AD26-7-000 · 2026-08-21 · Talen Energy Corporation
Motion to Intervene and Comments of Talen Energy Corporation re PJM Governance and Stakeholder Reforms
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Governance and Stakeholder
Reforms
)
)
)
)
Docket No. AD26-7-000
MOTION TO INTERVENE AND COMMENTS OF
TALEN ENERGY CORPORATION
The Federal Energy Regulatory Commission (“FERC” or “Commission”) established
independent system operators (“ISOs”) based on a set of principles, including that the
“management and administration of the ISO should be carried out in an efficient manner.”1 PJM Interconnection, L.L.C.’s (“PJM”) current stakeholder process falls short of this principle. Chairman Laura Swett summarized the PJM stakeholder process recently as “slow where it must be fast, opaque where it must be transparent, and vulnerable to vetoes and agenda control exactly when the region needs immediate action.”2 Chairman Swett’s observation aptly sets forth three priorities the Commission should seek to bolster through PJM governance reforms: efficiency, transparency, and independence.
1 Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities and Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888, 61 Fed. Reg. 21,540 (May 10, 1996) FERC Stats. & Regs. ¶ 31,036 (1996) (providing 11 principles that FERC would use in evaluating the creation of voluntary ISOs, including: (1) the ISO’s governance should be fair and non- discriminatory; (2) the ISO and its employees must have no financial interest in the performance of any power market participant; (3) the ISO should provide open access; (4) the ISO is primarily responsible for short-term reliability; (5) the ISO must have control over the interconnection of transmission; (6) the ISO should be able to identify and relieve constraints on its system; (7) the ISO should have appropriate incentives for efficient management and administration and management and administration of the ISO should be carried out in an efficient manner; (8) the ISO’s pricing policies should promote efficient use and investment in generation, transmission, and consumption; (9) transmission system information should be publicly available on a timely basis; (10) the ISO should develop mechanism to coordinate with neighboring areas; and (11) alternative dispute resolution procedures should be established as a first resort to dispute resolution within the ISO).2 Chairman Laura Swett’s Comments at PJM’s Annual Meeting in Baltimore, MD (May 12, 2026), at https://www.ferc.gov/news-events/news/chairman-laura-swetts-comments-pjms-annual-meeting-baltimore-md- 0.
PDF page 2
2
Talen Energy Corporation (“Talen”) welcomes the opportunity presented by the
Commission to comment on PJM’s governance and stakeholder process. Talen also encourages the Commission to use every tool it possesses to further reforms that will result in PJM’s increased efficiency and transparency, while protecting the independence of the PJM Board.
I. MOTION TO INTERVENE
Pursuant to Rule 214 of the Commission’s Rules of Practice and Procedure,3 Talen respectfully submits this motion to intervene in the above-captioned proceeding. The formal legal name of Talen is Talen Energy Corporation. Talen is a corporation organized and existing under the laws of Delaware. Talen maintains its principal place of business at 2929 Allen Parkway, 22nd Floor, Houston, Texas 77019. Talen is a leading independent power producer and energy infrastructure company which owns and operates approximately 15.7 gigawatts of power infrastructure in the United States. Talen produces and sells electricity, capacity, and ancillary services into wholesale U.S. power markets, including and primarily in PJM. Accordingly, the actions taken by the Commission in this matter will directly affect the interests of Talen. Talen has a direct and material interest in the instant proceeding that no other party can adequately represent. Talen therefore requests that the Commission grant this motion to intervene and permit Talen to participate in this proceeding with full rights as a party thereto.
II. COMMENTS
The Federal Power Act (“FPA”) provides the Commission with authority to regulate ISOs and regional transmission organizations (“RTOs”), such as PJM, as “public utilities” because the
3 18 C.F.R. § 385.214 (2026).
PDF page 3
3
RTOs operate the interstate transmission system.4 As a result, FERC has jurisdiction under FPA Sections 205 and 206 over PJM’s stakeholder process because the stakeholder process “provides input that directly affects the content of jurisdictional practices” and “is one that directly affects jurisdictional rates.”5 The Commission should not hesitate to exercise its jurisdiction to improve the governance and stakeholder process of the largest energy market in the country and ensure that the RTO, including its Board, remains compliant with the Commission’s RTO principles set forth in Order No. 888 and Order No. 2000.6
A. Talen supports reforms that would result in increased efficiency in the PJM
stakeholder and decision-making process.
