AD26-7-000 · 2026-08-21 · Capital Power Corporation

Post-Technical Conference Comments of Capital Power Corporation supplementing the previously filed comments re PJM Governance and Stakeholder Reforms

PDF page 1

1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

)
PJM Governance and

)

 Docket No. AD26-7-000
Stakeholder Reforms

)
)

POST-TECHNICAL CONFERENCE COMMENTS
OF CAPITAL POWER CORPORATION

Pursuant to the Commission’s July 30, 2026 Notice Requesting Post-Conference Comment, Capital Power Corporation (“Capital Power” or the “Company”) supplements its previously submitted comments and submits these post-technical comments, along with the Notice’s prescribed list, to the Federal Energy Regulatory Commission (“Commission” or “FERC”) in the above-referenced docket.  Capital Power appreciates the opportunity to provide further commentary and commends the Commission for focusing this proceeding on actionable reforms to improve transparency, efficiency, and accountability in PJM Interconnection LLC’s (“PJM”) governance.

I. EXECUTIVE SUMMARY
Capital Power is an independent power producer that entered the PJM market last year with its acquisition of Hummel Station and Rolling Hills, owning and operating approximately 2.2 GW of generation in PJM. At this point in the proceedings, the challenges and frustrations are well- documented, and the Commission was clear: reforms are necessary, and they are happening one way or another.1 The record reflects broad concern that PJM must be able to respond more

1 Chairman Laura Swett (opening remarks): “[I]f we can’t all agree, then FERC will be in a position where we may have to do it for you.”). FERC, Commission-Led Technical Conference on PJM Governance and Stakeholder

PDF page 2

2

effectively to resource adequacy challenges, accelerated load growth, transmission needs, interconnection constraints, and rapidly evolving market-design questions. At the same time, the record does not support abandoning the stakeholder-driven framework that has long provided a forum for market participants, states, customers, and PJM to develop durable market solutions. In that vein, Capital Power supports targeted, actionable reforms to PJM’s governance and stakeholder processes.

Capital Power therefore urges the Commission to focus on reforms that: (1) strengthen Board independence and accountability; (2) formalize transparent and early state engagement; (3) preserve meaningful stakeholder participation in market design and Federal Power Act (“FPA”) section 205-related processes; and (4) improve transparency around priorities, timelines, and committee ownership.

II. COMMENTS
A. The Commission Should Pursue Targeted Reforms, Not Wholesale Redesign of
PJM’s Governance Framework.

Capital Power agrees that PJM’s governance processes must be capable of producing timely, durable decisions. The July 23 technical conference reflected significant concern about whether PJM’s current processes can respond quickly enough to resource adequacy needs, load growth, transmission development, and market-design challenges. But speed alone should not be the measure of success. For investors in generation and related infrastructure, the critical question is whether PJM’s processes produce decisions that are transparent, durable, legally sustainable, and grounded in a full record. The Commission should therefore distinguish between reforms that improve process discipline and reforms that would reallocate substantive rights in ways that could

Reforms, at 11:00 (FERC.gov, July 23, 2026), https://www.ferc.gov/news-events/events/PJM-Governance- Stakeholder-Reforms.

PDF page 3

3

destabilize market expectations. Capital Power supports the former and urges caution with respect to the latter.

In his remarks, Peter Lake, Senior Director of Power at the National Energy Dominance Council, urged industry stakeholders to learn from the successes of other ISOs as it grapples with this governance issue. In its first set of comments, Capital Power describes the stakeholder materials and governance structure in Alberta’s Independent Electricity System Operator (“AESO”), where the Company has been a long-standing participant. Just as the AESO informed the Company’s position in those comments, in these comments, Capital Power looks to the existing frameworks for ISO New England (“ISO-NE”), the Southwest Power Pool (“SPP”), and the Midcontinent Independent System Operator (“MISO”).

1. Stakeholder Process: Transparency, Accountability, and Certainty
Capital Power does not believe the Commission should begin from the premise that PJM’s sector-weighted voting structure is the principal cause of delay. Further, the Company does not support converting the stakeholder process into a purely advisory process. Indeed, it is paramount to preserve the benefits of stakeholder engagement and regional collaboration that have long characterized PJM governance. Destabilizing the stakeholder framework at this stage will only cause further delay and create more confusion in the already confusing process described later in this section. While independent power producers do not require guaranteed outcomes, they do need visible timelines, decision pathways, initiative ownership, and escalation rights, because the absence of procedural certainty increases regulatory risk, delays investment decisions, and undermines confidence in PJM’s stakeholder process.

