EL25-49-000 · 2026-10-27 · Exelon Corporation, American Transmission Systems and 23 others

20261027-0003_Part1 (1)

PDF page 1

STAN BERMAN PLLC
3502 FREMONT AVENUE N., SUITE 1
SEATTLE, WASHINGTON 98103
6 L _0
o
ek,
it.O7-boo
oe21.0,- / 409-  6")
October 21, 2026
Stan Berman
Direct Dial (206) 321-3221
stan@bermlaw.com
Re:
Exelon Corp. et al. v FERC, Case No. 26-3621 (3rd Circuit)
FERC Docket Nos. EL25-20, AD24-11, EL25-49
Honorable Debbie-Anne A. Reese
Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, D.C. 20426
Dear Secretary Reese,
Enclosed is a date-stamped copy of a Petition for Review that was filed in the Third Circuit Court of Appeals on October 16, 2026.

Respectfully submitted,
/s/ Stan Berman
Stan Berman
Stan Berman PLLC
3502 Fremont Ave N, #1
Seattle, WA 98103
(206) 321-3221
stan@bermlaw.com

PDF page 2

Case: 26-3621
Document: 1-1
Page: 1
Date Filed: 10/16/2026
IN THE UNITED STATES COURT OF APPEALS
FOR THE THIRD CIRCUIT
Exelon Corp.; American Transmission Systems, Incorporated, Jersey Central Power & Light Company, Keystone Appalachian Transmission Company, Mid-Atlantic Interstate Transmission LLC, Monongahela Power Company, The Potomac Edison Company, and Trans- Allegheny Interstate Line Company; American Electric Power Service Corporation on behalf of its affiliates, Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power

Company, AEP Appalachian Transmission Company, Inc., AEP Indiana Michigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and AEP West Virginia Transmission Company, Inc.; The Dayton Power and Light Company d/b/a AES Ohio; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a Dominion Energy Virginia; Duquesne Light Company; East Kentucky Power Cooperative, Inc.; PPL Electric Utilities Corporation; and Rockland Electric Company,

Petitioners,
v. Federal Energy Regulatory Commission,
Respondent.
PETITION FOR REVIEW
No. 26-
Petitioners—collectively, the Indicated PJM Transmission Owners—are 1

1 of 515

PDF page 3

Case: 26-3621
Document: 1-1
Page: 2
Date Filed: 10/16/2026
Exelonl; FirstEnergy?; American Electric Power Service Corporation on behalf of its affiliates, Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian Transmission Company, Inc., AEP Indiana Michigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and AEP West Virginia Transmission Company, Inc.; The Dayton Power and Light Company d/b/a AES Ohio; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a Dominion Energy Virginia; Duquesne Light Company; East Kentucky Power Cooperative, Inc.; PPL Electric Utilities Corporation; and Rockland Electric Company.

Pursuant to Section 313(b) of the Federal Power Act, 16 U.S.C. § 8251(b), and Federal Rule of Appellate Procedure 15(a), Petitioners hereby petition this Court for review of the following orders and notices of the Federal Energy Regulatory Exelon refers collectively to Exelon Corporation, on behalf of its affiliates Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company, Commonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company, and Potomac Electric Power Company.

FirstEnergy and the FirstEnergy Transmission Companies collectively to American Transmission Systems, Incorporated, Jersey Central Power & Light Company, Keystone

Appalachian
Transmission
Company,
Mid-Atlantic
Interstate
Transmission LLC, Monongahela Power Company, The Potomac Edison Company, and Trans-Allegheny Interstate Line Company.

2
2 of 515

PDF page 4

Case: 26-3621
Document: 1-1
Page: 3
Date Filed: 10/16/2026
Commission (FERC):
PJM Interconnection, L.L.C. et al.; Order on Show Cause Proceeding, Directing Compliance Filings, Establishing Paper Hearings, and Granting in Part and Denying in Part Complaint, 193 FERC ¶ 61,217 (December 18, 2025) (Attached as Attachment A).

PJM Interconnection, L.L.C. et al.; Notice of Denial of Rehearing By Operation of Law and Providing for Further Consideration, 194 FERC ¶ 62,089 (Feb. 20, 2026) (Attached as Attachment B).

PJM Interconnection, L.L.C. et al.; Order on Rehearing, Clarification, Compliance Filing, and Paper Hearings, 195 FERC ¶ 61,209 (June 18, 2026) (Attached as Attachment C).

PJM Interconnection, L.L.C. et al.; Notice of Denial of Rehearing By Operation of Law and Providing for Further Consideration, 196 FERC ¶ 62,089 (Aug. 20, 2026) (Attached as Attachment D).

The Indicated PJM Transmission Owners petition for review of these orders on the grounds that the Commission's orders are arbitrary and capricious, reflect a failure to engage in reasoned decision-making, are not supported by substantial evidence, and are otherwise contrary to law.

Exelon and FirstEnergy separately filed petitions for review of the first two of these orders earlier this year (Case Nos. 26-1901 and 26-2494). Those cases have been consolidated, along with two petitions filed by the PJM Industrial Customer 3

3 of 515

PDF page 5

Case: 26-3621
Document: 1-1
Page: 4
Date Filed: 10/16/2026
Coalition et al. (Case Nos. 26-1840 and 26-3122). The PJM Transmission Owners Petitioners suggest this case be consolidated with these four prior cases.2 Because the Commission denied the petitioners' most-recent request for rehearing by operation of law on August 19, 2026, this petition for review is timely. Pursuant to Federal Rule of Appellate Procedure 15(c) and 18 C.F.R. § 385.2012, a copy of this Petition will be served by mail upon the Respondent, Robert H. Solomon, FERC Solicitor, 888 First Street, NE, Washington, DC 20426, and Debbie-Anne Reese, FERC Secretary, 888 First Street, NE, Washington, DC 20426, and by email on each party in the proceeding below (Service List is Attachment E).

a All the cases are currently held in abeyance until the earlier of December 31, 2026 or when FERC issues its order on further reconsideration in the underlying proceeding.

4
4 of 515

PDF page 6

Case: 26-3621
Document: 1-1
Page: 5
Date Filed: 10/16/2026
Respectfully submitted,
Gary Guy
Assistant General Counsel
Exelon Corporation
701 Ninth St. N.W.
Washington, DC 20068
301-956-6754
gary.guy@exeloncorp.com
/s/ Stan Berman
Stan Berman
Stan Berman PLLC
3502 Fremont Ave. N. #1
Seattle, WA 98103
206-321-3221
stan@bermlaw.com
Attorneys for Exelon Corporation
On behalf of the Indicated PJM Transmission Owners Morgan E. Parke

Associate General Counsel
Amanda Parker
Corporate Counsel
FirstEnergy Services Company
341 White Pond Dr.
Akron, OH 44320
(330) 730-8558
mparke@firstenergycorp.com
aparker@firstenergycorp.com
David M. Gossett
Michael Kunselman
Davis Wright Tremaine LLP
1301 K Street, NW, Ste. 500-E
Washington, DC 20005
(202) 973-4200
davidgossett@dwt.com
michaelkunselman@dwt.com
Attorneys for the FirstEnergy Transmission Companies Steven M. Nadel

Senior Counsel
PPL Services Corp.
645 Hamilton Street, Suite 601
Allentown, PA 18101
Tel. 610.774.4775
SMNadel@pplweb.com
Attorney for PPL Electric Utilities Corp.
5
5 of 515

PDF page 7

Case: 26-3621
Document: 1-1
Page: 6
Date Filed: 10/16/2026
David Samford
East Kentucky Power Cooperative, Inc.
PO Box 707
Winchester, KY 40392-0707
859-744-4812
david.samford@ekpc.coop
Attorney for East Kentucky Power Cooperative, Inc. William M. Rappolt

Assistant General Counsel, FERC
AES US Services LLC
4300 Wilson Blvd
Arlington, VA 22203
(703) 682-6337
William.rappolt@aes.com
Attorney for Dayton Power and Light Company d/b/a AES Ohio 6

6 of 515

PDF page 8

Case: 26-3621
Document: 1-1
Page: 7
Date Filed: 10/16/2026
Carrie L. Bumgarner
Senior Counsel
American Electric Power Service
Corporation
1 Riverside Plaza
Columbus, OH 43215
(614) 716-2941
clbumgarner@aep.com
Attorney for American Electric Power Service Corporation on behalf of its affiliates Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian

Transmission Company, Inc., AEP Indiana Michigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and AEP West Virginia Transmission, Inc. Steven G. Boughton

Dominion Energy Services, Inc.
Senior Counsel, Federal Regulatory
120 Tredegar Street
Riverside Building, Fifth Floor
Richmond, VA 23219
steven.boughton@dominionenergy.com
(804) 718-5988
Attorney for Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a Dominion Energy Virginia

7
7 of 515

PDF page 9

Case: 26-3621
Document: 1-1
Page: 8
Date Filed: 10/16/2026
Michael Brechlin
Manager Asst GC - Regulatory Law State Regulatory Duquesne Light Company

Nova Place
100 South Commons, Suite 118
Mail Drop OGC-L1
Pittsburgh, PA 15212
Phone: 412-393-6431
Email: mbrechlin@duqlight.com
Attorney for Duquesne Light Company
October 16, 2026
8 of 515
8

PDF page 10

Case: 26-3621
Document: 1-1
Page: 9
Date Filed: 10/16/2026
CERTIFICATE OF SERVICE
I hereby certify that I have this day caused the foregoing Petition for Review to be served by email on the service list in the proceeding below (see Attachment E for list of recipients), and, pursuant to Rule 2012 of the FERC Rules of Practice and Procedure, 18 C.F.R. § 385.2012, have this day caused to be served a date-stamped copy of the foregoing documents on Respondent FERC both by email and by US Mail to the FERC Solicitor, Robert Solomon, 888 First St. NE, Washington, DC 20426, and by US mail to the FERC Secretary, Debbie-Anne Reese, 888 First St. NE, Washington, DC 20426.

Dated at Seattle, WA, October 16, 2026.
/s/ Stan Berman
Stan Berman
Stan Berman PLLC
3502 Fremont Ave. N. #1
Seattle, WA 98103
206-321-3221
stan@bermlaw.com
9 of 515
1

PDF page 11

Case: 26-3621
Document: 1-1
Page: 10
Date Filed: 10/16/2026
ATTACHMENT A
PJM Interconnection, L.L.C. et al.; Order on Show Cause Proceeding, Directing Compliance Filings, Establishing Paper Hearings, and Granting in Part and Denying in Part Complaint, 193 FERC ¶ 61,217 (December 18, 2025).

10 of 515

PDF page 12

Document Accessicq
gt4p.k18 _34qcumenwrjd  atlizie:A),Bipte Filed: 10/16/2026 193 FERC ¶ 61,217

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
Before Commissioners: Laura V. Swett, Chairman; David Rosner, Lindsay S. See,

Judy W. Chang, and David LaCerte.
PJM Interconnection, L.L.C.
Docket Nos. EL25-49-000
Allegheny Electric Cooperative, Inc.
EL25-49-001
American Transmission Systems, Incorporated Atlantic City Electric Company

Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative

PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company

Trans-Allegheny Interstate Line Company Transource West Virginia, LLC

UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company

AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.

AEP West Virginia Transmission Company, Inc. Appalachian Power Company

Indiana Michigan Power Company
11 of 515

PDF page 13

DoCument Acce-ssiccia:
 gt§gA18 - 3 E-lacumentiilAd DraEle:inis/Pge Filed: 10/16/2026
Docket No. EL25-49-000, et al.
2
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Duquesne Light Company
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
AD24-11-000
Constellation Energy Generation, LLC
EL25-20-000
(Consolidated)
v. PJM Interconnection, L.L.C.
ORDER ON SHOW CAUSE PROCEEDING, DIRECTING COMPLIANCE FILINGS,
ESTABLISHING PAPER HEARING, AND GRANTING IN PART AND DENYING
IN PART COMPLAINT
(Issued December 18, 2025)
1. On March 24, 2025, PJM Interconnection, L.L.C. (PJM) and the PJM transmission owners filed answers in Docket No. EL25-49-000, to comply with the Commission's February 20, 2025 order establishing a show cause proceeding, under section 206 of the Federal Power Act (FPA).1  The Show Cause Order directed PJM and the transmission owners to either: (1) show cause as to why the Open Access Transmission Tariff (OATT), the Amended and Restated Operating Agreement of PJM, and the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region (the Tariff) remains just and reasonable and not unduly discriminatory or preferential without

1  PJM Interconnection, L.L.C., 190 FERC ¶ 61,115 (2025) (Show Cause Order). 12 of 515

PDF page 14

Document Accessig4 a§q: ?pAp 3:18 _3gqcurrleq.ilr j d DeaReAh8/pate Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 3
provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Co-Location Arrangements;2  or (2) explain what changes to the Tariff would remedy the identified concerns if the Commission were to determine that the Tariff has in fact become unjust and unreasonable or unduly discriminatory or preferential and, therefore, proceeds to establish a replacement Tariff. The Show Cause Order consolidated the new show cause proceeding with a pending complaint proceeding in Docket No. EL25-20 involving Co-Located Load.3

2. As discussed below, we find that PJM's Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to generators serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.4 Specifically, we find that PJM's Tariff is unjust and unreasonable because it does not include types of transmission service that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their use of the transmission system under certain conditions. We direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff to set forth specific terms and conditions that an Interconnection Customers  in PJM seeking to serve

2  The Show Cause Order defined Co-Location Arrangements as referring to both the Co-Located Load and the associated generator. Id P 3 & n.4.
3  The Show Cause Order defined Co-Located Load as a "configuration [that] refers to end-use customer load that is physically connected to the facilities of an existing or planned Customer Facility on the Interconnection Customer's side of the Point of Interconnection to the PJM Transmission System." Id The PJM Tariff defines an Eligible Customer as (1) any electric utility or any person generating electric energy for sale for resale, but with respect to transmission service that the Commission is prohibited from ordering by section 212(h) of the Federal Power Act, such entity is eligible only if the service is provided pursuant to a state requirement that the Transmission Provider or Transmission Owner offer the unbundled transmission service, or pursuant to a voluntary offer of such service by a Transmission Owner or (2) any retail customer taking unbundled transmission service pursuant to a state requirement that the Transmission Provider or a Transmission Owner offer the transmission service, or pursuant to a voluntary offer of such service by a Transmission Owner. PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions — E-F (41.0.0). An Eligible Customer may include but is not limited to electric utilities and power marketers. 5  PJM defines Interconnection Customer as a Generation Interconnection Customer and/or a Transmission Interconnection Customer. PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions - I - J - K (15.0.0) 13 of 515

PDF page 15

Document AccessiA a4c: 4'2§P?ii8-311qcurnent'ili-Jd Dftle:iMs/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

4
Co-Located Load must follow in order to effectuate a Co-Location Arrangement. We also direct PJM to file, within 30 days of the date of issuance of this order, a compliance filing to revise its Tariff to make clear how Interconnection Customers can make use of provisional interconnection service, the ability to request interconnection service below nameplate capacity, the potential to accelerate the interconnection process under certain circumstances, and surplus interconnection service to interconnect new generating facilities seeking to serve Co-Located Load. In addition, we direct PJM to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of the Co-Located Load takes one of three transmission services: (1) Network Integration Transmission Service (NITS), (2) a new Firm Contract Demand transmission service, or

(3) a new Non-Firm Contract Demand transmission service.6  We establish a paper hearing to determine the just and reasonable rates, terms, and conditions for these new transmission services. We further find that the Behind the Meter Generation (BTMG) rules in PJM's Tariff are no longer just and reasonable because loads with BTMG are not fully accounted for in resource adequacy planning and shift costs onto other transmission customers contrary to the Commission's cost causation principles. We therefore direct PJM to revise its Tariff to revise the BTMG rules and to implement a transition process for existing BTMG participants, as described below. We also grant in part and deny in part Constellation Energy Generation, LLC's (Constellation) complaint against PJM in Docket No. EL25-20-000. Finally, we require PJM to submit an informational report within 30 days of the date of issuance of this order.

I. Background
A. Show Cause Order
3. The Show Cause Order defined Co-Located Load as a "'configuration [that] refers to end-use customer load that is physically connected to the facilities of an existing or planned Customer Facility on the Interconnection Customer's side of the Point of Interconnection to the PJM Transmission System.'"7  As the Commission did in the Show

6  Capitalized terms used but not otherwise defined in this order have the meanings ascribed to them in the Tariff. Show Cause Order, 190 FERC ¶ 61,115 at P 3 & n.4. We note that, in the Show Cause Order, the Commission adopted this definition from the Guidance Document that PJM developed on Co-Located Load. See id. As noted below, PJM rescinded this document pending Commission guidance in this docket. PJM March 24 Answer at 33. Prior to PJM's transition to its new interconnection process, PJM used the terms Interconnection Customer and Generation Interconnection Customer. PJM's Tariff defines Generation Interconnection Customer as "an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission 14 of 515

PDF page 16

Document AccessicciaW ikgpiki8 _3pRcurnentiiirid Dpage:11 18/pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 5
Cause Order, when referring to both the Co-Located Load and the associated generator, we will use the term Co-Location Arrangement.

4. As explained in the Show Cause Order, Co-Location Arrangements are becoming increasingly common in PJM and, since the issuance of the Show Cause Order, entities continue to raise issues involving Co-Location Arrangements with the Commission.8  The Commission instituted the Show Cause Order to determine whether the Tariff remains just and reasonable and not unduly discriminatory or preferential.9  The Commission set forth, in the Show Cause Order, the principles relating to the Commission's jurisdiction over the matters relevant to Co-Location Arrangements.10  The Commission also made several preliminary findings about the justness and reasonableness of the Tariff. First, the Commission found that the Tariff appears to be unjust and unreasonable or unduly discriminatory or preferential because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Co-Location Arrangements." In addition, the Commission preliminarily found that this System in the PJM Region." PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions — G - H (9.0.1) (defining Generation Interconnection Customer). The Tariff's new rules for generation interconnection, effective January 3, 2023, utilize the terms Project Developer and Generation Project Developer. PJM's Tariff defines Generation Project Developer as "an entity that submits a Generation Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region." PJM, Intra-PJM Tariffs, OATT, § VIII.A 400 Definitions G (0.1.0) (defining Generation Project Developer). For ease of simplicity in this order, and consistent with the Show Cause Order, the Commission will use the term Interconnection Customer to refer to both the PJM Tariff definitions of Generation Interconnection Customer and Generation Project Developer.

8  See, e.g., PJM Interconnection, L.L.C., 191 FERC ¶ 61,112 (2025) (accepting necessary studies agreement). The Show Cause Order consolidated the new show cause proceeding with a pending complaint proceeding in Docket No. EL25-20-000 involving Co-Located Load. We address that complaint below. See discussion infra Part IV.B.7.
9  Show Cause Order, 190 FERC ¶ 61,115 at P 2. 18  Id. P66. " Id. P 74. 15 of 515

PDF page 17

Document Accessiccia§e:  g2§gkl8 -3 PicicurnenWrla DrOcite:11Pis/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

6
lack of applicable Tariff provisions raises the potential for undue discrimination or preferential treatment.I2

5. As to specific concerns raised regarding Co-Location Arrangements, the Commission found that the Tariff may be unjust, unreasonable, unduly discriminatory, or preferential as it does not specify the transmission service that Co-Location Arrangements must take, if any, or otherwise provide a process to ensure that Co- Location Arrangements are paying for the benefits they receive from the transmission system consistent with the cost causation principle, which provides that all Commission- jurisdictional rates and charges must "reflect to some degree the costs actually caused by the customer who must pay for them," and that costs must be allocated in a manner that is at least roughly commensurate with the benefits that entity receives.13  The Commission also found that the absence of rates, terms, and conditions of interconnection service specific to Co-Location Arrangements, and, especially regarding studies of the impacts of those arrangements, may render the Tariff unjust and unreasonable or unduly discriminatory or preferential.14  Moreover, the Commission found that the absence of rates, terms, and conditions governing the use and sale of ancillary services and black start services by Co-Location Arrangements may render the Tariff unjust and unreasonable or unduly discriminatory or preferential.''

6. The Commission also expressed concern about the reliability and resource adequacy implications of Co-Location Arrangements.16  The Commission stated that it was concerned that the Tariff may be unjust and unreasonable and unduly discriminatory or preferential insofar as it lacks rules necessary to provide PJM with sufficient information to perform appropriate analysis to ensure reliable system operations given the characteristics of Co-Location Arrangements. In response to concerns about the market and price impacts of Co-Location Arrangements, the Commission recognized that these concerns are not necessarily unique to Co-Location Arrangements and that significant load growth more generally may raise many of the same concerns.17  The 12 Id. P75.

13  Id. PP 74-78 (citing Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1368 (D.C. Cir. 2004); Ill. Corn. Comm'n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009)).
14  Id. P 79. 15  Id. P 82.
16  Id. P 83.
17  Id. PP 84-85. 16 of 515

PDF page 18

Document A„es sicaa§c:  ?P2*218 - 3gqcumentiiirid DDsge:11118/pae Filed: 10/16/2026 Docket No. EL25-49-000, et al.

7
Commission stated that, while both Co-Located Load and non-co-located load may have similar resource adequacy impacts, the speed at which Co-Located Load can be added to the grid may pose particular resource adequacy challenges, especially if Co-Location Arrangements are not adequately and transparently reflected in existing resource adequacy planning mechanisms, e.g., the PJM capacity market.18

B. Behind the Meter Generation
7. Regarding PJM's BTMG rules (which we and commenters sometimes refer to as retail BTMG),19  the Tariff allows load serving entities (LSEs) that provide service to loads with qualifying BTMG to reduce their costs by netting output from BTMG in the calculation of their peak demand for the purpose of determining NITS charges.20  The Commission has previously found that BTMG netting is just and reasonable because it would encourage load response during periods when generation or transmission are in short supply and prices are rising.21  The Commission has also found that "charges for use of PJM's transmission system should be allocated to network customers based on a network customer's actual use of PJM's system, consistent with the principle of cost causation."22

8. Transmission rates for NITS and Point-to-Point Service (PTPS) are based on transmission formula rates filed by the transmission owners. Transmission formula rates capture utilities' cost of providing transmission service and include the cost of operating and maintaining the transmission facilities, depreciation expenses, taxes, and a rate of 181d. P 85.

