AD26-7-000 · 2026-08-21 · North Carolina Electric Membership Corporation

Comments of North Carolina Electric Membership Corporation re PJM Governance and Stakeholder Reforms

PDF page 1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Governance and Stakeholder Reforms
Docket Nos. AD26-7-000
COMMENTS OF NORTH CAROLINA ELECTRIC MEMBERSHIP
CORPORATION
North Carolina Electric Membership Corporation (NCEMC) submits these comments pursuant to the Commission’s Notice Requesting Post-Conference Comment of July 30, 2026.

NCEMC is a generation and transmission cooperative responsible for the full or partial power supply requirements of its 25 members throughout the state of North Carolina. Those 25 distribution cooperatives, in turn, supply electricity to approximately one million homes, farms, and businesses in which more than 2.5 million North Carolinians live and work. NCEMC distribution cooperative loads are located throughout the service areas of three investor-owned public utilities: Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, both subsidiaries of Duke Energy Corporation, and Virginia Electric and Power Company, doing business as Dominion Energy Virginia in Virginia and as Dominion Energy North Carolina in North Carolina (hereinafter, Dominion).

NCEMC is a member of PJM Interconnection, L.L.C., (PJM) and a member of the Electric Distributor sector. NCEMC purchases transmission services from PJM to serve the loads of its six member cooperatives that distribute power at

PDF page 2

2
retail in the Dominion transmission zone of the PJM region. NCEMC also participates in PJM’s energy, ancillary services, capacity, and financial transmission rights markets.

NCEMC has appended to these comments its responses to the questions posed in the appendix to the Commission’s July 30 Notice Requesting Post- Conference Comment.

Respectfully submitted,
/s/ Michael D. Youth
Charles Bayless
Senior Vice President and General
Counsel
Michael D. Youth
Vice President and Deputy General
Counsel
North Carolina Electric Membership
Corporation
3400 Sumner Blvd.
Raleigh, NC 27616
Charlie.Bayless@ncemcs.com
Michael.Youth@ncemcs.com
Sean T. Beeny
F. Alvin Taylor
Randolph L. Elliott
McCarter & English, LLP
1301 K Street NW, Suite 1000 West
Washington, D.C. 20005

(202) 753-3421
sbeeny@mccarter.com
ataylor@mccarter.com
relliott@mccarter.com
Attorneys for North Carolina Electric
Membership Corporation
August 21, 2026

PDF page 3

3
Appendix
The questions below focus on broad themes, shared concerns, or potential points of consensus that emerged during the technical conference.  They are not intended to be exhaustive, dispositive, or a comprehensive catalog of all matters relevant to governance and stakeholder issues.  Although these questions contain individual elements that are interrelated and potential changes to one element may affect others, please answer each question independently.  In your response, please indicate the PJM member sector to which your company or organization belongs, or, if you are not a PJM member, please indicate that.  In addition to answering the questions, the Commission welcomes post- conference comments that provide any additional information, perspectives, or proposals that market participants believe will best facilitate reforms to PJM’s governance structure and stakeholder processes.

PJM Board Independence
Questions/Comments
Yes
No
1) Should Board members’ terms be extended to five or more years?
Comments: Depending on the totality of the PJM reforms implemented during this reform process, NCEMC could support Board members’ terms being

extended to five years.
2) Should there be a maximum number of years that a Board member
may serve (e.g., 10 years)?
X
Comments: At this point in time, NCEMC does not support term limits.
3) Should the Board member qualification rules be revised to provide a preference for some Board members that reside in the PJM region?

Comments: At this point in time, NCEMC does not support a residency
requirement for Board members; that said, NCEMC has no objection to exploring revision of the Board member qualification rules to include a residency preference where all else is equal between candidates.

4) Should the conflict-of-interest rules be revised to reduce the cooling off period for Board members from two years to one year?

X
Comments:
5) Should restrictions on Board communications be relaxed to enable
more communication between the Board and stakeholders?
X

PDF page 4

4
Questions/Comments
Yes
No
Comments: NCEMC would support relaxed restrictions on Board communications that are made to all stakeholders in a fair and impartial manner; at this time, NCEMC does not support relaxing any restrictions that would sanction unconstrained ex parte communications.

