AD26-7-000 · 2026-08-20 · Chesapeake Climate Action Network

Comments of Chesapeake Climate Action Network re PJM Governance and Stakeholder Reforms

PDF page 1

August 20, 2026
Federal Energy Regulatory Commission (FERC)
Comment Submitted to FERC Docket No. Docket No. AD26-7-000

Dear FERC Chairman Laura V. Swett,

Chesapeake Climate Action Network represents tens of thousands across the PJM territory from Virginia to Illinois. Our network’s families and business owners are facing rapidly rising electricity bills because of a number of contributing factors including the proliferation of data centers. One thing is clear: the current PJM stakeholder process for decision making is not delivering the responsiveness that consumers deserve.

Every year of unnecessary delay means consumers lose access to lower-cost energy resources, reliability improvements are postponed, and states are prevented from implementing the clean energy policies their citizens have chosen. We cannot afford governance structures that slow the transition to a more reliable, affordable, and cleaner electric grid. FERC and PJM have an opportunity to strengthen public confidence in PJM by modernizing its governance and ensuring that the voices of consumers and states carry appropriate weight alongside market participants. We urge FERC and PJM to consider the following reforms:

1.​ Reflect affordability and the public interest in PJM’s mission and governing documents. Decisions made at PJM impact 67 million ratepayers across 13 states and the District of Columbia. At the same time, PJM has no formalized commitment to serve the public interest or to consider electric affordability on the same footing as electric reliability. If the PJM Board is to have its independence and power expanded, this should only happen if steps are taken to meaningfully commit PJM to serve the public, and not just its members, such as by explicitly including a public interest mandate and affordability in the PJM mission and governing documents.

PDF page 2

2.​ Grant OPSI 205 jump ball filing rights. Currently, the states do not have a strong enough voice in PJM’s decision-making process. One way to strengthen the voice of the states is to grant the Organization of PJM States, Inc. (OPSI) 205 “jump ball” filing rights with the Federal Energy Regulatory Commission (FERC), so that they can advance proposals to be considered on even footing with those from PJM. This is already the case for other regional transmission organizations (RTOs) and PJM should be brought into alignment with this standard. Additionally, 205 filing rights for OPSI can serve as an oversight mechanism for a public interest mandate, as the states will have a formal route to intervene.

3.​ Formalize Board consultation with OPSI. Under the status quo, the PJM Board does not sufficiently consult OPSI and the states prior to making major filings with FERC. Poor communication increases the likelihood that the states and the PJM Board will be at odds on proposals, especially those that would increase costs substantially for ratepayers. While granting OPSI 205 filing rights provides a backstop, increased consultation between the PJM Board and the states - such as getting feedback on draft filings - would foster trust, credibility, and avoid litigation. 4.​ Require cost impact information. To evaluate whether PJM is serving the public interest on the basis of affordability, it is necessary for states, advocates, stakeholders, and the public to have access to accurate cost impact information. PJM should analyze all proposals for cost impact and make the results widely and publicly available so that interested parties can make informed decisions. Such transparency will also serve to improve PJM’s accountability to the public.

5.​ Appoint an Independent Transmission Monitor. For over 25 years, an Independent Market Monitor has provided indispensable oversight of PJM’s power markets, performing cost impact analysis and identifying structural problems. Just like the energy and capacity markets, transmission planning at PJM has a significant impact on ratepayer costs. During a time when transmission costs are consistently rising, creating an Independent Transmission Monitor would provide necessary oversight of PJM’s approach to planning.

6.​ Expand the Nominating Committee to include state representatives. If the PJM Board is to better engage with the states, it would help to have more formalized involvement of the states in the nominating process for Board directors. Currently, the Nominating Committee does not consistently include a consumer advocate, and the states do not get to appoint representatives. Along with reserving a permanent seat for a consumer advocate, the Nominating Committee should also allow for one appointee from OPSI and another from a governors’/legislators’ organization - as recommended by the Governors’ Collaborative.

7.​ Expand the Board expertise requirements to include state and ratepayer experience. Expertise requirements are an important guardrail to ensure the PJM Board has the collective experience and insight necessary to do its job effectively. However, the current requirements do not include expertise in state regulatory work, consumer advocacy, or clean energy. To have a Board that is equipped to understand how their decisions impact electric affordability for ratepayers, it is critical to require that at least one Board member brings direct experience from each of these areas.

PDF page 3

Moreover, expanding requirements in this way would better equip PJM to adhere to a public interest and affordability mandate in its governing documents. 8.​ Open Board meetings and publish Board votes. Perhaps the most straightforward reforms PJM can choose to make would be to open all Board meetings to the public and publish the results of individual Board votes. By increasing the transparency of Board proceedings, PJM can concretely demonstrate accountability to its mission - which should include an explicit public interest and affordability mandate - rather than merely asking PJM members and the public to trust the process. Moreover, with published votes, all interested parties will be equipped to evaluate the performance of individual Board directors.

9.​ Expand sector-weighted voting to all Standing Committees and Senior Task Forces. At higher committee levels in PJM the practice of sector-weighted voting helps ensure that no individual sector overwhelms the others. However, this voting method is not employed in lower level standing committees and senior task forces, which leads to outsize influence by supply-side interests and their many affiliate members. Applying sector-weighted voting at all committee levels would ensure the voice of end-use customers, including representatives of residential ratepayer interests, are not drowned out.

10.​Require transparency of individual firm votes across all committee levels. In a body like PJM, whose decisions ultimately impact the affordability of electricity for 67 million people, there is no justification for keeping the votes of PJM members under wraps. Just as votes by the Board should be made public, votes at all committee levels of PJM should be transparent and accessible to oversight. If states are to conduct meaningful oversight of the utilities within their jurisdiction, PJM should not serve as an obstacle to that function by allowing member votes to remain obscured. In the same spirit of transparency, all PJM meetings should be recorded and made publicly available.