AD26-7-000 · 2026-07-21 · Virginia State Corporation Commission

Pre-filed Statement of Judge Kelsey A. Bagot, Chair and Commissioner, Virginia State Corporation Commission, for the PJM Governance and Stakeholder Reforms…

PDF page 1

PJM Governance and Stakeholder Reforms
Docket No. AD26-7-000

1

Pre-Conference Comments of
Kelsey A. Bagot, Chair, Virginia State Corporation Commission

The issues facing regional power grids, including the one operated by PJM Interconnection, L.L.C. (“PJM”), have become more complicated in recent years.  As the PJM stakeholder process has failed to drive meaningful and timely outcomes for the most critical of issues facing PJM, trust among (and between) stakeholders has eroded.

There are three overarching concerns that challenge the ongoing efficacy of PJM as an independent regional transmission operator as compared to other RTOs/ISOs:

(i) the PJM Board is not sufficiently independent, undermining stakeholder confidence in the impartiality and durability of Board decision-making;

(ii) the PJM stakeholder process is prone to delay and gridlock, impeding PJM’s ability to take timely action or requiring PJM to pursue less-optimal solutions; and,

(iii) State representatives feel their concerns are neither acknowledged nor sufficiently addressed by voting Members or PJM, resulting in states using blunt measures to force outcomes regardless of how disruptive they may be to the markets PJM operations or to achieving resource adequacy.

Addressing these challenges requires solutions that enable PJM to engage in independent, comprehensive decision-making, with the benefit of all stakeholder input, and without creating more complexity or gridlock.  Reforms should be targeted, purposeful, and – where appropriate – iterative or incremental.  These objectives can be achieved by consideration of the following reforms, which fall within two broad, and interrelated, categories: (1) establishing greater PJM Board independence and (2) defining calibrated, appropriate roles for the States.

1. Ensuring Board Independence
States are not currently voting Members of PJM – an intentional decision made at the time of PJM’s creation.  However, the input of state regulators, like that of voting Members and all other stakeholders, serves an essential purpose: educating PJM and the PJM Board on the operational, financial, legal, and consumer trade-offs of action contemplated by the Board.  While Members naturally advance solutions that protect their interests, state elected officials and regulatory commissions are directly accountable to the retail consumers they are mandated to protect and are uniquely positioned to understand the challenges facing their particular jurisdictions.  Moreover, actions taken by PJM can be undermined or made less effective if states are unclear, unable, or unwilling to fully enable PJM’s intended outcomes.

The appropriate system of governance would balance PJM’s access to the knowledge, experience, and innovation of all its stakeholders, including the States, on an advisory basis, against the authority of the Board to take action, independent from undue influence of any of its stakeholders. To get closer to this balance, given the present challenges, the following recommendations merit consideration:

PDF page 2

PJM Governance and Stakeholder Reforms
Docket No. AD26-7-000

2

•
Section 205 Filing Rights: Section 205 filing authority (with certain limited exceptions, e.g., transmission rate-setting or cost allocation) should rest firmly with the PJM Board. The Board’s decision-making should be advised by outcomes of the stakeholder process but should not be constrained by it.  This will prevent procedural gridlock when decisive action is required and allow the Board to pursue the most optimal solutions without unnecessary legal hurdles.  Currently, the Board is often unable to move forward with critical reforms because one or more elements require changes to the Operating Agreement, requiring a degree of Members Committee support that is not always achievable.  Allowing the Board to tailor reforms, considering the guidance received from the stakeholder process but not beholden to specified stakeholder proposals, would enable the Board to act comprehensively and independently where it is now prevented from doing so.

•
Board Terms & Candidate Pool: Board members’ terms should be extended so the Board can engage in long(er)-term decision-making and benefit from institutional expertise and experience gained over time.  At the same time, prohibitions on serving consecutive terms should be considered to allow the Board to take independent action without regard toward potential renomination.  Additionally, at least one or more candidates with regulatory experience, preferably at the retail level, should be given preference to ensure that the Board and the actions it takes benefit from the perspective of an individual familiar with striking a balance that fairly accounts for the interests of the retail end-user.  Finally, preference should be given to candidates with professional experience in the PJM region.

•
Nominating Committee: State interests should be adequately represented on the Board Nominating Committee.  Specifically, the States should have the ability to appoint three new Nominating Committee members.  For a Board candidate to move forward, the candidate should be supported by at least two of the three new state-appointed members.

2. Crafting Appropriate Roles for State Leadership and Regulators
Reforms must recognize the distinct roles and perspectives of state elected officials (e.g., Governors) versus utility commissions (e.g., PUCs/OPSI).

•
State Elected Officials (Governors): Governors hold a distinct political mandate. Their input would be well leveraged, for example, through holding/appointing seats on the Nominating Committee and/or selecting state representation on the Board.  The Governors’ representatives should also have a seat on the Strategic Steering Committee discussed below.

•
State Utility Commissions & OPSI:  The States have long advocated for “jump-ball” 205 filing rights over resource adequacy and transmission cost allocation issues at PJM.  Under the current regime, where the PJM Board lacks sufficient independence or authority to take timely action, Section 205 filing rights would enable OPSI to force action when state perspectives are not reflected in PJM proposals or when the PJM stakeholder process has stagnated.  To the extent concerns about Board independence and authority are adequately addressed, Section 205 filing right for OPSI may no longer be desirable or necessary. (This position differs from OPSI’s position, which views increased PJM Board independence and OPSI Section 205 filing rights as complementary reforms.)

PDF page 3

PJM Governance and Stakeholder Reforms
Docket No. AD26-7-000

3

That said, the durability and efficacy of many PJM outcomes require meaningful consideration of state perspectives.  As a result, the following additional reforms should be considered:

-
Strategic Steering Committee: OPSI (and potentially the Governors) should meet annually with the Board and other Members as the Strategic Steering Committee to collaborate on developing and approving PJM’s annual strategic plan. OPSI’s voice in this process should have equal weight as other Member representatives.  At present, the plan is developed without direct participation by OPSI.

-
Pre-205 Filing Consultation Requirement: To the extent such a process would not result in undue delays, PJM and the PJM Transmission Owners should be required to engage in a pre-filing consultation with OPSI to solicit OPSI feedback and collaboration.  This process should (i) provide adequate time for OPSI to review and provide meaningful feedback on any proposed filing, and (ii) require the filing entity (PJM/TOs) to explain in the body of the filing why it rejected any recommendations made by OPSI in the consultation process.  To hold OPSI accountable, any such process should be clearly defined and time-limited.

-
Non-Tariff Process Enhancements: Today, PJM is already enabled to improve state engagement through efforts that require no 205 filing at FERC to implement.  For example, PJM can serve as a technical resource to the States in working through proposed reforms.  State engagement processes should be standardized and more clearly defined to allow PJM to (i) help enable consensus among the States, where possible, (ii) elucidate areas where continued refinement of reforms might result in additional cooperative action among the States, and/or (iii) highlight where State policies create impediments to cooperative action.  Under new leadership, PJM has already demonstrated its increased commitment in working with OPSI and other state representatives.  Continued improvements should not be held up awaiting other potential governance reforms.