6) In order to increase transparency, should Board votes be made public or the Board be required to explain its reasoning?

X
Comments:
7) In order to increase transparency, should some Board meetings be open or available to the public?

X
Comments:
8) Should PJM’s governing documents be revised to explicitly state that the responsibility of PJM and its Board is to serve the public interest? X

Comments:
9) Should state representatives have at least one voting member on the Nominating Committee?

X
Comments:
10) Should PJM adopt public performance metrics and tie management compensation to their achievement?

Comments: At this time, NCEMC takes no position on this question other than observing that – on information and belief – PJM may already use performance assessment metrics to evaluate staff and adjust compensation. Section 205 Filing Rights

Questions/Comments
Yes
No
11) Should the stakeholder process be advisory, i.e., stakeholder votes only inform the Board?

X
Comments:

PDF page 5

5
Questions/Comments
Yes
No
12) Should PJM have section 205 filing rights over the energy market and ancillary services unencumbered by the requirement to obtain approval of two-thirds of the Members Committee?

Comments: PJM stakeholders, including NCEMC, are actively discussing the “Section 205 Filing Rights” questions. At this time, NCEMC does not support PJM having Section 205 filing rights in non-exigent circumstances or in circumstances where the stakeholder process is advancing toward consensus.

13) Should PJM have section 205 filing rights over Regional Transmission Expansion Planning (RTEP) unencumbered by the requirement to obtain approval of two-thirds of the Members Committee?

Comments:  PJM stakeholders, including NCEMC, are actively discussing the “Section 205 Filing Rights” questions. At this time, NCEMC does not support PJM having Section 205 filing rights in non-exigent circumstances or in circumstances where the stakeholder process is advancing toward consensus.

14) Should the Organization of PJM States Inc (OPSI) have “jump ball” rights over resource adequacy and transmission cost allocation filings when a supermajority of OPSI agrees on an alternative proposal? Comments: PJM stakeholders, including NCEMC, are actively discussing the “Section 205 Filing Rights” questions.

15) Should the Members Committee have “jump ball” filing rights over the portions of the tariff where PJM has 205 filing rights when a supermajority of stakeholders approves an alternative proposal? Comments: PJM stakeholders, including NCEMC, are actively discussing the “Section 205 Filing Rights” questions.

Stakeholder Process
Questions/Comments
Yes
No
16) Should the approval threshold in the Members Committee be lowered from two-thirds sector-weighted voting?

X
Comments:

PDF page 6

6
Questions/Comments
Yes
No
17) Should the voting rules barring affiliate votes, which apply to senior standing committees, also apply to lower-level committees?

X
Comments:
State Participation
Questions/Comments
Yes
No
18) In addition to OPSI, should there be a second state representative group consisting of governors’ representatives and/or state legislators’ representatives?

Comments: At this time, NCEMC supports enhanced state participation in the PJM stakeholder process. That said, NCEMC is not convinced that a second state representative group, in addition to OPSI is needed. NCEMC supports the following proposal put forward by PJM: “PJM proposes to increase state participation in PJM in two ways. First, PJM will work with the states to enhance OPSI to include in a bicameral structure for both the state commissions and the executive branches of each state. It is important that each state speak with one voice through OPSI. PJM would support increased funding for the reconstituted OPSI, recognizing not only the addition of the executive branch, but also the need for greater engagement in the stakeholder process. Second, PJM proposes to revise the stakeholder process to allow for OPSI to make a proposal on equal footing with any Member proposal or any PJM proposal, each in the area of resource adequacy, at any stage in the stakeholder process.”

19) Should state representatives have a formal voting role in the stakeholder process (limited to certain topics, such as resource adequacy and regional transmission cost allocation) in addition to the consumer advocate votes?

Comments: At this time, NCEMC supports giving OPSI a formal informational vote at a minimum and NCEMC is open to exploring the concept of affording OPSI a more formal vote that is more than merely informational.

20) Should PJM be required to consult with OPSI prior to making a section 205 filing related to resource adequacy and transmission cost allocation?

X

PDF page 7

7
Questions/Comments
Yes
No
Comments: