AD26-7-000 · 2026-08-10 · Individual No Affiliation
Post-Technical Conference Comments of Persistence Analytics Group LLC re PJM Governance and Stakeholder Reforms
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
Exploring the Current State of PJM Governance
Docket No.
AD26-7-000
POST-TECHNICAL CONFERENCE COMMENTS
OF PERSISTENCE ANALYTICS GROUP LLC
PJM Governance and Stakeholder Reforms
August 10, 2026
Governance reform should determine not only who may make a consequential decision, but what evidence must support it, when material assumptions must be revalidated, and how implementation outcomes are verified afterward.
Submitted by: Neil P. Osnato, Founder
Persistence Analytics Group LLC | United Grid
neil@persistenceanalyticsgroup.com | 609-464-9055 | persistenceanalyticsgroup.com
PDF page 2
I. INTRODUCTION AND INTEREST OF PERSISTENCE ANALYTICS GROUP LLC
Persistence Analytics Group LLC (PAG) respectfully submits these post-technical conference comments in response to the Commission's examination of PJM Interconnection, L.L.C. governance and stakeholder processes in Docket No. AD26-7-000. PAG is an independent infrastructure-risk and decision-assurance firm focused on large- load integration, demand durability, grid stress, load integrity, transmission cost causation, and implementation verification.
The Commission's July 23, 2026 technical conference was directed toward concrete, actionable reforms that can improve PJM's ability to address operational and market needs in a timely and efficient manner. The Commission's subsequent process also identifies Board independence, section 205 filing rights, more timely and transparent stakeholder decision-making, and meaningful structured participation by state entities as major reform themes. PAG's central recommendation is straightforward: governance reform should include an explicit decision- assurance layer. The stakeholder process should not end when a proposal receives the votes, approvals, or filings necessary to move forward. For decisions with material reliability, transmission, cost-allocation, large-load, or capital consequences, the process should identify the assumptions supporting the decision, the evidence supporting those assumptions, the conditions requiring revalidation, and the evidence showing whether the expected result was ultimately realized.
A stakeholder process can be procedurally complete while the assumptions underneath the
resulting decision remain unverified.
These comments address governance principles only. PAG does not address the merits of any specific contested proceeding pending before the Commission.
II. THE GOVERNANCE PROBLEM IS ALSO AN EVIDENCE PROBLEM
PJM is operating in an environment in which changes in large-load development, generation availability, transmission needs, equipment lead times, financing conditions, siting, permitting, and state policy can materially change the assumptions supporting major system decisions. The governance challenge is therefore not simply speed. A faster process that relies on assumptions that are incomplete, stale, internally inconsistent, or insufficiently tested can accelerate the wrong decision.
The inverse is also true. A process that repeatedly relitigates settled questions because participants lack a common evidentiary record can delay decisions even when the underlying need is real. Better governance should therefore create a disciplined way to distinguish policy disagreement from factual uncertainty, and to determine which assumptions require verification before a decision becomes difficult to reverse.
PAG recommends that PJM distinguish among at least four categories of information: (1) announced or forecast conditions; (2) contractually supported conditions; (3) independently supportable or executable conditions; and (4) realized operating outcomes. These categories are not interchangeable. For example, announced load is not the same as durable operating demand, and financial security is not the same as proof that every critical infrastructure dependency can be delivered on the required timetable.
PDF page 3
III. A PJM ACCOUNTABLE DECISION ARCHITECTURE
PAG recommends that the Commission encourage PJM and its stakeholders to develop an Accountable Decision Architecture for material governance decisions. The architecture need not prescribe substantive outcomes. Its function is to create a repeatable evidentiary record around consequential decisions. Decision
Material
assumption
s
Supporting
evidence
Affected
states
Cost
causation
Authority /
approval
Implementat
ion
Exceptions
Revalidatio
n
Measured
outcome
1. What is being assumed? Identify the material load, timing, reliability, cost, resource, transmission, implementation, and market assumptions that make the proposed decision reasonable.
2. What evidence supports each assumption? Separate forecasts, representations, contracts, engineering evidence, operating data, and other forms of support so decision-makers can see the quality and limitations of the record.
3. Who is affected if an assumption is wrong? Identify states, customers, market participants, transmission owners, generators, and other stakeholders that bear material consequences if an assumption fails.
4. What event requires revalidation? Define objective triggers for reconsideration when material facts change, including delays, downsizing, cancellation, changes in load, changed infrastructure dependencies, or other deviations from the record supporting the decision.
5. Who owns the exception? Assign responsibility for identifying, escalating, correcting, and closing material exceptions rather than allowing them to persist across committees or planning cycles.
