; ER24-673-007; ER14-25-028; ER14-2630-026; ER22-2410-005; ER23-1889-007; ER22-1010-021; ER24-188-004 Applicants: Wild Springs Solar, LLC, TerraForm IWG Acquisition Holdings II, LLC, Sweetland Wind Farm, LLC, Sonny Solar, LLC, Regulus Solar, LLC, Prairie Breeze Wind Energy LLC, PGR 2022 Lessee 5, LLC, PGR 2022 Lessee 4, LLC, PGR 2021 Lessee 9, LLC, PGR 2021 Lessee 13, LLC, Old Hayneville Solar, LLC, North Rosamond Solar, LLC, Niagara Wind Power, LLC, Moonshot Solar, LLC, Mesa Wind Power LLC, Ironwood Windpower, LLC, Imperial Valley Solar 1, LLC, Gonzaga Ridge Wind Farm, LLC, Gonzaga Ridge Battery Facility, LLC, NG Renewables Energy Marketing, LLC, Frontier Windpower, LLC, Frontier Windpower II, LLC, Evolugen Trading and Marketing LP ,Erie Wind, LLC, Erie Boulevard Hydropower, L.P., Crocker Wind Farm, LLC, Cimarron Windpower II, LLC, Cane Creek Solar, LLC, Canandaigua Power Partners II, LLC, Canandaigua Power Partners, LLC, Bulldog Solar, LLC, Brookfield Renewable Trading and Marketing LP, Brookfield Renewable Energy Marketing US LLC, Brookfield Energy Marketing US LLC, Brookfield Energy Marketing LP, Brookfield Energy Marketing Inc., BREG Aggregator LLC, LSP Safe Harbor Holdings, LLC, AM Wind Repower LLC, 83WI 8me, LLC Description: Notice of Non-Material Change in Status of 83WI 8me, LLC, et al. al. Filed Date: 11/2/26 Accession Number: 20261102-5415 Comment Date: 5 pm ET 11/23/26 Docket Numbers: ER20-391-021; ER21-2557-018; ER22-2662-018; ER22-2663-018; ER22-2664-018; ER23-1275-016; ER23-1276-016; ER24-1276-008; ER24-2249-014; ER24-2250-008; ER24-2251-013; ER24-2854-012; ER24-2855-012; ER24-2856-012; ER25-939-010; ER25-940-010; ER25-1422-006; ER26-178-004; ER26-181-004; ER26-671-002; ER26-672-002; ER26-673-004; ER26-676-003; ER26-2695-003; ER26-2696-004 Applicants: Aron Energy Prepay 73 LLC, Aron Energy Prepay 70 LLC, Aron Energy Prepay 68 LLC, Aron Energy Prepay 66 LLC, Aron Energy Prepay 65 LLC, Aron Energy Prepay 64 LLC, Aron Energy Prepay 62 LLC, Aron Energy Prepay 60 LLC, Aron Energy Prepay 57 LLC, Aron Energy Prepay 53 LLC, Aron Energy Prepay 52 LLC, Aron Energy Prepay 46 LLC, Aron Energy Prepay 45 LLC, Aron Energy Prepay 44 LLC, Aron Energy Prepay 43 LLC, Aron Energy Prepay 42 LLC, Aron Energy Prepay 41 LLC, Aron Energy Prepay 35 LLC, Aron Energy Prepay 22 LLC, Aron Energy Prepay 21 LLC., Aron Energy Prepay 16 LLC, Aron Energy Prepay 15 LLC, Aron Energy Prepay 14 LLC, Aron Energy Prepay 5 LLC, J. Aron & Company LLC Description: Notice of Non-Material Change in Status of J. Aron & Company LLC, et al. Filed Date: 11/2/26 Accession Number: 20261102-5416 Comment Date: 5 pm ET 11/23/26 Docket Numbers: ER20-2819-000 Applicants: Pleinmont Solar 1, LLC Description: Refund Report: Refund Report to be effective N/A. Filed Date: 11/10/26 Accession Number: 20261110-5034 Comment Date: 5 pm ET 12/1/26 Docket Numbers: ER21-350-000 Applicants: Highlander Solar Energy Station 1, LLC Description: Refund Report: Refund Report to be effective N/A. Filed Date: 11/10/26 Accession Number: 20261110-5047 Comment Date: 5 pm ET 12/1/26 Docket Numbers: ER21-521-000 Applicants: Richmond Spider Solar, LLC Description: Refund Report: Refund Report to be effective N/A. Filed Date: 11/10/26 Accession Number: 20261110-5039 Comment Date: 5 pm ET 12/1/26 Docket Numbers: ER21-2474-000 Applicants: Pleinmont Solar 2, LLC Description: Refund Report: Refund Report to be effective N/A. Filed Date: 11/10/26 Accession Number: 20261110-5035 Comment Date: 5 pm ET 12/1/26 Docket Numbers: ER21-2557-017; ER22-2662-017; ER22-2663-017; ER22-2664-017; ER23-1275-015; ER23-1276-015; ER24-2249-013; ER24-2251-012; ER24-2854-011; ER24-2855-011; ER24-2856-011; ER25-939-009; ER25-940-009; ER26-178-003; ER26-181-003; ER26-673-003; ER26-2695-002; ER26-2696-003 Applicants: Aron Energy Prepay 73 LLC, Aron Energy Prepay 70 LLC, Aron Energy Prepay 66 LLC, Aron Energy Prepay 62 LLC, Aron Energy Prepay 60 LLC, Aron Energy Prepay 53 LLC, Aron Energy Prepay 52 LLC, Aron Energy Prepay 46 LLC, Aron Energy Prepay 45 LLC, Aron Energy Prepay 44 LLC, Aron Energy Prepay 43 LLC, Aron Energy Prepay 41 LLC, Aron Energy Prepay 22 LLC, Aron Energy Prepay 21 LLC, Aron Energy Prepay 16 LLC, Aron Energy Prepay 15 LLC, Aron Energy Prepay 14 LLC, Aron Energy Prepay 5 LLC Description: Notice of Non-Material Change in Status of Aron Energy Prepay 5 LLC, et al. Filed Date: 11/2/26 Accession Number: 20261102-5413 Comment Date: 5 pm ET 11/23/26 Docket Numbers: ER22-2867-005 Applicants: Bluegrass Solar, LLC Description: Refund Report: Refund Report to be effective N/A. Filed Date: 11/9/26 Accession Number: 20261109-5196 Comment Date: 5 pm ET 11/30/26 Docket Numbers: ER23-628-000 Applicants: Bellflower Solar 1, LLC Description: Refund Report: Refund Report to be effective N/A. Filed Date: 11/10/26 Accession Number: 20261110-5023 Comment Date: 5 pm ET 12/1/26 Docket Numbers: ER23-1736-000 Applicants: Big Plain Solar, LLC Description: Refund Report: Refund Report to be effective N/A. Filed Date: 11/10/26 Accession Number: 20261110-5031 Comment Date: 5 pm ET 12/1/26 Docket Numbers: ER26-3515-002 Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Compliance Filing re Large Load Definition and Large Load Registry to be effective 10/12/2026. Filed Date: 11/9/26 Accession Number: 20261109-5217 Comment Date: 5 pm ET 11/30/26 Docket Numbers: ER27-454-000 Applicants: PJM Interconnection, L.L.C. Description: §205(d) Rate Filing: Revised Reliability Backstop Procurement Rules in ER26-3380-000 to be effective 1/29/2027. Filed Date: 11/9/26 Accession Number: 20261109-5216 Comment Date: 5 pm ET 11/30/26 Docket Numbers: ER27-455-000 Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Notice of Cancellation SA No. 7551, Project Identifier No. AG1-365 to be effective 1/10/2027. Filed Date: 11/10/26 Accession Number: 20261110-5038 Comment Date: 5 pm ET 12/1/26 Docket Numbers: ER27-456-000 Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Notice of Cancellation of ISA, Service Agreement No. 6370; Queue No. AC1-191 to be effective 1/10/2027. Filed Date: 11/10/26 Accession Number: 20261110-5053 Comment Date: 5 pm ET 12/1/26 Docket Numbers: ER27-457-000 Applicants: Clearway Power Marketing LLC Description: §205(d) Rate Filing: Market-Based Rate Tariff Revisions to be effective 11/11/2026. Filed Date: 11/10/26 Accession Number: 20261110-5058 Comment Date: 5 pm ET 12/1/26 The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 pm Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at:http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202) 502-6595 or OPP@ferc.gov. Carlos D. Clay, Deputy Secretary. header1 (Word template) CNF111026A1