AD26-7-000 · 2026-07-23 · RTO Governance Research Network

Comments Based on Research from the RTO Governance Research Network re the PJM Governance and Stakeholder Reforms

PDF page 1

1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Governance and Stakeholder Reforms )
)
)
Docket No. AD26-7-000

COMMENTS BASED ON RESEARCH FROM THE RTO GOVERNANCE
RESEARCH NETWORK1
SUBMITTED BY DR. SETH BLUMSACK, PROFESSOR OF ENERGY POLICY AND
ECONOMICS AND DIRECTOR OF THE RTO GOVERNANCE RESEARCH
NETWORK, PENN STATE UNIVERSITY
I. Introduction
Drawing on research and editorial input from researchers affiliated with the RTO Governance Research Network, I am pleased to submit these comments addressing a

number of the Commission’s Questions posed under Docket AD26-7 related to

1 The RTOGov researchers who contributed to these comments and/or are cited within include: Dr. Seth Blumsack, Professor of Energy Policy and Economics and Co-Director of the Penn State Center for Energy Law and Policy, Pennsylvania State University; Michael H. Dworkin, JD., Professor Emeritus, Vermont Law School; Lara Fowler, Teaching Professor, Penn State Dickinson Law School, Pennsylvania State University; Dalten Fox, who performed research while a Graduate Student at Boise State University; Michael Helbing, Executive Director, Penn State University Center for Energy Law and Policy; Dr. Nicholas Johnson, Associate Professor, Principia College; Kevin Jones, Institute for Energy and Environment, Vermont Law School; Dr. Lynne Kiesling, Director of the Institute for Regulatory Law and Economics, Northwestern University; Dr. Andrew Kleit, Professor Emeritus of Energy Economics, Pennsylvania State University, Dr. Stephanie Lenhart, Associate Professor, School of Public Service, Boise State University; Joshua Macey, Associate Professor, Yale Law School; Ari Peskoe, Director, Electricity Law Initiative, Harvard Law School; Abe Silverman, Research Scholar, Johns Hopkins University; Christina Simeone, who performed research while a Senior Fellow, Kleinman Center for Energy Policy, University of Pennsylvania; Zachary F. Teti, who performed research while a Graduate Student, Pennsylvania State University; Daniel Walters, Associate Professor, Texas A&M Law School; Shelley Welton, Professor, Carey School of Law, University of Pennsylvania; Hannah Wiseman, Professor and Co-Director of the Penn State Center for Energy Law and Policy, Penn State Dickinson Law School, Pennsylvania State University; Dr. Kyungjin Yoo, who performed research while a Graduate Student, Pennsylvania State University.

PDF page 2

2
governance of the PJM Interconnection. These comments are being filed in advance of the Commission’s technical conference on July 23, 2026.

Figure 1: The RTO Governance Network
The RTO Governance Research Network (“RTOGov”) is an interdisciplinary network of academic researchers and practitioners with interests in the governance of regional organizations that plan, manage, and ensure reliable operation of interconnected bulk power systems. The RTOGov network is currently administered by the Center for Energy Law and Policy at Penn State University, and engages affiliated researchers at dozens of academic institutions and interested non-academic organizations (Figure 1). RTOGov operates as an affiliation of independent researchers and organizations that develop research concepts to pursue under the RTOGov banner. Governance of PJM has been studied by several researchers affiliated with RTOGov, and the purpose of this comment is to collect and synthesize those research findings as they relate to the specific issues identified by the Commission under the present Docket. Since this comment synthesizes a number of research findings, it should not be taken to represent the views of the network as a whole.

The RTOGov network was launched in 2019, and has received ongoing financial support from the Alfred P. Sloan Foundation, the Heising Simons Foundation, the Nicholas Institute for Energy, Environment and Sustainability at Duke University and the Center for Energy Law and Policy at Penn State University. Research papers,

PDF page 3

3
presentations and other written pieces forming the basis for these comments are freely available at RTOGov’s web site, https://rtogov.org.

