AD26-7-000 · 2026-07-23 · National Caucus of Environmental Legislators
Comments of the National Caucus of Environmental Legislators re the PJM Governance and Stakeholder Reforms Technical Conference
PDF page 1
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
PJM Governance and Stakeholder Reforms
Docket No. AD26-7-000
COMMENTS OF THE NATIONAL CAUCUS OF ENVIRONMENTAL LEGISLATORS
July 20, 2026
We appreciate FERC addressing critical governance issues at PJM and welcome the opportunity to comment. As state lawmakers, we believe it is crucial that FERC prioritize reforms that ensure states can engage meaningfully in PJM processes and have access to sufficient information. Doing so will allow our states to more effectively fulfill our obligations and exercise our authority under the Federal Power Act.
The Federal Power Act recognizes states' authority over key energy policy issues, most notably in the realm of resource choice, siting, permitting, generation, and retail cost allocation. PJM’s role in transmission planning, energy markets, and resource adequacy decisions — and the lack of a state voice in these processes — directly impacts our ability to fully and appropriately execute these duties while achieving state policy objectives.
Creating meaningful opportunities for state participation is a crucial step for improving PJM governance. We believe this can be accomplished by drawing on the lessons and precedents from other regions, including the New England States Committee on Electricity (NESCOE) and the Southwest Power Pool’s (SPP) Regional State Committee (RSC).
We urge FERC to take action on the following:
● Establish a formal governance role for a new or existing organization
representing state interests. This role could be based on the “direction to file” and regional policy functions exercised by state entities in other regions, such as the RSC in SPP or ISO-NE’s NESCOE.
● Provide this new or existing organization with the ability to submit alternative proposals to FERC for consideration when stakeholder processes — or work among the stakeholders, states, and PJM — produce competing results. This mechanism would enable FERC to evaluate more than one option and function similarly to the New England Power Pool's “jumpball rights.”
● Provide a seat on the Nominating Committee for the PJM Board to a representative from the states.
● Modify the Board makeup requirements to provide two additional seats, including a seat to represent the interests of states and a seat to represent the interests of end-use customers.
● Amend PJM’s foundational operating agreement to codify an explicit public interest mandate that requires PJM to balance system reliability and market efficiency with public interest objectives, explicitly including ratepayer cost containment and state public policy alignment.
● Strengthen transparency by allowing designated representatives of PJM state governments to attend Liaison Committee meetings.
202-744-1006 • www.ncelenviro.org • 1140 3rd Street NE, 2nd Floor, Office 2137 • Washington, DC 20002
PDF page 2
National Caucus of Environmental Legislators
Page 2
Additionally, some practical modifications and adjustments to the PJM stakeholder process would generally improve the process and make decision-making more effective and transparent:
● Record all PJM Stakeholder Meetings and make these recordings publicly available. ● Implement sector-weighted voting in the Standing Committees to align committee work with the ultimate stakeholder decision-making process.
● Publish and disseminate records of voting results taken in all PJM committees, task forces, and similar standing, ad-hoc, or issue-specific stakeholder groups. ● Allow media to be present in all stakeholder process meetings.
● Require cost impact analyses to be presented during the First Read at the Senior Standing Committees.
● Establish an Independent Transmission Monitor to help control rising transmission costs and efficiently move forward with needed projects.
The governance reforms identified above would strengthen alignment between PJM decision-making and state policy objectives, while also improving transparency and accountability in the system. Energy affordability concerns and the need for a modernized grid are two issues that no single entity can solve. We look forward to continuing to work with PJM and FERC in our efforts to reduce costs and deliver customer reliability.
