AD26-7-000 · 2026-08-21 · Individual No Affiliation

Post-Technical Conference Joint Statement of Current and Former Sector Representatives at the PJM Nominating Committee

PDF page 1

1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Governance and Stakeholder Reforms

Docket No. AD26-7-000

POST-TECHNICAL CONFERENCE JOINT STATEMENT OF CURRENT
AND FORMER SECTOR REPRESENTATIVES AT THE
PJM NOMINATING COMMITTEE
The undersigned Current and Former Sector Representatives at the PJM Nominating Committee (the “Representatives”) are submitting this Joint Statement to assist the Commission and participants in this proceeding with an understanding of the Nominating Committee process and their experience on the Nominating Committee.  Nothing in this Joint Statement is intended to provide a response or opinion on the questions the Commission has circulated in preparation for Settlement discussions in September.1

Governing Documents: Section 7.1 of the Operating Agreement establishes the Nominating Committee.  This Section prescribes Board qualification requirements and Nominating Committee deadlines2.  The PJM Manual 34 on the Stakeholder Process restates the Operating Agreement’s provisions.  The Manual notes that the Nominating Committee has its own Charter and Code of Conduct.

The Nominating Committee Charter and Formation of the Committee
The Members Handbook contains the Nominating Committee Charter.  Of particular importance is the composition of the committee: Three Board Members who are not up for re-election, of which one member cannot vote but chairs the committee.  In addition, each of the five sectors in PJM elects a representative annually to the committee.  The PJM President may also participate as an ex officio non-voting member.  Finally, the Secretary of PJM shall attend to serve as the secretary of the Nominating Committee, and the Assistant to the President and PJM Board shall attend for the purpose of scheduling meetings.

The Nominating Committee’s mission is to identify and nominate qualified Board of Managers candidates for election by the Members Committee, and to report annually to the Members on the nomination process.  A quorum is necessary for a vote to be successful.  Votes are by blind ballot.

1 PJM Governance and Stakeholder Reforms, Docket No. AD26-7-000. 2 Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. § 7.1, https://agreements.pjm.com/oa/18380 (last visited Aug. 19, 2026 (the “OA”).

PDF page 2

2

Core duties: Developing/reviewing Board qualification criteria; at its option, retaining an independent consulting firm to identify candidates; vetting that firm's independence annually; and distributing nominee information to the Members Committee at least 30 days before the Annual Meeting.3

The Nominating Committee Code of Conduct.
Prior to the commencement of the annual work of the Nominating Committee, each member of the Nominating Committee and each ex officio participant in the Nominating Committee executes a certification that he or she has read and understood the content, spirit and intent of the Nominating Committee Code of Conduct and agrees that he or she will fully abide by its terms. Although the Code of Conduct provides the process by which candidates are identified, interviewed and then elected, the two most salient points are the confidentiality provisions and the requirement that the Representatives set aside their sector interests for the greater needs of PJM: “1. The members of the Nominating Committee shall undertake and fulfill their duties in furtherance of the best interests of PJM without regard to the individual or affiliated company interests of any member of the Nominating Committee and without regard to the interests of any other PJM member or group of PJM members.”

“2. All information that the members of the Nominating Committee receive in undertaking and performing their duties shall be deemed confidential information of PJM and shall not be disclosed in any manner to any other member of PJM or any other person, except as specifically permitted by this Code of Conduct.”4

The Process.  The Nominating Committee meets as frequently as necessary to accomplish their mission.  It has been the course of conduct that an outside consultant is hired to assist in identifying and vetting applicants.  The only exception to the confidentiality provisions governing the Nominating Committee is that the consultant is privy to confidential information and is required to sign confidentiality agreements.

The Representatives would like to highlight the confidentiality that is critical in this process.  Many candidates are applying while employed and would leave their employment if chosen.  Other candidates want their privacy to be respected in the event they are not chosen.  The Representatives believe that the pool of candidates could diminish if this strict adherence to confidentiality were not maintained.  Additionally, the Code of Conduct explicitly states at the outset that “it is the policy of PJM to attract the best qualified candidates to serve on the PJM Board.  In order to fulfill that goal, it is the policy of PJM to employ nominating procedures that strictly maintain the

3 https://www.pjm.com/-/media/DotCom/committees-groups/committees/nc/postings/charter.pdf.
4 Id.

