ER26-3515-000 · 2026-09-01 · East Kentucky Power Cooperative, Inc.

Answer of East Kentucky Power Cooperative, Inc. in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in…

PDF page 1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

PJM Interconnection, L.L.C.
)
Docket No. ER26-3515-000

ANSWER OF
EAST KENTUCKY POWER COOPERATIVE, INC. TO
MOTION FOR EXTENSION OF TIME TO FILE COMMENTS

Pursuant to Rule 213 of the Commission’s Rules of Practice and Procedure1 and the August 31, 2026 Notice Shortening Answer Period in this proceeding,2 East Kentucky Power Cooperative, Inc. (“EKPC”)3 submits this Answer in support of the Motion for Extension of Time filed by the Organization of PJM States, Inc. (“OPSI”).4 In this proceeding, PJM Interconnection, L.L.C. (“PJM”) has proposed revisions to its Open Access Transmission Tariff (“Tariff”) and Reliability Assurance Agreement Among Load Serving Entities (“RAA”) to implement Interim Resource Adequacy Service (“IRAS”). PJM’s proposal is complex and materially different from the “Connect and Manage” (the predecessor to IRAS) proposal considered in the stakeholder process. Allowing participants additional time to review PJM’s proposal and provide substantive comments will provide for a more thorough and complete record for the Commission to review as it considers PJM’s proposal. An extension of time to September 14, 2026 is reasonable given the complexities of PJM’s proposal, and the requested extension is consistent with Commission precedent in recent

1 18 C.F.R. § 385.213 (2026).
2 PJM Interconnection, L.L.C., “Notice Shortening Answer Period,” Docket No. ER26-3515-000 (Aug. 31, 2026).
3 EKPC filed a doc-less motion to intervene in this proceeding on August 18, 2026.
4 PJM Interconnection, L.L.C., “Motion for Extension of Time of The Organization of PJM States, Inc.,” Docket No. ER26-3515-000 (filed Aug. 28, 2026) (“Motion”).

PDF page 2

2
proceedings that involve similarly complex issues.5 Therefore, EKPC respectfully requests that the Commission grant OPSI’s request for an extension of the comment deadline in this proceeding.

Respectfully submitted,

Denise R. Foster Cronin
Chief Compliance Officer and Senior Vice
President
East Kentucky Power Cooperative, Inc.
4775 Lexington Road, P.O. Box 707
Winchester, KY 40392-0707
Tel.: 859-745-9615
Email: denise.cronin@ekpc.coop

On behalf of
East Kentucky Power Cooperative, Inc.

/s/ Daniel E. Frank

Daniel E. Frank
Allison E. S. Salvia
Kelly A. Cuthbertson
Adriana J. Santana
Eversheds Sutherland (US) LLP
700 Sixth St., N.W., Suite 700
Washington, DC 20001-3980
Tel.: 202-383-0100
Email: danielfrank@eversheds-sutherland.com
allisonsalvia@eversheds-sutherland.com
kellycuthbertson@eversheds-sutherland.com
anasantana@eversheds-sutherland.com

Counsel for
East Kentucky Power Cooperative, Inc.

Dated: September 1, 2026

5 See, e.g., Pennsylvania Public Utility Commission v. PJM Interconnection, L.L.C., “Notice of Extension of Time,” Docket No. EL26-98-000 (Sept. 1, 2026) (granting extension of time for complaint involving complex issues).

PDF page 3

Certificate of Service

I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding. Dated at Washington, DC this 1st day of September, 2026.

/s/ Allison E. S. Salvia
Allison E. S. Salvia