EL26-71-001 · 2026-08-20 · Secretary of the Commission - FERC

Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re California Independent System Operator Corporation et al

Word notes use stable document IDs, such as [fn:8], which can differ from printed footnote numbers.

Document text

196 FERC ¶ 62,091
	UNITED STATES OF AMERICA
		FEDERAL ENERGY REGULATORY COMMISSION
	
California Independent System Operator Corporation 

Citizen S-Line Transmission LLC
Citizens Sunrise Transmission LLC 
Citizens Sycamore-Penasquitos Transmission LLC 
City of Anaheim, California
City of Azusa, California
City of Banning, California
City of Colton, California
City of Pasadena, California
City of Riverside, California
DCR Transmission, L.L.C. 
DesertLink, LLC 
GridLiance West LLC 
Horizon West Transmission, LLC 
LS Power Grid California, LLC 
Morongo Transmission LLC
Pacific Gas and Electric Company 
San Diego Gas & Electric Company 
Southern California Edison Company 
Startrans IO, L.L.C. 
SunZia Transmission, LLC 
Trans Bay Cable LLC 
Valley Electric Association, Inc. 
Viridon Path 15, LLC 
Western Area Power Administration
Docket No.
 EL26-71-001


















NOTICE OF DENIAL OF REHEARING BY OPERATION OF LAW AND PROVIDING FOR FURTHER CONSIDERATION

(August 20, 2026)

	Rehearing has been timely requested of the Commission’s order issued on 
June 18, 2026, in this proceeding.  Cal. Indep. Sys. Operator, Inc., 195 FERC ¶ 61,214 (2026).  In the absence of Commission action on a request for rehearing within 30 days from the date it is filed, the request for rehearing may be deemed to have been denied.   
16 U.S.C. § 825l(a); 18 C.F.R. § 385.713 (2025); Allegheny Def. Project v. FERC,  
964 F.3d 1 (D.C. Cir. 2020) (en banc).

As provided in 16 U.S.C. § 825l(a), the request for rehearing of the above-cited order filed in this proceeding will be addressed in a future order to be issued consistent with the requirements of such section.  As also provided in 16 U.S.C. § 825l(a), the 
Commission may modify or set aside its above-cited order, in whole or in part, in such manner as it shall deem proper.  




Debbie-Anne A. Reese,
Secretary.


header1 (Word template)
CUICUI
CUI
CUI

header2 (Word template)
Docket No. EL26-71-001		-2-