II. The Evolving Role of RTOs and Governance
Before addressing the Commission’s specific Questions related to PJM’s overall governance structure, it is useful to put this structure into some context. Lenhart and Fox (2022) provide a useful overview of the governance structures of existing U.S. ISOs and RTOs (including ERCOT, which is not FERC-jurisdictional). FERC-jurisdictional ISOs and RTOs have, for many years, needed to reconcile two broad governance goals as laid out by the Commission (Lenart and Fox, 2022; Helbing, 2023). RTOs needed to demonstrate independence from the commercial interests of their Membership (Order 888 and Order 2000) and also needed to demonstrate responsiveness to their Members (Order 719). While there are differences among RTOs in how they have responded to these principles of independence and responsiveness, there are some common features including independent Boards, roles for Member and Non-Member stakeholders and establishment of committees to represent interests of the states. (As we will discuss later in this Comment, the state committee in PJM has perhaps the least formal role of any ISO/RTO.)

Tension in PJM’s governance process is not new. Johnson, et al. (2023) have documented the emergence of tensions in PJM’s governance process beginning well over a decade ago. As with the current situation in which PJM finds itself, the source of the tensions described in Johnson, et al. (2023) can be traced in part to an evolution in the roles that the RTO has needed to assume, without substantial corresponding evolution or adaptation in the RTO’s governance model.

One important aspect of PJM’s evolution is an incremental and ongoing expansion of the organization’s activities in response to federal policy and legislation. PJM’s original mandate was narrowly defined in terms of reliability and open-access transmission (Welton, 2021). The Energy Policy Act of 2005 gave PJM and other RTOs new responsibilities for reliability coordination and compliance. Introduction of the Reliability Pricing Model capacity market shifted responsibility for resource adequacy procurement to PJM. Transmission planning also created higher stakes for transmission owners and other Members following the issuance of Order 1000.

A second important aspect of PJM’s evolution is the RTO as a focal point for implementation of state policy, especially state preferences over power generation technologies.

PDF page 4

4
PJM’s governance model was built for an organization that was to be largely technocratic and administrative. That organization, however, has evolved into one that has substantial market responsibilities. As Silverman (2026) has noted, RTOs describe themselves as “policy-takers.” While this is true in one respect, the expanded role of RTOs (relative to their original conception) means that their rules and actions in planning and markets have policy implications for consumers in the states that they serve (Welton, 2021).

III. Comments on PJM’s Governance Structure
This section provides some responses to the first set of Questions posed by the Commission, focused on PJM’s governance structure and the roles of different actors in PJM governance.

Question: What governance reforms would best improve accountability and responsiveness? Research into structural governance reforms in PJM and other RTOs highlights overlapping categories of structural governance reform that would be helpful. The discussion here draws liberally from a few articles in particular - Yoo and Blumsack (2018a, 2018b), Welton (2021), Peskoe (2021 and 2023) and a forthcoming piece on filing rights from Macey (2027). A first set of reforms could make PJM a more efficient and decisive institution. A second set of reforms would reduce the ability of incumbents to block adaptation and change. A third set of reforms would scale back PJM’s responsibilities to return it closer to its origin as a technical organization with reliability continuing to be its primary mission. We will discuss each of these in turn. First, PJM needs to be able to act quickly and independently. To that end, the RTO and the public interest would be helped if the Board were to have (at least shared) filing rights over all major aspects of PJM’s functions – including regional transmission planning and resource adequacy compliance. One aspect which makes PJM’s governance particularly complex is the number of separate governing documents with different (unilateral) filing rights assigned. Consolidation of these governing documents into the Open Access Transmission Tariff would give PJM a more streamlined governance structure.

Second, and relatedly, PJM should be independent of its members. That entails not simply requiring that board members not have financial entanglements with PJM members, but also that the board nominating process include input from states; the most straightforward way to accomplish this would be to include state representation on the Board nominating committee and also to devise a mechanism for states to hold some manner of filing rights as is the practice in both SPP and MISO. True independence also means that PJM is able to make decisions independent of its membership without ignoring Members’ viewpoints. Accomplishing this would mean a

PDF page 5

5
vastly reduced role for the stakeholder process as part of PJM governance, so that stakeholder voting would either be eliminated or would become advisory, as the stakeholder process is currently structured for MISO. The California ISO also features a stakeholder process whose role is purely advisory, but is fundamentally different from other ISOs/RTOs in that there is no formal plenary stakeholder committee and no voting.

