EL25-49-000 · 2026-01-26 · Individual No Affiliation
Motion to Intervene and Comments of Andrew D. Hinz on Federal Interconnection Tariffs for Large Loads Co-Located at Generating Facilities
PDF page 1
Motion to Intervene and CommentsFederal Tariffs for Large Loads Co-Located at Generating Facilities 1
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
_____________________________________
)
Federal Energy Regulatory Commission
)
PJM Interconnection, L.L.C.
)
EL25-49-000
Midcontinent Independent System Operator, Inc.)
ER25-2454-002
Southwest Power Pool, Inc.
)
ER25-2296-002
____________________________________ )
AD24-11-000
ANDREW HINZ’S MOTION TO INTERVENE AND COMMENTS ON FEDERAL
INTERCONNECTION TARIFFS FOR LARGE LOADS CO-LOCATED AT
GENERATING FACILITIES
Any and all tariffs approved by the Federal Energy Regulatory Commission (FERC) and/or approved by an entity regulated by FERC to interconnect large loads co-located at generating facilities must meet the following requirements to preclude violating the Natural Gas Act and The Constitution of the United States of America:
1. The comprehensive economic public benefit of any Large Load and any Co- Located Generating Facility subject to any such tariff must be established and considered and demonstrated to mutually benefit ALL ratepayers, regardless of any other tariff terms and conditions.
2. Any Large-Load Customer and any Co-Located Generating Facility must have open and free access to any such tariff.
3. States and Indigenous Tribes or Nations must have the ability to approve or reject any terms of any interconnection under any such tariff.
4. Any such tariff must include demand response conditions that preclude the Large Load and/or Co-Located Generating Facility from having any negative impact on congested grids during peak demand or public emergency response.
PDF page 2
Motion to Intervene and CommentsFederal Tariffs for Large Loads Co-Located at Generating Facilities 2
Below please find my Motion to Intervene and Comments for any proposed Federal Interconnection Tariffs for Large Loads Co-Located at Generating Facilities. For the reasons stated below, the Commission should grant this motion to intervene and confer party status on Andrew Hinz and enter these comments into the official record for the named proceedings for Interconnection Tariffs for Large Loads Co-Located at Generating Facilities.
I. MOTION TO INTERVENE
I live in the State of Maryland. The State of Maryland has begun to estimate the amount of money taxpayers will need to invest in adaptation and mitigation to climate change caused by burning petroleum, methane, and other fossil fuels. The estimates are staggering and my contribution to meet the amounts estimated, under all practical taxation and revenue generation scenarios, exceeds my ability to make that contribution and continue to live. Federal electricity interconnection tariffs that ignore the costs I must pay to adapt to and mitigate climate change are unjust and unreasonable. Federal electricity interconnection tariffs that subvert state law enacted to adapt to and mitigate climate change costs are unjust and unreasonable. Federal electricity interconnection tariffs that threaten public health during constrained grid and extreme weather conditions and other public health emergencies are unjust and unreasonable. The costs of climate change from consuming fossil fuels (costs to adapt to climate change, costs to mitigate the effects of climate change, and costs to reduce further climate change) must be included in the consideration of any and all federal tariffs providing connection of any Large Loads Co-Located at Generating Facilities and to the subsequent connection of Large Loads Co-Located at Generating Facilities under such tariffs.
PDF page 3
Motion to Intervene and CommentsFederal Tariffs for Large Loads Co-Located at Generating Facilities 3
A. Initial Position and Interests
With respect to Federal interconnection tariffs for large loads co-located at generating facilities: ALL reasonable costs and benefits must be properly weighed and applied; ALL citizens and legal entities must have equal access to the tariffs (for example, a municipality, tribe or any other entity can declare itself a Large Load, establish Co-Located Generation, and use any federal tariff or a federally-regulated entity’s interconnection tariffs for Large Loads with Co- Located Generation); no state law or policy can be subverted by any federal tariff or a federally- regulated entity’s interconnection tariffs for Large Loads with Co-Located Generation); any federal tariff or a federally-regulated entity’s interconnection tariffs for Large Loads with Co- Located Generation) that directly results in public harm during grid emergencies and/or other public emergencies is unjust and unreasonable. Finally, given the future expenses to be borne by each and every state in this union, any federal tariff or federally-regulated entity’s interconnection tariffs for Large Loads with Co-Located Generation) that subverts that State’s ability to manage those expenses violates The Constitution of the United States of America. For the reasons set forth above, I have a direct and substantial interest which may be materially affected by the outcome of this proceeding, and no other party is willing to represent my interests. These interests are further shared by the public at large. As such, I respectfully move to intervene.
PDF page 4
Motion to Intervene and CommentsFederal Tariffs for Large Loads Co-Located at Generating Facilities 4
B. Communication
I respectfully request that the Commission add me to the official service list for this proceeding. Communications should be directed to the following:
Andrew Hinz
1427 Park Avenue
Baltimore, Maryland 21217
ahinz61@outlook.com
II. COMMENTS
Any and all tariffs approved by the Federal Energy Regulatory Commission (FERC) and/or approved by an entity regulated by FERC to interconnect large loads co-located at generating facilities must meet the following requirements to preclude violating the Natural Gas Act and The Constitution of the United States of America:
1. The comprehensive economic public benefit of any Large Load and any Co- Located Generating Facility subject to any such tariff must be established and considered and demonstrated to mutually benefit ALL ratepayers, regardless of any other tariff terms and conditions.
2. Any Large-Load Customer and Co-Located Generating Facility must have open and free access to any such tariff.
3. States and Indigenous Tribes or Nations must have the ability to approve or reject any terms of any interconnection under any such tariff.
4. Any such tariff must include demand response conditions that preclude the Large Load and/or Co-Located Generating Facility from having ANY impact on congested grids during peak demand or public emergency response.
PDF page 5
Motion to Intervene and CommentsFederal Tariffs for Large Loads Co-Located at Generating Facilities 5
III. CONCLUSION
I request that the Commission grant this Motion to Intervene and incorporate these Comments into the official record for the Amendment Application under EL25-49-000, ER25-2454-002, ER25-2296-002, AD24-11-000 etal.
.
Dated: January 24, 2026
Respectfully submitted,
Andrew Hinz
Name
PDF page 6
Motion to Intervene and CommentsFederal Tariffs for Large Loads Co-Located at Generating Facilities 6
DECLARATION OF SERVICE
FEDERAL INTERCONNECTION TARIFFS FOR LARGE LOADS CO-LOCATED AT
GENERATING FACILITIES
(EL25-49-000, ER25-2454-002, ER25-2296-002, AD24-11-000 etal.)
I, Andrew Hinz, declare that I today, January 25, 2026, served the attached “ANDREW HINZ’S MOTION TO INTERVENE AND COMMENTS ON FEDERAL INTERCONNECTION
TARIFFS FOR LARGE LOADS CO-LOCATED AT GENERATING FACILITIES”
by electronic mail, or by first-class mail if no e-mail address is provided, to each person on the official service list compiled by the Secretary in this proceeding.
Dated: January 24, 2026