19  PJM defines BTMG as "a generation unit that delivers energy to load without using the Transmission System or any distribution facilities (unless the entity that owns or leases the distribution facilities has consented to such use of the distribution facilities and such consent has been demonstrated to the satisfaction of the Office of the Interconnection); provided, however, that [BTMG] does not include (i) at any time, any portion of such generating unit's capacity that is designated as a Generation Capacity Resource; or (ii) in an hour, any portion of the output of such generating unit that is sold to another entity for consumption at another electrical location or into the PJM Interchange Energy Market." PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions - A-B (21.0.0) (defining BTMG).
20  See PJM Interconnection, L.L.C., 107 FERC ¶ 61,113, at P 6 (2004); PJM, Intra-PJM Tariffs, OATT, § III.34.2 Netting of Behind the Meter Generation (0.0.0).
21  PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at PP 27-28.
22 Id. P 28. 17 of 515

PDF page 19

Document Acceseiccia,4q:
_ 34qcument.i1Ad DFage:11818/pgte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 8
return for the utility. The rates also include the costs of any Network Upgrades needed to ensure ongoing reliability or deliverability of generation to Network Load,23  including planned regional transmission upgrades. Transmission rates are charged based on demand coincident with the annual peak(s) of the zone.24  For loads using BTMG, only the net demand is used for billing, but for loads not relying on BTMG, transmission charges are based on their gross use of the transmission system at the time of the coincident peak.25

9. Recognizing that Co-Location Arrangements may interact with the transmission system in a similar way to BTMG arrangements, the Show Cause Order sought briefing on how any proposed replacement rate adopted in this proceeding would interact with existing BTMG arrangements.26

C. Eligible Customer
10. In Order No. 888 and its progeny, the Commission established specific criteria for potential transmission customers to be eligible to receive non-discriminatory open access transmission service.27  Consistent with the Commission's findings about who is an

23  PJM defines Network Load as the load that a Network Customer designates for NITS, including all load served by the output of any Network Resources designated by the Network Customer. See PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions - L-M-N (51.0.1) (defining Network Load).
24  See id. § III.34.1 Monthly Demand Charge (1.0.0). PJM's 22 transmission zones represent the geographical areas served by individual PJM transmission owners. See id., attach. J (8.0.0).
25  See id § III.34.2 Netting of Behind the Meter Generation (0.0.0).
26  Show Cause Order, 190 FERC ¶ 61,115 at P 88, pt. a.iv ("parties may also ... consider how any proposed replacement rate would interact with [BTMG] arrangements").
27  See, e.g., Recovery of Stranded Costs by Pub. Utils. and Transmitting Utils., Order No. 888, FERC Stats. & Regs. ¶ 31,036 (1996) (cross-referenced at 75 FERC ¶ 61,080), order on reh'g, Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,214 (modifying definition of Eligible Customer) (cross-referenced at 78 FERC ¶ 61,220), order on reh'g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), order on reh'g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff'd in relevant part sub nom. Transmission Access Pol 'y Study Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000) (TAPS), aff'd sub nom. New York v. FERC, 535 U.S. 1 (2002). 18 of 515

PDF page 20

Document Access ici a§e:  gt§g118-3PRCUMentiilAci DFaae:11918/p@te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 9
eligible customer in the pro forma tariff, PJM's Tariff currently defines an Eligible Customer as:

(i) Any electric utility ... or any person generating electric energy for sale for resale ... However, with respect to

transmission service that the Commission is prohibited from
ordering by Section 212(h) of the Federal Power Act, such
entity is eligible only if the service is provided pursuant to a state requirement that the Transmission Provider or

Transmission Owner offer the unbundled transmission
service, or pursuant to a voluntary offer of such service by a Transmission Owner.

(ii) Any retail customer taking unbundled transmission service pursuant to a state requirement that the Transmission Provider or a Transmission Owner offer the transmission service, or

pursuant to a voluntary offer of such service by a Transmission Owner, is an Eligible Customer under the Tariff....28

11. This definition forms the basis for PJM's existing transmission cost allocation approach, through which each Eligible Customer is billed for the charges associated with the transmission services used to serve its load.

28  PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions - E-F (41.0.0) (defining Eligible Customer). 19 of 515

PDF page 21

Document Accessiga.§c:  ?g2-§gi.18-3,4qcu me n
-Aci. DE"t3ae:3.?918/Pge Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 10 -
H. PJM's Answer to Show Cause Order and Responsive Pleadings29
A. PJM's Options for Co-Location Arrangements
12. PJM states that its existing Tariff remains just and reasonable "although improvements and clarifications may be appropriate based on Commission guidance."3° As further detailed below, PJM discusses eight pathways to facilitating co-location service, three of which exist in the current Tariff and five of which would be new. PJM supports only five of the eight options and identifies problems with the remaining three. PJM requests that, if "the record supports consideration of additional options," the Commission issue detailed guiding principles that PJM can operationalize in an FPA section 205 filing.31

13. PJM notes that the options are not mutually exclusive and instead may be used seriatim or concurrently. PJM further clarifies that it does not consider all of the options "equivalent, desirable, or even necessarily workable."32  For example, PJM argues that state law may limit the availability of various options. PJM also notes that six of its options are premised on large Co-Located Load being Network Load, where the large Co-Located Load would realize significant benefits. PJM also argues that Co-Location Arrangements implicate several different, interrelated study frameworks and cost allocation constructs. PJM further notes that there is a resource adequacy dimension to Co-Location Arrangements and explains that three of its potential new options relate to adding additional supply and operational flexibility.

14. Turning to the eight options, first, PJM states that new loads may interconnect as traditional Network Load that takes NITS in accordance with traditional load

29  The appendix lists the entities who intervened and filed responsive pleadings in Docket No. EL25-49-000, along with short names. On March 21, 2025, then-Chairman Christie responded individually to comments filed with the Commission by Pennsylvania Governor Josh Shapiro of Pennsylvania on October 4, 2024, and by Virginia Governor Glenn Youngkin on November 1, 2024, respectively, on data centers and Co-Located Load. On April 2, 2025, then-Chairman Christie responded to a letter filed on February 19, 2025, by United States Senators Chris Van Hollen, Cory A. Booker, Mark Kelly, and Tim Kaine inquiring about a technical conference addressing data centers and other large new loads. 3°  PJM March 24 Response at 4.
31  Id.
32  Id at 5. 20 of 515

PDF page 22

Document AccessiAa§c: gtgp,21_ 3g1qcumeq,i11-jd DWREte:13118/p@tfi Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 11 -
interconnection processes (PJM option 1).33  PJM states that the load uses and pays for NITS, energy, ancillary services, and capacity. PJM explains that the load has a separate point of interconnection with the grid and thus need not be at the same site as the generator. PJM supports this option.

15. Second, PJM explains that load could co-locate with generation behind the same point of interconnection (PJM option 2).34  PJM states that, in this configuration, the load is Network Load and the generator is a Capacity Resource, each separately metered, with no change to the generator's Capacity Interconnection Rights. PJM states that the load uses and pays for NITS, energy, ancillary services, and capacity. PJM also explains that the large load is studied and could be connected to the grid under existing load interconnection processes. PJM supports this option.

16. Third, PJM states that a Network Load could co-locate with generation and then use PJM's BTMG rules under which the load would be charged for its net use of the grid, after deducting BTMG (PJM option 3).35  PJM states that the load uses NITS, energy, ancillary services, and capacity and pays for these services based on the net peak withdrawal quantity. PJM does not support this option, explaining that historically, BTMG has supported relatively small loads, not on the scale of large data centers. PJM further states that charging load for its net use of the grid under the BTMG rules may not capture the costs caused by co-located data center arrangements because such arrangements could avoid all costs by netting to zero if the entire data center load is supplied by the associated generator.36

17. Fourth, turning to new options not currently in the existing Tariff, PJM explains that a possible Co-Located Load configuration could include a load located behind a generator, with system protection facilities in place to prevent the delivery of system energy to serve the load (PJM option 4). PJM states that "in this configuration, load is not Network Load unless designated by the customer subject to applicable state law."37 PJM explains that the load is located behind the Point of Change of Ownership between the transmission owner and generator, and system protection facilities are installed to prevent delivery of system energy from the grid if the generator goes offline. PJM clarifies that this configuration should not be considered "fully" or "wholly" isolated,

33  Id. at 10.
34  Id. at 11.
35  Id. at 12-13.
36  Id at 36.
37  Id. at 14. 21 of 515

PDF page 23

Document Accessircia§C:  ?§2§3:18-311qcurnentiiirad DPaCte:i??1.8/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 12 -
arguing that it is inconsistent with engineering and economic principles.38  PJM argues that the configuration relies on and takes grid services (e.g., ancillary services) and should pay its fair share of those charges. PJM does not support this option, raising concerns that this configuration carries operational risk because it depends on a protection system to support reliability, and, if the protection system fails, the large load would instantly take significant energy from the system. PJM argues that, though a few such configurations may seem tolerable, the risk increases with large quantities of such configurations.

18. Fifth, PJM identifies a new option that is the same configuration as PJM option 4, but the load can receive back-up service from the grid with PJM's advanced authorization (PJM option 5).39  PJM clarifies that this option requires real-time, bespoke operational decision-making to determine if load can continue to be served. PJM explains that approval for back-up service is subject to condition, including withdrawing or withholding authorization if needed to protect grid reliability or integrity. PJM does not support this option, because, like PJM option 4, the load is not designated as Network Load, which concerns PJM because of the dependence on protection schemes.4°

19. Sixth, PJM discusses a new option that would allow new large Network Load additions to bring additional generation that could serve as a Capacity Resource (PJM option 6).4' The additional generation, PJM clarifies, could take different forms, such as new incremental generation, generation that has or is scheduled to deactivate, or existing generation so long as the generator is available to PJM as a Capacity Resource if it clears in the capacity market. PJM indicates that incentives could be explored to offer faster processing of generation that enters the queue under this option, such as (1) accelerating interconnection studies of new generation, (2) enhancing existing provisional interconnection service options at discrete study points to accelerate in a non-discriminatory manner the ability of new generation to achieve commercial operation, and (3) states assuming cost responsibility for transmission upgrades in the Regional Transmission Expansion Plan pursuant to the State Agreement Approach to promote state policies to encourage large load development. PJM clarifies that a physical co-location configuration can be used, but the new generation may additionally enter a bilateral agreement with the load for financial or contractual purposes. PJM states that 3s Id.

39  Id. at 15. 4°  Id. at 39. 41 Id. at 16-17. 22 of 515

PDF page 24

Document Accessigna§e:  g`I§P121.18 - 3 gtqcumentiiirid DFacie:IP
, 18/ :pate Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 13 -
this option would involve an interconnection study for the new generation resource. PJM supports this option.

20. Seventh, PJM discusses a new option that would allow a new large load to become Network Load at a potentially faster pace subject to the load electing a new transitional non-capacity backed service offering (PJM option 7).42  PJM states that large loads would have the option to be classified as a non-capacity backed load for a transitional period until any resource adequacy supply/demand imbalances associated with this load addition are addressed. Then, PJM explains, the load could assume full Network Load status. PJM states that, under this offering, the load would avoid capacity costs during the transition period in return for its willingness to curtail. PJM indicates that variations of this option could be explored to enhance resource adequacy and allow large loads to efficiently connect to the system through incentives to be flexible. PJM states that a physical co-location configuration can be used but all load would be in front of the meter. PJM supports this option.

21. Eighth, PJM discusses a new option where Co-Located Load that is Network Load may be able to participate in the PJM wholesale markets as a Demand Response resource (PJM option 8).43  PJM explains that this option already exists in PJM but there could be an additional review of Demand Response rules or review of emissions restrictions on back-up generation to enhance this option, potentially requiring Tariff revisions. PJM states that back-up generation provides a way to serve the Co-Located Load when asked to curtail for Demand Response. PJM contends that this option may enhance resource adequacy under tight system conditions in the short term. PJM supports this option.

B. General
1. PJM's March 24 Response
22. PJM argues that the Tariff remains just and reasonable.44  PJM argues that its Tariff is not unjust and unreasonable merely because it does not provide alternative pathways to accommodate a business goal. However, as noted, PJM discusses eight pathways, acknowledging that "clarifications and enhancements could well be in order given this is an evolving area and Tariff provisions did not contemplate the type of arrangements at issue in this docket or their implications.i45  PJM notes that it rescinded

42  Id. at 18-19.
43  Id. at 20.
44  Id. at 32-34. 451d. at 32. 23 of 515

PDF page 25

Document AcceseiA a§c: 2§2§618 _ 3 nqcumentii1Ad DaNe:3. 418/pgte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 14 -
its Guidance Document46  pending Commission guidance in this docket about a Commission-approved path forward.

2. Transmission Owners' March 24 Responses47
23. Generally, Indicated Transmission Owners contend that no Tariff changes are needed.48  Indicated Transmission Owners argue that the Tariff addresses and encompasses Co-Location Arrangements. According to Indicated Transmission Owners, all load in PJM must be designated as Network Load and served by a Network Customer (or take PTPS), thereby ensuring this load pays its fair share of transmission costs. AES Ohio also argues that the PJM Tariff is just and reasonable regarding service to Co-Located Load taken under NITS or Firm PTPS, but acknowledges there may also be alternative reasonable transmission service arrangements.49

3. Reply Comments
24. Some parties agree with PJM and transmission owners that the Tariff remains just and reasonable, arguing, for example, that it ensures visibility into Co-Located Loads, that Co-Located Load pays its fair share of costs, and that the grid can continue to rely on existing generation resources.5°  However, a number of parties disagree with PJM and transmission owners, arguing that PJM's Tariff is unjust, unreasonable, and unduly discriminatory and preferential as to Co-Located Load because the Tariff lacks clarity and does not provide for rates, terms, and conditions applicable to Co-Location

46  PJM developed .a Guidance Document on Co-Located Load, first posted in 2024, which includes non-binding guidance for generators and loads seeking to enter into Co-Location Arrangements in PJM. PJM, PJM Guidance on Co-Located Load (Mar. 22, 2024) (updated Apr. 17, 2024), https://www.pjm.com/-/media/DotCom/markets- ops/rpm/rpm-auction-info/pjm-guidance-on-co-located-load.pdf.
47  Apart from the arguments summarized below, several transmission owners submitted responses that took no position on the issues raised in the Show Cause Order, specifically Allegheny Electric Cooperative, Inc., NextEra Energy Transmission MidAtlantic, Inc., and Silver Run Electric, LLC.
48  Indicated Transmission Owners March 24 Response, attach. A at 2-3.
49  AES Ohio March 24 Response at 1. 5°  See Buckeye April 23 Reply Comments at 3, 5; Glatz/Silverman April 23 Reply Comments at 4; NOVEC April 23 Reply Comments at 8, 10; NREMC April 23 Reply Comments at 4-6. 24 of 515

PDF page 26

Document AccessiA.aW ?§A§:?i18- 3411curnentiilAd DEaRe:iP
, 1 8 /pAte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 15 -
Arrangements.51  Other parties allege the Tariff is unclear and/or urge the Commission to provide guidance on Co-Location Arrangements.52  Indicated Transmission Owners argue no party has shown the existing Tariff is unjust and unreasonable, and recent events indicate that existing types of service can be used.53

C. Jurisdiction
1. PJM's March 24 Response
25. PJM contends that different state laws may impact the permissibility of certain potential Co-Location Arrangements.54  PJM explains that states in the PJM region assessed several decades ago whether to introduce competition for retail service. As to states that did not pursue deregulation, PJM argues that the state's exclusive retail franchise territory law may restrict non-franchised suppliers from serving Co-Located Load. PJM further asserts that state laws in deregulated states may or may not impose limitations on Co-Located Load suppliers, such as requiring load to be designated as Network Load or take a specific transmission service.

26. PJM argues that the Show Cause Order did not capture some nuance regarding the Commission's jurisdiction.55  PJM asserts that, due to both federal- and state-level deregulation, there could be regulatory gaps with respect to Co-Location Arrangements. PJM cautions against overgeneralizing when characterizing what states may or may not regulate regarding Co-Location Arrangements. PJM asserts that state law does not

51  See SEIA April 23 Reply Comments at 2, 5-6; CATF April 25 Reply Comments at 6; Constellation April 23 Reply Comments at 13-14; Antora April 23 Reply Comment at 2; EPSA/P3 April 23 Reply Comments at 9-12; Enchanted Rock April 23 Reply Comments at 2; Mainspring April 23 Reply Comments at 2, 4; AEU April 23 Reply Comments at 10. See also Joint Parties' April 22 Motion to Stay at 3.
52  See Market Monitor April 23 Reply Comments at 2; BrightNight April 23 Reply Comments at 3; Bloom April 23 Reply Comments at 2; DCC April 23 Reply Comments at 7; Industrials April 23 Reply Comments at 14. See also National Security Experts April 22 Reply Comments at 1.
53  Indicated Transmission Owners June 3 Answer at 3; Indicated Transmission Owners June 27 Answer at 2-3 (noting Talen's announcement that the co-location arrangement between Talen and Amazon will transition to a front-of-the-meter arrangement).
54  PJM March 24 Response at 23, 26-27.
55  Id. at 21, 27-29. 25 of 515

PDF page 27

Document Accessig.,
a§c: ?mg:?1:18 _ 3 PaCUMerVAd Dk)e:3.?23.8/Pge  Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 16 -
necessarily regulate companies making end-use sales, for example, in the case of industrial customers' self-supply of electricity in Indiana. Moreover, PJM contends that, based on its understanding of Pennsylvania law, a company agreeing to sell electricity to a data center may not be subject to public utility regulation in that state. PJM alleges that New Jersey has similarly declined to exercise its authority to regulate retail sales to large end users.

27. PJM presents several arguments that the Commission has authority over Co-Location Arrangements pursuant to its jurisdiction under the FPA over transmission in interstate commerce.56  PJM states that, to adequately support a finding based on interstate transmission jurisdiction, one can show that a utility's lines are indirectly connected to the interstate grid. PJM argues that the Commission has jurisdiction regarding the transmission service associated with the ancillary services that Co-Location Arrangements use because the data center in the arrangement will be interconnected to the grid. PJM separately argues that the Commission's transmission jurisdiction is implicated because the Commission has authority over interconnections to the grid, including modifications by the generator to add load. With respect to the Commission's jurisdiction over wholesale sales in interstate commerce, PJM argues that it is increasingly complicated to analyze such sales due to the interconnectivity of the grid, technological advancements, and industry deregulation, but suggests that some Co-Location Arrangements may involve Commission-jurisdictional sales for resale.

2. Transmission Owners' March 24 Responses
28. Indicated Transmission Owners state that they generally agree with the jurisdictional principles outlined in the Show Cause Order.57  Indicated Transmission Owners argue that the Commission can set a transmission rate that Network Customers serving all Network Load must pay for services and associated charges, but how a state chooses to assign and allocate the recovery of the cost of that charge between individual retail customers or among classes of end-use load may vary, as long as there is no cost-trapping. Indicated Transmission Owners state they would welcome the Commission reaffirming that PJM generation interconnection procedures apply to the interconnection of and service to generation, including generation with Co-Located Load, but not to the load itself, which interconnects under state jurisdiction.

29. AES Ohio argues that no changes are necessary to ensure clarity regarding the aspects of service to Co-Location Arrangements that may be administered through the

56  Id at 30-31.
57  Indicated Transmission Owners March 24 Response, attach. A at 1-2; AES Ohio March 24 Response at 1. 26 of 515

PDF page 28

Document AccessiAa§c:  ?§2§'18- 3 PficumentiilAd DrtNe:13718/pte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 17 -
Tariff versus state jurisdictional retail tariffs.58  Indicated Transmission Owners state that the Commission could clarify that generation interconnection agreements do not "confer the right to serve end-use retail load or the right of new load to take retail service at a specific point or under particular rates" as those rights are regulated under state law.59 AES Ohio and Indicated Transmission Owners state that, in general, the continued obligation, if any, of generation to serve classes of end-use customers to pay for that generation is a matter of state jurisdiction and concern.°

3. Reply Comments
a. Requests to Clarify the Scope of Federal Jurisdiction
30. Several parties contest that there is shared responsibility between states and the Commission with respect to service to Co-Located Load and generation61  and request that the Commission clarify the scope of its jurisdiction. OPSI, NRDC, and Pennsylvania Commission request that the Commission affirm that the sale between a Co-Located Load and a generator is a retail sale subject to state jurisdiction and that states also have power to regulate wholesale sales not in interstate commerce, as well as facilities used for the generation and distribution of electricity.62  ELCON and Talen request that the Commission use this proceeding to clarify that the Commission generally has jurisdiction over the types of large-scale Co-Location Arrangements discussed in PJM's Answer to the Show Cause Order.63  Talen also requests that the Commission clarify that the basis of the Commission's jurisdiction will vary based on the specifics of the Co-Location Arrangement and confirm that the Commission's limited role is to ensure that the Co-Location Arrangement does not impair overall system reliability; that interconnections between generators and the grid are safe and reliable; and that the rate

58  AES Ohio March 24 Response at 12.
59  Indicated Transmission Owners March 24 Response, attach. A at 20-21. 6°  Id, attach. A at 21-22; AES Ohio March 24 Response at 13.
61  See AEU April 23 Reply Comments at 8; Talen April 23 Reply Comments at 9 (citing New York v. FERC, 535 U.S. at 20-24).
62  OPSI April 23 Reply Comments at 6; NRDC April 23 Reply Comment at 2; Pennsylvania Commission April 22 Reply Comments at 2-3 (citing Nat'l Ass 'n of Regul. Util. Comm 'rs v. FERC, 964 F.3d 1177, 1187 (D.C. Cir. 2020)).
63  ELCON April 23 Reply Comments at 4-5; Talen April 23 Reply Comments at 3. 27 of 515

PDF page 29

Document AccessiAa re:  gt-§.3:18-3,4qcurnentiiirJa DVt:Ne:i?Na/Rigte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 18 -
for any service is reasonable.64  Talen argues that the Commission cannot favor one type of Co-Location Arrangement or configuration over another.

31. Many parties commented on the scope of the Commission's authority over Co-Location Arrangements, but several disagree on the components that are subject to Commission oversight. California Utilities, EPSA/P3, AEU, and Talen agree with PJM that the Commission has jurisdiction over the allocation of transmission, ancillary services, and other related costs between customers using or benefiting from the transmission system, but clarify that state or local regulators may choose to reallocate such costs in retail rates.65  EPSA/P3 qualifies its comments by noting that in states with retail choice, there is no nexus between state regulation and the transmission rates established by the Commission, such that only the Commission-approved transmission rate and interconnection procedures govern.66

b. Areas of Commission Jurisdiction
32. Several parties support the Commission's exercise of jurisdiction over the taking of transmission service.67  Market Monitor and UCS argue that Co-Location Arrangements are interconnected to the transmission grid and receive jurisdictional service from jurisdictional transmission facilities.68  CATF argues that the Commission has jurisdiction to require transmission tariff provisions for Co-Located Load because all co-located configurations receive essential services from the transmission grid, and therefore, all rates, practices, and procedures involving such facilities must be just, reasonable, and not unduly discriminatory.69

33. Talen contends that if the load is not using any transmission network, point-to-point, or ancillary services, then the basis of Commission jurisdiction is not that

64  Talen April 23 Reply Comments at 3, 9-10 (citing 16 U.S.C. § 824d).
65  California Utilities April 23 Reply Comments at 3-4.
66  EPSA/P3 April 23 Reply Comments at 6-8.
67  NOVEC April 23 Reply Comments at 8.
68  Market Monitor April 23 Reply Comments at 13; UCS April 11 Reply Comments at 16 (citing Show Cause Order, 190 FERC ¶ 61,115 at P 76 ("The Commission has defined transmission service as the provision of `electric transmission, network or point-to-point service, ancillary services or other methods of electric transmission, or the interconnection with jurisdictional transmission facilities.'")).
69  CATF April 25 Reply Comments at 5. 28 of 515

PDF page 30

Document Accessiccia§9:  gc72.§§?18 -3“qcumen ilrid Drelfle:1;918/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 19 -
the Co-Located Load itself takes a Commission-jurisdictional form of transmission service but that the Interconnection Service Agreement (ISA) governing the Co-Location Arrangement is jurisdictional.70  Talen contends that there may be situations in which Co-Located Load takes Commission-jurisdictional transmission service.

34. Talen also agrees with PJM that "the Commission's jurisdiction over transmission service in interstate commerce" is "necessarily implicated in matters relating to co-located load arrangements where generator interconnections are being modified," or where a generator's ISA contemplates a Co-Location Arrangement.71  California Utilities disagree, arguing that the Commission has jurisdiction only over the wholesale generator interconnection and cannot "bootstrap such jurisdiction to dictate the terms and conditions of service to retail load.i72  Talen asserts that Co-Location Arrangements may also create different (or supplementary) bases for Commission jurisdiction either because sales are interstate sales or when they constitute sales for resale.73  Talen concludes that when the load has no grid connection, there can be no jurisdictional service.

