PUBLIC COMMENT SUBMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY
REGULATORY COMMISSION
Docket No. AD26-7-000 PJM Governance and Stakeholder
Reforms
COMMENTS OF Nikki Gerber/Conserve Ohio Committee
Member/MoonDoggie LIVERee-Owner
Date 7/22/2026(docket date 7/23/2026)
REGARDING PJM GOVERNANCE, TRANSPARENCY, AND
PUBLIC-INTEREST MANDATES
I. INTRODUCTION & INTEREST OF THE COMMENTER
Nichole Gerber/Owner of MoonDoggie LIVERee LLC./ Conserve Ohio Committee Member / Adams County, OH, submits these public comments in response to the Federal Energy Regulatory Commission (FERC) Notice of Technical Conference regarding PJM Interconnection, L.L.C. ("PJM") Governance and Stakeholder Reforms under Docket No. AD26-7-000.
As a constituent and small business owner in Adams County, OH and as a Conserve Ohio committee member on a statewide Constitutional Amendment initiative, banning data centers larger than 25MW, within the PJM footprint in the Great State of Ohio, we witness firsthand how PJM current governance structure ISOLATES LOCAL COMMUNITIES and state leadership while PRIORITIZING PRIVATE,MULTIBILLION-dollar corporate INTERESTS.
PJM decision-making frameworks directly impact our local electric reliability, regional water security, and monthly utility bills, especially in the heavily targeted Ohio rural Appalachian region for proposed data centers development.
II. COMMENTS ON PANEL
2: STAKEHOLDER PROCESS, TRANSPARENCY, AND DECISION-
MAKING
1. Codify an Explicit Public-Interest Mandate
PDF page 2
PJM current five-sector voting model was designed for a slower-moving energy transition, not for hyper-accelerated, speculative load growth from hyperscale data centers and artificial intelligence infrastructure. PJM board and stakeholder processes currently operate with a bias toward legacy utilities and private corporate developers, leaving residential and agricultural rate-paying communities out of the equation for hike we are footing the bill for infrastructure For proposed deals, rate increases, and future grid strains SOLELY IMPACTING US!
•
Requested Reform: FERC must order PJM to amend its governance documents to explicitly include a Public Interest Mandate. PJM must be legally bound to prioritize ratepayer affordability, grid reliability, and state environmental/resource policies over corporate capital expenditure goals.
2. Eliminate Corporate Gridlock and "Squeaky Wheel" Lobbying
The current PJM stakeholder process routinely degenerates into procedural gridlock, where well-funded private actors stall necessary reforms to defend hyper-specific business models. Conversely, when regional state coalitions or consumer advocates push for ratepayer protections such as forcing large-load developers to pay for 100% of their own transmission and substation upgrades corporate interests use procedural maneuvers to veto consensus. In Ohio protections are being proposed such as the ratepayer protection act and HB 970 but no action has been taken as they sit on the table.
•
Requested Reform: Establish time-bound, transparent decision-making pathways for large-load interconnects that prioritize Ratepayer Insulation. Speculative data center projects must not be granted queue access or capacity allocations without proving they bring their own generation capacity and bear 100% of their infrastructure footprint. Make sure permits include that behind the meter power generation is provided before they power on and help to keep current clean air safeguards in place for the American People as you can.
3. Formalize State and Local Government Access
State legislatures, county commissions, and consumer advocates are currently forced to react to PJM decisions from the "outside looking in." When local counties face sudden grid instability, industrial noise pollution, or depleted aquifers caused by uncoordinated large-load deployments, PJM offers zero direct mechanisms for local public accountability. •
Requested Reform: Grant the Organization of PJM States, Inc. (OPSI) and regional local official coalitions formal, elevated status within PJM board governance. If state utility regulators and local county governments broadly oppose a PJM market rule or transmission cost-allocation proposal, FERC should establish a "jump ball" mechanism allowing state leadership to submit alternative proposals directly to FERC alongside PJM filings.
4. Mandatory Public Board Meetings and Decisional Transparency
PJM Board of Managers currently makes key regional determinations behind closed doors without providing detailed roll-call votes, comprehensive meeting minutes, or clear evidentiary orders justifying their actions.
•
Requested Reform: Mandate that all PJM Board meetings involving wholesale market rules, transmission expansion planning, or large-load queue management be open to
PDF page 3
public observation. The Board should be required to publish formal Decisional Orders explaining the factual and public-interest basis for every major policy decision.
III. CONCLUSION
PJM is currently failing the 67 million residents who rely on its grid for safe, affordable power. The status quo” corporate entities dictate regional grid terms while shifting billions in transmission costs onto rural and working-class families” is completely untenable. We urge the Commission to use Docket No. AD26-7-000 to order structural, binding governance reforms that enforce public transparency, protect residential ratepayers, and hold PJM accountable to the communities it serves.
Respectfully submitted,
Nikki Gerber Conserve Ohio. MoonDoggie LIVERee-owner Manchester, Adams County, OH moondoggieliveree2020@gmail.com 513-713-5874 Dated: July 23, 2026