ER26-3515-000 · 2026-09-03 · Ohio Energy Leadership Council
Motion of Ohio Energy Leadership Council to Intervene
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
)
)
)
Docket No. ER26-3515-000
MOTION OF OHIO ENERGY LEADERSHIP COUNCIL TO INTERVENE
Pursuant to Rules 212 and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (the “Commission” or “FERC”), 18 C.F.R. §§ 385.212 and 385.214, Ohio Energy Leadership Council (“OELC”) respectfully submits this motion to intervene in the above- captioned proceeding.
I. COMMUNICATIONS AND CORRESPONDENCE
The names and addresses of the individuals who are to be served with future notices, orders, pleadings, correspondence, and other documents in this proceeding are stated below:
David F. Proaño
David F. Proaño (Counsel of Record)
Benjamin A. Kurtz
BAKER & HOSTETLER LLP
127 Public Square, Suite 2000
Cleveland, OH 44114
216-621-0200 / Fax 216-696-0740
Email: dproano@bakerlaw.com
Email: bkurtz@bakerlaw.com
*Willing to Accept Service by Email*
COUNSEL FOR OHIO ENERGY
LEADERSHIP COUNCIL
PDF page 2
2
II. MOTION TO INTERVENE
On August 13, 2026, PJM Interconnection, L.L.C. (“PJM”) filed, pursuant to section 205 of the Federal Power Act (“FPA”), 16 U.S.C. § 824d, proposed revisions to the PJM Open Access Transmission Tariff (“Tariff”) and the Reliability Assurance Agreement Among Load Serving Entities (“RAA”) to establish Interim Resource Adequacy Service (“IRAS”) and a Large Load Registry. PJM proposes that IRAS be available beginning with the 2027/2028 Delivery Year during periods in which system conditions indicate insufficient resources to reliably meet demand in real-time operations. PJM also requests that the Commission accept the proposed Tariff and RAA revisions effective October 12, 2026.
OELC is a not-for-profit trade association that represents its members’ interests in utility and ratemaking matters in Ohio. OELC advocates for fair, transparent, and reasonable utility tariffs and rates so that Ohio remains an attractive place for businesses and enterprises to remain, grow, and invest. OELC’s members include energy-intensive manufacturing, industrial, educational, institutional, information-technology, and retail business customers in Ohio. Collectively, OELC’s members annually consume many billions of kilowatt-hours of electricity and are major contributors to Ohio’s economy and employment sector.
OELC has a direct, immediate, and substantial interest in this proceeding. OELC’s members include large commercial and industrial energy customers in Ohio that are served in the PJM Region. PJM’s proposed IRAS framework would establish a new mechanism for real-time load-reduction actions in Electric Distributor zones or areas during specified emergency conditions. Under the proposal, PJM may direct an Electric Distributor zone or area to reduce load up to the capacity quantity attributable to Eligible New Large Loads in that zone or area. The proposed Large Load Registry, related definitions of Large Load and New Large Load, requirements concerning new capacity for New Large Loads, and proposed revisions affecting the
PDF page 3
3
Variable Resource Requirement Curve may also affect the reliability, rates, terms, and conditions of electric service received by OELC’s members.
OELC’s interests include ensuring that the Commission’s disposition of PJM’s proposed IRAS and Large Load Registry protects existing commercial and industrial customers through just, reasonable, and not unduly discriminatory rates, terms, and conditions; that the proposed framework does not result in inappropriate cost shifts; and that it appropriately accounts for the reliability and affordability effects of the proposed revisions on Ohio customers. These interests directly implicate OELC’s mission to promote customer-driven policies supporting adequate, reliable, and efficient delivery and supply of energy at competitive, reasonable, and transparent rates.
OELC’s participation is in the public interest and will assist the Commission in developing a full and complete record. OELC and its members have substantial experience with electric-utility rates, tariffs, resource adequacy, reliability, infrastructure planning, and the economic effects of electricity costs on Ohio businesses and institutions. OELC can provide the Commission the perspective of large commercial and industrial customers that depend on reliable and competitively priced electricity service and may be affected by the proposed IRAS framework and related Tariff and RAA revisions.
No other party can adequately represent OELC’s interests. OELC’s members have distinct interests as large energy consumers in Ohio and as customers potentially affected by the proposed IRAS framework, including its load-reduction mechanisms, resource-adequacy requirements, Large Load Registry, and related Tariff and RAA revisions. This motion is timely, will not unduly delay or prejudice any party, and satisfies the requirements for intervention under 18 C.F.R. § 385.214.
PDF page 4
4
III. CONCLUSION
WHEREFORE, OELC respectfully requests that the Commission grant this motion to intervene and permit OELC to participate fully in this proceeding for all purposes.
Date: September 3, 2026
Respectfully submitted,
/s/ David F. Proaño
David F. Proaño (Counsel of Record)
Benjamin A. Kurtz
BAKER & HOSTETLER LLP
127 Public Square, Suite 2000
Cleveland, OH 44114
216-621-0200 / Fax 216-696-0740
Email: dproano@bakerlaw.com
Email: bkurtz@bakerlaw.com
*Willing to Accept Service by Email*
COUNSEL FOR OHIO ENERGY
LEADERSHIP COUNCIL
PDF page 5
CERTIFICATE OF SERVICE
I hereby certify that on this third day of September 2026, I served the foregoing document by electronic means on each person listed on the Federal Energy Regulatory Commission’s official service list in Docket No. ER26-3515-000.
chum@wrightlaw.com;
collins@wrightlaw.com;
craig.glazer@pjm.com;
mark.stanisz@pjm.com;
jesse.jacobe@pjm.com;
neil@persistenceanalyticsgroup.com;
Suzette.Krausen@monitoringanalytics.com;
jeffrey.mayes@monitoringanalytics.com;
Joseph.Bowring@monitoringanalytics.com;
dmabry@mwn.com;
sbruce@mcneeslaw.com;
lhuff@mwn.com;
NancyB@epsa.org;
blipman@rpa.nj.gov;
dwand@rpa.nj.gov;
rglover@rpa.nj.gov;
dlayugan@rpa.nj.gov;
morris.schreim@maryland.gov;
joey.chen@maryland.gov;
Ransom.Davis@Maryland.gov;
dslifer@gtpowergroup.com;
gthomas@gtpowergroup.com;
laurac@chappelleconsulting.net;
scott.metzger@ilag.gov;
kimberly.janas@ilag.gov;
andrew.obeso@ilag.gov;
susan.satter@ilag.gov;
aleksandar.mitreski@brookfieldrenewable.com;
nathalie.godard@brookfieldrenewable.com;
OBustami@mintz.com;
sshparber@mintz.com;
emily.starobin@huschblackwell.com;
linda.walsh@huschblackwell.com;
emmanix.simon@edf-re.com;
temujin.roach@edf-re.com;
paul.youchak@bpu.nj.gov;
steven.chaplar@law.njoag.gov;
7
dgoulet@mccarter.com;
angela.obrien@occ.ohio.gov;
john.mccaffrey@stinson.com;
lmcalister@amppartners.org;
ghull@amppartners.org;
cnorton@amppartners.org;
/s/ David F. Proaño
David F. Proaño
Counsel of Record