UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

PJM Governance and Stakeholder Reforms
)
)
)

 Docket No. AD26-7-000

 PRE-TECHNICAL CONFERENCE COMMENTS OF MARJORIE PHILIPS, LS
POWER DEVELOPMENT, LLC
I. Introduction
LS Power Development, LLC (“LS Power”) appreciates the opportunity to participate in this examination of the efficacy of PJM Interconnection LLC (“PJM”) governance structure.1 Founded in 1990, LS Power is a premier development, investment, and operating company focused on the North American power and energy infrastructure sector, with leading platforms across generation, transmission and energy expansion solutions. Since inception, LS Power has developed or acquired 50,000 MW of power generation, including utility-scale solar, wind, hydro, battery energy storage, and natural gas-fired facilities. Through its transmission business, LS Power Grid, the company operates 7 transmission utilities, has built 780+ miles of high-voltage transmission with another 400+ miles currently in construction or development. LS Power actively invests in and scales businesses that are meeting the growing needs of the energy expansion, including electric vehicle charging, demand response, microgrids, renewable fuels and waste-to-energy platforms. Over the years, LS Power has raised more than $85 billion in debt and equity capital to support North American infrastructure. LS Power has been an active participant in PJM for three decades.

Every stakeholder, whether Member and non-Member has had grievances with the PJM governance process at one point or another, but the bottom line is that Members, the Board, and the relevant regulatory bodies should be proud: PJM’s

1 All terms used herein shall have the meaning set forth in the PJM Operating Agreement.  PJM, Amended and Restated Operating Agreement, Rate Schedule FERC No. 24, (eff. 7/14/2011) (“Operating Agreement”).

PDF page 2

LS Power Comments
Page 2

“constitutional” documents have allowed PJM to evolve over more than thirty years while maintaining reliability through independent and competitive markets. Considering the unprecedented growth in data center demand, all market participants, including PJM, are having to reconsider how their past programs can be improved to meet rapidly developing needs and stability for the future. We are all doing so while trying to balance enhanced stakeholder engagement up and down the value chain. And so, we must ask here, is PJMs present need to make adjustment one of fundamental governance reform or just another step-change aligned with the governance structures which have served the region well over time?

In answering this question, we find that the unanticipated resource adequacy issue facing PJM (amongst others) is not fundamentally one of governance. While record unanticipated load growth associated with data center development is a matter of critical importance - ranging from national security to everyday personal use - addressing this need is more logically addressed through the lens of stable market rules, efficient interconnection queues, supply chain constraints and broader permitting regimes, rather than PJM governance.

While it is true that PJM did not have or in some cases, did not robustly follow the rules in place to facilitate and manage this unanticipated load growth,  it is also true that no amount of governance reform today can change the physical reality that it presently takes roughly five years to bring a new combined-cycle plant online, and considerably longer for coal and nuclear facilities, not to mention getting transmission upgrades built.

Driving the governance discussion is the concern policy makers have expressed: they lack access to the Board, and it is not independent of stakeholder influence. This is a false narrative.  Policy makers and Members already have access to the Board; policy makers through the Organization of PJM States (“OPSI”) meetings, and Members through the Liaison Committee.  The states are not restricted by ex parte rules that apply to stakeholders.  Furthermore, all these parties can participate in stakeholder proceedings, and any interested party can send a letter to the Board expressing its opinion, which is then shared publicly.  Indeed, PJM has filed joint proposals with state utility commissions and representatives of governors have made presentations in the stakeholder process.2

2 PJM Interconnection, L.L.C., Docket No. ER25-1357-000, "Proposal for Revised Price Cap and Price Floor for the 2026/2027 and 2027/2028 Delivery Years, and Request for a Waiver of the 60-Days' Notice Requirement to Allow for a March 31, 2025 Effective Date," filed February 20, 2025. See also https://www.pjm.com/- /media/DotCom/committees-groups/committees/mrc/2025/20250618/20250618-item-04---3-sub-annual-capacity- market---presentation.pdf