6. What evidence proves the outcome? After implementation, compare the realized condition against the assumptions that justified the decision and make the result available to improve future governance.
IV. FIVE GOVERNANCE REFORMS THE COMMISSION SHOULD ENCOURAGE
1. Material-Assumption Disclosure. For consequential decisions, PJM should identify the material assumptions that drive the recommendation before the relevant stakeholder or Board action. The objective is not disclosure of every model input. It is a concise decision-level record showing which assumptions are outcome- determinative and the evidence category supporting each one.
2. Structured State Evidentiary Access. State entities should have a defined path to the evidence underlying decisions that materially affect customers in their jurisdictions. Meaningful state participation requires more than an opportunity to comment after an allocation or planning conclusion has largely hardened. It requires timely access to the assumptions and evidence that drive the decision.
3. Defined Revalidation Triggers. PJM should identify circumstances that require a material assumption to be revisited before the next irreversible implementation or capital step. Revalidation should be targeted, not an invitation to reopen every prior decision. The trigger should be tied to a change in a fact that was material to the original decision.
4. Decision and Exception Ownership. Material assumptions, unresolved exceptions, and corrective actions should have identifiable institutional owners. Governance slows when responsibility is diffuse. A transparent owner-and-deadline structure can improve accountability without changing voting rights or substantive market rules.
5. Post-Decision Outcome Verification. For selected high-consequence decisions, PJM should compare actual outcomes with the assumptions that supported approval. The purpose is not retrospective fault-finding. It is institutional learning: determine where assumptions were durable, where they failed, and which governance controls should change as a result.
V. LARGE-LOAD INTEGRATION SHOWS WHY REVALIDATION MATTERS
Large-load integration illustrates the need for an explicit verification and revalidation discipline because a single project may depend on several timelines that do not move together. Customer commitment, utility construction, network upgrades, generation, substations, transformers, fuel supply, permitting, financing, cooling, and customer occupancy may each be credible individually while remaining inconsistent as a combined execution plan.
PDF page 4
Financial security and minimum-payment structures can be important tools for allocating financial consequences. They do not, by themselves, prove that the underlying load will energize on schedule, persist at the assumed level, or create the precise system need attributed to it. Governance should therefore distinguish the question of who pays if an assumption fails from the separate question of whether the assumption should be relied upon in the first instance.
CREDIT / CONTRACT PROTECTION
DECISION ASSURANCE
Who bears defined financial consequences if the project changes
or fails?
What evidence shows the assumptions are sufficiently durable
and executable to rely upon before additional commitments are
made?
A governance process that explicitly records the difference between forecast, commitment, executability, and realized performance would improve the Commission's and states' ability to understand when a change in large-load conditions should affect planning, cost causation, or implementation sequencing. It would also reduce the risk that an assumption continues to influence later decisions after the underlying facts have materially changed.
VI. A PRACTICAL IMPLEMENTATION PATH
Phase 1 - Select. Choose a limited set of high-consequence decision types in which material assumptions are identifiable and changes in those assumptions can materially affect reliability, cost, or implementation. Phase 2 - Record. Create a concise decision record listing the material assumptions, evidence category, affected stakeholders, accountable owner, and revalidation trigger.
Phase 3 - Revalidate. When a trigger occurs, require a focused update of the affected assumption rather than reopening the entire governance record.
Phase 4 - Verify. After implementation, compare actual performance with the assumptions that justified the decision and identify any recurring governance failure modes.
Phase 5 - Scale. Use the results to determine which elements should become standard across additional PJM stakeholder, planning, market, or Board processes.
This approach is compatible with different views regarding voting structures, Board independence, section 205 filing authority, sector representation, and state participation. It provides a common evidentiary layer regardless of which institutional reforms the Commission and PJM ultimately pursue.
VII. CONCLUSION
The Commission has appropriately focused this proceeding on concrete and actionable reform. PAG respectfully submits that durable reform requires more than changing who participates, who votes, or how quickly a proposal advances. It also requires a disciplined record of what the decision assumes, what evidence supports those assumptions, what changes require revalidation, and whether the expected result was ultimately realized. A governance process should be able to answer three questions at any consequential
decision point: What did we assume? What evidence supported it? What happened
afterward?
PAG therefore recommends that the Commission encourage PJM to incorporate material-assumption disclosure, structured state evidentiary access, revalidation triggers, decision and exception ownership, and post-decision outcome verification into the governance reforms developed through this docket.
Respectfully submitted,
Neil P. Osnato
Founder
Persistence Analytics Group LLC | United Grid
National Security & Infrastructure Risk Analytics
Infrastructure Assumption Verification™ | Decision Assurance™
neil@persistenceanalyticsgroup.com | 609-464-9055
persistenceanalyticsgroup.com