PJM Interconnection, L.L.C. submits notice of Compliance Filing submitted on 08/17/2026 in compliance with the directives in the 06/18/2026 Order
PDF page 1
1200 G Street, N.W., Suite 600
Washington, D.C. 20005-3898
Phone: 202.393.1200
Fax: 202.393.1240
wrightlaw.com
August 26, 2026
Honorable Debbie-Anne A. Reese
Secretary
Federal Energy Regulatory Commission
888 First Street, NE, Room 1A
Washington, DC 20426
Re:
PJM Interconnection, L.L.C., Docket No. EL25-49-000, et al.
Compliance Filing in Docket No. ER26-1479-002
Dear Secretary Reese:
This letter, being served on all parties to the above-referenced proceeding, confirms that PJM Interconnection, L.L.C. (“PJM”) submitted on August 17, 2026, a filing in Docket No. ER26-1479-002 (Accession No. 20260817-5195) in compliance with the Federal Energy Regulatory Commission’s sixty-day compliance directives in the June 18, 2026 order1 and the notice granting an extension of time for certain compliance obligations.2 PJM requested an effective date of October 17, 2026, for the revisions in Parts I, III, VI, VII, VIII, and IX and June 1, 2028, for the provisions in Part XI. On August 18, 2026, the Commission set 5 PM ET on September 8, 2026, for comments on this filing.31 PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026).2 PJM Interconnection, L.L.C., Notice of Extension of Time, Docket Nos. EL25-49-002, et al. (Aug. 14, 2026).3 Harquahala Sun 1, LLC, Harquahala Sun 2, LLC, HV Sun SFA Manager 1, LLC, MEC Phase 1, LLC, MEC Phase 2, LLC, Olympus Phase 1, LLC, Olympus Phase 2, LLC, Olympus Phase 3, LLC, Saguaro Bidco Inc., Combined Notice of Filings # 1, Docket Nos. EC26-140-000, et al. (Aug. 18, 2026).
PDF page 2
Honorable Debbie-Anne A. Reese
August 26, 2026
Page 2
Respectfully submitted,
/s/ Wendy B. Warren
Craig Glazer
Vice President – Federal Government Policy PJM Interconnection, L.L.C.
1200 G Street, NW, Suite 600
Washington, DC 20005
202-423-4743
craig.glazer@pjm.com
Mark J. Stanisz
Associate General Counsel
PJM Interconnection, L.L.C.
2750 Monroe Blvd,
Audubon, PA 19403
610-666-8800
mark.stanisz@pjm.com
August 26, 2026
Wendy B. Warren
Ruth M. Porter
Wright & Talisman, P.C.
1200 G Street, NW, Suite 600
Washington, DC 20005
202-393-1200
warren@wrightlaw.com
porter@wrightlaw.com
Counsel for
PJM Interconnection, L.L.C.
PDF page 3
CERTIFICATE OF SERVICE
I hereby certify that I have this 26th day of August 2026 caused a copy of the foregoing document to be served upon each person designated on the official service list compiled by the Secretary in this proceeding.
/s/ Ruth M. Porter
Ruth M. Porter
Wright & Talisman, P.C.
1200 G Street, NW, Suite 600
Washington, D.C. 20005
(202) 393-1200
porter@wrightlaw.com