PDF page 3

LS Power Comments
Page 3

What PJM’s governance structure can offer in times of robust growth is a stable
regulatory forum for decision-making, one which continues to be deeply invested in
providing the regulatory certainty and price-signals required to allow stakeholders
to make multi-decade investments in U.S. wholesale power infrastructure possible.
With that said, opportunities exist to enhance PJM’s existing governance structure
to ensure better transparency, policy maker input, and stakeholder alignment while
preserving PJM’s independence and mission to ensure reliability through
competitive markets.
II. The Board and PJM’s Jurisdictional Authority
Our comments are grounded in the jurisdictional and regulatory limits that apply to
the Commission, PJM, and the states. The Federal Power Act does not speak in terms
of “affordability.” Instead, it requires FERC to judge whether a rate is “just and
reasonable” — a standard that turns on the relationship between a seller’s costs and
market position (market power), and the price that seller charges.3 “Affordability,”
by contrast, is a qualitative judgment about the impact of a rate on the buyer, and
turns on the relationship between a customer’s income and its retail bill.
This distinction is why it is critical that the PJM Board focuses on producing
wholesale market outcomes that are just and reasonable, while the states focus on
how those market outcomes are then allocated — equitably or otherwise — to their
retail constituents. Keeping these two distinct responsibilities straight and keeping
them with the entities who jurisdictionally manage them, is foundational to
everything that follows.4  Addressing the present significant load growth challenge
will require hyperscalers, state and federal regulators, PJM, the PJM Board,
transmission and generation asset owners and developers, end users, transmission
dependent utilities and consumer advocates to work cooperatively to implement
rules and regulations in the RTO, at the federal and at the state levels to manage this

3 Federal Power Act § 206(a), 16 U.S.C. § 824e(a) (2018).
4  “We recognize that states have exclusive authority over resource planning and the generation mix within their boundaries. Nothing about our preliminary finding here, however, intrudes or is intended to intrude on that exclusive authority.” New York Independent System Operator, Inc., 195 FERC ¶61,216, at ¶93 (2026). See also Commissioner LaCerte concurrence: To that end, and in light of our action in today’s orders, I also ask the state public utility commissions—whether they have already approved large load retail tariffs, are in the process of crafting large load retail tariffs, or have yet to embark on this essential tariff design process—to take a hard look and ensure their large load retail tariff provisions insulate ratepayers from the negative impacts of data center growth. Additionally, I expect PJM to design proposals in response to this show cause order that dovetail with the efforts on the retail side to implement the Ratepayer Protection Pledge, protect customers, and ensure that large loads cover the costs they incur to integrate with the grid. PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 (2026) (LaCerte, Comm'r, concurring at 3).

PDF page 4

LS Power Comments
Page 4

new grid reality while ensuring PJM fulfills its missions of maintaining reliability through competitive markets.  Our recommendations below are offered in recognition of those jurisdictional realities and in the core understanding that cooperation and coordination is imperative to success.

The three pillars of PJM governance, the Open Access Transmission Tariff, the Operating Agreement and the Consolidated Transmission Owners Agreement (“CTOA”), are each foundational documents upon which PJM was approved and has operated for three decades.  Section 3.1 of the Operating Agreement provides that the purpose of the LLC (PJM) is “to operate in accordance with FERC requirements as an Independent System Operator, comprised of the PJM Board, the Office of the Interconnection, and the Members Committee, with the authorities and responsibilities set forth in this Agreement.”5  The Members Committee is an integral part of PJM as an Independent System Operator.  No single FERC approved document regarding PJM’s formation is more important than the other, and each holds equal authority in the ongoing operation and governance of PJM.  Any assertion to the contrary does not appropriately reflect the foundation of PJM.6   This deliberately crafted allocation and balance among the parties is what has contributed to PJM’s success; any action that significantly tilts this balance in order to meet the moment must be considered judiciously so that it does not undermine PJM’s overall success.