The more practical concern for newer and growing market participants like the Company is that PJM’s stakeholder process can be difficult to navigate. Significant effort may be required to

PDF page 4

4

identify the responsible committee, determine how an issue moves from one body to another, understand the decision pathway, and assess whether an initiative remains on schedule. Capital Power therefore recommends that PJM develop and maintain a public strategic work plan identifying priority initiatives, the responsible committee or PJM office, expected milestones, target decision dates, dependencies on other initiatives, and the expected filing pathway. PJM should also consider simplifying its committee structure or assigning broader mandates to fewer forums where issues are cross-cutting. These reforms would improve speed and accountability without destabilizing the stakeholder framework.

2. FPA 205 Filing Rights: Utilize a Well-Defined “Jump Ball” Mechanism
Capital Power does not support materially expanding PJM’s unilateral section 205 filing authority in a manner that would bypass existing stakeholder approval rights over major market- design provisions. Materially altering the allocation of existing section 205 filing rights, including by relocating substantive market-design or transmission-planning provisions into documents more directly controlled by PJM, could disturb the balance of authority that underpins stakeholder participation and reduce confidence that major market-design changes will be developed through a transparent, multi-sector process. With that being said, Capital Power recognizes the Commission’s concern that gridlock and supermajority thresholds may sometimes leave the Commission without a clear set of alternatives when urgent reforms are needed. A carefully designed “jump ball” mechanism could strike the right balance without rendering stakeholder participation advisory.

As an example, the Company looks to section 11.1.5 of ISO-NE’s Participants Agreement (the “jump ball” provision),2 which has helped optimize the Commission’s decision-making authority

2 Section 11.1.5 of the ISO-NE Participants Agreement provides that if a Market Rule proposal that differs from that proposed by ISO-NE is approved by a Participants Committee vote of 60 percent or more, ISO-NE “shall, as part of

PDF page 5

5

by allowing the Commission to consider fully developed alternatives and, where appropriate, adopt the proposal or combination of proposals it finds just and reasonable. In January 2014, ISO-NE and the New England Power Pool Participants Committee (“NEPOOL”) jointly submitted, pursuant to FPA section 205 and section 11.1.5 of the ISO-NE Participants Agreement, alternative proposals intended to address fleet-wide resource performance problems in New England.3 While ISO-NE’s proposal suggested significant changes to the Forward Capacity Market design and NEPOOL’s proposal involved incremental changes to the Forward Capacity Market and the energy and ancillary services market, the Commission ultimately held that neither proposal, standing alone, was just and reasonable. However, after having the opportunity to review the details of both proposals, the Commission was able to invoke its FPA section 206 rights and direct ISO-NE to file a hybrid of both proposals, finding that “aspects of the two proposals, in combination and as modified by the Commission, constituted a just and reasonable solution to the region’s resource performance problems.”4 Similarly, more recently in 2021, ISO-NE and NEPOOL jointly submitted two alternative proposals, based on two competing methodologies, to calculate Offer Review Trigger Prices in the Forward Capacity Market.5  Again, FERC’s approved approach ended up being one that encompassed different aspects of both proposals. It should be noted, however, that the jump rights in ISO-NE are properly limited by subject matter – to Market Rule proposals

– and cannot be used for any and every ISO-NE governance, planning, transmission, administrative, or manual issue. Further, the proposal alternative to ISO-NE’s must receive at least

any required Section 205 filing, describe the alternate Market Rule proposal in sufficient detail to permit reasonable review by the Commission [and also explain its] reasons for not adopting the [alternate] proposal, and [why it] believes its own proposal is superior….” Section 11.1.5 provides that the Commission may “adopt any or all of ISO[-NE]'s Market Rule proposal or the alternate Market Rule proposal as it finds ... to be just and reasonable and preferable.” ISO-NE Participants Agreement, § 11.1.5.

3 ISO New England Inc., et al., 147 FERC ¶ 61,172 (2014), reh’g denied, 153 FERC ¶ 61,223 (2015) (“Rehearing Order”).
4 Rehearing Order, P 1.
5 See generally ISO New England Inc., 175 FERC ¶ 61,195 (2021), clarified, 176 FERC ¶ 61,125 (2021).