PDF page 3

3

confidentiality of the identity of potential Board candidates and that ensure that those involved in the nomination process strictly follow procedures that maintain such confidentiality.” Representatives may choose to meet with their sector members to discuss the open Board seats, what type of candidate would be a good fit, and to encourage stakeholder nominations as well. With respect to a Board member who could run for re-election, the Representatives may receive input from others but must abide by the confidentiality provisions of the Code of Conduct. Stakeholders may provide input with respect to an individual board member whose term is up for renomination.  The Representatives may not disclose whether a Board member is seeking re- election and may not disclose any non-public information.

The usual practice has been that the consultant will manage the vetting of candidate’s resumes, which may be submitted by anyone, including a Member of PJM, a state regulator, or even a stakeholder with an interest in PJM.  In fact, the public notice of the initiation of the Nominating Committee with information about the qualifications and experience being targeted includes information for how resumes may be provided to the consultant.  The consultant identifies potential candidates, the Nominating Committee asks questions to understand the background, experience and potential conflicts of those potential candidates.  Ultimately, the Nominating Committee conducts a blind vote on the list of potential candidates provided by the consultant indicating which candidates the Nominating Committee desires to further consider.  The consultant then narrows the list down based on the candidates that received the most votes.  At this point, the candidates are discussed, and a decision is made about whether a candidate should proceed to the next step of evaluation.  In recent years, best efforts have been made to ensure candidates are interviewed by the entire Nominating Committee.

Representatives evaluate candidates based on the candidates’ qualifications and whether they meet the requirements to fill the open Board seat.  They consider each candidate’s career, integrity, personality fit with the Board, and, most importantly, whether or how the candidate would help further the best interests of PJM.  Although the Member Representatives are selected by their respective sectors, their role on the nominating committee is not to advocate for the interest or preferred outcome of those sectors.  In evaluating candidates, representatives are expected to set aside sector-specific commercial and policy interests and exercise independent judgement based on the qualifications established in the Operating Agreement, the needs of the Board as a whole, and the best interest of PJM.  Sector affiliation provides the Committee with a diversity of perspectives, but it does not determine which candidate a Representative supports.  Consistent with that responsibility, the Committee focuses on identifying candidates who are likely to form their own opinions that are supported by expertise in fields necessary for PJM to function, and question PJM staff, PJM management, the Independent Market Monitor and stakeholders.  The most challenging discussions occur with respect to which candidate has the best qualifications to fill a seat when candidates could satisfy various qualifications identified in the Operating Agreement. After a candidate has been nominated by the Nominating Committee, the consultant goes through typical background checks.  Under Section 9 of the Code, the President then informs the candidates of their selection, as well as the Board and the Members Committee.

PDF page 4

4

Finally, a Members Committee vote on the Board nominations takes place at the PJM Annual Meeting held in the Spring.  If the Members Committee does not achieve a quorum or an affirmative vote to approve the Nominating Committee’s recommendations, then the process starts anew.  While there have been sector votes against specific nominees, it is rare that the majority of the Members Committee does not approve the Nominating Committee’s recommendations, as occurred in 2025.  Overall, the Nominating Committee process has generally resulted in Board candidates receiving the necessary support and has served as an important component of PJM’s governance for decades.  The membership has a high degree of confidence and respect for the integrity of the Nominating Committee process that has supported a decades-long track record of success for PJM notwithstanding the current resource adequacy and market challenges. Again, the Representatives appreciate the opportunity to provide insight into their experience on the Nominating Committee in hopes of aiding the Commission in its deliberations of PJM governance.