35. Talen argues, however, that the Commission should not condition its assertion of jurisdiction on the assumption that Co-Located Loads always take

Commission-jurisdictional services from the transmission system. Talen contends that the specifics of Susquehanna's Co-Location Arrangement, in which the Co-Located Load is not a network customer and has no right to take transmission service or backup from the grid, make clear why it would be a mistake for the Commission to assert blanket jurisdiction over Co-Location Arrangements based on that load's supposed receipt of jurisdictional transmission service or ancillary services. Talen contends that the practical effect of such an assertion would be to improperly federalize the entire electric system.

36. PPL argues that the Commission has the jurisdictional authority to ensure that Co-Location Arrangements do not impact the safety or reliability of the bulk electric system and do not create conditions for improper subsidization of Co-Located Loads by

70  Talen April 23 Reply Comments at 4-5.
71  Id. at 5. 72  Id. at 2; California Utilities April 23 Reply Comments at 4; EPSA/P3 April 23 Reply Comments at 6; AEU April 23 Reply Comments at 8.
73  Talen April 23 Reply Comments at 4-8. 29 of 515

PDF page 31

Document Accessicia§c:  g2§§3:18-3q19,curnenti9.1111 DFACIe:A918/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 20 -
network customers.74  Chevron states that the Commission has the right to clarify rules relating to the ongoing sales of essential reliability services by the generator.75 c. Areas of Exclusive State Jurisdiction

37. Many parties note that states retain sole jurisdiction over distribution and retail rates and sales, non-bypassable charges, and interconnection of load at distribution voltage levels, whereas the Commission has jurisdiction over the interaction of generators with the PJM markets.76  Among other retail charges, PIOs argue that states retain authority over whether consumption by a Co-Located Load should count for purposes of allocating transmission and distribution system charges to retail customers.77  Indicated Transmission Owners note that state-jurisdictional special contracts or rates can provide other financial benefits to the Co-Located Load.78  Constellation and Talen state that the Commission has no authority to prohibit a generator from selling directly to Co-Located Load.79  Talen adds that the Commission cannot compel participation in federally regulated energy or capacity markets.8°

d. Potential Jurisdictional Gap
38. Commenters disagree on whether the FPA's division of jurisdictional authority leaves a regulatory gap with respect to Co-Location Arrangements. PPL agrees with PJM

74  PPL April 23 Reply Comments at 7.
75  Chevron April 23 Reply Comments at 4.
76  See Constellation April 23 Reply Comments at 68, 70; EDFR April 23 Reply Comments at 7; Joint Consumer Advocates April 23 Reply Comments at 8; NOVEC April 23 Reply Comments at 8. EPSA/P3 April 23 Reply Comments at 6; AEU April 23 Reply Comments at 8; Talen April 23 Reply Comments at 2; PPL April 23 Reply Comments at 1; Indicated Transmission Owners April 23 Reply Comments at 2; California Utilities April 23 Reply Comments at 2.
77  PIOs April 23 Reply Comments at 42.
78  Indicated Transmission Owners April 23 Reply Comments at 14.
79  Constellation April 23 Reply Comments at 72; Talen April 23 Reply Comments at 10. 80  Talen April 23 Reply Comments at 10. 30 of 515

PDF page 32

Document Accessiga§c:  g24c42113- 3 Pp, CUrnentii irJa Dk
e.l )18/Pate Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 21 -
that there is a potential jurisdictional gap.81  PPL states that under prevailing Pennsylvania law, a single generator providing service to a single customer is not a public utility and is not subject to the retail jurisdiction of the Pennsylvania Commission, nor are the terms of that retail sale subject to federal oversight. Pennsylvania Commission rejects this view, however.82  Pennsylvania Commission argues that when Co-Located Load receives services from the grid, the respective Commission that regulates that portion of the grid has jurisdiction over those services.83  OPSI also argues that there is no regulatory gap, explaining that sales of electricity from a generator to an end use customer in intrastate commerce are subject to state jurisdiction.84  OPSI disagrees with PJM's assertion that jurisdiction across the PJM region is unclear, emphasizing that OPSI's member states have processes by which jurisdictional issues can be resolved. Constellation states that differing treatment of direct sales by states is not indicative of a regulatory gap, but a deliberate policy choice.85

e. Jurisdiction over Large Load Interconnection
39. Commenters also disagree on whether the Commission should assert jurisdiction over the interconnection of large loads. California Utilities state that the Commission cannot exercise jurisdiction over the interconnection of a Co-Located Load to the transmission system as an element of transmission service in interstate commerce where the purpose of the arrangement is to facilitate a retail sale.86  PIOs argue, however, that the Commission should assert jurisdiction over Co-Location Arrangements on PJM's transmission system and must not disclaim jurisdiction over interconnection of large loads.87  PIOs note that the introduction of large loads has potential to disrupt transmission system reliability. PIOs state that the Commission has not historically exercised jurisdiction over "any and all transmission-level interconnections of retail

81  PPL April 23 Reply Comments at 7.
82  Pennsylvania Commission April 22 Reply Comments at 3-4 (citing 66 Pa.C.S. § 102; Drexelbrook Assocs. v. Penn. Pub. Util. Comm'n, 212 A.2d 237, 240 (Pa. 1965); Borough of Ambridge v. Pub. Serv. Comm 'n of Penn., 165 A. 47, 49 (Pa. Super. Ct. 1933)). 831d at 5.
84  OPSI April 23 Reply Comments at 5-6.
85  Constellation April 23 Reply Comments at 73.
86  California Utilities April 23 Reply Comments at 5.
87  PIOs April 23 Reply Comments at 34-35, 37. 31 of 515

PDF page 33

Document Accessicaa c:  ?I§2§g18-3PAcurnenWAd Dfta.9e:A?18/Pg.te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 22 -
load."88  PIOs interpret "any and all" to mean the Commission has not exercised plenary authority over every transmission-level load interconnection, although there are cases where the Commission and its regulated entities have sought to control interconnections of load. PIOs assert that "the Commission's statutory mandate to ensure that transmission users, owners, or operators satisfy reliability criteria provides ample support for regulating the interconnections of large loads that . . . have usage characteristics that can cause unacceptable disruption to the bulk power system."89  PIOs argue that the Commission must plan for wholesale sales at co-located facilities.

40. Talen asserts that interconnection service is a form of Commission-jurisdictional service, and a generator's interconnection to the interstate transmission system does not stop being Commission-jurisdictional merely because there is Co-Located Load behind the point of interconnection.90  Talen argues that for that reason, the Commission has for decades approved amendments to ISAs designed to accommodate Co-Located Load, and notes that Order No. 2003 rejected the idea that the Commission loses jurisdiction over interconnections if the generator makes behind-the-meter sales. Talen states that the presence of non-jurisdictional facilities behind the meter does not divest the Commission of jurisdiction over the generator's interconnection, because non-jurisdictional facilities (including the generator itself) always exist behind the meter. Talen contends that the argument that the Commission does not have jurisdiction over the interconnection of end-use load is undermined by the Supreme Court's decision in EPSA, which confirmed that the Commission can exercise jurisdiction over matters the FPA charges it with administering, even if the exercise of jurisdiction indirectly affects the states' regulatory powers, so long as Commission's action does not "target" the states' domain.91 f. Need for Flexible PJM Tariff Provisions

41. AEU, NOVEC, and PIOs argue that any tariff changes put forward by PJM must be flexible enough to accommodate states' different regulatory frameworks and

88  Id. at 34 (citing Show Cause Order, 190 FERC ¶ 61,115 at P 72).
89  Id. at 36.
90 Talen April 23 Reply Comments at 8-9.
91  Id. at 9 (citing Standardization of Generator Interconnection Agreements & Procs., Order No. 2003, 104 FERC ¶ 61,103, at PP 813-14 (2003), order on reh'g, Order No. 2003-A, 106 FERC ¶ 61,220, order on reh'g, Order No. 2003-B, 109 FERC ¶ 61,287 (2004), order on reh'g, Order No. 2003-C, 111 FERC ¶ 61,401 (2005), aff'd sub nom. Nat'l Ass 'n of Regul. Util. Comm'rs v. FERC, 475 F.3d 1277 (D.C. Cir. 2007) (NAR UC)). 32 of 515

PDF page 34

Document Accessigha§e:  g2§§?18-3Pacumentiiirid DeaCie:iPis/p,?
Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 23 -
acknowledge that not all Co-Location Arrangements will be available in all states.92 AEU argues that such flexibility will allow states to decide whether changes to state law are needed to either expand or constrain access to Co-Location Arrangements, according to state-specific circumstances and policy goals. NOVEC explains that, under its understanding of relevant state law, the Co-Location Arrangements sought by Constellation in Docket No. EL25-20 would not be permissible in Virginia unless the supplier to the Co-Located Load is authorized under state law to be a retail supplier in the geographic area in which the Co-Located Load is located.93

42. NOVEC submits that the Commission should not create a novel contractual arrangement in the PJM Tariff that allows Co-Location Arrangements to bypass transmission service, local distribution utilities, and the capacity market.94  If it does, NOVEC contends that the Commission risks creating an uneven patchwork of co-location rules across PJM as some jurisdictions permit it and others do not. PIOs argue that PJM must not limit states' authority over the co-located generation mix.95 PIOs add that the PJM Tariff should treat Co-Located Load as any other consumption.

43. Constellation argues that requiring Co-Located Loads to take NITS unduly limits state jurisdiction and flexibility.96  Constellation asserts that requiring large loads to take wholesale service, rather than taking service directly from a generator, and requiring the generator to only make wholesale sales, rather than providing service directly to a Co-Located Load, effectively precludes states from regulating transactions that fall squarely within their jurisdiction.

D. Cost Allocation
1. PJM's March 24 Response
44. PJM states that Co-Location Arrangements should pay the costs of any grid services they consume.97  PJM states that it believes the load and generator must be completely isolated and physically disconnected from the grid to ensure the load never

92  AEU April 23 Reply Comments at 8; NOVEC April 23 Reply Comments at 8.
93  NOVEC April 23 Reply Comments at 8.
94  Id. PIOs April 23 Reply Comments at 40-43.
96  Constellation April 23 Reply Comments at 26-28, 73-74.
97  PJM March 24 Response at 4, 42-45. 33 of 515

PDF page 35

Document AccessiAa§q:
prtaie:A.,48/pg.te Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 24 -
takes any form of transmission service. PJM maintains that it is always possible that any protection system in an isolated (but not islanded) Co-Location Arrangement could mis-operate, be disabled, or degrade, and that, in the few instances where such schemes exist on the PJM system, PJM has observed these schemes fail, and the load has taken grid service. Other challenges, PJM notes, include unplanned generator run-backs or reductions in output, generator megawatt (MW) oscillations, and Co-Located Load utilization fluctuations. PJM argues that, when these conditions occur, they result in brief, but routine, imbalances between the load and the generation that would need to rely on the grid to balance.

45. PJM explains that proposed Co-Located Loads are not "wholly isolated from the grid" because the load and generator are connected to and synchronized with the multi-state bulk power system.98  PJM avers that there are obligations to ensure power to nuclear plants to ensure safe shutdown. PJM explains that synchronized to the grid means the generator matches the voltage, frequency, and phase of the entire grid before connecting to the grid to facilitate safe, stable power transfer. PJM also asserts that Co-Located Load is connected to and synchronized with the multi-state bulk power system and, at minimum, benefits from ancillary services.

46. PJM states that it prefers that Co-Location Arrangements be designated as Network Load in front of the meter.99  In support of its preference, PJM argues the Network Load designation means: (1) more reliable service for these critical loads;

(2) more comprehensive and holistic system planning based on Network Load status;
(3) enhanced ability to manage load curtailment priority in emergency conditions; (4) less operating complexity and reduced dependence on protective schemes, which can mis-operate and are designed to address N-1 conditions; (5) greater access to potential Demand Response capabilities of large Co-Located Loads; and (6) fewer negative implications for resource adequacy if accompanied by some of the optional offerings (i.e., Demand Response, incentives to bring generation, or use of a new non-capacity-backed service). PJM suggests that it may be an open question what level of NITS charges, if any, should be assessed to certain Co-Location Arrangements in accordance with cost causation principles.

47. PJM recognizes that Co-Location Arrangements involving large data centers may appear similar to the BTMG configuration in PJM's Tariff but that the rules were not designed for large loads and are not a good fit.'°°  PJM explains that its BTMG Tariff provisions were developed in 2004 and that BTMG netting is only available to entities

98  Id. at 42-43.
99  Id. at 38-40. 10°  Id. at 34-36. 34 of 515

PDF page 36

Document Accessiccia§c:  gct-
i18_31;:gcumentiiirid DP
e.1
Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 25 -
taking NITS. PJM states that BTMG netting was justified at the time it was proposed because certain market participants "rely to a lesser degree on the PJM integrated transmission system to serve load."1°1  However, PJM cautions that "20-years later cost causation principles may dictate a different outcome for co-located data center loads that appear to have different customer profile and load characteristics."102  PJM contends that co-located data center configurations use the transmission grid to receive service because they "appear to require certain ancillary services (load following) and black start service" and ancillary services "pass through transmission lines, not the air."1°3  PJM asserts that "simple netting may not capture the costs `caused' by co-located data center arrangements" because they would always net to zero where the generator serves the entire data center load.104  PJM notes that BTMG does not carry reserves, and that PJM's planning and resource adequacy will not account for loads in this configuration. PJM suggests that the record "raise[s] questions about the status" of the BTMG rules.'°5

2. Transmission Owners' March 24 Responses
48. Indicated Transmission Owners and AES Ohio argue that Co-Located Load interconnected to the transmission system is using and benefiting from the transmission system, causes changing flows from second to second, and should pay its costs of essential grid services.1°6  Indicated Transmission Owners state that Co-Located Load that is connected to the grid has the potential to draw real or reactive power from the grid at any time and relies on and benefits from its connection to the transmission system at all times. Indicated Transmission Owners state that the presence of on-site backup generation does not exempt load from paying the costs of transmission service because it still benefits from the transmission system.

1°1  Id. at 36 (citing PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at P 7).
102  Id. (citing Cities of Bethany v. FERC, 727 F.2d 1131, 1138 (D.C. Cir. 1984) (recognizing different rates could be charged to different customer groups); Ala. Elec. Coop., Inc. v. FERC, 684 F.2d 20, 27-28 (D.C. Cir. 1982) (explaining undue discrimination)). 103 Id
104 Id. 1°5  Id. 106 Indicated Transmission Owners March 24 Response at 5, 7, 14; id., attach. A at 5, 19-20; AES Ohio March 24 Response at 2. 35 of 515

PDF page 37

Document AccessiAa§q:
 Pz§.P.i.18-3Rcicurner1W111 DPtaae:A21.8/Pge Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 26 -
49. Indicated Transmission Owners state that the only arrangement where the end-use load does not need to take some form of transmission service is one in which the load is completely islanded and does not connect to, take service from, or rely on the transmission or distribution system in any way, for any grid service, at any time.107 Indicated Transmission Owners note that such an arrangement would not be within the Commission's jurisdiction. Indicated Transmission Owners further contend that "[e]ven if operational protection and control technologies, such as relay switches, are used with Co-Located Load and generation, the load still benefits from and utilizes grid services when 1) the load and generator are both connected to the system, and 2) the load is connected and the generator is disconnected from the system, even if the load is connected momentarily before it trips." Further, Indicated Transmission Owners argue that, regardless of Co-Located Load using grid services, Co-Location Arrangements rely on the grid and grid facilities without which the generator could not operate and the arrangement could not exist.

50. Indicated Transmission Owners argue that load cannot be "fully isolated" if it remains connected to the transmission and/or distribution grid, even through protection systems.108  Indicated Transmission Owners note that the definition of a Co-Location Arrangement that the Commission adopted in the Show Cause Order "obscures the engineering and economic truth that the load relies upon the functioning grid and grid services whichever side of the meter it is located on."109  Indicated Transmission Owners state that PJM's pro forma tariffs and interconnection agreements require that all interconnection customers be synchronized to the grid as a condition of service and explain that this is necessary to preserve voltage stability and reliability.110

51. Indicated Transmission Owners argue that the transmission system must be planned and built to support any load able to be served by the transmission system to ensure compliance with state requirements that end-use load must be served.111  Indicated

107  Indicated Transmission Owners March 24 Response, attach. A at 9-10. 1°8  Id. at 7, 9.
109  Id. at 7, n.17. 11°  Id. attach. A at 9 (citing e.g., PJM, Intra-PJM Tariffs, OATT, attach. O app. 2, § 1.4 Initial Operation)).
111  Id. at 5, 8, 16, attach. A at 6 (citing PJM, Intra-PJM Tariffs, OATT, § 28.2 Transmission Provider Responsibilities (stating, "[t]he Transmission Provider shall include the Network Customer's Network Load in the Transmission System planning and the Transmission Owners shall, consistent with the terms and conditions of the Tariff, the Operating Agreement, and Good Utility Practice, endeavor to construct and place into service sufficient transfer capability to deliver the Network Customer's Network 36 of 515

PDF page 38

Document Accessiccia§e:g,2§giis_ 3 nqcumen0-jd Draae:147,8,p@te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 27 -
Transmission Owners explain that the fact that the load is not constant does not reduce the capital investment or operational and maintenance costs incurred to ensure the system is available to the customer if the customer has the ability to serve their full load from the transmission system.

52. Indicated Transmission Owners argue that Co-Located Load fits within the current Tariff construct and should receive either NITS or PTPS.112  Indicated Transmission Owners argue that this will ensure Co-Located Loads are appropriately studied, charged, and factored in operationally by PJM and transmission owners. Indicated Transmission Owners therefore conclude that the PJM Tariff is just and reasonable and there is no basis for the Commission to act under FPA section 206. Indicated Transmission Owners clarify that no party has alleged that the current Tariff, which requires load to take either NITS or PTPS, has impaired any load's ability to secure service safely, reliably, and at reasonable cost, or that service had been unobtainable. Indicated Transmission Owners argue that there have been, instead, allegations that efforts to request service outside of the PJM Tariff provisions have been thwarted, but that such allegations do not impact the Tariff. AES Ohio generally agrees, but notes that different configurations of Co-Located Load may result in different forms of service and there may be new approaches that are just and reasonable and incentivize Co-Located Load to provide reliability benefits and cost savings."3

53. Indicated Transmission Owners suggest that adding a definition of Co-Located Load to the PJM Tariff specifying that co-located must be either Network Load or served by PTPS and does not meet the definition of BTMG may clarify expectations and obligations associated with such load.114  Indicated Transmission Owners argue that allowing Co-Located Load to evade existing Tariff charges for grid usage by carving out this load from NITS or PTPS would violate cost causation principles.'"

54. Indicated Transmission Owners further contend that if Co-Located Loads are not designated as Network Load, it would undercut reliability and exacerbate affordability Resources to serve its Network Load on a basis comparable to the delivery of each Transmission Owner's own generating and purchased resources to its Native Load Customers")).

n2  Id at 2-3, 13; id., attach. A at 7, 21.
113  AES Ohio March 24 Response at 2, 5.
114  Indicated Transmission Owners March 24 Response, attach. A at 2, 9, 18. n5  Id. at 18 (citing Pub. Serv. Elec. & Gas Co. v. FERC, 989 F.3d 10, 13 (D.C. Cir. 2021) (quoting Midwest ISO Transmission Owners v. FERC, 373 F.3d at 1368-69)). 37 of 515

PDF page 39

Docurnent Accessicgra rc:
 §.2.§g:?18-3Placumentiiii-Jd DetaSte:APi /Pgte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 28 -
concerns because it would allow Co-Located Load to avoid "wires charges," including the fixed costs of the poles, wires, transformers, and substations that comprise the transmission and distribution network that would then be subsidized by other customers.116  Indicated Transmission Owners allege that "carving a 480 MW Co-Located Load in the Commonwealth Edison territory (which hosts multiple nuclear units) out from Network Service would avoid approximately $121 million in annual charges, leading to a 1.53% increase in representative residential customer bills, or about $25.57 annually, compared to a similar load customer who paid its share of the costs of the grid."117

55. Indicated Transmission Owners explain that transmission owners are allowed to recover the embedded costs of the transmission grid from network customers on a postage stamp basis without consideration of the distance between load and generation.118 Indicated Transmission Owners argue the idea that load is responsible for the embedded costs of the transmission grid based on fairness predates Order No. 888.119  Indicated Transmission Owners state that the Commission's pro forma definition of Network Load does not allow a Network Customer to designate only part of the load at a discrete Point of Delivery as Network Load unless arrangements for PTPS are made. Indicated Transmission Owners explain the Commission found in Order No. 888-A that "all potential transmission customers, including those with generation behind the meter, must choose between [NITS] or [PTPS].',120

56. Indicated Transmission Owners argue that the PJM RAA provides that a Load Serving Entity (LSE) is defined as "any entity (or the duly designated agent of such an entity), including a load aggregator or power marketer, (i) serving end-users within the PJM Region and (ii) that has been granted the authority or has an obligation pursuant to state or local law, regulation or franchise to sell electric energy to end-users located

116  Id at 3, 18.
117  Id. at 18-19.
118  Id. at 10-12, 17-18. 119  Id. at 10-11 (citing Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,707; Fla. Mun. Power Agency v. Fla. Power & Light Co., 67 FERC ¶ 61,167, at 61,482 (1994)). 120 Id at 11-12 (citing Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260). Indicated Transmission Owners argue the Commission has recently rejected requests that some load should be treated as "special third categories." Id. at 17-18 (citing e.g., Nat'l R.R. Passenger Corp. v. PPL Elec. Utils. Corp., 171 FERC ¶ 61,237, order on reh'g, 173 FERC ¶ 61,043 (2020) (Amtrak)). 38 of 515

PDF page 40

Document Accessig.p§c: g)2§§kia_ 3gqcumerA.A-jd Deage:30 18/pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 29 -
within the PJM Region."121  According to Indicated Transmission Owners, the RAA further requires that LSEs shall "provide or arrange for Network Transmission Service or Firm Point-to-Point Transmission Service for service to the projected load of the party … 9122 Indicated Transmission Owners contend that, together, these provisions mean that any entity serving an end-use load, including a Co-Located Load, must become an LSE and is responsible for ensuring that its load is taking either NITS or PTPS.

57. Indicated Transmission Owners state that the BTMG rules do not apply to Co-Located Load that is Network Load because such arrangements must deliver energy to load without using the transmission system.123  Further, Indicated Transmission Owners explain, BTMG adjustments are only available to Network Customers and would not be available to Co-Located Loads served by a contractual intermediary, rather than the generator directly, as the generator would only be an upstream supplier.

58. PSE&G states that transmission charges, if imposed, must apply cost causation principles that are based on a party's actual usage of the transmission system, which PSE&G argues should include netting consistent with BTMG rules.124  PSE&G and AES Ohio state that both Co-Located Load and BTMG employ similar configurations and should pay for transmission services based on their actual system usage, i.e., net use.125 PSE&G argues that Co-Located Load is not using or impacting the transmission system any differently than BTMG customers and urges the Commission to ensure that there is no undue discrimination in the treatment of Co-Location Arrangements.126  PSE&G adds that any replacement rate must not adversely impact existing customers with BTMG.