PDF page 6

6

a 60% supermajority threshold and is triggered only when ISO-NE is making a required section 205 filing. Meaning, it is not a free-floating independent filing right for NEPOOL. Capital Power encourages the Commission to consider a PJM-specific alternative-proposal mechanism informed by the guardrails used in ISO-NE, while preserving the existing allocation of section 205 filing rights in PJM. The Company envisions a mechanism whereby if a defined supermajority of Organization of PJM States, Inc. (“OPSI”) or the Members Committee supports an alternative proposal on specified subjects, that alternative could be presented to the Commission alongside PJM’s proposal. The supermajority threshold would be important to ensure that only strongly supported alternatives would be filed before the Commission, thereby avoiding procedural clutter. Ultimately, a jump ball mechanism that is appropriately designed would preserve the Commission’s decisional authority while allowing the record to reflect meaningful alternatives developed through transparent processes.

3. Board Reform to Promote Accountability and Transparency
Capital Power supports reforms that strengthen the transparency and accountability of the PJM Board and specifically suggests two vehicles for doing so: public observation of non- confidential meetings and annual governance reporting. The Commission has long recognized independence as a core characteristic of RTO governance, and transparency is necessary to ensure that independence exists not only in form, but also in practice.6 The Commission has also emphasized the importance of RTO and ISO responsiveness to customers, stakeholders, and ultimately the consumers who benefit from and pay for electricity service.7

6 See, e.g., Regional Transmission Organizations, Order No. 2000, 89 FERC ¶ 61,285 (1999) at 152, order on reh’g, Order No. 2000-A, 90 FERC ¶ 61,201 (2000), aff’d sub nom., Pub. Util. Dist. No. 1 of Snohomish County v. FERC, 272 F.3d 607 (D.C. Cir. 2001).
7 See generally Wholesale Competition in Regions with Organized Elec. Mkts., Order No. 719, 125 FERC ¶ 61,071 (2008), order on reh’g, Order No. 719-A, 128 FERC ¶ 61,059, order on reh’g, Order No. 719-B, 129 FERC ¶ 61,252 (2009).

PDF page 7

7

To be clear, enhanced Board accountability should not be confused with unilateral Board control over detailed market design. The Company asserts that the Board’s proper role is to set strategic direction, ensure that PJM management is prioritizing the region’s most significant risks, and hold management accountable for execution, while the detailed development of market rules should continue to occur through a transparent stakeholder process, subject to Commission review. Longer Board terms, reasonable maximum service limits, and qualification criteria that ensure familiarity with the PJM region would help stabilize Board oversight while preserving independence.

Capital Power supports greater transparency into Board decision-making via public observation of non-confidential strategic sessions where appropriate. Capital Power recognizes that not all Board matters can or should be conducted publicly. Board sessions should remain closed where necessary to address personnel matters, cybersecurity, physical security, enforcement, litigation, privileged legal advice, commercially sensitive information, Critical Energy/Electric Infrastructure Information, or other confidential information protected by applicable law or Commission policy. In addition, to further enhance visibility of the Board’s decision-making processes, Capital Power also supports requiring PJM to provide public explanations when the Board acts on significant market-design, resource adequacy, transmission planning, interconnection, or governance matters. PJM should provide a public report explaining the Board’s disposition, the legal and policy basis for the decision, the principal alternatives considered, the reasons any material alternatives were rejected, and the extent to which the Board’s action reflects or departs from stakeholder positions. Such reforms would not require the Board to become a market design committee or intrude into confidential matters. Rather, they would

PDF page 8

8

enhance confidence that the Board is exercising its oversight role in a transparent, accountable, and independent manner.

Capital Power also recommends that PJM prepare an annual governance report. The Commission has repeatedly asked for evidence and data to understand where the issues with governance lie. An annual governance report would help create that evidence going forward by documenting where governance bottlenecks actually arise and whether reforms are improving the timeliness and quality of PJM decision-making. At a minimum, such a report should identify major initiatives considered during the year; the origin and subject matter of each initiative; committee referrals; elapsed time by stage; number and reasons for deferrals; stakeholder voting outcomes by sector and in the aggregate; Board dispositions; whether alternatives were considered; whether the Board accepted, rejected, or modified committee or stakeholder recommendations; filing dates; implementation dates; whether expedited procedures were used; and whether the initiative later returned for redesign.

For independent power producers and other investors, such information is directly relevant to market confidence. Investors do not require certainty that their preferred policy outcome will prevail. They do require reasonable visibility into how PJM prioritizes issues, where decisions are made, when decisions are expected, and why significant proposals advance, stall, or are rejected. A public governance report would provide PJM, stakeholders, states, and the Commission with a common factual basis for assessing whether governance reforms are improving accountability and process discipline without undermining PJM’s stakeholder-driven framework.