In the absence of eliminating stakeholder voting altogether, PJM should consider (with appropriate structural changes to prevent stalemates, as we discuss in our response to a subsequent Question) expanding the use of an advisory stakeholder input mechanism similar to what it uses during its Critical Issue Fast Path process. This process provides a structured way for stakeholders to provide input to the Board on its preferred options while retaining the decision-making authority of the Board itself. PJM could consider using this type of process for any issue over which the Board possesses unilateral or shared §205 filing rights.

Third, where possible, empower states–not PJM–to make politically salient decisions regarding resource adequacy. Reducing PJM’s role in capacity procurement sounds like a market reform (which it would be) but perhaps more importantly it would represent a major governance reform by shifting some responsibility for resource adequacy away from the RTO. PJM was created to be a technocratic body. It was supposed to do transmission planning, dispatch resources in real time, and play some role in resource adequacy compliance. Over the past twenty years, PJM has seen a great deal of mission creep. Its role in capacity procurement through the Reliability Pricing Model (not just compliance a la accreditation and margin requirement calculations) has been the source of a great deal of governance tension. One way to ameliorate this tension would be to give PJM authority over technocratic aspects of resource adequacy but put states in a position to conduct procurements themselves (ideally through mostly long-term capacity contracts as happens in some other RTOs but that would be a matter for states to oversee). To that end, PJM could continue to establish reserve margins, accredit capacity resources (if there is still a capacity market), and impose hedging requirements.

Question: How does the division of Federal Power Act section 205 filing rights among PJM, Transmission Owners, and the Members Committee affect PJM’s ability to act effectively and quickly, when warranted, to address operational and market needs?

PJM is nearly unique among ISOs and RTOs in having no concept of shared filing rights over any governing document. This structure in and of itself makes aspects of governance reform difficult because the Members retain sole filing rights over the Operating Agreement, which among other things covers the stakeholder process and the election of Board members.

Any structural governance reform in PJM is challenging because the RTO has been boxed in by its own governance structure. Making changes not only to filing rights but

PDF page 6

6
also the stakeholder process, regional transmission planning and Board selection would require either sufficient support of PJM’s membership or a §206 finding that would instigate change. The structural governance reforms to PJM that we have outlined previously would mostly fall into this difficult category. We acknowledge the difficulty in implementation.

Question: To what extent do provisions in PJM’s Operating Agreement, Transmission Owner Agreement, Open Access Transmission Tariff, Reliability Assurance Agreement, or Manuals impede timely decision-making by PJM?

Three features of PJM’s governing documents      make it difficult for PJM to efficiently promote the public interest. First, under the Consolidated Transmission Owners’ Agreement, some filing rights – especially cost recovery for local transmission and planning – remain with Transmission Owners (TOs). This exacerbates TO’s incentives to favor small supplemental projects over more efficient regional solutions (Peskoe 2021, 2023; Macey, 2027). Second, TOs and retain certain withdrawal rights. The threat of withdrawal can make it difficult for PJM to enact important but controversial rules (Peskoe 2023; Macey 2027). Third, of the filing rights held by PJM (as opposed to TOs or other market participants), a large number reside in the Operating Agreement rather than the Tariff. Matters that are governed by the Operating Agreement generally require sufficient support in a vote by the Members Committee. This is an onerous and time-consuming process, and it gives various coalitions of Members the ability to veto or delay important market changes (Yoo and Blumsack 2018a, 2018b; Welton, 2021; Johnson et al., 2023; Macey 2027). In an ideal world, the Board would have more filing rights and would create other mechanisms to get stakeholder input surrounding tariff changes.     .

Question: Recognizing regional differences, are there lessons from other regional transmission organization/independent system operator (RTO/ISO) governance structures that PJM could reasonably adopt to improve its responsiveness to the region’s operational and market challenges?