59. The transmission owners also argue that Co-Located Load that is physically interconnected with and synchronized to the grid uses ancillary services and black start

121  Id. at 15-16 (citing PJM, Intra-PJM Tariffs, RAA, ARTICLE 1 - DEFINITIONS (53.0.0) (Definition of Load Serving Entity)). 122 Id. (citing PJM, Intra-PJM Tariffs, RAA, Article 9 Sec 1 - Overall Coordination (2.0.0)).
123 Id., attach. A at 4.
124  PSE&G March 24 Response at 5-6, 11-13.
125  Id. at 15; AES Ohio March 24 Response at 4.
126  PSE&G March 24 Response at 2, 13-14, 18. 39 of 515

PDF page 41

Document AccessigaW g).2§.M8- 3 gqcu
nefae:a.491.8/pge Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 30 -
service.127  Indicated Transmission Owners state that Co-Located Load that is connected to the grid has the potential to draw real or reactive power from the grid and change power flows at any time, even if connected to the distribution system.128  Indicated Transmission Owners note load co-located with nuclear units depends on the grid for load following, voltage support, black start, and other ancillary services. PSE&G argues that the Commission should establish ancillary services charges for Co-Located Load configurations based on actual use consistent with cost causation principles.129

3. Reply Comments
a. General
60. Several commenters urge the Commission to ensure any cost allocation to Co-Location Arrangements is consistent with the Commission's cost causation and beneficiary pays principes.13°  California Utilities argue that cost allocation will depend on whether a state or local regulator allows a generator to serve Co-Located Load and whether the regulator requires the Co-Located Load to pay for retail transmission service.131  Data Center Coalition argues that large loads, particularly data center operators, must retain the ability to pursue behind-the-meter and other innovative configurations.132  United States Senators argue that the Show Cause Order is an important start to address a crisis affecting ratepayers, and the Commission should ensure

127  Indicated Transmission Owners March 24 Response, attach. A at 5; AES Ohio March 24 Response at 7-8.
128  Indicated Transmission Owners March 24 Response, attach. A at 5.
129  PSE&G March 24 Response at 9-13. 138  See AEU April 23 Reply Comments at 17-19; ACEG April 23 Reply Comments at 2; BrightNight April 23 Reply Comments at 7; Consumers' Research April 23 Reply Comments at 1-2; EEI April 23 Reply Comments at 7; ELCON April 23 Reply Comments at 6-7; PIOs April 23 Reply Comments at 25-26; Vistra April 23 Reply Comments at 24 (citing Midwest ISO Transmission Owners v. FERC, 373 F.3d at 1368; Ill. Corn. Comm'n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009) (/CC v. FERC 1)).
131  California Utilities April 23 Reply Comments at 2, 8.
132  Data Center Coalition April 23 Reply Comments at 4. 40 of 515

PDF page 42

Document Accessiccia§c: gp2-4g?,18_3pacumentiiirid DFaae:14118/Pge  Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 31 -
that data center owners and operators do not burden households with more than their fair share of power infrastructure costs."'

61. Several commenters argue that Co-Located Load should be assessed charges based on services it uses.134  OPSI states that the Commission must determine the extent to which Co-Location Arrangements rely on the bulk power system and impact rates for other customers in determining cost allocation.135  Several commenters argue that Co-Located Load uses and benefits from its connection to the transmission system.136 NREMC states that the intermittent nature of Co-Located Load does not lessen the need for ongoing investment in infrastructure or the operational costs to ensure reliability.137 CATF similarly argues that Co-Located Load creates the need for additional new investment in transmission infrastructure and grid services. Pennsylvania Commission states that the grid must be planned to accommodate the Co-Located Load should any protection schemes fail. Several parties warn of potential cost shifts to consumers if costs are not appropriately allocated to Co-Located Load. t38  NOVEC argues that co-location proposals that exempt Co-Located Load from the costs of transmission service effectively give them free use of the transmission system and cause other load to subsidize that use.

62. Several parties argue Co-Located Load cannot be fully isolated because Co-Located Load and generators are physically interconnected to and rely on the 133  United States Senators November 25 Letter at 2.

134  See SEIA April 23 Reply Comments at 3-4; EDFR April 23 Reply Comments at 10; Glatz/Silverman April 23 Reply Comments at 5; AEU April 23 Reply Comments at 18; EPSA/P3 April 23 Reply Comments at 13; BrightNight April 23 Reply Comments at 7; Ohio FEA April 23 Reply Comments at 5.
135  OPSI April 23 Reply Comments at 4.
136  See CATF April 25 Reply Comments at 4; NREMC April 23 Reply Comments at 7; NOVEC April 23 Reply Comments at 10; Pennsylvania Commission April 22 Reply Comments at 4-5; UCS April 11 Reply Comments at 1-2.
137  NREMC April 23 Reply Comments at 7. 138  See id. at 5-6; CATF April 25 Reply Comments at 12; Consumers' Research April 23 Reply Comment at 1-2; ELCON April 23 Reply Comments at 7; PIOs April 23 Reply Comments at 26-28; ACEG April 23 Reply Comments at 2; Market Monitor April 23 Reply Comments at 4, 7; NOVEC April 23 Reply Comments at 11; Pennsylvania Commission April 22 Reply Comments at 4. 41 of 515

PDF page 43

Document Accessiciag)2§g118-3PRCUmentiilrjd DFp„Re:14?3.8/pgte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 32 -
transmission system.139  CATF states Co-Location Arrangements routinely include unplanned generator run-backs, MW output oscillations, and load utilization fluctuations, resulting in brief imbalances that rely on the grid for support. Parties also argue that protection systems could fail and the generator may go offline.'" NOVEC contends that "fully isolated" Co-Located Load is not fully isolated if there is any physical tie to the transmission system. NOVEC asserts that the benefits of, and the need for, the transmission system is why Co-Located Loads do not seek islanded arrangements. California Utilities similarly argue for Co-Located Load to be fully isolated, neither the generator nor the load may be electrically connected to the transmission system. UCS argues that the Co-Located Load would require system generation reserves and transmission capacity when the output of the generator does not match their consumption and may impact load ramp rates.14' OPSI discourages the Commission from accepting the premise that load can be wholly isolated from the grid without a comprehensive showing that it is impossible for the load to ever receive grid services or impact transmission rates for existing customers.142

63. ELCON states that large loads that do not take any grid services should not be allocated any grid costs unless there is a demonstration that such configuration has a direct cost impact on other grid consumers.143

b. Network Service
64. Several commenters argue that Co-Location Arrangements should be required to take either NITS or PTPS.144  NOVEC notes that PJM charges transmission customers on

139  See CATF April 25 Reply Comments at 4; Pennsylvania Commission April 22 Reply Comments at 4; Joint Consumer Advocates at 5; UCS April 11 Reply Comments at 4-5; PIOs April 23 Reply Comments at 25; Buckeye April 23 Reply Comments at 8; NOVEC April 23 Reply Comments at 9; California Utilities April 23 Reply Comments at 8. 140 UCS April 11 Reply Comments at 4-5; Buckeye April 23 Reply Comments at 8. 141  UCS April 11 Reply Comments at 4-5, 8-9.
142  OPSI April 23 Reply Comments at 4-5.
143  ELCON April 23 Reply Comments at 7.
144  UCS April 11 Reply Comments at 16; NREMC April 23 Reply Comments at 4; NOVEC April 23 Reply Comments at 9-10; AMP April 23 Reply Comments at 3; PIOs April 23 Reply Comments at 8 (Network Load); CATF April 25 Reply Comments at 4; 42 of 515

PDF page 44

Document Accessiccia§C:  gt§P?18 -3 gq.cumentiiiAd Drage:143 ,18/p@te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 33 -
a formulary basis without regard for the distance between load and generation and thus distance does not relieve one of the need to procure transmission service. Pennsylvania Commission states that if a retail customer is served by a generator connected to the transmission system that is prima facie evidence the Co-Located Load is Network Load. Buckeye notes non-Network Load, "behind-the-generator" Co-Location Arrangements may not be permissible in all states and argues that treating Co-Located Load as Network Load respects state laws while providing for consistent application of the Tariff across the PJM footprint. AMP states that it is important that Co-Located Load should take NITS or PTPS to avoid unjust and unreasonable cost-shifting and to promote reliable transmission planning and resource adequacy. PIOs argue that it would violate cost causation and beneficiary pays principles to allow Co-Location Arrangements that rely on ancillary services to avoid paying transmission rates because transmission service is required to receive these services.145

65. Buckeye states that ensuring Co-Located Load is Network Load will ensure visibility to the grid operator, allow PJM to conduct appropriate planning to ensure grid reliability, ensure the load pays for its share of grid costs, and ensure generation resources remain available for the entire grid.146  Buckeye states that, conversely, co-located large load arrangements where the load is behind the meter of the generator, and is not Network Load, may create significant impacts to the grid, increase costs, and decrease reliability for those that rely on the grid for affordable and reliable electricity. Buckeye states that, while certain parties have advocated that these "fully isolated" arrangements will avoid transmission investments, those potential cost savings are outweighed by significant concerns about impacts to reliability, resource adequacy, and just and reasonable rates.

66. Other commenters disagree that Co-Located Load should be required to take NITS or PTPS.147  Industrials state that requiring all Co-Located Load be Network Load would be a departure from precedent that actual use of the transmission system is the appropriate way to measure cost causation. Constellation states that Co-Located Load should not be required to pay for transmission service where there are physical protections to prevent the delivery of system energy from the grid. EDFR asserts that Buckeye April 23 Reply Comments at 5, 7-8; Pennsylvania Commission April 22 Reply Comments at 5.

145  PIOs April 23 Reply Comments at 26.
146  Buckeye April 23 Reply Comments at 5-6.
147  Industrials April 23 Reply Comments at 3; Constellation April 23 Reply Comments at 82-83; EDFR April 23 Reply Comments at 11, 13; EPSA/P3 April 23 Reply Comment at 13. 43 of 515

PDF page 45

Document Accessig'i a§c: g,2-§g318 _3pOqcumenti,i1Ad
taze:14 18/pg.te Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 34 -
Co-Located Load that places minimum demands on the transmission system should pay less in grid costs. EPSA/P3 argues that Co-Located Load that is behind the meter does not require full Network Services for gross load. SEIA urges the Commission not to mandate one approach.'"

67. Data Center Coalition argues that requiring all load to be classified as Network Load risks undermining commercial arrangements, misaligning cost allocation, and chilling innovation.'49  BrightNight states that Co-Located Load should not have to subsidize other customers.15°  Constellation asserts that requiring all large Co-Located Loads to take NITS is unjust and unreasonable because it: (1) would delay service to data centers due to system studies and the need for new upgrades; (2) would impose unnecessary transmission upgrade costs on all existing customers; (3) does not respect state jurisdictional authority; and (4) violates fundamental ratemaking principles and is unduly discriminatory by imposing a one-size-fits-all solution on loads that are not similarly situated.151  Constellation states that the expected integration cost of a 1,000 MW large load is about $126 million, which would be socialized across all transmission customers under a NITS-only approach. Antora argues that requiring Co-Located Load to be Network Load would overcharge both the interconnecting load customer and other customers on the system for transmission service or upgrades to the extent PJM assumes it must serve the customer's full peak demand even if the load is flexible or curtailable.152

68. ELCON states that the Commission should ensure that there are no regulatory barriers to islanded configurations with no connection to the larger grid if allowed by state law.153  ELCON states that forcing all large loads into either NITS or PTPS and limiting flexibility risks driving significant increased overall system costs and limits the ability of customers, state regulators, and utilities to find creative and cost-effective solutions based on individual needs and circumstances.

148  SEIA April 23 Reply Comments at 4.
149  Data Center Coalition April 23 Reply Comments at 7.
15°  BrightNight April 23 Reply Comments at 7.
151 Constellation April 23 Reply Comments at 15, 20.
152 Antora April 23 Reply Comments at 11.
153  ELCON April 23 Reply Comments at 6. 44 of 515

PDF page 46

Document AccessiAa§e: 4 2§cqi18 _3,14qcunnentiiii-jd DE:Age:14518 /pat Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 35 -
c. Netting
69. Several commenters argue that Co-Located Load should be charged for any wholesale services it uses on a net demand basis.'54  Industrials state that a gross load metering approach is analogous to the gross load outcome that the Commission rejected in prior cases.'55  Industrials assert that this approach would cause significant rate increases and disincentivize customers from taking steps to manage use of the grid which could otherwise lead to the avoidance of network upgrades.

70. Constellation argues that requiring Co-Located Loads to be charged NITS on a gross basis is unduly discriminatory because it would charge the same rates to customers who impose different costs on the system.'56  Constellation states that Co-Located Load should have the choice to be Network Load and pay gross NITS or to pay net NITS if the portion of the generator serving the load delists and PJM procures capacity for the load based on net load during the coincident peaks. Constellation states that since Co-Located Load is unlikely to be withdrawing energy during coincident peak hours, it is appropriate to charge the higher of NITS or a `standby charge' to reflect that the system must be built to a certain extent to serve the load on a firm basis.

71. Constellation further argues that charging all large Co-Located Loads NITS based on gross demand would be unduly discriminatory because it is inconsistent with treatment of BTMG.157  Constellation argues that there are no physical, technical, or economic reasons why netting rules applied to existing retail BTMG customers should not apply to co-located. Constellation states that size is not a rationale for discriminatory rate treatment. In response to concerns that PJM is not required to carry reserves for BTMG, Constellation states that BTMG rules could be modified to require the Co-Located Load to carry or pay for reserves and ancillary services or, if needed, a minimum demand charge for NITS for any non-volumetric costs the BTMG load imposes on the system.

72. On the other hand, Indicated Transmission Owners argue that to afford Co-Located Load similar treatment to BTMG load would be to grant an undue preference 154  Vistra April 23 Reply Comments at 25; Constellation April 23 Reply Comments at 31; Industrials April 23 Reply Comments at 4.

155  Industrials April 23 Reply Comments at 4-5 (citing Occidental Chem. Corp. v. PJM Interconnection, L.L.C., 102 FERC ¶ 61,275 (2003)).

156  Constellation April 23 Reply Comments at 31-33, 40-41.
157  Id. at 32-33, 39, 41-45, 77, 80-81. 45 of 515

PDF page 47

Document Accessig"la: g)2N18-3149. cumentiilAd DERReAP18/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 36 -
to such configurations over others that also rely upon Network Service.158  Indicated Transmission Owners and AMP argue that because Co-Location Arrangements use the transmission system, they cannot qualify as BTMG. PPL states that behind-the-meter generation at an existing load differs both in kind and degree from load appearing behind the meter of an existing generator. Indicated Transmission Owners and NREMC argue that allowing large Co-Located Load to utilize the BTMG model of netting generation against load could allow these facilities to avoid most, if not all, costs, unfairly shifting costs to other grid users since Co-Located Loads rely on and benefit from the grid.

73. AMP and NREMC agree with PJM that BTMG was not designed to accommodate large loads.159  NOVEC argues that BTMG loads had or developed generation to supply the load, but Co-Located Load as contemplated in this record would instead repurpose existing generation from the supply stack.16°  NOVEC contends that the additional generation provides greater flexibility to customers and PJM, not less, and that Co-Located Loads are on a significantly larger scale than existing BTMG and may have larger impacts on the PJM system. NREMC argues that large Co-Located Loads paired with BTMG present significantly greater operational risks than traditional BTMG arrangements because they lack adequate reserves.161

74. AMP states that regardless of what the Commission decides with respect to Co-Located Load, the Commission should preserve the current BTMG netting provisions in the PJM Tariff.162  AMP contends that PJM does not provide any citations to discussion in the record regarding PJM's BTMG rules that call the existing netting provisions into question, nor does it identify any reason why the practice of netting loads served by BTMG might no longer be consistent with cost causation principles. AMP states that the longstanding nature of the netting provisions is a reason to retain, not

158  Indicated Transmission Owners April 23 Reply Comments at 6-7 (citing 16 U.S.C. § 824d(b)). See also AMP April 23 Reply Comments at 12 (citing PSE&G March 24 Response at 15); PPL April 23 Reply Comments at 8; NREMC April 23 Reply Comments at 5.
159  NREMC April 23 Reply Comments at 5; AMP April 23 Reply Comments at 11-12 (citing PJM March 24 Response at 35). 16°  NOVEC April 23 Reply Comments at 18.
161  NREMC April 23 Reply Comments at 5.
162  AMP April 23 Reply Comments at 13. 46 of 515

PDF page 48

Document Accessigia§c:  g'24§1318-3gqcumentiiirli DPACIe:1473.8/p@te Filed.  10/16/2026 Docket No. EL25-49-000, et al.

- 37 -
revisit them, given the reliance interests of PJM market participants in the existing rules.163

d. Replacement Rates
i. PJM Options
75. AEU contends that all eight PJM co-location options should be accommodated, although each also requires additional development.'" Vistra argues that if PJM option 3 (BTMG where load is Network Load) left the BTMG rules unchanged, it would be unduly discriminatory to prohibit behind-the-meter loads from engaging in the same type of netting.165  Vistra also argues that PJM option 4 configurations (Co-Located Load connected to the grid with protection facilities) would use the transmission system less than a retail BTMG configuration because protective systems ensure that the load never draws energy from the grid, whereas retail BTMG arrangements may do so. Antora argues that PJM option 4 is the only pathway that allows for the fully coordinated study of co-located generation and load.166  Antora states that the risks PJM identifies with this option would be mitigated for low-load factor loads that only charge when energy is abundant and low cost.

76. Vistra argues that when option 5 configurations (Co-Located Load connected to the grid with protection facilities, but with back-up service from the grid) draw power from the grid, PJM should apply netting provisions consistent with the BTMG program.167  Vistra states that, during those periods when the configuration is drawing power from the grid, it may make sense to require such configurations to pay for PTPS, NITS, or a new conditional, non-firm transmission service. PPL states that under this option, PJM must modify its Tariff to facilitate the type of "real-time, bespoke operational decision-making to determine whether load can continue to be served" that

163  Id. at 10-11 (citing Dep't of Homeland Sec. v. Regents of the Univ. of Cal., 591 U.S. 1, 30 (2020)). 164  AEU April 23 Reply Comments at 11-17.
165  Vistra April 23 Reply Comments at 14.
166  Antora April 23 Reply Comments at 6, 13-14-15.
167  Vistra April 23 Reply Comments at 8, 28. 47 of 515

PDF page 49

Document Accessig1 a re:
_ 3 pacumentiiirJa Detaoqe:i4P18/Pgte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 38 -
PJM contemplates.168  PPL notes that under Pennsylvania law, PPL cannot deny backup service properly requested under its General Tariff.169

77. Antora argues that the Commission should direct PJM to build out option 7 by developing a new non-capacity backed service offering that is available on both a permanent and transitional basis (as PJM's option 7 is only transitional) to facilitate the integration of highly flexible, low load factor Co-Located Loads.17°  Antora argues that offering non-capacity backed transmission service on a permanent basis would allow PJM to capture the benefits of co-located facilities, serving the same amount of total load at lower cost, with less transmission infrastructure and fewer capacity resources.

78. Constellation states it supports an interruptible transmission service assessed on net load to promote a more efficient use of the system's existing headroom, resource adequacy benefits, and lower costs for customers.171  Constellation argues that allowing load to temporarily curtail consumption during peak periods would limit needed upgrades, arguing a study showed that a new load curtailment rate of just 0.5% annually would result in nearly 18 GW of potential new load integration in PJM without capacity expansion. Constellation states that an interruptible service should cease to be available once the upgrades are complete—not based on PJM's assessment of resource adequacy as PJM suggests. NRDC states that it has concerns that the proposed no-capacity backup service could lead to unduly preferential results and argues it would be preferable to use existing demand products than invent new ones.172  Indicated Transmission Owners argue that if Co-Located Load wishes to be compensated for being interruptible, at the transmission level, such load must show why that outcome is the correct rate design and

168 PPL April 23 Reply Comments at 11.
169  Id. (citing PPL Electric Utilities Corporation General Tariff, Rule 6, https://www.pplelectric.com/-/media/PPLElectric/At-Your-Service/Docs/Current- Electric-Tariff/rule6.pdf (providing for "[s]ervice to customers who have another source of power which can be substituted for Company's service for any of customer's operations"); PPL Electric Utilities Corporation General Tariff, Rule 7, https://www.pplelectric.com/-/media/PPLElectric/At-Your-Service/Docs/Current- Electric-Tariff/rule7.pdf (providing for "[t]emporary service . . . for less than one year or for a year or more when Company must install facilities that will be used solely for a service that is known to be limited in duration.")). 170  Antora April 23 Reply Comments at 6-7, 13, 16-18.
171  Constellation April 23 Reply Comments at 23-26, 56-57.
172  NRDC April 23 Reply Comments at 5-6. 48 of 515

PDF page 50

Document AccessiAa§q: ?§2-qi18 _ 3 aqcumeq,il-i-ja  Dfacie:i491 8/pate  Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 39 -
why the current demand response rules fail to adequately compensate load appropriately.173

Other
79. Vistra states that it would be reasonable to create a penalty regime to address any unintended grid use by Co-Located Loads with protective schemes.174  Vistra explains that such a penalty would be conceptually similar to the unreserved use penalties that the Commission created in Order No. 890 that subject transmission customers to penalties for using transmission service that they did not reserve. Buckeye raises concerns with an annual single coincident peak (1 CP) transmission cost allocation, arguing that reduction in the load during a single hour after building the transmission infrastructure to serve that load will not reduce overall costs.175  Buckeye suggests a potential mechanism that should be considered to help mitigate unreasonable cost shifts is changing the 1 CP billing determinant to 12 coincident peaks (12 CP) or to one or more non-coincident peaks (NCP). Buckeye argues that moving to 12 CP may make it more difficult for large loads to shift costs to other wholesale customers and their retail members, but notes this would not address stranded costs.

80. Glatz and Silverman recommend the Commission explore the potential to develop a new level of non-firm or interruptible transmission service that prioritizes connection of new flexible loads, regardless of whether they are co-located with generation.176 Enchanted Rock supports a transitional non-firm service where the load relies on PJM to provide energy, but where the load is under a commitment to dispatch co-located generation during PJM curtailments.177  Under this option, Enchanted Rock maintains that the co-located facilities could be quickly interconnected and would only require curtailment in a small number of hours of a year, allowing more efficient use of generation resources and transmission capacity, lowering costs to customers, and buying time for new infrastructure to be built.

81. Constellation states Co-Located Loads should have three options: (1) a firm NITS option with the load paying based on either gross load or net load, depending on its configuration; (2) a generator-contingent option where Co-Located Load does not pay

173  Indicated Transmission Owners April 23 Reply Comments at 12.
174  Vistra April 23 Reply Comments at 13, 25-26.
175  Buckeye April 23 Reply Comments at 12.
176  Glatz/Silverman April 23 Reply Comments at 12-13.
177  Enchanted Rock April 23 Comments at 10-12. 49 of 515

PDF page 51

Document Accessig!PW P-2-§g18-3Pcsq.CUrneq'ilijd Deae:1§918/Pgte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 40 -
NITS but pays for any necessary upgrades and could pay a discounted transmission charge for as-available energy purchases, if any; and (3) an interruptible transmission option—lasting until network upgrades are completed—where Co-Located Load pays a discounted transmission charge reflecting its inferior service.178  Constellation proposes that, regarding the generator-contingent option, it would be reasonable to provide as-available energy at the locational marginal price plus a discounted transmission charge because, while energy would be drawn from the grid, it would only be "as-available" when it is not adding any burden to the transmission system and the load would not need to be planned for reliability or resource adequacy.