Electric sector innovation will not wait for PJM. Rather, PJM must meet the moment.
There may be instances where imminent and significant decisions must be made quickly to keep pace with the industry or reliability considerations. PJM’s existing stakeholder process has proven inadequate in this regard. For example, recent and significant Critical Issue Fast Path (“CIFP”) proceedings proved unproductive. PJM’s 2026 CIFP combining Reliability Backstop
Procurement (RBP) and the Connect & Manage (C&M) put forth about a dozen proposals for each
4 PJM Interconnection, L.L.C., 101 FERC ¶ 61,318 at P 25 (2002) (explaining that PJM “as the operator of the transmission facilities that make up the PJM grid and the provider of transmission services within the PJM control area, is just as much a public utility as the owners of those facilities”).5 PJM Interconnection, L.L.C., 157 FERC ¶ 61,229 at P 11 (2016); FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 278 (2016) (providing that FERC’s jurisdiction under FPA Sections 205 and 206 are limited to practices that “directly affect the [wholesale rate]”); see also New England Power Pool Participants Committee, 166 FERC ¶ 61,062 at P 48 (2019) (holding that the New England Power Pool Participants Committee “rules with respect to membership fall within the Commission’s jurisdiction because they directly affect Commission-jurisdictional rates”). 6 Supra at n.1; Order No. 2000, Regional Transmission Organizations, 89 FERC ¶ 61,285 at p. 38 (1999) (providing that RTO independence is based on three main criteria: (1) RTO employes and directors have no financial stake in any market participant; (2) the RTO must have a decision-making process that is independent of control by any market participant or class of participants; and (3) the RTO must have exclusive and independent authority to file changes to its transmission tariff).
PDF page 4
4
issue, with only one RBP proposal receiving stakeholder support.7 The CFIP process for Large Load Additions in 2025 required months of member-driven deliberations and led to twelve separate proposals, none of which were approved by the required threshold of votes.8 In addition, the 2023 CIFP on resource adequacy resulted in 20 rejected packages.9 PJM should avoid such quagmires for certain issues that the PJM Board deems a priority. PJM could publish such priority issues annually, with quarterly updates or on an individual, one-off basis as determined by the PJM Board in its discretion. For an issue that has previously been subject to the stakeholder deliberation process but has lagged therein for any reason, then, to the extent that the PJM Board believes it must act unilaterally, the Board should also be able to label such issues as a priority to avoid further undue delay.
For imminent, priority concerns, the stakeholder process should become advisory. That does not mean the stakeholder process would be circumvented altogether. The PJM Board can benefit from the insights, expertise, and opinions of stakeholders; however, the Board should be able to move quickly to address imminent issues without the need for a prolonged stakeholder process. Similar advisory processes have already been adopted by the California Independent
7 Leith-Yessian, Devin, PJM Stakeholders Endorse 1 Backstop Procurement Proposal, Reject ‘Connect and Manage’, RTO INSIDER (June 30, 2026), available at https://www.rtoinsider.com/135656-pjm-stakeholders- endorse-backstop-procurement-proposal-reject-connect-and-manage/.8 Leith-Yessian, Devin, PJM Stakeholders Reject all CIFP Proposals on Large Loads, RTO INSIDER (Nov. 20, 2025), available at https://www.rtoinsider.com/120206-pjm-stakeholders-reject-all-cifp-proposals-large-loads/.9 Leith-Yessian, Devin, PJM Pushing Forward on Efforts to Meet Rising Data Center Load, RTO INSIDER (Jan. 5, 2026), available at https://www.rtoinsider.com/122643-pjm-pushing-forward-on-efforts-to-meet-rising-data- center-load/.
PDF page 5
5
System Operator (“CAISO”),10 the Midcontinent Independent System Operator (“MISO”)11 and the Southwest Power Pool (“SPP”).12 Consequently, PJM should have FPA Section 205 filing rights unencumbered by the requirement to obtain approval of two-thirds of the Members Committee for issues the Board has deemed a priority. This can extend to issues involving the energy market, ancillary services, regional transmission expansion planning, etc. There is no need to lower the Members Committee approval threshold from two-thirds sector-weighted voting for issues not deemed a priority.
