AD26-7-000 · 2026-07-15 · Indiana Department of Energy and Natural Resources

Pre-filed Statement of Suzanne Jaworowski, Secretary of Energy and Natural Resources for Indiana Governor Mike Braun's Office, for the PJM Governance and…

PDF page 1

1
BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
Technical Conference on the PJM Interconnection Stakeholder Process and Governance July 23, 2026

Written Statement of Suzanne Jaworowski
Secretary of Energy and Natural Resources, State of Indiana Office of Governor Mike Braun Introduction

Chairman and Commissioners, thank you for convening this technical conference and for the opportunity to testify. I serve as Indiana's Secretary of Energy and Natural Resources in the administration of Governor Mike Braun. Indiana sits at the seam of two regional transmission organizations: most of our state is served by MISO, while Indiana Michigan Power serves a substantial portion of northeastern Indiana within PJM. That dual vantage point, together with our responsibility for one of the fastest-growing large-load pipelines in the country, informs the perspective I offer today.

Indiana's message is straightforward. PJM has served this region well for nearly a century, but the demands now converging on it — unprecedented load growth, resource interconnection backlogs, transmission expansion, and capacity price outcomes that have become politically intolerable in several states — have outpaced a stakeholder process designed for a slower era. Governor Braun joined fellow PJM governors in a Statement of Principles because the states' confidence in PJM's governance has eroded. Of the four multi-state RTOs, the states' voice in PJM is the most muted. That must change, and it can change through a focused package of reforms drawn from proven practice across the organized markets.

My testimony draws substantially on the governance recommendations recently advanced by Pat Wood III, former Chairman of this Commission, which Indiana broadly endorses. They are grounded in a generation of experience across all seven U.S. RTOs and ISOs, and they answer the questions the Commission has posed for this panel.

Strengthening the State Role (Question 3)
The Federal Power Act establishes a federal-state partnership, and RTOs perform functions whose practical effects span both jurisdictions. Yet the structured opportunities for state participation in PJM today are inadequate. The Organization of PJM States (OPSI) communicates on a consensus basis, which leaves it ill-suited to convey state positions when states diverge, and states are otherwise left to write letters to a Board that has no obligation to act on them. Indiana recommends two structural reforms:

• Establish bifurcated state engagement channels. Mirroring the New England model, PJM should complement OPSI's technical regulatory role with a PJM States' Committee on Electricity (PJMSCOE) focused on state policy and economic development perspectives. PJMSCOE should have formal standing at PJM, a defined right to bring issues directly to the Board, and the duty to appoint three state members to the current eight-member Board Nominating Committee, which includes the PJM CEO as a voting member. One of those appointees could be the OPSI President.

PDF page 2

2
• Clarify the Regional State Committee's authority. Indiana further supports vesting the states, acting through their Regional State Committee, with Federal Power Act Section 205 filing rights over the matters where state jurisdictional interest is clearest — resource adequacy program structure and the state-facing elements of regional transmission cost allocation. This is not a novel arrangement: SPP's Regional State Committee has exercised Section 205 authority over cost allocation for two decades, and it has produced durable regional compacts rather than serial litigation. Filing rights are what convert consultation into partnership. A state position that PJM may note and set aside is advice; a state position that reaches this Commission on its own Section 205 footing carries both voice and responsibility. Consistent with the Federal Power Act's federal-state design, Indiana urges that any reform of PJM's governing documents give the states that footing.

Voting Thresholds and Committee Structure (Questions 1, 6, and 7)
Sector-weighted voting has value, but the current design no longer strikes the right balance between consensus and timely action. A two-thirds supermajority across all matters gives incumbent coalitions an effective veto over reform, and independent analysis has documented the consequences: five voting sectors unchanged since 2000 despite dramatic membership growth, per-firm vote dilution in the oversubscribed supply sectors, average member participation of roughly 20 percent at the senior standing committees, and lower-level committee rules that allow affiliate voting to skew outcomes toward supply-side interests. The result is a process where proposals grind through lower committees only to die at the top, leaving the Board — and ultimately this Commission — to resolve what the stakeholder process could not. Indiana supports the following reforms:

• Move to an advisory stakeholder model. Non-binding stakeholder voting is the approach taken in every other U.S. RTO and ISO — now including ERCOT — and it works well. It should be paired with a more structured engagement between the Members Committee and the Board, akin to that employed in SPP, so that stakeholder counsel is elevated rather than diminished even as the veto arithmetic ends.