PJM is unique among RTOs and ISOs in having a governance structure in which states have no formal authority. Aside from the New York ISO and California ISO as single- state entities with clear connections to state legislative and policy preferences, governance structures in the three multi-state RTOs (aside from PJM) all feature a state organization or committee with a well-defined role. These state committees (the Regional States Committee in SPP, Organization of MISO States in MISO and New England States Committee On Electricity in ISO New England) differ in the extent of their responsibility, and governance structures in SPP and MISO provide a potential model for how the RTO may workably share filing rights with the states.

PDF page 7

7
IV. Comments on PJM’s Stakeholder Process
This section includes responses to the second set of Questions posed by the Commission, which focus on PJM’s stakeholder process.

Question: Do sector-weighted voting and existing voting thresholds strike the right balance between achieving consensus and taking timely action?

Based on existing research, the short answer to this Question is that PJM’s sector- weighted voting process has, at times, been highly challenged either to move stakeholders towards consensus or to send clear signals to the Board as to the preferences of stakeholders. Designing electricity markets via PJM’s stakeholder structure has been fraught when the more contentious aspects of market design are at stake. The challenges that arise in PJM’s stakeholder voting stem from a couple of structural facts about the stakeholder process.

● PJM’s sector-weighted voting system makes it relatively easy for a minority of Members to block proposals with which they disagree;

● Differences in voting rules between the lower level committees and the plenary Members Committee can lead to situations where proposals may emerge from lower level committees highly influenced by one set of Members only to be defeated in the Members Committee by another set of Members.

The remainder of our response expands on these two critical points.
Like some other RTOs (notably ISO New England and the New York ISO), PJM uses a sector-weighted voting procedure in the Members Committee. Under such a voting procedure, each voter is assigned to a specific group, and then voting happens within those groups. Perhaps the most well-known example of a sector-weighted voting system is the Electoral College used in U.S. Presidential elections. Under the Electoral College, voters are divided into groups based on the state in which they cast their vote, and each state’s voting outcome carries a different weight in the overall election. In PJM’s Members Committee, each vote-bearing Member chooses or is assigned to one of five sectors based on the primary business area of each Member. Each of the five stakeholder sectors is given equal weight in PJM’s system, whereas those weights vary by sector in other RTOs (Lenhart and Fox, 2022; Yoo and Blumsack, 2018a). The five sectors are very uneven in terms of the total number of Members in each sector. Table 1, taken from PJM (2026) shows the membership distribution among the five stakeholder sectors. Voting members are permitted to cast votes in the Members and

PDF page 8

8
Markets and Reliability Committees. Voting and Affiliate Members are permitted to cast votes in the lower level committees.

Table 1. PJM Sectoral Stakeholder Membership (screen shot taken from PJM, 2026)

The decision threshold in PJM’s Members Committee is sometimes described as requiring a two-thirds supermajority in order for a voting item to be passed. This is something of a blunt description which masks how a voting item actually passes or fails. When presented with a voting item, votes in the Members Committee are tallied within their sectors. For each sector, a “voting score” is calculated which represents the fraction of “yes” votes that the voting item has attained within each sector. These voting scores are thus between zero and one for each sector. The voting scores across all five sectors are then summed, and if the resulting total exceeds 3.335, then the voting item passes. The “two thirds supermajority” refers to the fraction of the overall voting score that a voting item must achieve in order to pass. It does not refer to the total number of votes. Because the number of voting Members in the five sectors are so unequal, a voting item can pass even if two-thirds of the voting Members do not support it. Similarly, a voting item can fail even if two-thirds of the total number of voting Members do support it.

Because this system was devised by incumbent PJM Members, it is not surprising that some research has found that the system benefits those incumbents who helped to design it (Welton 2021; Walters and Kleit 2022) and is purposefully slow to adapt in ways that make it more difficult for new technologies or market actors to enter (Jones 2017; Walters and Kleit 2022; Kiesling 2026). This has been interpreted to mean that transmission owners can leverage “stagnant” governance structures for their own advantage (Peskoe, 2023). It has also been interpreted to imply that suppliers exert substantial authority at the Members Committee level at the expense of consumers (this perception is reported in the academic literature, for example, by Yoo and Blumsack (2018b) and by Johnson, et al. (2023)).