III. Board Independence
Section 7.7 (i) of the Operating Agreement places the duty on the PJM Board to ensure “that a Member or group of Members shall not have undue influence over the operation of the PJM Region.”

Note that the discussion around who has 205 rights applies only to the Operating Agreement.  With respect to resource adequacy, PJM has exclusive 205 rights under the Reliability Assurance Agreement (“RAA”).  Under the Operating Agreement, on the other hand, for matters that pertain to the energy market and regional transmission planning protocols, when the Members Committee reaches a 2/3 sector weighted vote, PJM is expected and indeed, required, to respect that vote and file

5 Operating Agreement Section 3.1.
6 Furthermore, the CTOA itself indicates that the Operating Agreement, which is controlled by the PJM Members Committee, is foundational.  Section 3.1 of the CTOA states:  Prior to [the CTOA] becoming effective as to any such entity, each of the following events shall have occurred: i. The Operating Agreement is in full force and effect.
ii. The Operating Agreement has been executed by the entity.  iii. [The CTOA] has been executed by the entity. iv. All required regulatory approvals have been obtained.

PDF page 5

LS Power Comments
Page 5

the passed Members Committee language with the Commission acting in an
administrative capacity, accordingly.7  The Operating Agreement also provides the
PJM Board explicit powers to comment, either on its own initiative or at the request of a PJM User Group, on proposed Operating Agreement changes as it moves

through the stakeholder process or to submit directly to the Members Committee
proposed Operating Agreement language8. State Policy Makers, for their part, hold
no formal voting rights, but they nonetheless exercise considerable influence over
PJM outcomes.9
Given this structure, Board independence means that when the Board reaches a
decision, it must weigh the full range of views expressed by these constituencies and then act independently and consistently with its mandate and PJM’s governing

agreements. PJM Board independence is not only a governance imperative for just
and reasonable rates, but also an imperative to the long-term health of the market. Some are concerned with Board independence and transparency and have proposed

that the Board hold open meetings.10 For the PJM Board to continue to enjoy
independence requires them to continue to exercise their role with the highest ability to conduct fulsome deliberations which can only be afforded by maintaining closed

Board sessions. LS Power is concerned that honest deliberation will be muted if
Board members believe they are being judged for the appearance of favoring a
particular position, and that open sessions risk becoming performative rather than
substantive. The same reasoning counsels against disclosing individual votes.
Nonetheless, we see room for meaningful improvement short of full PJM Board
transparency or a change in the way Section 205 rights are allocated.  LS Power’s
recommendations include:

7 Duquesne Light Co. v. PJM Interconnection, L.L.C., 176 FERC ¶ 61,052 at PP 26-27 (2021).  The Members Committee can file Section 205 Operating Agreement language changes directly with FERC today without PJM’s administrative function.  PJM also acts in a purely administrative capacity when filing Section 205 filings for PJM Tariff revisions for PJM Transmission Owners. 8 Section 7.7(v) of the Operating Agreement explicitly provides the PJM Board with the authority to “on its own initiative or at the request of a User Group as specified in this Operating Agreement, submit to the Members Committee such proposed amendments to this Agreement or any Schedule herein, or proposed new Schedule, as it may deem appropriate.”

9 PJM Interconnection, L.L.C., Docket No. ER25-1357-000, "Proposal for Revised Price Cap and Price Floor for the 2026/2027 and 2027/2028 Delivery Years, and Request for a Waiver of the 60-Days' Notice Requirement to Allow for a March 31, 2025 Effective Date," filed February 20, 2025Cite to PAPUC VRR proposal; see also https://www.pjm.com/-/media/DotCom/committees-groups/committees/mrc/2025/20250618/20250618-item-04---3- sub-annual-capacity-market---presentation.pdf
10 Kavulla, Problems in Electricity Market Governance: An Assessment,” R Street Policy Study No. 180 (Oct. 2019), p. 11 (“Kavulla Report).