Sincerely,
Maryland Del. Lorig Charkoudian (MD-020)
Delaware Rep. Frank Burns (DE-021)
Illinois Rep. Maura Hirschauer (IL-049)
Illinois Rep. Joyce Mason (IL-061)
Illinois Rep. Rita Mayfield (IL-060)
Illinois Sen. Cristina Castro (IL-022)
Illinois Sen. David Koehler (IL-046)
Illinois Sen. Laura Murphy (IL-028)
Illinois Sen. Rachel Ventura (IL-043)
Indiana Rep. Carolyn Jackson (IN-001)
Indiana Rep. Matt Pierce (IN-061)
Maryland Del. Jackie Addison (MD-045)
Maryland Del. Heather Bagnall (MD-033C)
Maryland Del. Dylan Behler (MD-030A)
Maryland Del. Regina Boyce (MD-043A)
Maryland Del. Bonnie Cullison (MD-019)
Maryland Del. Kris Fair (MD-003)
Maryland Del. Jessica Feldmark (MD-012A)
Maryland Del. Linda Foley (MD-015)
Maryland Del. Catherine Forbes (MD-043B)
Maryland Del. Michele Guyton (MD-042B)
Maryland Del. Pam Guzzone (MD-013)
Maryland Del. Anne Healey (MD-022)
Maryland Del. Andre Johnson (MD-034A)
202-744-1006 • www.ncelenviro.org • 1140 3rd Street NE, 2nd Floor, Office 2137 • Washington, DC 20002
PDF page 3
National Caucus of Environmental Legislators
Page 3
Maryland Del. Steve Johnson (MD-034A) Maryland Del. Mary Lehman (MD-021)
Maryland Del. Robbyn Lewis (MD-046)
Maryland Del. Lesley Lopez (MD-039)
Maryland Del. Aletheia McCaskill (MD-044B) Maryland Del. Bernice Mireku-North (MD-014) Maryland Del. Gabriel Moreno (MD-013) Maryland Del. Julie Palakovich Carr (MD-017) Maryland Del. Cheryl Pasteur (MD-011A) Maryland Del. Edith Patterson (MD-028) Maryland Del. Sheila Ruth (MD-044B)
Maryland Del. Matthew Schindler (MD-002B) Maryland Del. Gary Simmons (MD-012B) Maryland Del. Ryan Spiegel (MD-017)
Maryland Del. Dana Stein (MD-011B)
Maryland Del. Sean Stinnett (MD-041) Maryland Del. Jen Terrasa (MD-013)
Maryland Del. Nicole Williams (MD-022) Maryland Del. Greg Wims (MD-039)
Maryland Del. Jamila Woods (MD-026)
Maryland Del. Teresa Woorman (MD-016) Maryland Del. Chao Wu (MD-009A)
Maryland Del. Natalie Ziegler (MD-009A) Maryland Sen. Joanne Benson (MD-024) Maryland Sen. Benjamin Brooks (MD-010) Maryland Sen. Brian Feldman (MD-015) Maryland Sen. Katie Hester (MD-009)
Maryland Sen. Shelly Hettleman (MD-011) Maryland Sen. Benjamin Kramer (MD-019) Maryland Sen. Karen Lewis Young (MD-003) Maryland Sen. Jim Rosapepe (MD-021)
Maryland Sen. Alonzo Washington (MD-022) Michigan Rep. Erin Byrnes (MI-015)
Michigan Rep. Veronica Paiz (MI-010) New Jersey Assemb. David Bailey (NJ-003) New Jersey Assemb. Clinton Calabrese (NJ-036) New Jersey Sen. Linda Greenstein (NJ-014) New Jersey Sen. Raj Mukherji (NJ-032) New Jersey Sen. Bob Smith (NJ-017)
North Carolina Rep. Mary Belk (NC-088) North Carolina Rep. Pricey Harrison (NC-061) North Carolina Rep. Carolyn Logan (NC-101) North Carolina Rep. Renee Price (NC-050) Ohio Rep. Tristan Rader (OH-013)
202-744-1006 • www.ncelenviro.org • 1140 3rd Street NE, 2nd Floor, Office 2137 • Washington, DC 20002
PDF page 4
National Caucus of Environmental Legislators
Page 4
Ohio Rep. Daniel Troy (OH-023)
Ohio Sen. Kent Smith (OH-021)
Pennsylvania Rep. Lisa Borowski (PA-168) Pennsylvania Rep. Joe Ciresi (PA-146) Pennsylvania Rep. Mary Daley (PA-148) Pennsylvania Rep. Joseph Hohenstein (PA-177) Pennsylvania Rep. Kristine Howard (PA-167) Pennsylvania Rep. MaryLouise Isaacson (PA-175) Pennsylvania Rep. Steven Malagari (PA-053) Pennsylvania Rep. Jennifer O'Mara (PA-165) Pennsylvania Rep. Danielle Otten (PA-155) Pennsylvania Rep. Christopher Rabb (PA-200) Pennsylvania Rep. Nikki Rivera (PA-096) Pennsylvania Rep. Abigail Salisbury (PA-034) Pennsylvania Rep. Greg Scott (PA-054) Pennsylvania Rep. Paul Takac (PA-082) Pennsylvania Rep. Arvind Venkat (PA-030) Pennsylvania Rep. Ben Waxman (PA-182) Pennsylvania Rep. Joe Webster (PA-150) Pennsylvania Sen. Amanda Cappelletti (PA-017) Pennsylvania Sen. Carolyn Comitta (PA-019) Virginia Del. Jessica "Jess" Anderson (VA-071) Virginia Del. Nicole Cole (VA-066)
Virginia Del. Rozia "J.R." Henson (VA-019) Virginia Del. Amy Laufer (VA-055)
Virginia Del. May Nivar (VA-057)
Virginia Del. Sam Rasoul (VA-038)
Virginia Del. Irene Shin (VA-008)
Virginia Del. Richard Sullivan (VA-006) Virginia Sen. Saddam Salim (VA-037)
202-744-1006 • www.ncelenviro.org • 1140 3rd Street NE, 2nd Floor, Office 2137 • Washington, DC 20002