AD26-7-000 · 2026-07-06 · Individual No Affiliation
Comments of Abdur Rahman re PJM Governance and Stakeholder Reforms
PDF page 1
1
Commission-Led Technical Conference on PJM Governance and Stakeholder Reforms
Docket No. AD26-7-000
By ABDUR RAHMAN
PJM Governance Mechanics, Board Authority, States' Role, Filing Rights, and Document Architecture
July 2026
Question 1. The PJM Board's role in ensuring that PJM is sufficiently tackling the region's operational and market challenges; how the Board evaluates its effectiveness in that role; and how often, and under what circumstances, the Board acts unilaterally, and whether this should change.
The Board's highest function in the current environment is that of execution steward: the body accountable not for the content of every solution but for the fact that identified needs reach a decision on a defined schedule. In large institutional transitions, the governing body that performs best is rarely the one that decides the most; it is the one that guarantees that decisions are made, on time, by the actor assigned to make them. That reframing matters because it gives the Board a role that is both stronger and more disciplined than episodic intervention: the Board becomes the owner of the machinery rather than an occasional substitute for it.
Three practices would operationalize that role. First, the Board should adopt and publish an annual governance execution review reporting, at minimum, the median and ninetieth-percentile elapsed time from issue identification to terminal decision by issue category, the inventory of open issues by age band, the number of filings made, and the number of matters resolved by default-outcome provisions. What is measured is managed, and today the performance of the governance system itself is largely unmeasured in any public, standardized form, which means the Board's effectiveness in its stewardship role cannot currently be evaluated by the Board, the states, or the Commission except by anecdote. Second, the Board should maintain a public decision log
PDF page 2
2
recording each significant Board action or deliberate inaction, the rationale, and the positions received, converting diffuse institutional memory into an auditable record against which effectiveness can be judged over time.
Third, on unilateral action: it should be rare, but it should be rule-bound rather than ad hoc. The Board should publish ex ante the criteria under which it will act without a supporting stakeholder vote, such as a reliability need identified by PJM operations or planning staff, a binding compliance deadline, or a demonstrated market integrity concern, together with the commitment that any such action carries a published rationale and attaches all dissenting positions. The question worth answering is therefore not how often the Board should act unilaterally but under what published rules. Rule-bound authority is more legitimate, and therefore more usable, than discretionary authority, and the existence of a credible, criteria-based backstop changes bargaining behavior upstream long before it is ever invoked, because participants negotiate more seriously against a known alternative than against an indefinite continuation of talks.
Question 2. How states, through the Organization of PJM States, Inc. or other structures, should interface with the Board to enable the region to meet operational and market challenges while respecting PJM's independence.
The design principle is structured voice without veto. State input is most valuable, and least disruptive to independence, when it arrives at defined stages, through defined channels, on a defined clock. Episodic or improvised access serves neither side: states cannot plan their participation, and PJM cannot demonstrate that participation was fairly provided. These comments recommend that every issue charter, as described under Question 3, include two state consultation windows: one at charter initiation, when scope and decision path are set and input has the greatest leverage, and one before any resulting filing is finalized, when the practical consequences for retail customers are clearest. Each window should have a fixed duration, a designated PJM owner responsible for receiving and responding to state input, and a requirement that a written disposition of state comments accompany the record. Joint technical sessions between PJM staff and OPSI on high-impact matters, held early rather than after positions harden, serve the same function at lower formality. Structure protects both sides: states receive a guaranteed, timely, documented channel rather than episodic access, and PJM's independence is protected precisely because the channel is advisory, bounded, and recorded rather than open- ended. Over time, the written dispositions also create a factual record of how state input shaped outcomes, which is the most durable answer to any perception that consultation is ornamental.
PDF page 3
3
Question 3. The governance reforms that would best improve accountability and responsiveness. Two reforms do the most work, and a third makes their effects visible. The first is single-owner accountability: every issue admitted into the governance process should have one named PJM executive sponsor accountable for driving it to terminal decision. Diffuse ownership is the most common failure mode in large-scale institutional execution; where everyone is responsible, no one is, and the record of stalled issues in any large organization is usually a map of unassigned ownership rather than a map of hard problems.
The second is the mandatory issue charter. At the moment an issue enters the process, a short public charter should fix five elements: the scope of the issue, the accountable owner, the clock to terminal decision, the decision path through the committee structure stated in advance, and the default outcome if the clock expires without the required support. The default outcome is the load- bearing element. A process with a defined default converts delay from a costless strategy into a choice with known consequences, which changes participant behavior at every stage before the default is ever reached. Charters also create the unit of account for governance metrics: without a defined start, clock, and terminus, cycle time cannot even be computed.