PDF page 6

LS Power Comments
Page 6

● Require the Board to explain its reasoning.11 Companies like ours are
investing billions of dollars in this market, and we need confidence that Board
decision-making is consistent over time. That confidence is undermined when
the Board takes actions inconsistent over time with no explanation.12  The
Board should be required to explain the basis for the given position and
provide sound reasoning especially when it reverses course.
● Relax the ex parte rules that apply to Board-stakeholder interactions. Other
RTOs build in structured, direct Board interaction with stakeholders — for
example, quarterly meetings with individual sectors — and PJM should
consider a similar approach.
● Adopt the ISO-NE model of assigning a Board member to each state.13 That
Board member would be responsible for maintaining a regular outreach
schedule with state representatives, potentially extending to the state’s utility
commission or the governor’s office. This would give states the level of direct
Board access that some have said they currently lack.  It would also provide
the Board with insight into interests that are particular to a given state and
worth considering in deliberations.  That said, these interactions should not
undermine the independence requirement of Board decisions. Having this
unique structure in place also enhances state engagement in a way that is not
available to stakeholders.
● Create a Market Surveillance Committee along the lines of the CAISO.14 This
Committee would be comprised of independent individuals with expertise in
electricity market design (with an emphasis on independence), who advise the
Board on decisions.  This could help break the perceived cycle of when PJM
proposes to modify an existing rule to ensure efficient price outcomes
stakeholders narrowly focus on their economic interest rather than the benefit

11 Kavulla Report, p. 14.
12 See https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2024/20240919-pjm-board- response-consumer-advocates-letter-re-urgent-reforms-pjm-capacity-market-re-reliability-must-run-units.pdf and subsequent change in position (issued September 19, 2024) and a subsequent reverse in position in December in a FERC filing PJM Interconnection, L.L.C., Docket No. ER25-682-000, "Revisions to Reliability Pricing Model," filed December 9, 2024
13 “Additionally, the Nominating and Governance Committee of the ISO-NE Board assigns two Board members to serve as liaisons between the Board and each state commission. The Board liaisons and the state commissions meet at least once per year, every six to eight months, depending on the interest of the state commission and the availability of the liaisons.[35] NESCOE, NECPUC, or state officials can request meetings with the Board as needed.”  Governance Structure and Practices in the FERC Jurisdictional ISOs/RTOs February 2021, Prepared for NESCOE by: Christopher A. Parent Katherine S. Fisher, William R. Cotton, Cali C. Clar, Exeter Associates, Inc. (February 2021), Section 3.2.2.
14 https://www.caiso.com/meetings-events/topics/market-surveillance-committee.

PDF page 7

LS Power Comments
Page 7

to the overall health of the market.  It would add some discipline and oversight into stakeholder input and provide the Board with greater ability to understand and evaluate the merits of PJM and stakeholder proposals.

IV. Enhancing State Participation in the Stakeholder Process
LS Power has long supported expanded Section 205 rights for PJM states related to cost allocation for new transmission and supports ensuring the states have a meaningful way to participate in Board, PJM and stakeholder deliberations.  Given that there are 13 states and the District of Columbia, there is no single policy to incorporate into the PJM markets, unlike single-state RTOs.  It would undermine the independence of PJM and the Board to integrate a single state policy goal into the market rules of PJM.