If member votes become advisory for deemed priority issues, then it is reasonable for the Members Committee to have recourse in the form of “jump ball” filing rights over portions of the PJM Tariff when a supermajority of stakeholders approves an alternative proposal. Such a right would be consistent with the ISO New England’s process, whereby the New England Power Pool (“NEPOOL”) may file an alternative proposal under FPA Section 205 if 60% or more stakeholders are in support.13 However, FERC and PJM should cooperate to determine the best way to enable stakeholders to independently reach consensus similar to the dedicated stakeholder process administered by NEPOOL. Subject to the limitations and context above, Talen votes “yes” on Nos. 11, 12, 13, and 15, and votes “no” on No. 16.
10 Corporate Governance Principles, Version #4.2, CALIFORNIA INDEPENDENT SYSTEM OPERATOR (Oct. 15, 2025) (establishing that the CAISO board shall consider stakeholder input, but will ultimately hold decision-making authority).11 Agreement of Transmission Facilities Owners to Organize the Midcontinent Independent System Operator, Inc., MIDCONTINENT INDEPENDENT SYSTEM OPERATOR, INC. (affirming that the MISO Advisory Committee will not excersie control over the MISO board or MISO).12 Governing Documents Tariff, SOUTHWEST POWER POOL (March 31, 2026) (establishing SPP stakeholder committees as “advisory” committees).13 Participants Agreement among ISO New England Inc. and the New England Power Pool and the Individual Participants § 11.1.5.
PDF page 6
6
PJM States should also have a role in the stakeholder process. Talen generally supports State involvement because States have a unique perspective to be able to opine on local issues and priorities. For this reason, Talen is supportive of providing a second state representative group consisting of governors’ representatives and/or state legislators’ representatives, in addition to the Organization of PJM States Inc. (“OPSI”).
Talen also supports OPSI consultation early in the stakeholder process. It would arguably be too late and inefficient to consult with OPSI “prior to making a section 205 filing” because any constructive feedback from OPSI would need to be circulated through the stakeholders again. Talen further supports allowing states to vote for informational purposes on motions before the Members Committee. However, providing formal voting rights to States puts PJM on the precipice of a slippery slope. The Federal Power Act provides the Commission with exclusive jurisdiction over wholesale sales of electricity in the interstate market and “leaves to the States alone, the regulation of [retail electricity sales.]14 States cannot set an interstate wholesale rate because it would “contraven[e] the FPA’s division of authority between state and federal regulators.”15 Accordingly, providing States formal voting rights—or providing OPSI “jump ball” filing rights—is ill-conceived and arguably inconsistent with the FPA. States and state commissions may continue to initiate their own proceedings with FERC should they desire to do so.16 Subject to the limitations and context above, Talen votes “yes” on Nos. 9, 18, and 20 and votes “no” on Nos. 14 and 19.
14 FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 264 (2016).
15 Hughes v. Talen Energy Marketing, LLC, 578 U.S. 150, 163 (2016).16 See, e.g., 18 C.F.R. § 385.206 (providing that any organization or person can file a complaint against another party alleging violation of a statute, rule, order, or other law administered by FERC or any other alleged wrong over which FERC may have jurisdiction).
PDF page 7
7
B. Talen supports reforms that would result in increased transparency in the
PJM stakeholder and decision-making process.
Reasoned decision-making ensures that there is a logical corollary between the facts presented and the decision made. Further, reasoned decision-making protects the legitimacy of the decision-maker.17 The PJM Board should provide the vote count and a reasoned explanation (similar to Decisional Letters) based on the facts and issues considered that resulted in the decision rendered. For this reason, Talen votes “yes” on No. 6.
Legitimacy is also fostered when voting rules bar the furtherance of affiliate interests. As such, Talen also supports applying voting rules barring affiliate votes to lower-level committees. For this reason, Talen votes “yes” on No. 17.
Notwithstanding the need for increased transparency, some existing and proposed
measures may be counterproductive towards the goal of increased efficiency. For example, restrictions on Board and stakeholder communications may undermine efforts to coalesce around best paths forward for imminent or priority issues. More frequent and recurring meetings between the Board and stakeholders would be beneficial for all parties. The Board should also be permitted to entertain individual meeting requests for imminent or “priority” issues. Subject to this limitation and context, Talen votes “yes” on No. 5.
In addition, opening Board meetings to the public may unnecessarily politicize the Board’s decisions and delay progress. PJM would not be alone in holding closed Board meetings.18 For
17 Cf., supra at n.2 (Chairman Swett explaining that complaints regarding PJM’s stakeholder process “are warning signs of a serious legitimacy crisis and a signal that confidence in PJM’s decision making has completely eroded”).18 See ISO-NE, By-Laws, Art. IV (Board meetings are only open to the directors and ISO-NE management); By- Laws of the New York Independent System Operating, Inc., Art. III, sec. 1(c) (Board meetings are closed to Stakeholders, though representatives from FERC and the NYPSC may attend as non-voting participants).