PDF page 9

9
At the level of the Members Committee, however, the existing body of research does not support the conclusion that one particular constituency or another consistently benefits from the existing voting system or exercises political power over the voting system. The broader structural problem is that PJM’s sector-weighted voting structure creates a broader “culture of ‘no’” when presented with difficult or contentious issues. Since PJM’s sector-weighted voting structure has five sectors that are equally weighted, any two sectors could vote together to block any voting item that they would prefer not move forward. This is not just a theoretical possibility – it has happened repeatedly in the PJM stakeholder process, particularly when contentious issues arise. Several research papers have examined voting patterns in PJM’s Members Committee, including Yoo and Blumsack (2018a, 2018b), Johnson (2021), Teti and Blumsack (2024) and Johnson and Blumsack (2026). This work has found two fairly strong coalitions of Members that (a) cross multiple defined sectors, and (b) tend to vote together on the most contentious issues. One of these coalitions crosses the Generation Owner and Transmission Owner sectors and may be seen as a kind of supply side coalition. The other crosses the Electric Distributor and End Use Customer sectors and may be seen as a kind of demand side coalition. Each of these coalitions has been able to block market reforms that they oppose. As illustrated in Yoo and Blumsack (2018a), Johnson (2021) and Johnson and Blumsack (2026) focused on capacity market votes, the supply side coalition has been able to block reforms that (other things equal) may have lowered capacity costs and led to lower installed capacity margins and the demand side coalition has done the same for reforms that may have increased capacity costs and installed capacity margins.

Differential voting rules and treatment of affiliates in PJM’s lower-level stakeholder committees is another contributing factor to inaction and stalemate. In PJM’s standing committees, affiliates of individual Members are given individual votes when voting does occur. Based on data published by PJM (2026), this would seem to principally benefit Members in the Generation Owner sector (which has more than twice the number of affiliates as voting Members) and the Transmission Owner sector (which has more than three times the number of affiliates as voting Members). The Other Suppliers sector also has a substantial number of affiliates, but also has two-thirds of the total voting Membership.

These differential voting rules for affiliates in the lower-level standing committees can confer some agenda-setting political power on certain Membership sectors (Simeone, 2021). It also creates an additional possibility for stalemate at the Members Committee - in which one Member constituency passes a proposal and sends it to the Members

PDF page 10

10
Committee only to have it rejected at the Members Committee vote.
Evaluating the impact of affiliate voting in lower-level committees is not as straightforward as in the Members Committee because the lower-level committee deliberations are not made public with substantial detail. (This could be addressed by PJM as a measure of additional transparency.) One example of this dynamic which seems clear, however, involved a price formation proposal sent to the Members Committee in February 2019. The proposal sent to the full Members Committee was presented by a supply-side Member in the lower-level Committee as a compromise measure. According to PJM reports, the proposal enjoyed broad support in that lower- level Committee (PJM, 2019). Once it reached the Members Committee, however, the proposal was defeated by a coalition of End Use Customers and Electric Distributors. Question: What transparency reforms would improve the quality of PJM’s stakeholder process and increase stakeholder confidence in its decision-making?

In some ways and at some levels, PJM’s stakeholder process is admirably transparent. Most meetings are open to public participation. Detailed voting reports from the Members Committee, for example, are made public by PJM. This has enabled independent analyses of decision-making activity within the Members Committee. PJM does not archive these materials in perpetuity – older voting reports from Members Committee meetings are eventually removed from PJM’s public web site. This older material has been independently archived by Teti and Blumsack (2021). While these voting reports from the Members Committee are not in a format that is easily searchable or digestible, the reports are made public and they contain substantial detail regarding voting activity at the level of individual Members.

Other senior and standing committees do not feature this same level of transparency, and PJM could consider making detailed meeting information and voting data available for those committees. Voting data for the Markets and Reliability Committee, for example, does not have the same high level of detail as the Members Committee. Only the aggregated sector-weighted voting results are recorded, making it difficult for interested parties to see where voting items in that Committee were driven to passage or failure. Where voting happens in PJM’s lower-level standing committees, those results are not always reported in a detailed way. (Other information from those meetings is posted on PJM’s web site for a period of time.)

