AD26-7-000 · 2026-07-15 · ISO New England Inc

Pre-filed Statement of Maria Gulluni, Vice President, General Counsel, and Chief Compliance Officer for ISO New England Inc., for Panel 1 PJM Governance…

PDF page 1

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

Pre-filed Comments of Maria Gulluni, ISO New England Inc.
Panel 1: PJM Governance Mechanics, Board Authority, States’ Role, Filing Rights,
and Document Architecture

I respectfully submit these comments in advance of the technical conference convened by the Federal Energy Regulatory Commission (Commission) on July 23, 2026 to discuss the governance and stakeholder processes of PJM Interconnection, L.L.C. (PJM).  I appreciate the invitation to join you on Panel 1.

New England, of course, is a smaller and more defined region than PJM’s control area, and its states’ energy policies and regulatory structure are generally more aligned than in PJM (although not perfectly so).  Given these characteristics, ISO New England Inc. (ISO-NE) may have fewer challenges than PJM in working with its states and market participants on regional energy issues.  Nonetheless, to the extent it is helpful, I will describe our governance structure in this document.

I outline below the governance mechanics cited in the description of the first panel, including Board authority, the states’ role, filing rights, and document architecture.  I will focus on the ways, to my knowledge, that ISO-NE’s mechanics differ from that of PJM.1

Document Architecture.  At the highest level, ISO-NE’s governing documents fall into three categories:  corporate; terms and conditions of service; and market participants and states. All of these documents are referenced throughout these comments.

On the corporate side, ISO-NE has a Certificate of Incorporation and By-Laws, both of which outline its internal governance.2  In the second category, ISO-NE’s terms and conditions of market and transmission service are outlined in:  the Transmission Operating Agreement, which describes the split of responsibilities between ISO-NE and the region’s transmission owners for

1 These comments are largely responsive to the sixth question addressed to the panel:  “Recognizing regional differences, are there lessons from other regional transmission organization/independent system operator (RTO/ISO) governance structures that PJM could reasonably adopt to improve its responsiveness to the region’s operational and market challenges?”
2 Third Restated Certificate of Incorporation of ISO New England Inc. (last amended September 28, 2021), available at second_restated_certificate_of_incorporation-copy-1.pdf (Certificate of Incorporation).  By-Laws of ISO New England Inc. (last amended September 14, 2023), available at 2021-02-18_bod_bylaws_of_iso_ne-copy-2.pdf (By- Laws). PJM Governance and Stakeholder Reforms Docket No. AD26-7-000

PDF page 2

Docket No. AD26-7-000

Page 2
managing the transmission system, and is the vehicle through which ISO-NE was assigned the rights to make filings with the Commission pursuant to Section 205 of the Federal Power Act (as discussed below);3 and ISO-NE’s single Tariff, which includes sections on the markets, open transmission access, and ISO-NE’s rate recovery.4

Finally, regarding market participants and states, the relevant documents describe their organizations, as well as ISO-NE’s interactions with those organizations.5  Notably, as set forth in the Participants Agreement, New England’s market participants formed the New England Power Pool (NEPOOL) in 1971.  NEPOOL has its own governance structure and counsel.  The states’ representative organizations are described in the next section.

States’ Role.  The New England states are represented by two organizations.  The New England Conference of Public Utilities Commissioners (NECPUC) “provides regional regulatory assistance” to New England’s public utilities commissions on topics including water, gas, electricity, and telecommunications.6  New England’s Regional State Committee, the New England States Committee on Electricity (NESCOE), was formed later than NECPUC and is more narrowly focused on electricity issues.7  NESCOE is directed by a committee composed of representatives appointed by each of the six New England governors, in his or her discretion; in practice, these appointees generally include energy policy officials as well as public utilities commissioners.8

NESCOE is funded through a rate in ISO-NE’s Tariff that is paid by Regional Network Load.9  The rate is based on NESCOE’s annually-filed budget that is approved by the