The states were intimately involved in the discussions involving the formation of PJM.  At that time, states did not want to be voting members because they did not want to be constrained by the rules governing stakeholders.  They wanted the ability to interface with PJM management and the Board outside of the stakeholder process. Some were also concerned that voting would give the appearance of prejudicing their primary role of ensuring wholesale prices are appropriately incorporated into state retail tariffs.  The concern was that it could prejudice the record if they were involved with the creation of these costs at the wholesale level.  They also did not want to participate directly in the RTO through a voting mechanism so that they could retain jurisdictional distinctions between the Commission and the states.15 This reasoning still stands today.  Indeed, providing the States with a formal role in running PJM would add to the policy uncertainty that exists today.  As noted early in these comments, making multi-billion-dollar investments with several decades of useful life will require market structure durability and contract sanctity.  Both of those drivers of investment can be undermined by political pressure, which runs in four-year cycles and is not primarily focused on long-term market viability. To that point, PJM’s job is to run a market which in its basic terms matches supply to demand and produces a just and reasonable cost for the service.  The allocation of that cost then becomes a rate-making issue for the states, who rightly manage affordability constructs.  To a great extent, the states already can control those costs: for example, states control the physical siting for hyperscalers from building data centers in their states limiting demand, they can develop tariffs that ensure the hyperscalers pay their fair share for interconnection costs and retail service, and they

15 https://www.eba-net.org/wp-content/uploads/2023/02/11-185-205.pdf

PDF page 8

LS Power Comments
Page 8

can implement tariffs that protect other customers from costs created by the need to provide hyperscalers electricity.  But all of these roles would benefit from increased coordination.  Thus, LS Power strongly supports the process proposed by Chairman Bagot of Virginia and representatives of the data centers to develop model retail tariffs.16

LS Power has examined other RTOs in the country for insight into the role of states. It is worth quoting an Energy Bar Association article that noted:

“As regulators began practical consideration of an advisory role in regional wholesale markets, it is helpful to restate, in this context, how those markets fit with state regulation.  These answers take slightly different shapes in states with retail competition regimes and those with traditional vertically integrated regulatory systems”.  For example, in SPP, states have voting rights over some of SPP’s tariff while in MISO, the states have a purely advisory role and do not vote, even on transmission related issues.17

Indeed, FERC itself has expressed concerns about the role of states in RTO governance as reported in a document prepared for NARUC:

“Overall, the Final Rule allows for flexibility as to the appropriate role of the states in RTO governance and operation (after RTO development and

formation), particularly in those few areas where the FERC does not intend to exercise exclusive authority under the Federal Power Act.  Stated another way, after RTO development and formation ... the role of the states in RTO governance and operation might tend to be mainly advisory in nature.”18 Some potential changes:

• The Commission could try to create a Federal-state Joint Board but that seems like a cumbersome approach at a time when fast action is demanded.

16 https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20260630-va-scc-and- data-center-coalition-letter-re-cifp-connect-manage-reliability-backstop-procurement.pdf
17 “The OMS Committee has the opportunity to provide input into the transmission planning, resource adequacy, and transmission cost allocation approach and processes, and may report periodically to MISO’s Board.” Agreement Of Transmission Facilities Owners To Organize The Midcontinent Independent System Operator, Inc., A Delaware Non-Stock Corporation, available at https://cdn.misoenergy.org/MISO%20TOA%20(for%20posting)47071.pdf Appendix F Section 6.3.
18 Regional Transmission Organizations And The Coordination Of Regional Electricity Markets: A Review Of FERC Order 2000, Costello and Burns (2000) https://pubs.naruc.org/pub/FA860A98-9F87-51CE-66CB-99061504D141 , p.45

PDF page 9

LS Power Comments
Page 9

Some recommendations:
• Expand OPSI to include representatives of the governors.  PJM finds itself in a relatively new circumstance: some governors are concerned that their state utility commissions cannot fully represent their states’ interests. In response, an additional option would be to supplement OPSI by changing the OPSI composition to include two members from each state: a representative from the state’s utility commission and a representative nominated by the governor, which could be another commissioner but would not need to be.    This would address governors’ concerns that they are not being fully represented by allowing governors to appoint their own representative to participate on the committee.   LS Power supports enhancing OPSI to bring the politics and policy needs into discussions at the stakeholder level, rather than those needs being proffered in a manner that appears to be political pressure when the stakeholder process is complete.  OPSI would continue under its structure in terms of voting rules, etc.

