EL25-49-000 · 2026-02-25 · PJM Interconnection, L.L.C.

Notice of Compliance Filing in ER26-1479-000 of PJM Interconnection, L.L.C.,

PDF page 1

PJM Interconnection, L.L.C.
2750 Monroe Boulevard
Audubon, PA 19403

Mark J. Stanisz
Associate General Counsel
Ph: (610) 666-4707
Mark.Stanisz@pjm.com
February 24, 2026

VIA ELECTRONIC FILING

Honorable Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
888 First Street, NE, Room 1A
Washington, DC 20426

Re:
PJM Interconnection, L.L.C., Docket No. EL25-49-000, et al.
Compliance Filing in Docket No. ER26-1479-000

Dear Secretary Reese:

This letter, being served on all parties to the above-referenced proceeding, confirms that PJM Interconnection, L.L.C. (“PJM”) submitted on February 23, 2026 a filing in Docket No. ER26-1479-000 (Accession No. 20260223-5181) in compliance with the Federal Energy Regulatory Commission’s 60-day compliance directives in the December 18, 2025 order.1 PJM requested a placeholder effective date of 12/31/9998.  On February 24, 2026, the Commission set 5 pm ET on March 16, 2026 for comments on this filing.

Respectfully submitted,

Craig Glazer
Vice President – Federal
Government Policy
PJM Interconnection, L.L.C.
1200 G Street, NW, Suite 600
Washington, DC  20005
(202) 423-4743
craig.glazer@pjm.com
           /s/   Mark J. Stanisz

Mark J. Stanisz
Associate General Counsel
Thomas DeVita
Associate General Counsel
Chenchao Lu
Associate General Counsel
2750 Monroe Blvd,
Audubon, PA 19403
(610) 666-8800
mark.stanisz@pjm.com
thomas.devita@pjm.com
chenchao.lu@pjm.com
Counsel for PJM Interconnection, L.L.C.

1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025).

PDF page 2

CERTIFICATE OF SERVICE

I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in these proceedings.

Dated at Audubon, P.A., this 24th day of February, 2026.

/s/ Mark J. Stanisz

Mark J. Stanisz
Associate General Counsel
PJM Interconnection, L.L.C.
2750 Monroe Blvd.
Audubon, PA 19403
(610) 666-4707
Mark.Stanisz@pjm.com

Attorney for
PJM Interconnection, L.L.C.