B. State Participation in PJM Governance Needs to be Early, Formal, and Structured, But Jurisdictionally Disciplined.

Capital Power supports earlier and more structured state engagement in PJM governance. Many of the region’s most significant challenges, including resource adequacy, transmission

PDF page 9

9

development, interconnection delays, generation retirements, siting, permitting, and large-load growth, cannot be addressed effectively through wholesale market rules alone. States have direct responsibilities over retail service, resource policy, siting, permitting, and other matters that materially affect whether PJM can maintain reliability and accommodate load growth. State perspectives should therefore be incorporated before positions become entrenched and before major proposals reach the end of the stakeholder process.

Formal state involvement in RTO governance is not novel, and an examination of each model demonstrates the spectrum on which formal participation can exist. Although none should be imported wholesale into PJM, a tailored approach that uses aspects of each may strike the appropriate balance. SPP and its Regional State Committee (“RSC”), comprised of one designated commissioner from each state regulatory commission having jurisdiction, provides perhaps the strongest example of formal state authority. The SPP RSC has “primary” responsibility for determining regional proposals in areas such as transmission cost allocation, financial transmission rights, remote resources, and regional resource adequacy.8 SPP demonstrates that defined state authority over resource adequacy and cost allocation can be formalized without eliminating the RTO Board or stakeholder process.

ISO-NE’s model provides states a formal platform, through its New England State Committee on Electricity (“NESCOE”), while appropriately limiting its authority to unilaterally make tariff changes.  NESCOE represents the policy perspectives of the New England governors on resource adequacy and system planning and expansion, is funded through the ISO’s budget, and is recognized as the FERC-approved Regional State Committee for New England.9 But NESCOE does not have unilateral authority to implement tariff or market-rule changes and instead

8 SPP, Bylaws, First Revised Volume No. 4, § 7.2.
9 ISO-NE, Oversight and Decision-Making, https://www.iso-ne.com/about/corporate-governance.

PDF page 10

10

works within the FERC-approved ISO-NE/NEPOOL stakeholder process.10 This model is instructive because it shows that a formal and sophisticated state role need not become a substitute for stakeholder process or Commission review.

Lastly, MISO provides another useful example. The Organization of MISO States
participates in the MISO stakeholder process, provides recommendations to the MISO Board on policies affecting state interests, intervenes in FERC proceedings, and has a special role in transmission planning and transmission cost allocation under MISO’s governing rules.11 Taken together, these examples demonstrate that formal state participation can be structured along a spectrum, ranging from advisory participation to defined responsibilities over particular state-sensitive subjects.

PJM already has a foundation for such engagement through OPSI, which was created to promote and protect the public interest in reliable and reasonably priced electric service within the PJM Control Area, and provides a vehicle for coordinated state participation. Rather than creating duplicative or conflicting state processes, the Commission should encourage reforms that clarify and strengthen OPSI’s role, coordinate that role with any Governors’ Collaborative function, and provide transparent channels through which state-identified issues can be considered in PJM governance.

Capital Power therefore supports requiring PJM to consult with OPSI before making section 205 filings related to resource adequacy, regional transmission cost allocation, and other matters that materially affect state responsibilities. Capital Power also supports a narrowly tailored state alternative-proposal mechanism, structured like the jump ball mechanism example above,

10 NESCOE, Our Work, https://nescoe.com/our-work/.
11 FERC, Participation in Midcontinent Independent System Operator (MISO) Processes, https://www.ferc.gov/participation-midcontinent-independent-system-operator-miso-processes. See also MISO, FERC Electric Tariff, Fifth Revised Vol. No. 1, Attachment FF (Transmission Expansion Planning Protocol), § I.B.

PDF page 11

11

under which a defined level of state support could require PJM to present an OPSI-supported alternative to the Commission alongside PJM’s own proposal on specified subjects. Such a mechanism should be limited, transparent, and procedural. It should not displace existing stakeholder rights, convert PJM’s stakeholder process into a purely advisory process, or give states general voting authority over wholesale market design.

To further bolster the states’ voice, Capital Power also supports including state representation in the Board nominating process. A state role in the Nominating Committee would improve regional legitimacy and help ensure that Board candidates understand the state-federal interface that is increasingly central to PJM’s reliability, resource adequacy, and transmission challenges. At the same time, Board selection reforms should preserve Board independence and should not make Board members representatives of particular states or constituencies. Finally, any enhanced state participation should be coordinated and transparent. To the extent OPSI, the Governors’ Collaborative, consumer advocates, or other state representatives are given formal roles, those roles should be clearly defined to avoid duplicative processes, inconsistent late-stage interventions, or uncertainty over which state body speaks for which purpose. The objective should be early engagement, durable outcomes, and better information for PJM, stakeholders, states, and the Commission, not another layer of procedural complexity.