3 Transmission Operating Agreement between the Initial Participating Transmission Owners and ISO New England Inc. (February 1, 2005), as amended, available at v1_er07_1289_000_toa_composite.pdf v1_er07_1289_000_toa_composite.pdf (Transmission Operating Agreement).
4 ISO New England Inc. Transmission, Markets, and Services Tariff, available at Transmission, Markets, and Services Tariff (Tariff).  Capitalized terms used but not defined in this document have the meanings ascribed to them in the Tariff.
5 The New England Regional States Committee is described in the Memorandum of Understanding Among ISO New England Inc., the New England Power Pool, and New England States Committee on Electricity, LLC (November 21, 2007), available at Microsoft Word - 41823466_2.DOC (NESCOE MOU).  The New England Power Pool’s structure and interaction with ISO-NE is contained in the Participants Agreement Among ISO New England Inc. as the Regional Transmission Organization for New England and the New England Power Pool and the Entities that are from time to time parties hereto constituting the Individual Participants (2004), available at parts_agree.pdf (Participants Agreement).
6 About NECPUC – NECPUC.
7 NESCOE MOU at Mission section of attached Term Sheet.  See also Home | NESCOE.
8 Id. at Organization section of attached Term Sheet.  See also NESCOE Managers | NESCOE.
9 Tariff at Schedule 5 to Section IV.A.

PDF page 3

Docket No. AD26-7-000

Page 3
Commission.10  For fiscal year 2026, NESCOE’s total budget is $2,731,108, largely for staff compensation and consulting services for economic, engineering and financial analysis.11 Given its resourcing, NESCOE is able to work through the market participant process as a fully committed and informed partner on markets and transmission initiatives.  In fact, NESCOE has committed to work within that process to present policy proposals for stakeholder consideration, and is required to collaborate with stakeholders to reach negotiated solutions where possible.12

NESCOE has committed to “make every effort to avoid duplication of efforts or conflicting policy positions” with NECPUC.13  NESCOE achieves this objective by meeting jointly with NECPUC, ISO-NE and stakeholders, and formally coordinating with NECPUC. While this coordination is required at least once annually to allocate lead responsibility for regional electric policy issues to “avoid conflicting recommendations and to make efficient use of available staff,”14 in practice it occurs much more frequently.

ISO-NE also works with the states’ consumer advocates through the NEPOOL process, as many consumer advocates are members of NEPOOL’s end user sector.  Consumers and consumer advocates also interact with ISO-NE through the Consumer Liaison Group, which was formed as part of the region’s compliance with the Commission’s Order No. 719.15 Board Authority.  Unlike PJM, ISO-NE is a non-stock, not-for-profit corporation organized pursuant to Delaware law.  Its Board of Directors is composed of nine independent members and the CEO, who is a non-voting member.  The Board of Directors also serves as the members of the Company, filling the role that shareholders play in a for-profit company.16  The Board does much of its work through its standing committees, which include Audit and Finance; Compensation and Human Resources; Nominating and Governance; Information Technology and Cyber Security; Markets; and System Planning and Reliability.17

The Board’s role is to provide direction on the management of the Company;18 as such, it is an oversight body.  While the Board and its relevant committees are certainly made aware of

10 NESCOE MOU at Cost Allocation and Revenue Collection section of attached Term Sheet.
11 ISO New England Inc., Filing of Revised Tariff Sheet for Recovery of Costs for the 2026 Operation of the New England States Committee on Electricity, Docket No. ER26-145-000 (October 15, 2025), available at revisions_for_recovery_of_costs_for_2026_operation_of_nescoe.pdf.
12 NESCOE MOU at Section 4.3 and Consultation and Dispute Resolution section of attached Term Sheet.
13 Id. at Section 2. 14 Id. at Scope of Activities section of attached Term Sheet. 15 See Consumer Liaison Group.
16 See Certificate of Incorporation at Sections 4 (Non-Profit Status), 6 (Members), 7 (Board of Directors), and 8 (Non-Affiliation).
17 See the Board committee charters at ISO New England.
18 By-laws at Section 3.1.

PDF page 4

Docket No. AD26-7-000

Page 4
major filings, including the underlying designs and stakeholder and state positions, the Board does not propose, review or vote on filings in the manner of PJM’s Board of Managers.19 New members of the Board are nominated through a process that includes representatives of the Board, NEPOOL members, and the states, working together as part of a Joint Nominating Committee.  The Committee seeks to reach consensus on new candidates.20  Following nomination by the Committee, NEPOOL votes on the slate, with a vote of 70% required to endorse the slate.21  Finally, the Board completes the process with a vote to elect.22 Board members must have a cross-section of skills, such as Commission electric regulatory affairs, energy industry management, corporate finance, bulk power systems, power pool operations, public policy, distributed generation or demand response technologies, renewable energy, consumer advocacy, environmental affairs, business management and information technologies.  At least three directors must have electric industry experience, and preference is given to New Englanders.23  Directors are subject to term limits and an age limit to facilitate turnover.24

 The Board interacts regularly with NEPOOL and the states (both NECPUC and
NESCOE).  Per the Participants Agreement, Board members are invited to NEPOOL meetings, which they regularly attend, and additionally meet with NEPOOL at least twice per year.25 These twice-yearly meetings occur between members of the Board and the individual sectors of NEPOOL, which are Transmission, Generation, Suppliers, Publicly-Owned Entities, Alternative Resources, and End Users.26

By practice, the Board also meets with representatives of both NECPUC and NESCOE twice per year, and has developed a “state liaison” program.  Per that program, the Board assigns two directors to each New England state public utilities commission.  These liaisons are available for the commissions to contact at any time, and the liaisons meet with their assigned commissions at least annually.  Each state commission usually invites the state’s governor- appointed NESCOE manager to these meetings.

Filing Rights.  As set out in ISO-NE’s agreement with the region’s transmission owners, ISO-NE has the filing rights under Section 205 of the Federal Power Act with respect to both the markets and the non-rate terms and conditions of transmission service.  The transmission owners

19 See, e.g., Amended and Restated Operating Agreement of PJM Interconnection, LLC, available at oa.pdf, at Section 7.7 (v)-(vi).
20 Participants Agreement at Section 13.1.
21 Id. at Section 13.2.
22 Id. at Section 13.2.1.
23 Id. at Section 9.2.2.
24 By-laws at Section 3.2; Participants Agreement at Section 9.2.3.
25 Participants Agreement at Section 10.2.6.
26 Id. at Section 7.3.2.

PDF page 5

Docket No. AD26-7-000

Page 5
retain their rights to set revenue requirements for transmission facilities and establish terms and conditions for local transmission service.27

ISO-NE has contractually shared its Section 205 rights with NEPOOL via a “jump ball;” pursuant to the relevant provision of the Participants Agreement, if NEPOOL approves an alternative to an ISO-NE market rule proposal, ISO-NE must file that alternative with the Commission pursuant to Section 205 on equal footing with ISO-NE’s own proposal.28 This “jump ball” right extends to a proposal made by NESCOE.  As noted above, NESCOE has committed to work within the participant process and present its policy proposals through that process.29  If NEPOOL supports an alternative market rule change proposed by NESCOE, the “jump ball” provision applies to that proposal.30  The states have other rights pursuant to the Tariff, as well, including decision-making on certain transmission planning projects through the Longer-Term Transmission Planning process.31  States can also provide scenarios to analyze through ISO-NE’s economic studies32 and Probabilistic Energy Adequacy Tool.

The transmission owners also granted NESCOE a “jump ball” regarding proposals for the allocation of the costs of generation and transmission interconnection upgrades.  Pursuant to that provision of the Transmission Operating Agreement, if NESCOE opposes the transmission owners’ cost allocation proposal for interconnection costs, NESCOE may provide the transmission owners with an alternative proposal that must be included in the transmission owners’ filing with the Commission on equal footing.33

27 Transmission Operating Agreement at Section 3.4(a)-(c).
28 Participants Agreement at Section 11.1.5.  NEPOOL’s approval requires at vote of 60%.
29 NESCOE MOU at Section 4.3 and Consultation and Dispute Resolution section of attached Term Sheet.
30 Id. at fn. 11 of Consultation and Dispute Resolution section of attached Term Sheet.
31 Tariff at Section II, Attachment K, Section 16.
32 Id. at Section 17.
33 Transmission Operating Agreement at Section 3.04(h)(C).

PDF page 6

Docket No. AD26-7-000

Page 6
I respectfully request that the Commission accept these comments, and I look forward to joining you on July 23.

Respectfully submitted,

                        ISO NEW ENGLAND INC.

By:_/s/ Maria Gulluni
Maria Gulluni
Vice President, General Counsel and Chief
Compliance Officer
ISO New England Inc.
One Sullivan Road
Holyoke, MA  01040-2841
Tel:   (413) 540-4473
E-mail: mgulluni@iso-ne.com

Submitted on:  July 14, 2026