PDF page 11

11
Question: What reforms to the stakeholder process could ensure PJM can meet the region’s challenges?

Earlier in this Comment, we discussed potential reforms to the allocation of §205 filing rights over PJM’s governing documents to ensure that the Board has ultimate (or at least shared) authority over PJM’s organizational decision-making. We also discuss the benefits of making stakeholder voting purely advisory (as is the case with MISO’s stakeholder process) or eliminating stakeholder voting altogether and providing an alternative mechanism for Members to provide input to the Board (as is the case with the California ISO’s governance process). These reforms may themselves address existing issues in PJM’s stakeholder process. Our response to this Question focuses on the stakeholder process as it exists today.

Existing research on PJM’s stakeholder process, particularly at the plenary Members Committee level, suggests several potentially beneficial reforms.

● Lowering the passage threshold in PJM’s sector-weighted voting. Reducing the threshold to 3.0, for example, would maintain a supermajority while removing the ability of some strong cross-sector coalitions to block voting items. Under such a threshold, for example, the 2019 price formation proposal would have passed the Members Committee. PJM currently has the highest passage threshold among RTOs which use sector-weighted voting. The New York ISO uses a threshold of 58% for most voting items, while ISO New England uses a threshold of 60% for market-related voting items.

● Expanding the number of sectors would reduce the vote dilution that happens in the Other Suppliers sector in particular. Expanded sector definitions could represent emerging aligned interests which are distinct but currently lumped into a single sector (examples might include financial players, energy storage developers and so forth). We note that simply expanding the number of sectors will not in and of itself break up the strong voting coalitions that exist within the PJM stakeholder process, but in some cases could make it more difficult for existing coalitions to block voting items so easily.

● PJM is unique among RTOs in the sheer size of its membership, in part because it opens membership up to a broad array of market participants in ways that some other RTOs do not (Lenhart and Fox, 2022). Reducing vote dilution could potentially encourage additional participation in the stakeholder process (as Teti and Blumsack (2024) write, the majority of PJM voting Members never cast votes). Encouraging participation is a good goal, but realistically may also make

PDF page 12

12
quick decision-making more difficult.
● PJM should consider structural changes to its sector-weighted voting process that address the stalemate that can happen in the Members Committee. Several possible options exist. One is to use rank-choice voting or other tiebreaker mechanisms rather than having Members take individual votes on multiple competing proposals. Even with no other changes to the stakeholder process, such a shift would be appropriate for voting items involving changes to the Open Access Transmission Tariff where the Board holds §205 filing rights and the role of deliberations at the Members Committee level is to signal a most-favored proposal to the Board. A second would be to change the nature of the decision threshold to be based on support from a majority of the sectors rather than a stakeholder-wide weighted voting calculation. A third option would be to adopt an approach similar to that used in the SPP Markets and Operations Policy Committee (MOPC), which is SPP’s equivalent to the Members Committee (Lenhart and Fox, 2022). SPP’s structure still weights votes, but uses only two sectors for voting (based on whether Members are transmission owners or users of other Members’ transmission systems). The voting calculation ensures that one sector cannot unilaterally defeat a voting item if there is sufficient support from the other sector.

● Eliminate affiliate voting, where voting is used in PJM’s lower level committees (below the Members Committee and Markets and Reliability Committee). Question: What near-term reforms to stakeholder representation could PJM and its Members take to improve speed in decision-making while preserving stakeholder input? Effective participation in PJM’s stakeholder process can require substantial resources in terms of staff time and technical knowledge. Teti and Blumsack (2024) report that over a thirteen-year period approximately 60% of voting-eligible Members did not cast a single vote in the Members Committee. More recently, voting results from PJM’s recent Critical Issue Fast Path proceeding on large load interconnection suggested that only a small percentage of voting-eligible Members in the Other Suppliers sector cast any votes (including abstentions).

Improving the ability of more Members to effectively participate would improve stakeholder input without necessarily sacrificing speed when needed. A mechanism to broaden the use of proxy participants, along with the resources to support those proxies, is one potential mechanism.

PDF page 13

13
Question: Should PJM increase the use of fast-path or time-bound review procedures to expedite committee action on high-importance topics?

In a sense, a mechanism like the Critical Issue Fast Path has elements that should be embraced more often – for the Members to express collective preferences to RTO leadership and the Board before the Board makes a decision on a filing to FERC, rather than for the Members to have ultimate authority over decisions that should fall under the Tariff. Even without reforms to §205 rights or other reforms to stakeholder voting, PJM could explore a process like the CIFP for all issues involving changes to governing documents over which the Board possesses §205 rights.

Such a process, however, should have a mechanism (such as rank-choice voting) which will drive Membership to communicate their most-preferred option(s) to the Board. Question: Recognizing regional differences, are there lessons from other RTO/ISO stakeholder processes that PJM could reasonably adopt to improve speed in voting processes and stakeholder representation?

There are multiple practices used in other ISOs and RTOs that could be considered for adoption in PJM. Both MISO and the California ISO have stakeholder processes that are more advisory in nature than is the case in PJM. In the New York ISO and ISO New England, which use stakeholder-voting systems most closely resembling PJM’s, stakeholder voting may be contentious but research does not suggest that it has led to the types of stalemates as in PJM. This may be due in part to the lower passage threshold used in those RTOs. Finally, both New York ISO and ISO New England (along with other RTOs) have some mechanism for sharing filing rights among multiple parties. The breadth of unilateral filing rights held by PJM Members, as well as the separation of filing rights over a number of different governing documents, is unique among RTOs and it itself a potential barrier to reforming PJM’s governance. Works cited

Helbing, M. D. (2023). Fifteen years later-literature perspectives on the impacts of dworkin and goldwasser and ferc order no. 719. Energy LJ, 44, 325.

Johnson, N., Lenhart, S., & Blumsack, S. (2023). The Evolution of Participatory Policy- Making for Regional Power Grids. Energy LJ, 44, 433.

Johnson, N. (2021). Studies in the Governance of Regional Transmission Organizations, Ph.D. Dissertation, Pennsylvania State University.

Jones, K. (2017). How the RTO Stakeholder Process Affects Market Efficiency. Publication available at https://www.rstreet.org/research/how-the-rto-stakeholder- process-affects-market-efficiency/

PDF page 14

14
Kiesling, L. (2026). The promise and perils of exclusion: using institutional design principles and the theory of clubs to analyse regional transmission organization governance. Journal of Institutional Economics, 22, e7.

Lenhart, S., & Fox, D. (2022). Participatory democracy in dynamic contexts: A review of regional transmission organization governance in the United States. Energy Research & Social Science, 83, 102345.

Macey, J. (2027, forthcoming). Utility Filing Rights and the Grid’s Governance Problem. Forthcoming in Yale LJ.

Peskoe, A. (2021). Is the utility transmission syndicate forever?. Energy LJ, 42, 1. Peskoe, A. (2023). Replacing the Utility Transmission Syndicate's Control. Energy LJ, 44, 447.

PJM Interconnection (2026). Oversight and Transparency. Publication available at https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/fact-

sheets/oversight-and-transparency-fact-sheet.pdf
PJM Interconnection (2019). Members Reject Compromise Proposal to Revamp Reserve Pricing Rules. PJM Inside Lines, available at https://insidelines.pjm.com/members- reject-compromise-proposal-to-revamp-reserve-pricing-rules/.

Silverman, A. (2026). Governance of Multi-State Electricity Markets for the 21st Century. Publication available at https://energyinstitute.jhu.edu/governance-of-multi- state-electricity-markets-for-the-21st-century/.

Walters, D. E., & Kleit, A. N. (2022). Grid Governance in the Energy-Trilemma Era: Remedying the Democracy Deficit. Ala. L. Rev., 74, 1033.

Welton, S. (2021). Rethinking grid governance for the climate change era. Cal. L. Rev., 109, 209.

Yoo, K., & Blumsack, S. (2018a). Can capacity markets be designed by democracy?. Journal of Regulatory Economics, 53(2), 127-151.

Yoo, K., & Blumsack, S. (2018b). The political complexity of regional electricity policy formation. Complexity, 2018(1), 3493492.