PDF page 8
8
this reason, Talen votes “no” on No. 7. If public guests are allowed in Board meetings, they should be pre-registered, at the invitation of a member, and appear in-person.
C. Talen supports reforms that would protect the independence of the PJM
Board.
The Commission explained in Order No. 2000, that RTO independence is based on three main criteria: (1) RTO employes and directors have no financial stake in any market participant;
(2) the RTO must have a decision-making process that is independent of control by any market participant or class of participants; and (3) the RTO must have exclusive and independent authority to file changes to its transmission tariff.19 The Commission should ensure PJM’s compliance with this criteria, but additional restrictions that becomes superfluous or restrict PJM’s ability to attract the best talent to serve on its Board are unnecessary. For example, Board member qualification rules should not include a preference for PJM residents. Prior experience with and an aptitude for PJM issues is more important than PJM residence. In addition, “cooling off” periods with respect to conflict-of-interest rules are unnecessary, provided that all financial conflict of interest rules remain intact and consistent with Order No. 2000. This approach would be consistent with how other ISO/RTOs, such as CAISO,20 the Electric Reliability Council of Texas,21 the Independent System Operator of New England,22 the New York Independent System Operator (“NYISO”)2319 Supra at n.7.20 See CA Public Utilities Code § 337(b); and Board Selection Policy, Version #5.5, CALIFORNIA INDEPENDENT SYSTEM OPERATOR (Oct. 19, 2025).21 See Amended and Restated Bylaws of Electric Reliability Council of Texas, Inc., ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. (approved on Dec. 20, 2022); and ERCOT Code of Conduct – The Way We Work, ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.22 See Participants Agreement among ISO New England Inc. and the New England Power Pool and the Individual Participants; and ISO New England Inc. Code of Conduct.23 See By-Laws of the New York Independent System Operator, Inc.
PDF page 9
9
and SPP,24 rely on financial conflict of interest rules instead of using a “cooling off” period.25 Accordingly, Talen votes “no” on No. 3 and votes “yes” on No. 4.
It is also not advisable to revise PJM’s governing documents in a manner that could subvert the Board’s independence. Tying management compensation to the achievement of public performance metrics is one such example. The Board is often called on to make difficult decisions that are in the best interests of stakeholders and the public in the long term. A perverse incentive could be created if a Board member’s compensation was tied to short-term metrics. For this reason, Talen votes “no” on No. 10.
It is also unnecessary to include a “public interest” responsibility in PJM’s governing documents. Section 7.7(i) of PJM’s Operating Agreement already provides that the Board’s Primary responsibility” is to
ensure that the President, the other officers of the LLC, and Office
of the Interconnection perform the duties and responsibilities set
forth in the Agreement, including . . . the safe and reliable operation
of the PJM Region . . . operation of a robust, competitive, and non-
discriminatory electric power market in the PJM Region, and . . .
shall not have undue influence over the operation of the PJM
Region.26
As a result, including a “public interest” responsibility would be redundant at best.27 For this reason, Talen votes “no” on No. 8.
24 Governing Documents Tariff, SOUTHWEST POWER POOL (March 31, 2026).25 MISO similarly reduced its cooling off period from two years to one year in 2017. See Midcontinent Independent System Operator, Inc., Docket No. ER17-686-000 (delegated letter order) (issued on Feb. 23, 2017).26 PJM Operating Agreement at Section 7.7(i) (Duties and Responsibilities of the PJM Board) (emphasis added).27 The only RTO/ISO with a specific “public interest” principle is CAISO and the principle is established by the Public Utility Code. See Ca. Pub. Utility Code § 345.5(a) (providing that CAISO “shall conduct its operations consistent with applicable state and federal laws and consistent with the interests of the people of the state”).
PDF page 10
10
Independence can also be reinforced by longer terms, subject to overall caps. Further, Board members should have staggered terms, with 3 seats expiring each cycle allowing for a full Board turnover every 6-years. Talen supports a 6-year term, with a 2-term limit (for a total of 12 years). The twelve-year total term limit is consistent with NYISO’s practice.28 Board members’ terms should expire every 2 years on a staggered basis, to preserve continuity and stability on the Board. Subject to this limitation and context, Talen votes “yes” on Nos. 1 and 2.