• The stakeholder process would benefit by enhancing the capability of all state representatives to more meaningfully participate in the stakeholder process. Members would provide additional funding to ensure OPSI’s staff include experts on electricity design who can participate in technical discussions.19 Staffing an enhanced OPSI enables stakeholders to engage in substantive dialogue — at a minimum reaching mutual understanding of each other’s positions, and at best arrive at solutions that meet our shared objectives. OPSI would continue to have its rights to meet with the PJM Board, attend stakeholder meetings and bring proposals forward when supported by some threshold level of the committee (to be determined). This gives OPSI the opportunity to be even better positioned to provide the states’ views and meaningfully contribute to influencing how Members consider issues and the issues that are considered.

• Enable OPSI to vote on cost allocation for new transmission (whether rebuild or regional).  There is precedent from SPP to consider, and LS Power would support a stronger OPSI, with Section 205 powers for transmission cost

19 LS Power considered the option of a NESCOE type organization as is used in New England, but determined there is no need to create yet another organization that would require separate funding, delineation of responsibilities and obligations between such a new organization and OPSI.  Rather, the simplest and most efficient approach is to enable governors to achieve direct participation in the stakeholder process is to enhance OPSI.

PDF page 10

LS Power Comments
Page 10

allocation proposals similar to the SPP Regional State Committee.20  Any such authority should be subject to some threshold level of consent.

• Expand the Nominating Committee to include the president of OPSI to participate as a non-voting member in the deliberations.

V. Making the Stakeholder Process More Efficient
LS Power observes that the stakeholder process needs more discipline generally. LS Power thinks the specifics of that discipline are best left to stakeholders themselves, and FERC should not be distracted by delving into the details of such a process.  The Commission has in fact done exactly what is necessary:  issued a Show Cause Order under FPA section 206 “in order to ensure that PJM’s ongoing processes generate reforms that are sufficiently timely and comprehensive to address the concerns we identify today.”21 More direct involvement could distract the Commission from its primary role as an economic regulator and create unnecessary ex parte concerns, actually limiting the ability to informally discuss proposed changes with the Commission.  The Members have imposed such discipline before — the creation of the CIFP process is a good example22 — and can do it again. In fact, the focus of the PJM Liaison Committee meeting on July 13, 2026, was PJM governance.23 There are guidelines to impose more discipline worth considering:

• Limiting the number of educational sessions. Educational sessions should continue to be taped so that no one can claim they were unable to attend. (PJM does not currently record meetings, and we support continuing that approach for non-educational meetings).

• At the MRC and Members Committee, attendees should arrive empowered to make final decision votes, including the ability to vote even if a proposal is amended on the floor — every time a representative must “go back” to their organization, that adds a month of delay to the process.

20 https://www.ferc.gov/introductory-guide-participation-southwest-power-pool-processes:  LS Power notes that SPP is comprised of vertically integrated utilities so comparisons are limited.
21 Order Instituting Proceeding Under Section 206 of the Federal Power Act, 195 FERC ¶61,211 (issued June 18, 2026) ¶31.   The OA language cited in footnote 1 (Section 1.5.3 of the PJM Operating Agreement) could be used as the basis for the Show Cause order.
22 PJM Manual 34: PJM Stakeholder Process, Section 8.6.4.
23 https://www.pjm.com/-/media/DotCom/committees-groups/committees/lc/2026/20260713/20260713-agenda.pdf .

PDF page 11

LS Power Comments
Page 11

• Proposals should be broken down into their individual components on which Members can vote; PJM should then address the “workability” of the components or any proposal based on them.