III. CONCLUSION
For the foregoing reasons, Capital Power respectfully urges the Commission to pursue targeted PJM governance reforms that improve transparency, accountability, state engagement, and decisional efficiency while preserving meaningful stakeholder participation and the existing balance of section 205-related rights. Capital Power appreciates the Commission’s leadership in this proceeding and looks forward to continued engagement on reforms that support reliable

PDF page 12

12

service, competitive markets, and the investment certainty needed to meet PJM’s evolving resource adequacy and transmission challenges.

Respectfully submitted,
____________________________
Darsh Singh
Senior Legal Counsel
Capital Power Corporation
2300 N Street, NW
Suite 520
Washington, DC 20037
Tel: (989) 633-7963
Email: dasingh@capitalpower.com

Counsel for Capital Power Corporation
Leah Adelman
Senior Advisor, Energy Market & Policy
Capital Power Corporation
2300 N Street, NW
Suite 520
Washington, DC 20037
Email: ladelman@capitalpower.com

August 21, 2026

PDF page 13

13

Appendix

PJM Board Independence

Questions/Comments
Yes
No
1) Should Board members’ terms be extended to five or more years?
Yes

Comments:
2) Should there be a maximum number of years that a Board member may serve (e.g., 10 years)?

Yes

Comments:
3) Should the Board member qualification rules be revised to provide a preference for some Board members that reside in the PJM region?

Yes

Comments:
4) Should the conflict-of-interest rules be revised to reduce the cooling off period for Board members from two years to one year?

Comments:
5) Should restrictions on Board communications be relaxed to enable more communication between the Board and stakeholders?

Yes

Comments:
6) In order to increase transparency, should Board votes be made public or the Board be required to explain its reasoning?

Yes

Comments:
7) In order to increase transparency, should some Board meetings be open or available to the public?

Yes

Comments:
8) Should PJM’s governing documents be revised to explicitly state that the responsibility of PJM and its Board is to serve the public interest?

Yes

Comments:
9) Should state representatives have at least one voting member on the Nominating Committee?

Yes

Comments:
10) Should PJM adopt public performance metrics and tie management compensation to their

PDF page 14

14

Questions/Comments
Yes
No
achievement?

Comments:

Section 205 Filing Rights

Questions/Comments
Yes
No
11) Should the stakeholder process be advisory, i.e., stakeholder votes only inform the Board?

No

Comments:
12) Should PJM have section 205 filing rights over the energy market and ancillary services unencumbered by the requirement to obtain approval of two-thirds of the Members Committee?

No

Comments:
13) Should PJM have section 205 filing rights over Regional Transmission Expansion Planning (RTEP) unencumbered by the requirement to obtain approval of two-thirds of the Members Committee?

Comments:
14) Should the Organization of PJM States Inc (OPSI) have “jump ball” rights over resource adequacy and transmission cost allocation filings when a supermajority of OPSI agrees on an alternative proposal?

Yes

Comments: Yes, provided that, as described in this filing, PJM remains the Section 205 filer and OPSI’s alternative is included for Commission consideration as part of a required PJM filing, rather than filed by OPSI pursuant to an independent or shared Section 205 right

15) Should the Members Committee have “jump ball” filing rights over the portions of the tariff where PJM has 205 filing rights when a supermajority of stakeholders approves an alternative proposal?

Yes

Comments:

Stakeholder Process

Questions/Comments
Yes
No
16) Should the approval threshold in the Members Committee be lowered from two-thirds sector-weighted voting?

Comments:

PDF page 15

15

Questions/Comments
Yes
No
17) Should the voting rules barring affiliate votes, which apply to senior standing committees, also apply to lower-level committees?

No

Comments:

State Participation

Questions/Comments
Yes
No
18) In addition to OPSI, should there be a second state representative group consisting of governors’ representatives and/or state legislators’ representatives?

Comments:
19) Should state representatives have a formal voting role in the stakeholder process (limited to certain topics, such as resource adequacy and regional transmission cost allocation) in addition to the consumer advocate votes?

Comments:
20) Should PJM be required to consult with OPSI prior to making a section 205 filing related to resource adequacy and transmission cost allocation?

Yes

Comments: