Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re Midcontinent Independent System Operator, Inc. et al
Word notes use stable document IDs, such as [fn:8], which can differ from printed footnote numbers.
Document text
196 FERC ¶ 62,090 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Midcontinent Independent System Operator, Inc. AEP Indiana Michigan Transmission Company, Inc. ALLETE, Inc. Ameren Illinois Company Ameren Transmission Company of Illinois American Transmission Company, LLC Cleco Power LLC Duke Energy Indiana, LLC Entergy Arkansas, LLC Entergy Louisiana, LLC Entergy Mississippi, LLC Entergy New Orleans, LLC Entergy Texas, Inc. GridLiance Heartland LLC Indianapolis Power & Light Company International Transmission Company ITC Midwest LLC Michigan Electric Transmission Company, LLC MidAmerican Energy Company Montana-Dakota Utilities Company Northern Indiana Public Service Company LLC Northern States Power Company, a Minnesota Corporation Northern States Power Company, a Wisconsin Corporation Northwestern Wisconsin Electric Company Otter Tail Power Company Pioneer Transmission, LLC Republic Transmission, LLC Southern Indiana Gas & Electric Company Union Electric Company Wolverine Power Supply Cooperative, Inc. Docket No. EL26-70-001 NOTICE OF DENIAL OF REHEARING BY OPERATION OF LAW AND PROVIDING FOR FURTHER CONSIDERATION (August 20, 2026) Rehearing has been timely requested of the Commission’s order issued on June 18, 2026, in this proceeding. Midcontinent Indep. Sys. Operator, Inc., 195 FERC ¶ 61,212, errata notice, 196 FERC ¶ 61,123 (2026). In the absence of Commission action on a request for rehearing within 30 days from the date it is filed, the request for rehearing may be deemed to have been denied. 16 U.S.C. § 825l(a); 18 C.F.R. § 385.713 (2025); Allegheny Def. Project v. FERC, 964 F.3d 1 (D.C. Cir. 2020) (en banc). As provided in 16 U.S.C. § 825l(a), the request for rehearing of the above-cited order filed in this proceeding will be addressed in a future order to be issued consistent with the requirements of such section. As also provided in 16 U.S.C. § 825l(a), the Commission may modify or set aside its above-cited order, in whole or in part, in such manner as it shall deem proper. Debbie-Anne A. Reese, Secretary. header1 (Word template) CUICUI CUI CUI header2 (Word template) Docket No. EL26-70-001 -2-