We also suggest stakeholders consider the following questions that are offered for further discussion rather than as settled recommendations:

• Consideration of a more explicit acknowledgement of a “jump ball” structure that exists in ISO-NE24 and which is implicitly available in the Operating Agreement.  The backbones for such an approach already exist, while not changing the current clear authority of the Members Committee:   “Nothing herein shall be construed as affecting in any way the right of the Members, acting pursuant to a vote of the Members Committee as specified in Operating Agreement, section 8.4, unilaterally to make an application to FERC for a change in any rate, charge, classification, tariff or service, or any rule or regulation related thereto, under section 205 of the Federal Power Act and pursuant to the rules and regulations promulgated by FERC thereunder, subject to the right of any Member that voted against such change in any rate, charge, classification, tariff or service, or any rule or regulation related thereto, in intervene in opposition to any such application.”25 In making this right more explicit, the Members Committee of PJM would have its own legal counsel, just like NEPOOL within the New England stakeholder process. This would help ensure that the PJM Members and PJM Transmission Owners, with separate 205 filing rights over some issues, are operating within their own appropriate roles and better help resolve stakeholder conflicts.   It would also ensure an independent legal review for the Operating Agreement language filed at FERC, proper Members Committee consultation of PJM Transmission Owner 205 Filings as required under the PJM Operating Agreement today, and monitoring timing of stakeholder process. The counsel could provide an important check on any unruly Members.

• Should voting at lower-level committees shift from affiliate-level voting to a single representative vote as is done at the senior committees? At minimum, we recommend that two votes be taken at lower committee meetings.  These votes are intended to help advance proposals to higher level committees, but

24 NEPOOL Participants Agreement, Section 11.1.5.
25 PJM Operating Agreement, Section 11.5(b)

PDF page 12

LS Power Comments
Page 12

they also provide information with respect to likely support at higher level committees.  They can also inform the Board.

V.  What the Commission Can Do
LS Power commends the Commission for its proactive efforts and orders to ensure that each region of the country can meet the changing electricity demands.  That said, LS Power believes that it is not just a cumbersome governance problem that has caused PJM to struggle to meet these demands, but a confluence of a number of challenges, including the need to revise retail tariffs, to better manage interconnection and transmission upgrades, to expedite supply chains, and the need to have forcing mechanisms that enable bilateral contracts between hyperscalers and new generation in order to obtain financing.  None of these challenges are unique to a competitive market such as PJM.  Vertically integrated utilities cannot bypass the physical realities of the current grid and supply chains, and moreover, their business model shifts the risk of cost and over-procurement back to ratepayers.  This reality should not, however, impede the ability to make enhancements to PJM’s governing process, as we have suggested here.

The Commission also has a critical role to play: it must act under its statutory authority as an economic regulator.  It, too, is an independent organization staffed by industry experts.26 This expertise enables the Commission to be the ultimate backstop in allowing the Board and PJM to make politically unpopular decisions in order to carry out their mission of ensuring reliability through competitive markets.

26 “Further, it has been suggested that FERC has perhaps been too deferential to proposals coming from the RTOs and may not give sufficient weight to minority stakeholder concerns or market monitor comments when it assesses contested filings. Interviewees suggested that instead, FERC should approach RTO proposals with sufficient scrutiny and not overly rely on RTO independence, particularly because RTOs themselves may be in pursuit of multiple goals, including state policy targets that conflict with market efficiency.”  How the RTO Stakeholder Process Affects Market Efficiency, James, Jones, Kricke & Greane, R Street Policy Study No. 112 (October 2017), p. 18.

PDF page 13

LS Power Comments
Page 13

In our comments, LS Power has endeavored to identify areas in the PJM’s governance structure that could be improved and provide specific recommendations that can be implemented without disrupting the need to focus all our attention on how we get new resources online as quickly as possible.  We look forward to working with the Commission and all interested parties to take advantage of the tremendous opportunities afforded us all to meet the energy demands of today and tomorrow.

Respectfully submitted,

/s/ Marjorie R. Philips
Marjorie Rosenbluth Philips
Senior Vice President, Wholesale Market
Policy
1700 Broadway, 35th floor
New York, NY 10019
On Behalf of LS Power Development, LLC
610-401-3612
mphilips@lspower.com
Dated: July 14, 2026