The third is transparency instrumentation: the public decision log and the cycle-time reporting described under Question 1, published quarterly by issue category. Accountability requires observability. A governance system whose throughput is visible tends to improve for the same reason that any measured operational process tends to improve, and visible metrics allow the Board, OPSI, and the Commission to distinguish between a system that is slow because its problems are hard and a system that is slow because its design permits it.
Question 4. How the division of Federal Power Act section 205 filing rights among PJM, the Transmission Owners, and the Members Committee affects PJM's ability to act effectively and quickly, when warranted, to address operational and market needs.
Divided filing rights create two predictable execution problems regardless of how any particular allocation is drawn. The first is negative space: issues that fall between rights-holders, where each actor plausibly believes initiation belongs to another, and which therefore belong to no one. The second is incentive misalignment: the actor holding the right to initiate a change is not always the actor with the incentive to initiate it, so needed reforms can lack a motivated sponsor even when few participants oppose them on the merits. Both problems are properties of the architecture, not of the participants, and both are treatable without reallocating any underlying legal right. Three responses follow. First, publish a filing-rights map that states, for each recurring category of tariff and agreement provision, which entity holds initiation rights, under which instrument, and
PDF page 4
4
through which amendment path, so that the negative space becomes visible and assignable rather than discovered issue by issue. Second, adopt an escalation protocol: where the Board designates a matter as a regional priority and the relevant rights-holder does not initiate within a defined period, the matter automatically proceeds to a defined alternative path, with the rights-holder's stated reasons attached to the record. Third, where rights are shared or contested, adopt tie-break mechanics built on the principle that disagreement should change the venue of decision rather than prevent a decision; the New England arrangements discussed under Question 6 illustrate the principle. The author takes no position here on the legal reallocation of any existing right. The recommendations concern the operational machinery that surrounds whatever allocation exists, which is where most of the delay actually accrues.
Question 5. The extent to which provisions in PJM's Operating Agreement, Transmission Owners Agreement, Open Access Transmission Tariff, Reliability Assurance Agreement, or Manuals impede timely decision-making by PJM.
The impediment is less any single provision than the architecture: five instruments, drafted and amended over decades, in which related provisions are distributed without a master index of who decides what through which path. Fragmented document architecture imposes a search cost on every issue before deliberation even begins, and search costs compound because they are paid by every participant separately. In large corporate transitions this is a familiar condition, and the remedies are familiar as well.
First, PJM should produce and maintain a public cross-instrument index of decision rights and amendment paths. This is a navigational document rather than a legal amendment; it can be completed quickly, requires no vote to be useful, and pays immediate dividends by shortening the search phase of every subsequent issue. Second, PJM and its members should adopt boundary discipline between tariff-level and Manual-level content: durable rights and obligations belong in the filed instruments, while operational detail belongs in Manuals governed by a defined, time- bound change process, so that routine operational updates do not carry tariff-amendment overhead and tariff amendments are not delayed by disputes that are operational in character. Third, a standing sunset review should identify provisions that require sequential approval by multiple bodies and evaluate, category by category, whether sequential approval still serves a purpose that parallel or single-body review cannot, since each additional sequential gate compounds cycle time multiplicatively rather than additively.
PDF page 5
5
Question 6. Lessons from other regional transmission organization and independent system operator governance structures that PJM could reasonably adopt, recognizing regional differences.
Two design lessons travel well. In MISO and CAISO, stakeholder processes are structured as advisory inputs to an independent board that retains both the authority and the obligation to act; those regions demonstrate that robust multisector voice and retained filing authority can coexist. New England offers a complementary lesson through a different mechanism: its governance arrangements provide a defined path by which a stakeholder-supported alternative can travel to the Commission alongside the regional transmission organization's own proposal, so that a failure of consensus changes the forum of decision rather than producing no decision at all. The transferable element is not any single structure, and these comments do not suggest that PJM abandon its multisector model, which reflects the region's history and gives its process legitimacy. The transferable element is the design principle common to both examples: every issue has a terminal decision point, the path to that point is defined in advance, and disagreement is carried forward in the record rather than allowed to arrest the process. PJM can adopt that principle within its existing sector architecture through the charter, escalation, and rule-bound backstop mechanisms described in these responses. Regional difference is a reason to adapt the machinery, not a reason to forgo the principle.
Respectfully submitted,
Abdur Rahman
Herndon, Virginia