ER26-3552-000 · 2026-08-28 · Michigan Environmental Justice Coalition, Community Collaboration on Climate Change and 2 others

Motion of Michigan Environmental Justice Coalition, et al. for Extension of Time to Submit Comments on the 08/18/2026 filing by the Midcontinent Independent…

PDF page 1

1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

Midcontinent Independent System Operator,
Inc.

Zero Injection Generator
Interconnection Agreement
)
)
)
)
)
)
)

Docket No. ER26-3552-000

MOTION OF PUBLIC INTEREST ORGANIZATIONS
FOR EXTENSION OF TIME TO SUBMIT COMMENTS

Pursuant to Rule 212 and 2008 of the Federal Energy Regulatory Commission’s (“Commission”) Rules of Practice and Procedure,1 Michigan Environmental Justice Coalition, Community Collaboration on Climate Change, Natural Resources Defense Council, and Sustainable FERC Project (collectively, “Public Interest Organizations”) respectfully move for an extension of time to submit comments on the August 18, 2026 filing submitted by the Midcontinent Independent System Operator, Inc. (“MISO”) to comply with the Commission’s recent Show Cause Order in Docket No. EL26-70.2  As discussed further below, Public Interest Organizations request an extension of the comment deadline from September 8, 2026 to September 15, 2026 to facilitate more fulsome consideration of the over-1,800-page filing and to support thorough comments to aid the Commission’s analysis of MISO’s proposal.

1 18 C.F.R. §§ 385.212 and 385.2008. 2 Midcontinent Independent System Operator, Inc., 195 FERC ¶ 61,212 (June 18, 2026).

PDF page 2

2

Public Interest Organizations request the Commission set a comment date of September 2, 2026 on this motion and render a decision by September 4, 2026, to allow parties to effectively plan their responses to MISO’s filing.3

I. MOTION FOR EXTENSION OF TIME
The Commission may extend filing deadlines for good cause.4  Here, good cause exists for the Commission to grant Public Interest Organizations’ request.  MISO’s Zero-Injection Generator Interconnection Agreement (“ZGIA”) filing responds to a lengthy Show Cause Order that itself followed a multi-stage rulemaking process5 in response to action by the United States Department of Energy.  The Commission’s Show Cause Order charged MISO with showing why its existing tariff should be found just and reasonable on certain issues concerning the integration of large electric loads into the bulk power system, or else with filing tariff amendments to render the tariff just and reasonable.  MISO and the MISO Transmission Owners then sought a 90-day abeyance of MISO’s response deadline (August 17, 2026) under the Show Cause Order, arguing that several new policy reforms, including ZGIA, to be codified through Section 205 tariff proposals during the abeyance period will adequately respond to the Show Cause Order.6   MISO expressly presents its Zero-Injection Generator Interconnection proposal in the instant filing as part of its response to the Show Cause Order.7

3 18 C.F.R. § 385.213(d)(1)(i) (setting five days for answers to motions for extension of time).
4 18 C.F.R. § 385.2008(a).
5 Advanced Notice of Proposed Rulemaking, Accession No. 20251027-4001; Notice Inviting Comments (Oct. 27, 2025), Accession No. 20251027-3056; Letter from Secretary of Energy (Oct. 23, 2025), https://www.energy.gov/sites/default/files/2025-10/403%20Large%20Loads%20Letter.pdf.
6 Motion of the Midcontinent Independent System Operator, Inc. and the MISO Transmission Owners to Hold Proceeding in Abeyance, Accession No. 20260803-5249 (Aug. 3, 2026).
7 Transmittal Letter at 1, 2.

PDF page 3

3

Public Interest Organizations, as well as other parties, would benefit from the additional time to review the ZGIA filing, evaluate the issues presented, consult with relevant technical and legal personnel, and prepare meaningful comments for the Commission’s consideration.  The complexity of the rulemaking process, Show Cause Order, and the instant ZGIA filing warrant providing commenters this additional time.  Furthermore, during the comment period set by the Commission, MISO also invited seven separate comment pieces from stakeholders at the August 27, 2026 Large Load Working Group meeting,8 and five separate comment pieces from stakeholders at the August 19, 2026 Resource Adequacy Subcommittee meeting,9 further constraining the availability of interested parties to craft responsive comments for submission to the Commission.  Finally, MISO has proposed an effective date of October 18, 2026, so an extension of seven days to September 15, 2026 would still give MISO and other parties adequate opportunity to respond to the first round of comments.

II. REQUEST FOR ACTION BY SEPTEMBER 4, 2026
Public Interest Organizations respectfully request that the Commission act on this request for extension of time by September 4, 2026.  Action by that date is important so that Public Interest Organizations can best structure their comments to MISO’s filing and provide as detailed and thorough a comment filing as possible.

8 https://www.misoenergy.org/events/2026/large-load-working-group-llwg---august-27-2026.
9 https://www.misoenergy.org/events/2026/resource-adequacy-subcommittee-rasc---august-19-2026.

PDF page 4

4

III. CONCLUSION
For the reasons given above, Public Interest Organizations request the Commission issue an order no later than September 4, 2026, granting the requested extension of time, until September 15, 2026, to comment on MISO’s ZGIA filing.

Respectfully submitted,

Dated: August 28, 2026

/s/ Sameer H. Doshi
Sameer H. Doshi
Christine Powell
Aaron Stemplewicz
Aaliyah Adkins
Earthjustice
311 S. Wacker Dr., 14th Floor
Chicago, IL 60606
sdoshi@earthjustice.org
cpowell@earthjustice.org
astemplewicz@earthjustice.org
aadkins@earthjustice.org

Attorneys for Michigan Environmental
Justice Coalition and Community
Collaboration on Climate Change

/s/ Anna Markowski
Director, Midwest
Climate and Clean Energy
Natural Resources Defense Council
20 North Wacker Drive, Suite 1600
Chicago, IL 60606
(312) 651-7927
amarkowski@nrdc.org

/s/ Natalie McIntire
Senior Advocate
Sustainable FERC Project
Natural Resources Defense Council
20 North Wacker Drive, Suite 1600
Chicago, IL 60606
(312) 995-5907
nmcintire@nrdc.org

PDF page 5

5

CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding.

Dated this 28th day of August, 2026.

/s/ Sameer H. Doshi
Sameer H. Doshi
Senior Attorney
Earthjustice
311 S. Wacker Dr., 14th Floor
Chicago, IL 60606
sdoshi@earthjustice.org