Electric Distributors Representatives:
End Use Sector Representatives:

Rory Sweeney
Principal, PJM & FERC Regulatory Lead
Northern Virginia Electric Cooperative
P.O. Box 2710 | Manassas, VA 20108
(571) 866-1563
rsweeney@novec.com
Susan Bruce
Counsel to PJM Industrial Customer Coalition
McNees Wallace & Nurick LLC
P.O. Box 1166
Harrisburg, PA  17108
(717) 237-5254
SBruce@mcneeslaw.com
Adrien I. Ford
Working at Old Dominion Electric
 Cooperative during NC Service, now:
VP, Government & Regulatory Affairs and
Market Development
Constellation Energy Generation, LLC
250 Massachusetts Ave. NW, Suite 760
Washington, D.C. 20001
(215)251-2427
Adrien.Ford@constellation.com
Jordan Nader
Senior Fellow, Energy & Environment
R Street Institute.
1411 K Street N.W., Suite 900
Washington, D.C. 20005
(513) 257-3058
jnader@rstreet.org
Signing in an individual capacity
Kevin Zemanek
Vice President of Operations
Buckeye Power, Inc
6677 Busch Blvd.
Columbus, Ohio 43229
(614) 430-7800
kzemanek@ohioec.org

PDF page 5

5

Generation Owners Sector Representatives: Other Suppliers Sector Representatives:

Michael R. Borgatti
Co-Chief Executive Officer | Gabel
Associates, Inc.
Managing Director | Wholesale Power &
Markets Services Group
2001 Market Street, Suite 2500
Philadelphia, Pennsylvania 19103
Phone: (732) 296-0770
Mobile: (848) 459-6436
Michael.Borgatti@gabelassociates.com
Neal A. Fitch
Senior Director, Regulatory Affairs
NRG Energy, Inc.
804 Carnegie Center
Princeton NJ 08540
(713) 302-1284
Neal.Fitch@nrg.com
Sean Chang
Director, Regulatory Affairs
Shell Energy North America (US), L.P.
1000 Main Street, Level 12
Houston, TX  77002
(713) 230-3340
Sean.Chang@shell.com
S. Ken Foldare
Director, RTO and Regulatory Affairs
Tangibl Inc.
Phone: (610) 255-2333
Mobile: (484) 241-1751
Ken.foldare@tangiblinc.com
Noha Sidhom
Executive Director
Energy Trading Institute Organization
(571) 242-0436
Noha@energytradinginstitute.org
Abhishek Josh Ghosh
Senior Manager, Market Development
Constellation Energy Generation, LLC
250 Massachusetts Ave. NW, Suite 760
Washington, D.C. 20001
(610) 419-9201
josh.ghosh@constellation.com
Bruce Bleiweis
BN Energy Advisors LLC
(914) 953-8753
bruce@bnenergyadvisor.com
Marjorie Philips
Sr. Vice President, Wholesale Market Policy
LS Power Development, LLC
250 West 55th Street, 31st Floor
New York, NY 10019
(610) 401-3612
mphilips@lspower.com
Jeffrey Whitehead
JW Energy Solutions, LLC
1486 Stirling Drive
Wayne PA 19087
(484) 576-9151
jeff@jwenergysolutions.com

PDF page 6

6

PDF page 7

7

On behalf of the Transmission Owners:

Jason Barker
[Working at Exelon during Committee service] Vice President, Regulatory Affairs

VC Renewables LLC
110 Edison Place, Suite 312
Newark, NJ 07102
bja@vcrenewables.com
Laura Yovanovich
Senior Regulatory Policy Specialist
Electric - Transmission
PPL Utilities Corporation
827 Hausman Road
Allentown, PA  18104
(610)235-7181
LYovanovich@pplweb.com
Denise R. Foster Cronin
Chief Compliance Officer and SVP
East Kentucky Power Cooperative, Inc. 4775 Lexington Road, P.O. Box 707

Winchester, KY 40392-0707
Office: (859) 745-9615
Cell: (610)220-6382
denise.cronin@ekpc.coop
John Horstmann
Sr. Director RTO Affairs
The Dayton Power and Light Company
 dba AES Ohio
Office: (610) 933-3170
Mobile: (610)724-9084
john.horstmann@aes.com
James G. Davis
Regulatory and Market Policy
 Senior Strategic Advisor
Dominion Energy Services, Inc.
120 Tredegar Street
Richmond, VA 23219
(804) 819-2718
james.g.davis@dominionenergy.com