• If the current structure is retained, bifurcate the threshold. Leave the supermajority at two-thirds for governance issues, and apply a simple majority to everything else. This preserves stability where stability matters most while restoring the ability to act on market design.

• Align lower-committee voting with the Members Committee. In either case, the voting makeup of lower committees should mirror the sector-weighted structure of the Members Committee, eliminating the structural bias introduced by unweighted affiliate voting at the working level.

Transparency and Accountability (Question 2)
Transparency reforms are the fastest way to rebuild stakeholder and public confidence in PJM's decision-making. Today, lower-level voting behavior is generally not disclosed, meeting minutes convey little substance to non-participants, and the Board rarely explains its reasoning. Indiana recommends that PJM:

PDF page 3

3
• Amend the governing charter to make clear that Board members have a
responsibility to the public interest, consistent with the Federal Power Act. Public legitimacy begins with a publicly stated duty.

• Publish individual voting results for votes taken by stakeholders throughout the committee structure.

• Adopt public annual and quarterly performance metrics and tie management
compensation to their achievement, as MISO does.
• Publish all Board ethics documents on PJM's public website, as ERCOT does, and prioritize selection of Board members who live in the PJM footprint.

• Modernize Board ex parte practices to allow more direct discussion with customers, stakeholders, elected officials, and regulators, subject to appropriate disclosure. Insulating the Board from the region it serves has not produced better decisions — it has produced less accountable ones.

Governing Documents, Expedition, and Lessons from Other Regions
(Questions 4, 5, 8, and 9)
Several provisions of PJM's governing documents impede timely decision-making, and implementing the reforms above will require amendments to those documents — the supermajority provisions, the lower-committee voting rules, and the informality of the Board's override authority all live there. Indiana takes no position today on the procedural vehicle. What matters is that the amendments be made, and made quickly, so that PJM, the states, and stakeholders can turn their full attention to the substantive challenges ahead. On expedition: the Board's exceptional override authority — the "critical issue fast path" designation — should be formalized with crisp procedures, including public articulation of the basis for its decisions and a final stakeholder consultation before filing. Fast-path tools are appropriate for high-importance topics, but they must be rule-bound and transparent so that speed does not come at the price of legitimacy or circumvent meaningful stakeholder deliberation. Finally, the Commission asked what PJM can learn from other regions. Each element of the reform package Indiana supports is drawn from practice that has worked elsewhere: New England's bifurcated state committees; the advisory stakeholder model that operates in every other RTO and ISO, now including ERCOT; SPP's structured engagement between its members and its Board; MISO's public performance metrics tied to compensation; and ERCOT's published ethics standards. None of this is experimental. PJM would simply be adopting the best of what a generation of RTO experience has already proven.

A Closing Note on Affordability
Governance reform matters because affordability is now the central energy question in every PJM state, including Indiana. Recent capacity-market price outcomes became politically intolerable in significant part because default-service retail load across the footprint was not adequately hedged. States will need to address that on their side of the jurisdictional line — but PJM retains a critical role in managing the residual capacity market and allocating its costs, and every state needs the

PDF page 4

4
ability to allocate those costs across customer classes consistent with the Governors' Statement of Principles and the ratepayer protections large customers have pledged. A PJM that hears its states clearly, votes efficiently, and explains its decisions publicly is a PJM that can carry that responsibility with the public's confidence.

Big issues await action by PJM and the states. Indiana urges the Commission and the PJM community to resolve these governance questions quickly, so all of us can focus on the future. Thank you, and I welcome your questions.