28 NYISO Bylaws at Art. II, Sec. 4 and Art. III, Sec. 3(b).
PDF page 11
III. CONCLUSION
Talen appreciates the opportunity to opine on the PJM governance and stakeholder process. The issues facing the RTO are too important and pressing to be bogged down by the existing stakeholder process. The Commission has identified certain measures that would increase the efficiency and transparency of PJM, while protecting the independence of the PJM Board. Talen respectfully requests that the Commission consider its comments provided herein. For ease of reference, Talen has attached hereto an Appendix with its standalone answers to the Commission’s questions.
Respectfully Submitted,
/s/ Jennifer Mansh
Jennifer Mansh
Senior Vice President, Regulatory
Counsel
Talen Energy Corp.
600 Hamilton Street, Suite 600
Allentown, PA 18101
Jennifer.Mansh@talenenergy.com
/s/ Andrew DeVore
Andrew DeVore
Lilla Grisham
Kirkland & Ellis LLP
1301 Pennsylvania Avenue, N.W.
Washington, D.C. 20004
(202) 389-3117
andrew.devore@kirkland.com
lilla.grisham@kirkland.com
Counsel for Talen Energy Corporation
Dated: August 21, 2026
PDF page 12
APPENDIX A
TALEN’S RESPONSES TO THE COMMISSION’S POST-TECHNICAL CONFERENCE QUESTIONS PJM Board Independence
Questions/Comments
Yes No
1) Should Board members’ terms be extended to five or more years? X
2) Should there be a maximum number of years that a Board member may serve (e.g., 10 years)?
X
3) Should the Board member qualification rules be revised to provide a preference for some Board members that reside in the PJM region?
X
4) Should the conflict-of-interest rules be revised to reduce the cooling off period for Board members from two years to one year?
X
5) Should restrictions on Board communications be relaxed to enable more communication between the Board and stakeholders?
X
6) In order to increase transparency, should Board votes be made public or the Board be required to explain its reasoning?
X
7) In order to increase transparency, should some Board meetings be open or available to the public?
X
8) Should PJM’s governing documents be revised to explicitly state that the responsibility of PJM and its Board is to serve the public interest?
X
9) Should state representatives have at least one voting member on the Nominating Committee?
X
10) Should PJM adopt public performance metrics and tie management compensation to their achievement?
X
Section 205 Filing Rights
Questions/Comments
Yes No
11) Should the stakeholder process be advisory, i.e., stakeholder votes only inform the Board?
X
PDF page 13
13
Questions/Comments
Yes No
12) Should PJM have section 205 filing rights over the energy market and ancillary services unencumbered by the requirement to obtain approval of two-thirds of the Members Committee?
X
13) Should PJM have section 205 filing rights over Regional Transmission Expansion Planning (RTEP) unencumbered by the requirement to obtain approval of two-thirds of the Members Committee?
X
14) Should the Organization of PJM States Inc (OPSI) have “jump ball” rights over resource adequacy and transmission cost allocation filings when a supermajority of OPSI agrees on an alternative proposal?
X
15) Should the Members Committee have “jump ball” filing rights over the portions of the tariff where PJM has 205 filing rights when a supermajority of stakeholders approves an alternative proposal?
X
Stakeholder Process
Questions/Comments
Yes No
16) Should the approval threshold in the Members Committee be lowered from two-thirds sector-weighted voting?
X
17) Should the voting rules barring affiliate votes, which apply to senior standing committees, also apply to lower-level committees? X
State Participation
Questions/Comments
Yes No
18) In addition to OPSI, should there be a second state representative group consisting of governors’ representatives and/or state legislators’ representatives?
X
19) Should state representatives have a formal voting role in the stakeholder process (limited to certain topics, such as resource adequacy and regional transmission cost allocation) in addition to the consumer advocate votes?
X
20) Should PJM be required to consult with OPSI prior to making a section 205 filing related to resource adequacy and transmission cost allocation? X
PDF page 14
CERTIFICATE OF SERVICE
I hereby certify that I have this day caused to be served the foregoing document upon each person designated on the official service list compiled by the Secretary in this docket. Dated at Washington, D.C. this 21st day of August, 2026.
/s/ Andrew DeVore
Andrew DeVore
Kirkland & Ellis LLP
1301 Pennsylvania Avenue, N.W.
Washington, D.C. 20004
Counsel for Talen Energy Corporation