82. Indicated Transmission Owners oppose Constellation's proposal, arguing that a discounted transmission rate for Co-Located Load only taking energy from the transmission system on an as-available basis would be unduly discriminatory because transmission rates are charged to all other customers based on full embedded costs, regardless of whether they take energy during peak times.179  Indicated Transmission Owners also argue that allowing certain customers with bundled load and generation to choose their own level of transmission service outside of NITS would be a departure from NERC Reliability Standards FAC-002-2 and TPL-001-5. Finally, Indicated Transmission Owners' affiant argues a flexible bundled interconnection framework is a new concept. Constellation opposes Indicated Transmission Owners' claims about NERC violations and Constellation emphasizes that it does not oppose studies of Co-Located Load, consistent with Reliability Standard FAC-002-2.18°

83. California Utilities state that, if PJM permits netting of load for transmission service, one option for cost allocation would be to require the Co-Located Load to pay for retail stand-by transmission service.181  Joint Consumer Advocates argue that forms of service tailored to specific Co-Located Load will lead to litigation that will further muddy the regulatory waters.182  Invenergy asserts that while new comprehensive rules are developed, PJM should implement a transition process so that large loads customers can move forward with Co-Location Arrangements in the short-term.183  Specifically,

178  Constellation April 23 Reply Comments at 37-38, 51.
179  Indicated Transmission Owners June 3 Answer at 20-21 (citing Powers Declaration at PP 7, 25-29). 180  Constellation June 12 Answer at 6.
181  California Utilities April 23 Reply Comments at 9.
182  Joint Consumer Advocates April 23 Reply Comments at 7.
183  Invenergy April 23 Reply Comments at 7. 50 of 515

PDF page 52

Document Accessigh a§e:
§§i1,3 _ 3 gltqcumenilria. Diage:1§,18/Pge Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 41 -
Invenergy suggests that large-load customers should be allowed to pursue behind-the-meter configurations with new generating facilities without being considered Network Load.

e. Ancillary Services
84. Several parties argue that any ancillary services charges assessed to Co-Located Load must be based on the extent to which Co-Located Loads use ancillary services.184 Market Monitor argues that co-location allows large loads to avoid ancillary service charges.185  Several commenters argue that Co-Located Load configurations either benefit from the provision of or contribute to the need for certain ancillary services and other services, including load balancing, reactive compensation, frequency response, voltage control, regulation, and black start service.186

85. NREMC argues that Co-Located Load benefits from the full range of ancillary services since both transmission and distribution operators depend on ancillary services to maintain grid reliability, stability, and power quality.187  California Utilities argue that generators synchronized to the grid serving Co-Located Load should pay ancillary service costs because they are not fully isolated, use ancillary services, and benefit from reliability and recovery services such as spinning reserve.188  UCS states that load variability from data centers can create imbalances more quickly than generators can correct them, resulting in voltage disturbances, thermal overloads, and stability issues,

184  See OPSI April 23 Reply Comments at 4; Pennsylvania Commission April 22 Reply Comments at 5; Talen April 23 Reply Comments at 13; ACEG April 23 Reply Comments at 2.
185  Market Monitor April 23 Reply Comments at 4.
186  See Pennsylvania Commission April 22 Reply Comments at 4-5; California Utilities Reply Comments at 8-9; UCS April 11 Reply Comments at 14, 15 n.42 (citing Kyle Hannah of Dominion Energy Inc., Pre-Conference Statement, Docket No. AD24-11-000 (filed Nov. 1, 2024)); ENGIE April 23 Reply Comments at 7; NREMC April 23 Reply Comments at 7; NOVEC April 23 Reply Comments at 9-10; PIOs April 23 Reply Comments at 25; ACEG April 23 Reply Comments at 2; California Utilities April 23 Reply Comments at 8-9; Buckeye April 23 Reply Comments at 8; AEU April 23 Reply Comments at 19; ELCON April 23 Reply Comments at 7.
187  NREMC April 23 Reply Comments at 7.
188  California Utilities April 23 Reply Comments at 8. 51 of 515

PDF page 53

Document AccessiAa rc:  gAg?1:15-3Picumentiiii-Jd Det3ae:1.§2 ,
Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 42 -
which can be mitigated by ancillary services.189  UCS states that Co-Location Arrangements benefit from essential reliability services including short-circuit fault current and system inertia. ACEG contends that if Co-Located Loads avoid their share of system costs while relying on that system in emergencies, or even just for stability, such reliance would undermine cost causation principles and unfairly shift costs onto other ratepayers!" Mainspring argues that black start and ancillary service cost allocation will vary by technology type as some generators can provide ancillary services others . cannot.191

86. NOVEC argues that the grid necessarily responds to all power-quality issues, including but not limited to frequency response, reactive needs, transient issues, and voltage contro1.192  NOVEC contends that Co-Located Load is akin to "parasitic load" because the transmission grid cannot differentiate between energy that is injected into the market and energy that is injected to serve Co-Located Load. Additionally, NOVEC argues that nuclear powered generation units are not operated as flexible or partially loaded assets but instead operate at full load between fueling cycles to maximize the value of their fuel rods and therefore, nuclear powered generation assets depend upon other generators on the grid to provide all ancillary service and other power-quality needs.

87. California Utilities argue it is up to the generator to decide how or whether to pass ancillary and black start service costs onto Co-Located Load.193  Talen states that while it continues to believe Co-Located Load should not pay for services it is not using, in the interest of compromise, Talen supports the load paying for certain ancillary services.194

88. Constellation argues that, while there may be some benefit to Co-Located Load for some ancillary services provided to the interconnected generator, a universal requirement for every Co-Located Load to pay for all ancillary services is unjust and unreasonable and unduly discriminatory and preferentia1.195  Constellation acknowledges, for example,

189  UCS April 11 Reply Comments at 13-15. 190 ACEG April 23 Reply Comments at 2.
191  Mainspring April 23 Reply Comments at 9. 192  NOVEC April 23 Reply Comments at 9-10.
193  California Utilities April 23 Reply Comments at 8-9.
194  Talen April 23 Reply Comments at 13 195  Constellation April 23 Reply Comments at 34, 48, 85-86. 52 of 515

PDF page 54

Document Accessicqe§e:
, 18 / —Ate
g2r§g.?18 - 3 4cicumentiiUd Drtae:i§
Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 43 -
that Co-Location Arrangements drawing energy from the system benefit from ancillary services and black start, but argues the generator relies on the service, not the load, and current Commission policy does not support charging generators for ancillary services.

89. Vistra requests that the Commission create a new rate design to ensure that Co-Located Load that is not Network Load pays only for ancillary services that they use.196  However, Vistra argues that PJM has not provided analysis of which ancillary services benefit Co-Located Load. As an example, Vistra offers that variances in the Co-Located Load could be viewed as related to the need for regulation service.

90. Vistra argues that ongoing charges for reactive power supply and black start service should not be assessed to Co-Located Load, however.19' Vistra argues that "the ability to isolate large loads so they cannot draw power from the system would act to sectionalize the grid and make black start more manageable."198  AEU argues Co-Located Loads should be compensated for any ancillary services their connections provide.199

E. Interconnection Procedures and Cost Allocation
1. PJM's March 24 Response
91. PJM states that the necessary study process is among several studies it may employ to evaluate Co-Location Arrangements, depending upon the type of co-location arrangement.200  PJM explains that it does not have a tariffed study process for non-Network Load located behind a generator's point of interconnection. PJM explains that its necessary studies process is designed to evaluate the potential reliability impact of a proposed addition or reduction of a Co-Located Load configuration on the PJM Transmission System.201  PJM explains that the scope of the study addresses generation deliverability, N-1 and N-1-1 thermal and voltage studies, special protection systems review, baseline stability, and, if applicable, a nuclear plant interface requirements voltage analysis.

196  Vistra April 23 Reply Comments at 8, 26-27. 197  Id. at 27-28.
198  Id. at 28 (quoting Shanker Aff. ¶ 66).
199  AEU April 23 Reply Comments at 19.
200  PJM March 24 Response at 47-49.
201 Id at 48-50. 53 of 515

PDF page 55

Dociament Accesgigei
42-118-34(icurnent'ili-Jd neae:IKEi/P§te Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 44 -
92. PJM explains that load studies currently are performed only through the traditional retail load integration processes. PJM commits, however, to exploring opportunities to enhance the visibility of the necessary study process and results where Co-Located Load is not Network Load. PJM notes that a deactivation study, unlike the necessary study, would not be appropriate for Co-Location Arrangements because deactivation studies are designed for the complete cessation of operations by a generator.

93. PJM states that its current necessary study process allows a co-location arrangement to demonstrate its capability to flexibly adjust its withdrawals from or injections to the transmission system.202  PJM clarifies that Co-Located Load configurations usually are modeled as if they never take power from the grid -that this "always on" load is modeled as offsetting the net output of a generator. PJM adds that if the result of this study indicates a thermal or voltage violation, the generator must mitigate the violation before the load can be added.

94. PJM states that, under certain Co-Location Arrangements, it is possible that the generation owner could propose a special protection scheme or Remedial Action Scheme to reduce the load under certain conditions.203  PJM states that, if such a configuration were permitted by the Commission, PJM would require language similar to the protection facilities language proposed in the most-recently filed Susquehanna ISA. PJM asserts that, if and where such facilities might misoperate, additional new language should be developed to require the generator to take immediate steps to stop the flow of energy from the grid to any co-located load or risk breach and non-compliance (given the absence of contractual privity between and among PJM, the Transmission Owner, and the Co-Located Load in certain situations).

95. PJM states that it conducts dynamic studies for Co-Located Load projects, which evaluate all applicable NERC, PJM, and transmission owner-specific contingencies and criteria.204  PJM notes that it also assesses the impact of the ramping behaviors of large loads, generally, and the stability impact of large Co-Located Loads, specifically.

96. PJM states that it would not support creating an additional interconnection queue for Co-Located Load because the necessary study process is capable of incorporating and evaluating the impact of Co-Location Arrangements.2°5

2°2  Id at 51-52.
2°3  Id. at 52.
2°4  Id at 53.
2°5  Id at 56.
54 of 515

PDF page 56

Document Accessicgia§c:
 )2N?i18,..34cicumen't-cid Dfgite:i.§3.8/Pge Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 45 -
2. Transmission Owners' March 24 Responses
97. Indicated Transmission Owners state that the necessary study process, together with other studies, including the individual transmission owners' studies, "are designed to ensure appropriate evaluation of, among other things, generator interconnections, modifications, and retirements and load additions."206  Indicated Transmission Owners explain that these studies are typically compatible with retail load addition studies and can be coordinated. Indicated Transmission Owners argue that these studies are collectively sufficient and that a separate study process for Co-Located Load is not necessary or appropriate.

98. Indicated Transmission Owners explain that it would not be appropriate for the necessary study process to include a "flexibility" analysis because whether a Co-Location Arrangement is capable of being flexible does not guarantee how the end-use load or generator will operate in real time.207  Indicated Transmission Owners state that, "[i]fl the absence of a state law or retail tariff allowing for a more durable commitment, any contractual commitment by end-use load to interrupt its operations or its use of retail electric service will at best be limited to the current contracting party."208 However, Indicated Transmission Owners note, known flexibility should be captured in PJM's large load forecast.

99. Indicated Transmission Owners state that the existing queue process is sufficient to study the interconnection of generation and that all load and generation seeking to interconnect should go through the established processes, as they can operate independently.209

206 Indicated Transmission Owners March 24 Response, attach. A at 12-13.
207 id
208 Id 209 , u attach. A at 16. 55 of 515

PDF page 57

Document AccessiAa§C.: glA§ 1.18 _ 3 gqC U
D' e:1018 D e Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 46 -
3. Reply Comments
a. Interconnection Procedures
i. Expedited Process & Joint Queue
100.
Several parties generally support creating a separate process in PJM for expediting the interconnection of new generation to serve Co-Located Load,21°  such as a joint review process for large load and generation.211  ENGIE and Enchanted Rock note challenges with having different studies for generation and load, including potential mismatching of the time when the load and the generation come online, mismatches in the lifetime of the load versus the lifetime of the generation, and variances of operational characteristics.212 Enchanted Rock also argues that generation interconnection study processes and queues do not adequately recognize the benefits Co-Location Arrangements can provide.213 BrightNight, Invenergy, EDFR, and ENGIE recommend that the Commission and PJM explore studying Co-Location Arrangements based on the net impact on the grid.214 101.

Invenergy proposes studying large loads over 50 MW or interconnecting to facilities at voltages greater than 115 kV along with generation and argues that this would more efficiently use the transmission system, decrease ratepayer costs, promote transparency, ensure that network upgrades reflect the expected topology of the system, and address a number of concerns raised in the Show Cause Order.215

210  See SEIA April 23 Reply Comments at 2; BrightNight April 23 Reply Comments at 9; Chevron April 23 Reply Comments at 7; AEU April 23 Reply Comments at 19-21.

211  See ENGIE April 23 Reply Comments 8; Invenergy April 23 Reply Comments at 3; EDFR April 23 Reply Comments at 7.
212  ENGIE April 23 Reply Comments at 8; Enchanted Rock April 23 Reply Comments at 14.
213  Enchanted Rock April 23 Reply Comments at 15.
214  See ENGIE April 23 Reply Comments at 8; BrightNight April 23 Reply Comments at 9; Invenergy April 23 Reply Comments at 5-6; EDFR April 23 Reply Comments at 7, 9.
215  Invenergy April 23 Reply Comments at 3-5. 56 of 515

PDF page 58

Document Accessicqa§c:  g'24'18 - 3 AqCUrnentiiiAd DEWie:i§lis/P@
Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 47 -
102. BrightNight states that an expedited process for generation serving Co-Located Load would incentivize Co-Located Load to bring its own generation.' BrightNight suggests using the surplus interconnection process to screen for material impacts and, if found, shifting the request into the normal interconnection process. Chevron argues that a separate expedited interconnection process for Co-Located Load is required to support AI data centers as part of the declared emergency processes and national security policy of the United States.217  Consumers' Research states that if Co-Located Load uses dispatchable fossil fuels, it should be moved ahead in the interconnection queue because it can increase grid reliability.218 EDFR states that the Commission should encourage PJM and other Independent System Operators to develop an expedited process for controllable load to interconnect and economically dispatch in the wholesale market, or to participate as voluntary load shed resources.

103.
Several parties support PJM's option 6 specifically.219  Market Monitor states that it supports an expedited interconnection process for load and matching new generation that is consistent with PJM's queue process so long as the load is connected to the grid directly and the new generation resource becomes a Capacity Resource. Ohio FEA explains this could mitigate both local grid impacts and regional resource adequacy concerns. AEU argues that allowing large loads to bring their own new generation would address the root causes of co-location while reducing the new load's impact on resource adequacy.

104.
PPL generally supports PJM's option 6, but notes that the option appears to be independent from questions around Co-Located Load.Z20  Enchanted Rock argues that, to the extent that the Commission directs PJM to implement option 6, load co-located with dispatchable generation projects should also be permitted to participate.221  SEIA asks the Commission to direct PJM to modify option 6 to implement an expedited co-located interconnection process, separate from the queue, to determine whether the 216  BrightNight April 23 Reply Comments at 9.

217  Chevron April 23 Reply Comments at 7.
218  Consumers' Research April 23 Reply Comment at 4.
219  See Mainspring April 23 Reply Comments at 11; Market Monitor April 23 Reply Comments at 11; PPL April 23 Reply Comments at 13; Buckeye April 23 Reply Comments at 9; Ohio FEA April 23 Reply Comments at 4-5; Exus May 15 Reply Comments at 1; AEU April 23 Reply Comments at 14. 220 PPL April 23 Reply Comments at 13.
221  Enchanted Rock April 23 Comments at 15. 57 of 515

PDF page 59

Document AccessiA aye: gi2g.§3:18-3PocicurnentiiirJa DE)tae:AP18/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 48 -
interconnection request for the co-located generation would require new network upgrades.222  SEIA suggests that this process would be analogous to surplus interconnection service and that there would be no queue jumping because the co-located resources would not be competing for network upgrades. SETA argues that such service is beneficial as it may help prevent transmission system overbuild and would help address issues of supply and demand.

105.
Other parties oppose PJM's option 6.223  Bloom argues that PJM's proposal to offer incentives for faster interconnection when the load is Network Load is too narrow. Bloom also asserts that a requirement that a generator with Co-Located Load be a Capacity Resource appears to mandate that the generator enter into a financial contract with Co-Located Load and may undermine resource adequacy goals by disincentiAfizing load seeking only physical arrangements. Bloom proposes an alternative to PJM's option 6 to adopt reforms to interconnect generation and Co-Located Load (both new) as a composite facility called an "energy park," instead of studying the load in one process and the generation in another.224

106.
Constellation asserts that PJM's option 6 is discriminatory against existing generation because it is functionally equivalent to an out-of-market payment or subsidy that depresses market economics for all other resources.225  Glatz and Silverman also question why PJM's option 6 should provide a preference to large load customers over customers aiming to meet other objectives, like clean energy commitments.226  Invenergy asserts that Co-Location Arrangements should not get priority access to available transmission system headroom, or deprive PJM of the resources needed to process the interconnection queue, in keeping with the Commission's long-standing policy against queue jumping.227  Constellation also argues it will lead to reduced new entry outside of the large load contract path and restrict the right to integrate with the system to only those

222 SETA April 23 Reply Comments at 10-11. 223  See e.g., Bloom April 23 Reply Comments at 8; Constellation April 23 Reply Comments at 52; NRDC April 23 Reply Comments at 3-4.
224  Bloom April 23 Reply Comments at 2, 10.
225  Constellation April 23 Reply Comments at 52 (citing Patterson Aff. ¶ 40).
226  Glatz/Silverman April 23 Reply Comments at 8-9.
227  Invenergy April 23 Reply Comments at 6. 58 of 515

PDF page 60

Document AccessiS a§C:?§2§§?18 - 3 RqCUrnentiiirJd DE)Xte:1§918 /Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 49 -
loads that bring their own generation. In addition, Constellation states that this option may create perverse incentives for existing generators to retire.228 107.

CATF states that the Commission must require large loads with co-located generation (such as data centers) to follow the same interconnection requirements of Order No. 2023 and Order No. 1920.229  PIOs argue that the Commission should reject proposals to allow generators seeking Co-Location Arrangements to access special, expedited interconnection pathways, because this would run counter to Order No. 2023 and Commission precedent, offer unduly preferential terms and conditions to a select set of entities, and come at the expense of the significantly backlogged interconnection process.23°  NRDC states that PJM's proposal could erode open access principles as this would be dividing what types of load can get this qualified access.231  Glatz and Silverman argue it is unclear whether option 6 would interconnect generation faster than the current interconnection queue.232  United States Senators argue that the Commission should not support arguments that large fossil fuel generators can jump the interconnection queue because of data center demand projections.233

ii. Study Processes
108.
Some parties argue that PJM's necessary study process remains just and reasonable. Constellation asserts that the necessary study process evaluates system-wide reinforcements and provides transparency and predictability into the development of Co-Location Arrangements. 234  Constellation and Vistra support adding clarifying

228  Glatz/Silverman April 23 Reply Comments at 8-9. 229  CATF April 25 Reply Comments at 16. 23°  PIOs April 23 Reply Comments at 28-30 (citing Midcontinent Indep. Sys. Operator, Inc., 186 FERC ¶ 61,054, at P 17 (2024); Order No. 2003, 104 FERC 61,103 at P 12; Improvements to Generator Interconnection Procs. & Agreements, Order No. 2023, 184 FERC ¶ 61,054, at PP 4, 5, 177, order on reh'g, 185 FERC ¶ 61,063 (2023), order on reh'g, Order No. 2023-A, 186 FERC ¶ 61,199, errata notice, 188 FERC ¶ 61,134 (2024)).
231 NRDC April 23 Reply Comments at 3-4.
232  Glatz/Silverman April 23 Reply Comments at 8.
233  United States Senators November 25 Letter at 2. 234  Constellation April 23 Reply Comments at 47, 62-63, 94-95. 59 of 515

PDF page 61

Document Acces s igtia&e: g,Agii8 _ 3  gqcumenWrJa Egtae:19.21.8/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 50 -
language to the Tariff of the obligation of transmission owners to cooperate and provide timely feedback on the necessary studies.235

109.
On the other hand, several parties express concern that the necessary study process is not adequate or appropriate to study Co-Location Arrangements.236  Antora argues that studying co-location using PJM's necessary study process offers a significant efficiency advantage over studying load separately from the co-located generation, as it assesses the electrical impacts of proposed new generation and load in a single interconnection process. However, Antora argues that the existing process is inadequate, because the Tariffs study procedures lack the necessary detail to inform customers such as Antora how their charging loads will be studied and confirm that the loads' flexibility will be accounted for. PIOs argue that thd necessary study "may not be fully capturing the transmission system impacts of co-locating load," and thus could result in Co-Location Arrangements with already-operational generators, "not paying the costs of network upgrades that would be caused by the co-location."237  Similarly, Market Monitor also argues that necessary study agreements miss the most fundamental issues associated with co-location. PIOs argue that the necessary studies process was designed for studying potential impacts from more minor, routine changes to the electrical characteristics of existing generating units previously studied by PJM and is a poor fit for the more significant nature of an existing generator entering into a Co-Location Arrangement for all or most of its energy production. PIOs argue that PJM has not allowed the addition of battery storage to existing generation to go through the necessary study process, in large part because batteries can act as load. PIOs argue that PJM offers no explanation for why Co-Located Load is thus offered preferential treatment.

110. PIOs state that PJM defends the necessary study process for studying co-location with an existing generator by explaining that other study processes are also used; however, PIOs argue that each of the other studies that PJM identifies pass costs to broader sections of load, not the large load customer(s) causing the need for the upgrades.238  PIOs argue that the necessary study process is the only process that PJM uses to identify the direct interconnection-related cost responsibility of co-locating large

235  Id. at 89; Vistra April 23 Reply Comments at 33-34.
236  Glatz/Silverman April 23 Reply Comments at 7; PIOs April 23 Reply Comments at 9-10, 14; OPSI April 23 Reply Comments at 3; RMI April 23 Reply Comments at 3-4; Market Monitor April 23 Reply Comments at 9; Antora April 23 Reply Comments at 7-8.
237  PIOs April 23 Reply Comments at 9 (citing Show Cause Order, 190 FERC ¶ 61,115 atP 79).
238  Id. at 10-11. 60 of 515

PDF page 62

Document Accessig:PW: igAc421:18 _ 3
qcumentii1rjd DK)ActeA118/p@te Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 51 -
load with an existing generator, and it fails to do so with appropriate accuracy. RMI states that PJM's necessary study process is not adequate because it does not assess the protection system that would prevent the load from using the transmission system.239 111.

Glatz and Silverman argue that a generator's reduction in Capacity
Interconnection Rights (CIR) is effectively a partial deactivation and that evaluating such changes without a deactivation study appears to be a means to avoid review by the Market Monitor, as such CIR reductions can affect market outcomes.24°  Glatz and Silverman also maintain that, when CIRs are removed from the system, the existing load must still be served and the generation to serve that load may require new network upgrades. Glatz and Silverman also charge that any system capacity potentially available due to a reduction in CIRs becomes unavailable if studied in concert with a behind-the-meter load addition.

112.
Ohio FEA also notes that Co-Location Arrangements that propose to take existing generation off the system have broad implications because they would change the power flow across the transmission system and affect the mix of resources available to participate in PJM's energy and capacity markets and should be subject to a robust analysis before they are allowed to proceed.24I

113.
Several parties argue that the necessary study process lacks transparency.242 OPSI emphasizes that modifications are privately negotiated and under non-disclosure agreements.243  OPSI also states that these arrangements avoid a comprehensive reliability analysis because the necessary study process was developed to study modifications to existing generating units, not the addition of large Co-Located Loads that are sometimes as large as metropolitan areas. PIOs argue the opaque process prevents ratepayer advocates from effectively challenging the prudence of transmission investments and cost allocation at either the federal or the state level. 114.

Pennsylvania Commission states that PJM's necessary study process must be revised to provide more information to regulators at the initial stage of the generation

239  RMI April 24 Reply Comments at 3-4. 24°  Glatz/Silverman April 23 Reply Comments at 8. 241  Ohio FEA April 23 Reply Comments at 4.
242  Glatz/Silverman April 23 Reply Comments at 7; OPSI April 23 Reply Comments at 3; PIOs April 23 Reply Comments at 9, 14; Pennsylvania Commission April 22 Reply Comments at 7.
243  OPSI April 23 Reply Comments at 3; PIOs April 23 Comments at 11, 15. 61 of 515

PDF page 63

Document Accesei.larc: gtgg?,18  _3 aqcumentiil-Ad DeElie:ip 18/14@te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 52 -
interconnection process because, sometimes when Co-Located Load comes online, the first time a state regulator hears about it is when the arrangement is filed with the Commission, unlike with generation retirement, even though they can have the same effects.244  Glatz and Silverman note that Indicated Transmission Owners mentioned that the necessary study process is conducted "together with other studies and analysis" but these other studies and analyses are not spelled out, nor is there transparency for consumers.245

115.
Several parties ask the Commission for further clarity on how Co-Location Arrangements will be studied and how those studies will be evaluated.246  AEU contends there must be a level of uniformity and detail outlining study requirements to ensure regulatory certainty for large loads and new generation and storage resources seeking to serve large loads.247  Glatz and Silverman recommend the Commission adopt a principle of "comparability" to ensure that new Co-Location Arrangements go through a study process comparable in terms of timing and cost responsibility to a new load locating in front of the meter.248

116.
Regarding PJM's current load interconnection process, Invenergy asserts that Attachment M-3 was designed for supplemental transmission projects, not load interconnection, and is not suitable for large load interconnection.249  EDFR asks the Commission to provide guidance to PJM and other Regional Transmission Organization or Independent System Operator (RTO/ISO) and non-RTO/ISO regions for developing a standardized and transparent load interconnection process at the federal leve1.25° 117.

Vistra explains that transmission owner load integration studies "live in a regulatory gap," because the studies, processes, and facilities associated with those interconnections are not currently subject to Commission regulation or oversight, despite

244 Pennsylvania Commission April 22 Reply Comments at 7.
245  Glatz/Silverman April 23 Reply Comments at 7 (citing Indicated Transmission Owners March 24 Response, attach. A at 12).
246  AEU April 23 Reply Comments at 19; Glatz/Silverman April 23 Reply Comments at 6.
247  AEU April 23 Reply Comments at 19.
248  Glatz/Silverman April 23 Reply Comments at 6.
249  Invenergy April 23 Reply Comments at 3-4. 250 EDFR April 23 Reply Comments at 6. 62 of 515

PDF page 64

Document Accessigla§c:  g`24 4 118 - 3 Aqui mentiiirli Dfacte:i.g.8/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 53 -
the fact that these configurations involve interconnections directly to the transmission system.' Vistra argues that the Commission has jurisdiction to close this regulatory gap because the Commission has jurisdiction when load interconnects to the transmission system in interstate commerce based on its exclusive authority over interstate transmission, just as the Commission regulates the terms of generation interconnections to the transmission system. Vistra states that the Commission should consider commencing a separate proceeding to explore the issue of front-of-the-meter load interconnection practices. Vistra argues that the Commission should exercise its authority over load interconnection to the transmission system to prevent undue discrimination and ensure that interconnection service is provided in a just and reasonable manner, perhaps by issuing a notice of inquiry on this issue.

118. Data Center Coalition recommends that the Commission direct PJM to enhance visibility into the relationship between new large loads and the transmission upgrades that support them by requiring: (1) disclosure of load linkages for Supplemental Projects, and

(2) confirmation that loads driving Supplemental Projects have already been incorporated into PJM's load forecast.252

119. Market Monitor argues for complete transparency in PJM's planning on the load side.253  Market Monitor requests that the PJM planning process be modified to integrate transmission planning with markets planning to eliminate major gaps. Market Monitor argues that PJM must have the authority to plan to meet large load additions as it does for generation additions.

iii. Changes to Pro Forma Interconnection Procedures
120.
Several parties request that the Commission modify the pro forma generator interconnection procedures and ISA. BrightNight states that at a minimum the pro forma process and agreement should allow for three configurations: (1) load and generation fully islanded from the electric grid, with no services from the grid; (2) flexible loads or demand response loads; and (3) loads that require backup service (e.g., behind-the-meter generation).254  Glatz and Silverman propose a new pro forma process for co-location.255 Vistra requests that the Commission modify the pro forma ISA to include a co-location 251  Vistra April 23 Reply Comments at 14-15, 36-39.

252  Data Center Coalition April 23 Reply Comments at 11-12.
253  Market Monitor April 23 Reply Comments at 7-9.
254 BrightNight April 23 Reply Comments at 7.
255  Glatz/Silverman April 23 Reply Comments at 9. 63 of 515

PDF page 65

Document Accesig`ia,Sre:  g2§,§?18-3PRCLIMerlWil. Deta-tge:1K8/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 54 -
section that will govern the applicable data exchange and coordination requirements and formalize any requirements regarding applicable protective schemes.2' 6  Vistra argues that, in addition to the items highlighted by PJM in its response, the pro forma ISA must include (1) details about coordinating the use of a secondary backup generator and (2) a process relating to the treatment of the generator's CIRs.

b. Cost Allocation
121.
Center refers to a Harvard Law School report stating that utilities are socializing the costs of data center booms by: (1) entering into special contracts; (2) taking advantage of discrepancies between federal and state regulations over cost allocation; and

(3) relying on co-location agreements.257  Center points out that quick moves to accommodate this load growth may result in residential customers shouldering infrastructure costs that are not ultimately needed. ELCON states that the Commission should ensure that regulatory authorities consider the long-term impacts of new large load projects in allocating network upgrade costs to protect non-large load ratepayers from paying the generation and transmission costs to serve large load even after initial electric service agreement terms expire.'

122.
Glatz and Silverman argue that the Commission should address the risk of stranded transmission investment associated with co-location where load does not materialize, particularly as all of PJM's proposed solutions socialize transmission costs, often spreading costs over multiple jurisdictions.259  Glatz and Silverman urge the Commission to ensure that any tariff changes account for the potential that data center load does not materialize and collaborate with states to manage this risk. Glatz and Silverman suggest that the Commission consider imposing "take-or-pay" structures for new large loads triggering transmission upgrades and backed by financial security postings.26°  Consumers' Research states that retail customers should not bear any of the 256  Vistra April 23 Reply Comments at 8, 29.

257  Center April 23 Reply Comments at 22 (citing Eliza Martin and Ari Peskoe, Extracting Profits from the Public: How Utility Ratepayers Are paying for Big Tech's Power, Environmental & Energy Law Program, Harvard Law School, (Mar. 2025), https ://eelp. law.harvard. e du/extracting-profits-from-the-pub lic-how-utility-ratep ayers- are-paying-for-big-techspower); id. at 25-26. 258  ELCON April 23 Reply Comments at 7.
259  Glatz/Silverman April 23 Reply Comments at 11-12. 260 Id. (indicating such structures are comparable to those debated in a proceeding before the Ohio Public Utilities Commission). 64 of 515

PDF page 66

Document Accessiccia§c: ?§2§§i18_341CUMeiltiilAd Drage:l@Pia/Pte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 55 -
risks of co-location, e.g., the costs for the infrastructure not being recovered or the ability to access reliable power, and suggest long-term financial commitments, take-or-pay clauses, and paying for the development of additional reliable generation as a way to mitigate this risk.261  Consumers' Research also states that Co-Location Arrangements should be transparent to the public to protect and inform customers.

123.
Buckeye argues that the Commission should consider requiring the LSE that is driving the transmission investment (i.e., the LSE in whose service territory the retail large load is locating) to be responsible for any cost-shifting caused by large loads that do not show up as expected, thereby covering the costs of transmission investments caused by their retail load.262  Buckeye states that the LSE with the large new load should be the entity that receives this price signal, because it has a retail relationship with the large load that creates the potential for stranded transmission investment and is therefore able to pass the stranded cost responsibility to that retail load. Buckeye argues that any costs collected under such retail arrangements should be credited to the wholesale transmission revenue requirement to ensure that any stranded transmission costs associated with such large loads are not shifted to other LSEs in the zone.

124.
Parties advocate that costs assigned for network upgrades required to
accommodate Co-Located Load should be consistent with cost causation principles.263 For example, ELCON states that, according to cost causation, if a large consumer in any co-location configuration impacts electricity flows on the grid either through adding to congestion, creating voltage or frequency instability, or impacting access to generation, and such impacts require upgrades to the distribution or transmission system, those costs should be allocated to that large consumer.264  Vistra requests that the Commission ensure that Co-Location Arrangements pay their fair share, including by allocating the costs of upgrades identified in the necessary study process to the generator.265  Consumers'

261  Consumers' Research April 23 Reply Comments at 2-3, 5.
262  Buckeye April 23 Reply Comments at 12.
263  Data Center Coalition April 23 Reply Comments at 4; ELCON April 23 Reply Comments at 7; Vistra April 23 Reply Comments at 8; PIOs April 23 Reply Comments at 12.
264  ELCON April 23 Reply Comments at 7.
265  Vistra April 23 Reply Comments at 8. 65 of 515

PDF page 67

Document Accessicgi a§e: gt§6k18 _ 3 gq.cumeq,i1Ad DfaRe:A
n gte Filed: 10/16/2026
Tivz-u
Docket No. EL25-49-000, et al.
- 56 -
Research states that to avoid improper subsidization the direct and indirect costs of Co-Located Load need to be considered, including any needed infrastructure upgrades.266 125.

Pennsylvania Commission states that PJM should revisit the potential direct cost allocation of transmission network upgrade costs for large load and should consider how zonal disparities in congestion and resource adequacy impact network upgrade costs.267 PIOs similarly argue that PJM's existing Tariff fails to ensure that Co-Location Arrangements pay their fair share of upgrade costs, which is unjust and unreasonable.268 PIOs note that when a Transmission Owner Load Integration Study identifies Supplemental Projects that resolve local transmission reliability needs, the costs are allocated not just to the large load customer that triggered the local transmission reliability need, but to the transmission owner's entire local utility footprint in that zone. PIOs argue that despite this cost allocation, there is no guarantee that these projects provide greater system benefits. PIOs argue that the transmission upgrades required to reliably integrate Co-Location Arrangements are differently situated from transmission upgrades required to reliably deactivate uneconomic generation (the costs of which are also socialized to load) and thus should be treated differently. PIOs state that while only the remaining load—not the deactivating generator—would utilize the transmission upgrades associated with retirements, Co-Located Load will continue to rely on, and benefit greatly from, such upgrades. PIOs argue that many early examples of transmission upgrades driven by data center loads have not led to system benefits, but rather, only provide the benefit of allowing the large load to operate—disproportionately benefiting the Co-Location Arrangement.

F. PJM Capacity Market, Reliability, and Resource Adequacy
1. PJM's March 24 Response
126.
PJM states that it does not believe that any changes to capacity market rules are necessary to accommodate Co-Location Arrangements.269  PJM explains that three of its proposed co-location options (PJM options 6, 7, and 8) address resource adequacy considerations. PJM adds that it is exploring with regulators and generators opportunities

266  Consumers' Research April 23 Reply Comments at 2.
267  For example, Pennsylvania Commission notes that the retirement of a generation resource to serve a single co-located customer may necessitate vastly different transmission upgrade plans with significant cost implications for customers to whom those costs may be allocated.
268  PIOs April 23 Reply Comments at 8, 12-13.
269  PJM March 24 Response at 57, 62-63. 66 of 515

PDF page 68

Document AccessiAa4c:  ?§2g§3:16 -
acumentiiii-Ja
e Filed-  10/16/2026
Docket No. EL25-49-000, et al.
- 57 -
to leverage at least 50 hours (or more) of diesel back-up generator service to enhance the available demand response portfolio. PJM also points to other ongoing efforts, including the transition to a new interconnection process and implementation of the Reliability Resource Initiative.

127.
PJM notes that, to the extent resources request removal from Capacity Resource status to serve non-PJM load, such requests will only be granted if Market Monitor approves it and PJM agrees, or if the Commission issues an order as such.27°  PJM adds that, to the extent PJM determines that a Co-Location Arrangement would result in transmission reliability issues, upgrades would have to be funded and constructed. 128.

PJM states that there may be opportunities to clarify or enhance existing planning processes.271 PJM  states that one such opportunity includes addressing risks that arise based on the existing load forecasting process since, given the potential size of these large load additions in the forecasts, uncertainty with respect to whether the large loads are actually added to the system could cause either overbuild or under-build to occur based on a single customer addition. PJM states that if Co-Located Load is not Network Load, questions arise as to how requirements for visibility and control of the Co-Located Load configuration are applied since the third-party load would not be a signatory to interconnection agreements. PJM states that the ISA and other governing documents may need to be revised to ensure that the overall system will continue to operate reliably as designed or as imposed by any temporary operational conditions on the system, including, for example, the non-conforming provisions included in the Susquehanna ISA.

2. Transmission Owners' March 24 Responses
129.
Indicated Transmission Owners state that if Co-Located Load is required to take either NITS or PTPS, no changes to the capacity market rules, energy market rules, or planning and load forecasting processes are necessary.272  Indicated Transmission Owners note that if a Co-Located Load is not metered, it can create an emergency if it appears on the system unexpectedly. AES Ohio urges PJM to consider whether the forecast frequency and load addition certainty are adequate given the pace of large load additions.273  AES Ohio argues that PJM should be required to advise stakeholders if it 270  Id. at 58-59, 63-65.

271  Id. at 60-62, 65-66.
272  Indicated Transmission Owners March 24 Response, attach. A at 17-19: see also AES Ohio March 24 Response at 12-13.
273  AES Ohio March 24 Response at 13. 67 of 515

PDF page 69

Doctiment Acces-icciarq: gc,Ap?,18 _3pRcumenteili-jd DEpae:j0 2.8/Rgte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 58 -
reasonably expects to serve all load, including Co-Located Load, reliably, particularly in periods of rapid load growth.

3. Reply Comments
130.
Market Monitor argues that there should be no artificial incentives or changes to fundamental capacity market rules that allow preferential treatment of large loads.274 OPSI states that Capacity Resources cannot prioritize serving non-PJM load, even as backup, without undermining system reliability and that sellers should not be allowed to choose between fulfilling PJM obligations or facing penalties.275  Vistra similarly states that resources that are committed to providing primary service to a Co-Located Load should not also sell that same capacity to PJM.276  NOVEC states that the lack of supply arising from congestion in the interconnection queue, failures to act on existing interconnection approvals, and retiring thermal generation are the collective impetus for the interest in Co-Located Load, but those supply problems affect all load, and it is discriminatory to afford some load a lifeboat in the form of co-location while the remaining load must address the consequences made worse by that lifeboat.277 131.

Pennsylvania Commission states that PJM's Tariff may not provide sufficient visibility into Co-Located Load's potential impacts on reliability and resource adequacy when generation is removed from the grid.278  Delaware Commission states that the existing Tariff will likely not maintain resource adequacy and reliability.279  Delaware Commission adds that the failure to adequately plan for and address resource adequacy shortages will result in system load curtailments and extreme shortage prices. 132.

Some parties argue that Co-Located Load should be Network Load to ensure reliability and resource adequacy.280 Indicated Transmission Owners contend that when

274  Market Monitor April 23 Reply Comments at 6-7.
275  OPSI April 23 Reply Comments at 3.
276  Vistra April 23 Reply Comments at 30.
277  NOVEC April 23 Reply Comments at 14.
278 Pennsylvania Commission April 22 Reply Comments at 6.
279  Delaware Commission April 23 Reply Comments at 1-2, 5. 28°  See Buckeye April 23 Reply Comments at 6 (citing PJM March 24 Response at 16-20); Indicated Transmission Owners April 23 Reply Comments at 13; Joint Consumer Advocates April 23 Reply Comments at 3. 68 of 515

PDF page 70

Document Accessicgi a§c: g)Acqii8  _3 gqcumentiiirjd Draae:19916/ p@te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 59 -
Co-Located Load is hidden and not appropriately accounted for, there is not only a cost allocation problem, but the study process is undermined and, consequently, PJM may be unable to adequately procure enough capacity to serve the load because the full load will not be accounted for in the capacity market, transmission planning, or operations processes and protocols. Buckeye states that Co-Located Load as Network Load provides significant reliability benefits by avoiding reliance on protective relays and enhances PJM's visibility and control over the Co-Located Load. Buckeye asserts that, "[i]f these large loads have the potential to appear on the system, even for a short time, this could have a significant impact on the grid."281

133.
Constellation argues that interruptible Co-Located Load and co-location configurations with protection schemes to prevent energy withdrawals should not be assessed capacity charges.282  Vistra also argues that special protection schemes are commonly used and reliable technologies, also referred to as "remedial action schemes," and that a NERC standard governs these technologies.283  On the other hand, NRDC states that if Co-Located Load is not Network Load, existing rules would not allocate the load any capacity costs if the on-site generation was running during PJM's peak hours, which would shift capacity costs to other customers.284  California Utilities argue that traditional customers could be forced to subsidize Co-Located Load or suffer impaired reliability without proper cost allocation of reliability services and resource adequacy costs.285  California Utilities acknowledge that the Commission cannot prevent a generator from making retail sales, even if those sales erode reliability, but argues the Commission can require wholesale customers to procure adequate capacity. California Utilities argue that the entity directly selling at retail to the Co-Located Load should pay its capacity costs because the Co-Located Load can impact grid reliability, but notes that how such costs are passed on to the load is a retail issue.

134. Vistra requests that the Commission clarify that a secondary generator that provides occasional, interruptible backup service to a Co-Located Load can also serve as a Capacity Resource because the generator will be available to PJM when needed.286 Vistra notes that existing retail BTMG provisions allow a generator that designates a

281  Buckeye April 23 Reply Comments at 8.
282  Constellation April 23 Reply Comments at 66.
283  Vistra April 23 Reply Comments at 18-19.
284 NRDC April 23 Reply Comments at 7-8.
285  California Utilities April 23 Reply Comments at 2, 6-7.
286  Vistra April 23 Reply Comments at 8, 30-31. 69 of 515

PDF page 71

Document AccessiS;, a§e: 2p2N?:18 _3gqcumentii1-Ad DFAqe:319 18/13gle Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 60 -
portion of its resource as BTMG to sell the rest of its resource as a Capacity Resource. Vistra argues that allowing secondary backup resources to participate in the capacity market ensures that the market gets the greatest reliability benefit from these resources because ratepayers would enjoy access to additional capacity that would otherwise be underutilized, while the generation resource's owner would put its resource to use and increase its contribution to the market. Comparing these secondary units to reliability must run (RMR) units, Vistra notes that the Commission currently allows RMR resources to participate in the capacity market because they "can be reasonably expected to perform" and argues that a secondary unit that occasionally serves Co-Located Load on an interruptible basis can also be expected to perform when needed because PJM can recall it. Vistra states that these secondary units also could be held subject to capacity market non-performance penalties and do not distort dynamic efficiency in the capacity market. Vistra adds that, if PJM deems it necessary, it could also create a mechanism to address how the secondary unit complies with its capacity must offer obligation when it is serving the Co-Located Load.

135.
Several commenters argue that existing generators moving to Co-Located Load configurations could threaten grid reliability and worsen the affordability crisis.287  Joint Consumer Advocates note this shift may degrade resource adequacy at an accelerated pace relative to connecting such load in traditional ways. Buckeye states that, although the balance of demand and supply is arguably the same regardless of whether the load is co-located with the generation, a non-Network Load Co-Location Arrangement has the potential to accelerate the pace with which the incremental demand arrives on the system, potentially without sufficient additional incremental supply, thereby exacerbating resource adequacy concerns. Glatz and Silverman suggest requiring PJM to manage the rate at which co-location is allowed to ensure reliability and affordability and avoid shortage conditions. Buckeye states that removing generation that is associated with a "fully isolated" Co-Location Arrangement from the rest of the grid is inconsistent with the grid's planning and operational foundations and thus threatens to alter flows in a manner that could require additional transmission upgrades and impair the operational flexibility that is essential to reliability.288

136. NERC states that co-location of large loads with generation facilities can have substantial reliability impacts due to interconnection timelines and loss of load incidents, while also presenting unique challenges and opportunities for grid transformation that

287  See Glatz/Silverman April 23 Reply Comments at 10-11; Joint Consumer Advocates April 23 Reply Comments at 5; NOVEC April 23 Reply Comments at 14; Buckeye April 23 Reply Comments at 6-7.
288  Buckeye April 23 Reply Comments at 7. 70 of 515

PDF page 72

Document Access Aa§c: ?§2§cq118  _ 3 g4JcumentillAd DE)ACie:1D ie/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 61 -
require special consideration.289  NOVEC argues Co-Located Loads can impact reliability and resource adequacy since, for example, protection systems may fail and place the full burden of the Co-Located Load onto the grid.290  PPL similarly states that because the Commission denied the amended Susquehanna ISA on unrelated grounds, the PJM Tariff does not include sufficient protections against this reliability risk.291  On the other hand, Constellation argues that it would be discriminatory to suggest that protective relaying cannot be used in the context of Co-Location Arrangements or that Co-Located Load must be designed to a different standard. 292  Constellation states that each element of the protective scheme is redundant, and the system is not planned for nor does PJM require upgrades to address subsequent "third contingency events."293

137.
Glatz and Silverman also express concern that, when load directly connects to another customer's facilities, the connection may not be subject to PJM's Consolidated Transmission Owners Agreement, which ensures not only that each PJM Transmission Owner maintain its system reliably, but also any connections to other systems, including load customers and other transmission systems as wel1.294  UCS states new variability in load resulting from data centers may require new Transmission Reliability Margin levels in some or all of PJM.295

138.
On the other hand, Vistra states that the development of Co-Located Load configurations "provides ample time for the PJM capacity market to calibrate to respond to changes in the balance of supply and demand."296  Vistra concludes that neither resource adequacy nor reliability concerns justify the failure to accommodate behind-the-meter Co-Located Load. Constellation argues that new load is no different than existing load with respect to resource adequacy planning, and the Commission should determine whether there are additional tools to address near-term capacity needs

289  NERC April 23 Reply Comments at 3. 29°  NOVEC April 23 Reply Comments at 11-12.
291  PPL April 23 Reply Comments at 10-11. 292  Constellation April 23 Reply Comments at 49.
293 Id. 294  Glatz/Silverman April 23 Reply Comments at 13-14.
295  UCS April 11 Reply Comments at 16-17.
296  Vistra April 23 Reply Comments at 17-18. 71 of 515

PDF page 73

Document Acces'dicqac.: g
3:18 _3,4qcument,i1Ad Detae:ini 8/pAte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 62 -
in separate proceedings.297  Antora also contends that if properly incorporated into PJM's operations, fully flexible load need not impose any new resource adequacy burden.298 139.

Some commenters argue that Co-Location Arrangements can provide reliability benefits.299  ENGIE contends that Co-Location Arrangements can offer improved grid reliability and stability. Data Center Coalition states that flexible, efficient service arrangements like co-location can help alleviate pressure on the broader system, which can serve both reliability and affordability objectives. Constellation argues that co-location provides reliability benefits by minimizing grid operational risks because fewer grid infrastructure facilities and potential failure points are implicated in serving the load.

140.
Several commenters recommend enhancements, such as additional clarity and transparency, to PJM's resource adequacy planning to account for the addition of large Co-Located Loads.30°  Glatz and Silverman express concern that neither PJM's nor Indicated Transmission Owners' studies would evaluate resource adequacy, and contend that requiring such a study would ensure system reliability. Pennsylvania Commission states that the Tariff must be revised to require PJM to conduct long-term scenario analysis on the potential reliability and cost impacts of Co-Location Arrangements. 141.

Several parties urge reforms to PJM's load forecasting process.301  PIOs, AEU, and ELCON argue for standard, transparent terminology and comparable parameters across planners, operators, and users. Data Center Coalition and PIOs argue that PJM's

297  Constellation April 23 Reply Comments at 11, 60-61 (citing Patterson Aff. ¶ 15).
298  Antora April 23 Reply Comments at 12.
299  See ENGIE April 23 Reply Comments at 7; Data Center Coalition April 23 Reply Comments at 5; Constellation April 23 Reply Comments at 22-23 (citing Kormos Aff. ¶ 4). 300 See CATF April 25 Reply Comments at 7, 8; California Utilities April 23 Reply Comments at 2; Glatz/Silverman April 23 Reply Comments at 10; NRDC April 23 Reply Comments at 8-9; PIOs April 23 Reply Comments at 22; Pennsylvania Commission April 22 Reply Comments at 7; OPSI April 23 Reply Comments at 3.
301 ELCON April 23 Reply Comments at 9; PIOs April 23 Reply Comments at 16-18, 20, 23; AEU April 23 Reply Comments at 22; Data Center Coalition April 23 Reply Comments at 9-10; Ohio FEA April 23 Reply Comments at 4; Constellation April 23 Reply Comments at 47; ACEG April 23 Reply Comments at 5, 7; Buckeye April 23 Reply Comments at 11. 72 of 515

PDF page 74

Document Accessigha§e:  ?§2.§c4k 18-3ACICUrnentiilAd DEACie:i??18/P@te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 63 -
current load forecasting methodology often reflects inconsistent assumptions. Ohio FEA states that installing large off-system loads behind existing generators adds complexity, including that the load would not be captured in the annual load forecasting and planning processes conducted by LSEs and PJM. Constellation and Data Center Coalition support increased transparency in forecasting. PIOs, Data Center Coalition, and ACEG argue for reforms to the load forecasting process to ensure that forecasted data center load is commitment-backed. PIOs state that PJM's load forecasting process does not include sufficient controls or standards to prevent speculative additions of large load from entering PJM's load forecast. ELCON, PIOs, and Buckeye argue that overestimating load growth could lead to substantial overbuilding of infrastructure, which increases costs for consumers. PIOs also argue that inaccurate load forecasting can artificially inflate the reserve margin in PJM's capacity market, which could result in unnecessary price increases.

142. At the same time, ELCON states that underestimating load growth could cause reliability challenges.302  ELCON states that enhanced transparency regarding both front-of-the-meter and behind-the-meter loads is necessary to enable operators to ascertain real-time load behavior, including the potential for excess power injection and reliance on back-up services during on-site interruptions.

143.
PIOs argue that consistent with the Commission's Rule of Reason doctrine, PJM's Large Load Forecast Process should be in its Tariff.303  ELCON states that the Commission should convene a dialogue addressing load forecasting methodologies and how to facilitate communication among state and federal regulators, transmission operators, generators, and customers to ensure all parties are positioned to serve all customers reliably and affordably.304  United States Senators maintain that the Commission should consider broader proceedings that would standardize load forecasting and other practices relevant to addressing data center demand growth.3°5 144.

In its response to then-Chairman Rosner's letter to the RTOs/ISOs asking about large load forecasting, PJM explains that it currently relies on Electric Distribution Companies (EDCs) and LSEs within the PJM footprint to provide relevant data on large load requests because PJM does not presently have a load interconnection process.306 3°2  ELCON April 23 Reply Comments at 9.

303 PIOs April 23 Reply Comments at 19. 3°4  ELCON April 23 Reply Comments at 8. 3°5  United States Senators November 25 Letter at 3. 3°6  PJM Response to Then-Chairman Rosner at 4. 73 of 515

PDF page 75

Document Acceseigia5 :  ?§A§,?1.18-3PaCLIMentiilAd Deta.ge.1;118/Pg.te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 64 -
PJM states that load interconnection processes are generally administered through retail tariffs. PJM states that, based on its survey of certain EDCs and LSEs, there are a wide range of approaches to load adjustment processes, from requiring financial commitments based on a minimum demand to using less stringent approaches. PJM also discusses how it recently enhanced transparency in its load adjustment request submission process by publishing the Load Adjustment Request Implementation Document that addresses load forecasting methods and PJM's need for certain information from forecast submitters.307 PJM explains that it relies on historical data when available for forecasting purposes, but when utilities have no historical data, utilities rely on milestone tracking and customer representations about expected demand.308  Lastly, PJM notes that utilities share best practices on load adjustment at the Load Analysis Subcommittee.3°9

G. Other Arguments
145.
Several commenters highlight the importance of data centers and AI to national security, particularly defense operations.31°  Several commenters also urge the Commission to act quickly, given that data centers seeking to connect and take service from the grid may face delays of seven to ten years before they can receive power. Several commenters argue that certainty is critical to foster national security goals associated with AI development. Indicated Transmission Owners contend that any attempt to change the PJM Tariff would likely stymie data-center development, as new terms would require development through the PJM stakeholder process, followed by Commission consideration and acceptance.

146. NOVEC and Market Monitor argue that national security is broader than AI and that other customers are vital to national security, such as existing large industrial customers and commercial and residential load.3" Market Monitor also argues that any national security issues relate not to co-location but to serving data center load. NOVEC also notes the Commission should consider whether the price increases that Co-Located 3" Id. at 2, 6.

3°8  Id. at 6.
3°9  Id. at 7.
310  See National Security Experts April 22 Reply Comments at 1; Constellation April 23 Reply Comments at 15-17; AEU April 23 Reply Comments at 25; PSE&G March 24 Response at 1, 20; BCSE April 23 Reply Comments at 2.

311  NOVEC April 23 Reply Comments at 19; Market Monitor April 23 Reply Comments at 7.

74 of 515

PDF page 76

Document AccessiAa§c:  ?§AP?18 - 3 “qcumentiiAd DFACte:i1P18/14@te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 65 -
Load could cause may threaten national security by harming existing data centers and the general prosperity of the United States.

147.
Parties argue that co-location offers a number of benefits to the grid that lower costs for customers. Several parties argue that Co-Location Arrangements can make efficient use of existing transmission infrastructure and forestall the need for new infrastructure investments.312  For example, California Utilities and Constellation argue that Co-Location Arrangements decrease line losses. In addition, Constellation argues that the benefits of co-location include speed to market, increased interconnection availability, and extended facility utilization. ENGIE contends Co-Location Arrangements can offer environmental benefits by encouraging the use of renewable energy sources and energy-efficient technologies.3" ENGIE also argues Co-Location Arrangements that provide benefits to the grid such as back-up service should be compensated for those benefits.314  Enchanted Rock argues that in regions with centralized transmission, but insufficient local generation, co-location can help reduce congestion and backfill any required transmission contingencies in the short-term.315 Indicated Transmission Owners note that the addition of end-use load typically benefits other customers with respect to transmission costs because it spreads the shared costs more broadly.316  However, Indicated Transmission Owners also argue that many loads provide benefits to the grid but are still required to pay their share of grid services.317 148.

Several parties argue that Co-Location Arrangements may encourage the development of new generating resources that can contribute to increased capacity and grid reliability.318  CATF states Co-Located Loads can provide demand response, access

312  ENGIE April 23 Reply Comments at 7; Constellation April 23 Reply Comments at 100-103; EDFR April 23 Reply Comments at 7; Enchanted Rock April 23 Reply Comments at 17-18; PSE&G March 24 Response at 7, 20; AES Ohio March 24 Response at 14; Enchanted Rock April 23 Reply Comments at 17; CATF April 25 Reply Comments at 12; California Utilities April 23 Reply Comments at 2. 313  ENGIE April 23 Reply Comments at 7.
314  Id.
315  Enchanted Rock April 23 Reply Comments at 12.
316  Indicated Transmission Owners March 24 Response, attach. A at 22.
317  Indicated Transmission Owners June 3 Reply Comments at 11.
318  ENGIE April 23 Reply Comments at 7; Chevron April 23 Reply Comments at 6. 75 of 515

PDF page 77

Document Accessila
?P2N?18 - 3 nqCUMent'ilAd DE'Age:1321e/Pgte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 66 -
to lower cost power, or black start and other ancillary services, and can help states to meet their clean energy obligations.319  EDFR states that large loads can also benefit:

(1) existing generators by locating in areas with surplus energy that would otherwise be curtailed; (2) American industries looking for access to affordable, carbon-free energy; and (3) local communities through tax revenue, construction jobs, and employment.32° 149.

Constellation states that consumers bear no risk related to owning and operating merchant generating resources originally paid for in base rates.321  Further, Constellation argues that consumers only paid for service, not for assets. On the other hand, NOVEC argues that given the historical cost-of-service arrangements for nuclear power plants that now, in part, make them attractive for these bilateral contracts, it would be unfair to dedicate such legacy generation to a single private customer after customers at large paid for such facilities and took the risks of construction since the time such resources were built.322  NOVEC urges the Commission to consider the legacy costs that retail customers bore before allowing private parties to dedicate the remaining benefits of existing generation to Co-Located Load and argues that the Commission should not permit any co-location paradigm that removes nuclear generation from the capacity market. NOVEC contends that nuclear units serve an important role in PJM's energy and capacity market, and notes that Market Monitor has described them as "baseload power." Although NOVEC agrees in principle that owners of generation assets should be able to seek to maximize the beneficial ownership of those assets, NOVEC argues that the Commission has the responsibility to reject proposals that are not just and reasonable because the Federal Power Act is a consumer protection statute.323  NOVEC notes that the Commission has periodically observed how the legacy of the pre-restructuring period has created inequities and the possibility of unjust and unreasonable results.324

319  CATF April 25 Reply Comments at 12. 320 EDFR April 23 Reply Comments at 8.
321  Constellation April 23 Reply Comments at 107-108.
322  NOVEC April 23 Reply Comments at 7, 15-17.
323  Id. at 16 (citing Xcel Energy Services, Inc. v. FERC, 815 F.3d 947, 952 (D.C. Cir. 2016) ("It is long-established that the `primary aim [of the FPA] is the protection of consumers from excessive rates and charges:" (quoting Mun. Light Bds. of Reading & Wakefield v. FPC, 450 F.2d 1341, 1348 (D.C. Cir. 1971))).
324  Id. at 17. For example, NOVEC states that in Opinion No. 494, the Commission found that the costs of legacy transmission facilities which were built to serve the transmission systems of individual companies and their customers could not be allocated to the entire PEW region under the Commission's cost causation principles. 76 of 515

PDF page 78

Document AccessiAa§c:  ?P24gqi)8 _ 3 PacumentiilAd DPACte:1?/18/-pte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 67 -
150.
A number of parties urge that any Commission action in this proceeding provide flexibility for different regions325  and/or different co-location configurations.326 California Utilities request that the Commission recognize that approaches to co-located facilities must be tailored to account for different state regulators, self-regulated non-jurisdictional entities, and regions.327  ENGIE contends that flexibility can enhance system reliability as configuration design can provide multiple pathways for power delivery.328

151.
Enchanted Rock and CATF oppose PJM's suggestion in option 8 to ease air pollution standards for co-located generation.329  Relatedly, Center argues that the Commission should consider the environmental implications of rules that encourage the growth of data centers or other large load facilities, including the climate change threats they pose, and should encourage renewable power to these facilities.330

III. Notice of Show Cause Proceeding and Responsive Pleadings
152. Notice of the Show Cause Order was published in the Federal Register, 90 Fed. Reg. 10818 (Feb. 27, 2025), with interventions due on or before March 13, 2025. The Appendix identifies entities that submitted notices of intervention and motions to intervene, as well as abbreviations for those entities. Numerous entities submitted comments and protests, as summarized in this order. Answers were submitted by Constellation, Vistra, Buckeye, PSE&G, PPL, and Indicated Transmission Owners. NOVEC explains that the instant situation is the inverse, but claims that it implicates the same principle. Id. (citing PJM Interconnection, L.L. C., Opinion No. 494, 119 FERC ¶ 61,063, at P 42 (2007)).

325  EDFR April 23 Reply Comments at 7.
326  Data Center Coalition April 23 Reply Comments at 4; ENGIE April 23 Reply Comments at 5-6; EDFR April 23 Reply Comments at 9; AEU April 23 Reply Comments at 10.
327  California Utilities April 23 Reply Comments at 9.
328  ENGIE April 23 Reply Comments at 6.
329  CATF April 25 Reply Comments at 13, 14; Enchanted Rock April 23 Comments at 16-17.
330 Center April 23 Reply Comments at 3-20. 77 of 515

PDF page 79

Dodument Accessig
g2§M18 - 3 gla.curnenWrJa DE'e:a.018/P§te Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 68 -
153.
On April 4, 2025, Vistra filed a motion for clarification and request for expedited treatment.331  On April 9, 2025, Talen filed an answer to Vistra's motion. On April 22, 2025, EPSA, P3, Calpine, Cogentrix, Constellation, and LS Power (together, Joint Parties), pursuant to Rules 212 and 603 of the Commission's Rules of Practice and Procedure, filed Joint Comments, a Motion to Stay Proceedings, and a Request to Establish Settlement Judge Procedures (Motion to Stay).332

 AMP, Indicated
Transmission Owners, PJM, NREMC, NOVEC, and Talen filed answers to the Motion to Stay.

154.
On September 19, 2025, a letter from then-Chairman Rosner to PJM was filed in this proceeding; then-Chairman Rosner's letter requests information on load forecasting. On October 20, 2025, PJM's response to then-Chairman Rosner's letter was filed in this proceeding.

155.
On November 21, 2025, Constellation filed a motion for expedited action. Constellation contends that the Secretary of Energy's October 23, 2025 proposal to the Commission of an Advanced Notice of Proposed Rulemaking (ANOPR) on large load interconnection to the transmission system underscores the urgent need for clarity regarding Co-Location Arrangements.333  PJM timely answered and AEP, Exelon, Indicated Transmission Owners, ODEC, and Virginia Commission filed late answers to or comments on Constellation's motion for expedited action. Indicated Transmission Owners, ODEC, PJM, and Virginia Commission argue that Constellation's motion asks the Commission to prejudge issues raised in the ANOPR proceeding. PJM alleges that granting the motion would not only preempt the PJM stakeholder process concerning the integration of large loads, but also violate the principle that agencies should defer taking

331  Vistra requests clarification regarding the Commission's interpretation of the November 1, 2024 Order in Docket No. ER24-2172 regarding whether it: (1) prejudged the permissibility of any particular co-location configuration; (2) indicated that the Commission generally opposes fully isolated behind the meter co-located load; or
(3) prohibits parties from following the currently effective tariff rules and negotiating the terms of non-conforming ISAs pursuant to existing tariff provisions while this proceeding is underway.

332  Joint Parties request that the Commission stay the show cause proceeding for a limited period of 90 days and establish settlement judge proceedings as expeditiously as possible to allow the parties to develop a new replacement rate.
333  Motion at 3-4 (citing U.S. Department of Energy, Secretary of Energy, Direction that the Commission Initiate Rulemaking Procedures and Proposal Regarding the Interconnection of Large Loads Pursuant to the Secretary's Authority Under Section 403 of the Department of Energy Organization Act (Oct. 23, 2025)). 78 of 515

PDF page 80

Document AccessiAa§c: ?§24@"21:18 - 3ggcumentiiirli DraEle:M3.8/pte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 69 -
action in specific adjudicatory matters where such action would supplant ongoing generic rulemakings.334  The Indicated Transmission Owners contend that granting the motion would cause confusion and unwarranted expense if it modified the PJM Tariff on an interim basis before addressing issues nationwide in the ANOPR proceeding.335  The Indicated Transmission Owners further allege that granting the motion would result in a premature, improper jurisdictional determination in this proceeding.336

IV. Discussion
A. Procedural Matters
156.
Pursuant to Rule 214 of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.214 (2025), the notices of intervention and timely, unopposed motions to intervene serve to make the entities that filed them parties to this proceeding. 157.

Pursuant to Rule 214(d) of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.214(d), we grant the late-filed motions to intervene given these entities' interests in the proceeding, the early stage of the proceeding, and the absence of undue prejudice or delay.

158.
Rule 213(a)(2) of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.213(a)(2), prohibits an answer to a protest or answer unless otherwise ordered by the decisional authority. We accept the answers because they have provided information that assisted us in our decision-making process.

B. Substantive Matters
159. As discussed further below, we find that the PJM Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load. We find that the absence of such provisions leaves entities unable to determine what steps they must take to effectuate Co-Location Arrangements, which creates uncertainty that has resulted in disparate treatment in PJM, where transmission owners have taken different approaches to performing the necessary steps that apply to Interconnection Customers seeking to serve Co-Located Load through a Co-Location

334  PJM Answer at 2 (citing Cities of Anaheim v. FERC, 723 F.2d 656, 659 (9th Cir. 1984).
335  Indicated Transmission Owners Answer at 3.
336  Id. at 5. 79 of 515

PDF page 81

Document AccessiAa5q:  g'2§118 - 3 gl,cicurnentiiii-Ja Drage:1§918/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 70 -
Arrangement, leading to no consistent understanding of entities' responsibilities with respect to their planned Co-Location Arrangements. We also find that PJM's Tariff is unjust and unreasonable because it does not include transmission services that reflect an Eligible Customer taking service on behalf of a Co-Located Load that is willing and able to limit its energy withdrawals from the transmission system under certain conditions. Further, we find that PJM's Tariff is unjust and unreasonable because it does not address charges related to Co-Located Loads' use of regulation and black start services, which introduces the risk that Co-Located Loads may benefit from regulation and black start services without contributing to cost recovery for such services and, thereby, the risk that costs may be allocated entirely to other transmission customers and passed through to residential customers, among others.

160.
As a replacement rate, we direct PJM to revise its Tariff to require that an Interconnection Customer who will use its generating facility to serve Co-Located Load specify an Eligible Customer who will take transmission service on behalf of the Co- Located Load. We also direct PJM to establish three new transmission services that reflect that Eligible Customers taking service on behalf of Co-Located Load are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Specifically, we direct PJM to revise its Tariff to allow Eligible Customers seeking to take NITS on behalf of Co-Located Load to, at their option, take a new interim, non-firm transmission service until all Network Upgrades necessary to provide NITS are complete. We further direct PJM to offer two other new transmission services—a Firm Contract Demand transmission service and a Non-Firm Contract Demand transmission service—that an Eligible Customer can choose to take on behalf of a Co-Located Load instead of taking NITS. These new transmission service options reflect a Co-Located Load's ability to limit withdrawals from the transmission system and potentially avoid costly and inefficient transmission system buildout that may not be necessary. Eligible Customers serving Co-Located Load that seek to rely on the transmission system to the same extent as Network Load customers will continue to be eligible to take NITS, billed on a gross demand basis. All Eligible Customers taking NITS or one of the new transmission services on behalf of Co-Located Load must be assessed charges for regulation and black start services on a gross demand basis, regardless of which transmission service they select, to ensure Co-Located Load contributes to cost recovery for such services. As noted below, a Co-Location Arrangement is synchronized to the transmission system.337  We also seek briefing as to whether the rate paid by an Eligible Customer on behalf of a Co-Located Load taking only the new Non-Firm Contract Demand transmission service that elects to not reserve any amount of that service for a period of time (e.g., one month) reflect not only charges

337  See also PJM March 24 Response at 42-43. 80 of 515

PDF page 82

Document AccessiAa§c:  gctg§.218-3P6qcumentiiirid DPAReA,18/pate Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 71 -
for regulation and black start services, but also an additional charge given that regulation and black start services could not be provided without the transmission system. 161.

Next, we direct PJM to clarify its interconnection procedures and agreements to ensure that it is clear to both new and existing Interconnection Customers how to interconnect in a Co-Location Arrangement. Specifically, we direct PJM to revise its Tariff to make clear how Interconnection Customers can make use of provisional interconnection service, the ability to request interconnection service below nameplate capacity, the potential to accelerate the interconnection process under certain circumstances (e.g., where the request has no Network Upgrade costs and does not require further studies), and Surplus Interconnection Service to interconnect new generating facilities seeking to serve Co-Located Load. We also direct PJM to revise its Tariff to clarify the procedures for the study necessary to determine any modifications to interconnection facilities or Network Upgrades to the transmission system PJM finds are needed to maintain transmission system reliability as a result of the Interconnection Customer's request to modify its interconnection service level for an existing generating facility to serve Co-Located Load. These clarifications also require existing Interconnection Customers to pay the full cost of any such modifications to interconnection facilities or Network Upgrades to the transmission system and specify that an existing generating facility cannot withdraw its capacity from the system to begin serving a Co-Located Load until all such modifications and Network Upgrades necessary to maintain reliability for existing customers are in service.

162.
In furtherance of the Commission's mandate to ensure just and reasonable rates for consumers, the replacement rate will ensure that Eligible Customers on behalf of Co-Located Load take transmission service and incur transmission costs in a way that is at least roughly commensurate with their derived benefits. The replacement rate will also ensure that Eligible Customers on behalf of Co-Located Load are able to take transmission services that reflect their actual impact on the transmission system, which in many cases may be more limited relative to conventional front-of-meter load and generation. Collectively, the replacement rate provides pathways that recognize Co-Located Loads that limit their energy withdrawals from the transmission system, which may require fewer Network Upgrades, and therefore may result in lower Network Upgrade costs as compared to requiring all Eligible Customers taking service on behalf of Co-Located Load to take NITS.

163.
The remainder of this determination is organized as follows. Part IV.B.1 establishes the definition of Co-Located Load and directs PJM to incorporate this definition into its Tariff. Part IV.B.2 addresses the Commission's and the states' jurisdiction over Co-Location Arrangements. Part IV.B.3 explains why PJM's Tariff is not just and reasonable absent provisions addressing the rates, terms, and conditions of service that apply to Interconnection Customers seeking to serve Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load. 81 of 515

PDF page 83

Document AccessiA a5e: ?§23 :18 _3,t1qcumenWrjd DepAe:a.§?2.8/Pge  Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 72 -
Part IV.B.4 directs a replacement rate that establishes just and reasonable rates, terms, and conditions of service for Eligible Customers taking transmission service on behalf of Co-Located Load and for Interconnection Customers that serve Co-Located Load. Part IV.B.4 also establishes paper hearing procedures to gather additional record evidence to set the appropriate replacement rate. The remaining sections address other issues raised in the record.

1. Definition
164. The Show Cause Order used the following definition of Co-Located Load: a "'configuration [that] refers to end-use customer load that is physically connected to the facilities of an existing or planned Customer Facility on the Interconnection Customer's side of the Point of Interconnection to the PJM Transmission System. "'338  We adopt that definition in this order as well. Indicated Transmission Owners object to this definition, arguing that this definition obscures that Co-Located Loads rely on the transmission system to receive service.339  We disagree. This definition reflects the fact that the Co-Location Arrangement is physically connected to and synchronized to the transmission system. This relationship, and specifically the interconnection of the generator to the transmission system, is critical to the determinations we make below. We thus direct PJM to incorporate this definition into its Tariff on compliance as part of the replacement rate detailed below.

2. Jurisdiction
165. As the Commission explained at length in the Show Cause Order, the issues presented in this proceeding implicate both federal and state interests, and their resolution will require the involvement of both federal and state actors, including the Commission, state public utility commissions, and other state and local entities.34°  Recognizing the careful balance that the FPA strikes between federal and state regulation, we make several findings below, including that: (1) states retain exclusive authority over the specific terms of retail sales, generator siting, the generation mix, and transmissions in intrastate commerce; (2) the Commission retains the authority to oversee the terms and conditions of generator interconnection to any Commission-jurisdictional distribution facility or transmission facility,341  including for generators that serve or plan to serve 338  Show Cause Order, 190 FERC ¶ 61,115 at P 3 & n.4 (citation omitted).

339  Indicated Transmission Owners March 24 Response at 7 n.17. 340  See Show Cause Order, 190 FERC ¶ 61,115 at P 66.
341  See infra P 172. 82 of 515

PDF page 84

Document AccessiglaW gkAP?118  _3 gq.CUMerltiiii-jd BeaReA3 18 /J:t.,e Filed: 10/16/2026 /

Docket No. EL25-49-000, et al.
- 73 -
Co-Located Load; and (3) the Commission has the authority to ensure that the rates for transmission service in interstate commerce are just and reasonable.

166.
Because the Commission is a creature of statute, it has jurisdiction only over those matters that Congress has given it the authority to regulate.342  Section 201(b)(1) of the FPA gives the Commission jurisdiction over the transmission of electric energy in interstate commerce, the sale of electric energy at wholesale in interstate commerce, and all facilities for such transmission or sale of electric energy.343  The FPA reserves to the states authority over any matters not expressly conveyed to the Commission,344  which includes retail sales and wholesale sales not in interstate commerce, as well as the facilities used for the generation and distribution of electricity, except as where otherwise provided.345  The Supreme Court has long held regulation of these matters to be within the states' historical police powers,346  and the Court has observed that the FPA's jurisdictional divide "was drawn with meticulous regard for the continued exercise of state power, not to handicap or dilute it in any way."347  We adhere to those principles here.

a. Areas of Exclusive State Authority
167.
We find that several aspects of Co-Location Arrangements fall squarely within the jurisdiction of the states. First, states retain exclusive authority over the specific terms of retail sales and retail rate design, including how the costs of interstate wholesale sales and transmission of electricity assigned to a wholesale customer are allocated among that wholesale customer's retail customers. Although "a State may not conclude in setting

342  Atl. City Elec. Co. v. FERC, 295 F.3d 1, 8 (D.C. Cir. 2002).
343  16 U.S.C. § 824(b)(1).
344  Nat'l Ass'n of Regul. Util. Comm'rs v. FERC, 964 F.3d at 1187 (citing N. Nat. Gas Co. v. State Corp. Comm'n of the State of Kan., 372 U.S. 84, 91-93 (1963)).
345  16 U.S.C. § 824(b)(1); see Dayton Power & Light Co. v. FERC, 126 F.4th 1107, 1129 (6th Cir. 2025).
346  See, e.g., Munn v. People of State of Ill., 94 U.S. 113 (1876).
347  Oneok, Inc. v. Learjet, Inc., 575 U.S. 373, 384-85 (2015) (discussing the analogous provisions in the Natural Gas Act) (quoting Panhandle E. Pipe Line Co. v. Pub. Serv. Comm'n of Ind., 332 U.S. 507, 517-18 (1947)); see also Nw. Cent. Pipeline Corp. v. State Corp. Comm'n of Kan., 489 U.S. 493, 511 (1989)). 83 of 515

PDF page 85

Doctiment Acces-siAa§C: ?.§2-§§?ili3_ 3 gqcument,i1Ad DE'tae:1§418/p,gte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 74 -
retail rates that the FERC-approved wholesale rates are unreasonable,"348  it is within a state's exclusive jurisdiction to determine how those FERC-approved rates are collected among the relevant retail consumers, including retail consumers that are Co-Located Load.349  Therefore, states have exclusive jurisdiction over how the costs assigned to Eligible Customers on behalf of Co-Located Load taking Commission-jurisdictional transmission services — including the new transmission services directed below — are allocated to individual retail consumers that are Co-Located Load, just as states have exclusive jurisdiction over how to allocate the costs of all Commission-jurisdictional rates (including for energy, capacity, and transmission) among retail customers, including allocating costs among different classes of retail customers.35°  Regulation of wholesale sales that are not in interstate commerce also falls to the states; we agree with commenters who note this distinction.351  We disagree with some parties' claim that there could be a regulatory gap under state law,352  as Co-Located Load that is not served by an islanded generator353  may receive some services from the distribution and transmission systems. We also agree with Pennsylvania Commission and OPSI that the commission that regulates each portion of the respective systems has jurisdiction over those services.354

168.
Second, we affirm the Commission's statement from the Show Cause Order that states retain the exclusive authority through state franchise laws to regulate which entities may make retail sales within their borders, and thus the states determine which entities

348  Nantahala Power & Light Co. v. Thornburg, 476 U.S. 953, 966 (1986).
349  See, e.g., PIOs April 23 Reply Comments at 42. 350 Order to Show Cause, 190 FERC ¶ 61,115 at P 68.
351 See, e.g., OPSI April 23 Reply Comments at 5.
352 Those parties specifically note concerns where, for example, a single generator provides service to a single customer or one large industrial end-use customer sells electricity to another large industrial end-user within the same complex. See PJM March 24 Response at 27; PPL April 23 Reply Comments at 7. 383  A fully islanded generator is one that is engaged in a self-sufficient arrangement with its load where the load and generation together are both fully electrically isolated from the transmission system. See Farhan Noor et al., Unintentional Islanding and Comparison of Prevention Techniques at 90 (2005), https://ieeexplore.ieee.org/stamp/stamp.jsp?arnumber=1560507&tag=1. 384  See Pennsylvania Commission April 22 Reply Comments at 4-5; OPSI April 23 Reply Comments at 5-6. 84 of 515

PDF page 86

Document A„„sicqa§c:  ?§24§8 - 3 PacurnentiiirJa DMe:1018/Pge
10/16/2026
Docket No. EL25-49-000, et al.
- 75 -
are legally permitted to provide electricity to retail customers in Co-Location Arrangements.' Nothing in this order changes who may provide, and bill for, retail service to a Co-Located Load. Furthermore, as OPSI explains, that parties seeking clarification of the extent to which a generator's retail sale of energy to Co-Located Load is state jurisdictional may file a petition for declaratory order with the relevant state commission.356

169.
Third, we confirm that states have authority over their generation resource mix, including through their siting authority.357  This authority means that which generating facilities are sited and allowed to serve Co-Located Load is also a question of state law.358  That is true notwithstanding the fact that PJM's markets might indirectly influence the resource mix through, for example, capacity market price signals that affect resource entry and exit.359

170.
Finally, we decline in this proceeding to comprehensively address jurisdictional matters regarding the interconnection of retail loads served through a Co-Location Arrangement to the interstate transmission system. As discussed below, we conclude that the Commission has jurisdiction to oversee the interconnection of generating facilities, including the generators that are used to serve Co-Located Load, to the interstate transmission system, as well as jurisdiction over the provision of transmission service in interstate commerce used by an Eligible Customer to serve Co-Located Load. We find that these determinations are sufficient to resolve the issues in this proceeding. Therefore, we establish requirements below that apply to Interconnection Customers 355  Show Cause Order, 190 FERC ¶ 61,115 at PP 68-69.

356  OPSI April 23 Reply Comments at 5-6.
357  See, e.g., Citizens Action Coal. of Ind., Inc. v. FERC, 125 F.4th 229, 238 (D.C. Cir. 2025) (citing 16 U.S.C. § 824(b)(1)).
358  See FERC v. Elec. Power Supply Ass'n,577 U.S. 260, 267 (2016) (EPSA) ("the Commission may not regulate . . . retail sales of electricity (i.e., sales directly to users)"); Show Cause Order, 190 FERC ¶ 61,115 at P 69 ("under the FPA, the states get to determine which entities are legally permitted to provide electricity to retail customers in co-location arrangements").
359  Accord EPSA, 577 U.S. at 281 ("It is a fact of economic life that the wholesale and retail markets in electricity, as in every other known product, are not hermetically sealed from each other. To the contrary, transactions that occur on the wholesale market have natural consequences at the retail level. And so too, of necessity, will FERC's regulation of those wholesale matters."). 85 of 515

PDF page 87

Document Acces s icgla§c:  ?§2§g3_18 - 3 aqcurnentiilAd netNe:iMe/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 76 -
seeking to serve Co-Located Load as well as Eligible Customers taking interstate transmission service on behalf of Co-Located Load.

b. The Commission Has Jurisdiction over Generation
Interconnection
171.
The Commission retains exclusive jurisdictional authority to ensure that the rates, charges, and classifications for the interstate wholesale sale and transmission of electricity, as well as the practices directly affecting such sale and transmission of electricity, are just and reasonable and not unduly discriminatory or preferentia1.36°  We agree with commenters that a generator's interconnection to the interstate transmission system does not fall outside of the Commission's jurisdiction merely because there is Co-Located Load behind the generator's point of interconnection.361  The Commission retains exclusive jurisdiction to oversee the interconnection of generating facilities to the interstate transmission system, including where generators serve Co-Located Load. 172.

Regarding generation interconnection, the Commission retains exclusive authority to regulate the procedures and agreements that apply to the interconnection of a generator that will make wholesale sales, both where the generator interconnects directly to the interstate transmission system and where a generator interconnects to dual-use distribution facilities.362  The standard interconnection procedures and agreements first adopted in Order No. 2003 apply when an interconnection customer "that plans to engage in a sale for resale in interstate commerce or to transmit electric energy in interstate commerce"363  requests interconnection to the facilities of a public utility's transmission system or distribution system "that, at the time the interconnection is requested, may be used either to transmit electric energy in interstate commerce or to sell electric energy at wholesale in interstate commerce pursuant to a Commission-filed Open Access 36°  16 U.S.C. §§ 824d, 824e; see EPSA, 577 U.S. at 278 (2016) (approving "a common-sense construction of the FPA's language, limiting the Commission's `affecting' jurisdiction to rules or practices that `directly affect the wholesale rate' (cleaned up)).

361  See Talen April 23 Reply Comments at 8.
362  See NARUC, 475 F.3d at 1282 (FERC's exercise of jurisdiction "only over `interconnections to a `distribution' facility when the facility is included in a public utility's Commission-filed OATT and the interconnection is for the purpose of facilitating a jurisdictional wholesale sale of electric energy' is permissible and not an example of jurisdictional "boot-strapping").
363  Order No. 2003, 104 FERC ¶ 61,103 at P 804. 86 of 515

PDF page 88

Document Accessiccia§C:gl§g?i18 _ 341CUMerVAd DeaRe:1§73.8/Pg.
 Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 77 -
Transmission Tariff (OATT)."364  In particular as to distribution-level interconnections, Order Nos. 2003 and 2006 established what is sometimes referred to as the "first use" test, under which the first interconnection to a distribution facility for the purpose of making wholesale sales is not typically Commission-jurisdictional because the facility is not at the time of the request used to transmit electric energy in interstate commerce or subject to wholesale open access under an OATT.365  This jurisdictional application has been found to be consistent with the FPA.366  Furthermore, once the generator has interconnected, the Commission retains authority over the generator's wholesale sales in interstate commerce.

c. The Commission Has Jurisdiction to Ensure that Eligible
Customers Taking Service on Behalf of Co-Located Loads
Are Allocated Costs for Transmission Service
173.
We affirm that the Commission has exclusive jurisdiction over the provision of transmission service used by an Eligible Customer to serve Co-Located Load, again

364  Id.; see also Standardization of Small Generator Interconnection Agreements & Procs., Order No. 2006, 111 FERC ¶ 61,220, at P 5, order on reh'g, Order No. 2006-A, 113 FERC ¶ 61,195 (2005), order granting clarification, Order No. 2006-B, 116 FERC ¶ 61,046 (2006) ("this Final Rule applies only to interconnections with facilities that are already subject to the Transmission Provider's OATT at the time the Interconnection Request is made").
365  See Order No. 2003, 104 FERC ¶ 61,103 at P 804; Order No. 2006, 111 FERC ¶ 61,220 at P 481 (explaining that "only facilities that already are subject to the Transmission Provider's OATT are covered by this rule [and that] the Commission is not encroaching on the States' jurisdiction"). The interconnection of a second generator to the same distribution facility for the purpose of engaging in wholesale sales is jurisdictional, however, because the facilities are already being used to facilitate wholesale transactions and are subject to wholesale open access, meaning that it and any subsequent wholesale generators must utilize the Commission-jurisdictional generator interconnection procedures and agreements. Participation of Distributed Energy Res. Aggregations in Mkts. Operated by Reg'l Transmission Orgs. & Indep. Sys. Operators, Order No. 2222, 172 FERC 1161,247, at P 93 (2020), order on reh'g, Order No. 2222-A, 174 FERC ¶ 61,197, order on reh'g, Order No. 2222-B, 175 FERC ¶ 61,227 (2021).
366  See NARUC, 475 F.3d at 1280-82 ("By establishing standard agreements FERC has exercised its jurisdiction over the terms of those relationships.") (citing TAPS, 225 F.3d at 696 ("FPA § 201 makes clear that all aspects of wholesale sales are subject to federal regulation, regardless of the facilities used.")). 87 of 515

PDF page 89

DocUment Acces-e-icia4q: gt§g118 _3,4qcumenW-i-Jd Drtae:2018/Pgte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 78 -
provided that transmission of electricity is in interstate commerce.367  As part of its transmission authority, the Commission has exercised jurisdiction over the terms of certain interconnections to the transmission system as "an essential element of [t]ransmission [s]ervice"368  and we agree with commenters who note the same.369  The Commission also "may exercise jurisdiction over generation facilities to the extent necessary to regulate interstate transmission"37°  and may require "physical changes" to those facilities as long as the changes "bear a close enough relation to [the Commission's] exercise of jurisdiction over jurisdictional transactions."371  Similarly,

367  See supra P 171. The Supreme Court has held that transmission facilities connected to the interstate grid operate in interstate commerce, but the presumption that transmission is in interstate commerce will not necessarily hold if transmission-level facilities are not connected to that interstate grid. See New York v. FERC, 535 U.S. at 16 (citing FPC v. Fla. Power & Light Co., 404 U.S. 453, 466-67 (1972) (Florida Power)); see also Florida Power, 404 U.S. at 462-63 ("[The Commission's] alternative assertion that energy commingles in a bus is, in our opinion, sufficient to sustain [the Commission's] jurisdiction."). See also Market Monitor April 23 Reply Comments at 13.
368  Order No. 2003-A, 106 FERC ¶ 61,220 at P 698; see NARUC, 475 F.3d at 1280 (affirming Order No. 2003 and observing that "interconnections appear to be relationships between parties with respect to electricity flowing over facilities. . . . By establishing standard agreements [the Commission] has exercised its jurisdiction over the terms of those relationships."). The Commission has reiterated this finding repeatedly. Pac. Gas & Elec. Co., 115 FERC ¶ 61,193, at P 36 (2006) ("[I]nterconnection is part and parcel of transmission of electric energy in interstate commerce, and thus interconnection service is part and parcel of jurisdictional transmission service."); see also id P 36 n.52 (citing Tenn. Power Co., 90 FERC ¶ 61,238, at 61,761, reh'g dismissed, 91 FERC ¶ 61,271 (2000)).
369  See, e.g., Talen April 23 Reply Comments at 4-5 (explaining that the basis of the Commission's authority is that the ISA governing a generator serving Co-Located Load is Commission-jurisdictional). 37°  TAPS, 225 F.3d at 718; NextEra Energy Res., LLC v. FERC, 118 F.4th 361, 369 (D.C. Cir. 2024) (holding that an upgrade to a generator's equipment directly affects the transmission of electricity in interstate commerce and is therefore within the Commission's jurisdiction).
371  NARUC, 475 F.3d at 1282. 88 of 515

PDF page 90

Document Accessig a§c: ?gAg?1:18- 3 g C1CUrnerVAd DEAcle:i.§918/P@te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 79 -
"FERC may regulate electric generating facilities so long as it is addressing a practice affecting wholesale rates."372

174.
We acknowledge, as the Supreme Court has recognized, that the boundaries between federal and state jurisdiction are not hermetically sealed.373  The application of the principles outlined in this order to Co-Location Arrangements depends on the specific facts and circumstances presented in particular situations. We find, however, that the changes to the PJM Tariff that the Commission directs in this order properly draw on the Commission's authority under the FPA without infringing on states' authority.

3. Show Cause Findings
a. Overview
175.
We find that PJM's Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.374  As the Commission explained in the Show Cause Order, the absence of such provisions leaves entities unable to determine what steps they must take to effectuate Co-Location Arrangements of various configurations. Furthermore, this absence creates uncertainty that has resulted in disparate treatment in PJM, where transmission owners have taken different approaches to performing the necessary steps that apply to Interconnection Customers seeking to serve Co-Located Load through a Co-Location Arrangement, leading to no consistent understanding of entities' responsibilities with respect to their planned Co-Location Arrangements.375  The absence of such provisions also introduces the risk that Co-Located Load may benefit from regulation and black start services

372  Nat'l Ass 'n of Regul. Util. Comm'rs, 964 F.3d at 1186 n.5; accord La. Pub. Serv. Comm 'n v. FERC, 522 F.3d 378, 390 (D.C. Cir. 2008) (explaining that "the generating facility exception of Section 201(b)(1)" conferring authority over generation facilities to States "does not apply where jurisdiction is specifically provided for in certain specified sections of the [Federal Power] Act, including Sections 201 and 206.").
373  EPSA, 577 U.S. at 281.
374  See, e.g., EPSA/P3 April 23 Reply Comments at 10.
375  See, e.g., Constellation, Complaint, Docket No. EL25-20-000 (filed Nov. 22, 2024); Baltimore Gas & Electric Company and PECO Energy Company, Petition for Declaratory Order, Docket No. EL24-149-000 (filed Sept. 30, 2024); Constellation April 23 Reply Comments at 4 n.4 (stating that "PJM is uniquely situated" in having an unjust and unreasonable tariff absent co-location rules). 89 of 515

PDF page 91

Document -AccedsiAaW gt".2ggil8 - 3119.curnentiiirJa Daa.qe:19918/Pge Filed: 10/16/2026. Docket No. EL25-49-000, et al.

- 80 -
without contributing to cost recovery for such services. Many parties to this proceeding filed comments supporting the Commission's preliminary finding that PJM's Tariff lacks sufficient clarity or consistency as to the rules for Co-Location Arrangements.376  We are not persuaded by PJM's argument that its Tariff remains just and reasonable, because while PJM asserts that its existing Tariff permits Co-Location Arrangements, PJM recognizes that there is a lack of clarity and consistency in the Tariff regarding the rules for Co-Location Arrangements.377

176. First, we find the PJM Tariff unjust and unreasonable because there is a lack of sufficient clarity or consistency as to the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load. As such, Interconnection Customers seeking to use their generating facilities to serve Co-Located Load have no means of knowing the appropriate mechanism for setting forth the terms and conditions of Co-Location Arrangements. Moreover, without an Eligible Customer designated to

376  See Constellation May 8 Answer at 9 ("In sum, the record in this proceeding unequivocally supports the Commission's preliminary finding that the PJM Tariff lacks clear co-location rules and is unjust and unreasonable."); see also AEU April 23 Reply Comments at 19 ("Loads and generators pursuing [C]o-[L]ocation [A]rrangements need clarity as to how these arrangements will be studied, and how those studies will be evaluated. There must be a level of uniformity and detail outlining study requirements to ensure regulatory certainty for large loads and new generation and storage resources seeking to serve large loads. This level of uniformity is currently lacking in PJM's interconnection procedures and cost allocation methodology . . . ."); EPSA/P3 April 23 Reply Comments at 2 ("EPSA and P3 agree with the Commission that PJM needs to establish tariff provisions and rules to accommodate the array of [C]o-[L]ocated [L]oad arrangements that will facilitate the timely and effective integration of large loads locating in the region."); DCC April 23 Reply Comments at 7 (". . . [T]he Commission should direct PJM to develop clear, enforceable tariff language that affirms the permissibility of multiple co-location configurations, including those where load is served directly from a generation resource located on or near the same site. Tariff clarity is essential to reduce unnecessary disputes, avoid case-by-case confusion, and enable transmission providers to process interconnection and load addition requests efficiently and predictably.").
377  PJM March 24 Response at 32 ("Nevertheless, clarifications and enhancements could well be in order given that this is an evolving area and Tariff provisions did not contemplate the type of arrangements at issue in this docket or their implications."); id. at 35 ("The extent to which netting [rules under the PJM Tariff] could or should apply to co-located data center load is not clear at this time."); see also Vistra April 23 Reply Comments at 11 (arguing that PJM has "effectively conceded" that the PJM Tariff does not contain sufficient clarity). 90 of 515

PDF page 92

Document AccessiAa§c:  ?,§2gP18 - 3 Acicumentiiirl DFafie:19118/P@
Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 81 -
take transmission service on behalf of a Co-Located Load, there is no mechanism for PJM to address situations in which a Co-Located Load withdraws energy from the transmission system. As described in Part IV.B.4.a, we therefore direct PJM to file, as the first part of the replacement rate, revisions to the generation interconnection procedures of the Tariff, including to require an Interconnection Customer who will use its generating facility to serve Co-Located Load to specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load. We also direct PJM to file Tariff changes specifying that an Interconnection Customer seeking to serve Co-Located Load using an existing generating facility must bear the costs of all Network Upgrades that PJM finds are necessary to preserve transmission system reliability for existing transmission customers, and that an existing generating facility cannot begin service to a Co-Located Load until all required Network Upgrades are in service. This requirement will protect existing transmission customers from transmission reliability risks and from bearing the cost of Network Upgrades required for an Interconnection Customer to begin serving Co-Located Load. Furthermore, as described in Part IV.B.4.d, we direct PJM to revise its Tariff to clarify that an Interconnection Customer seeking to serve a Co-Located Load with a newly interconnecting generating facility may: (1) request interconnection service at a level below its maximum facility output; (2) use existing procedures in the PJM Tariff to accelerate the study of the interconnection service request if the request has no cost allocation for Network Upgrades and does not require further studies; (3) request provisional interconnection service; and (4) request Surplus Interconnection Service.

177. Second, we also find that PJM's Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers378  taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. As discussed below, requiring Eligible Customers taking transmission service on behalf of Co-Located Load to take NITS, without the option to instead take the new transmission services set forth in this order, would be inefficient. Specifically, for Eligible Customers taking service on behalf of Co-Located Loads that do not reserve transmission or take energy from the transmission system but which receive only regulation and black start services, or that otherwise are willing and able to limit their energy withdrawals from the transmission system, requiring such Eligible Customers to take NITS on behalf of these Co-Located Loads may in some circumstances result in costly and inefficient transmission system

378  PJM defines Eligible Customer as: "(i) Any electric utility ... or any person generating electric energy for sale for resale ... (ii) Any retail customer taking unbundled transmission service pursuant to a state requirement that the Transmission Provider or a Transmission Owner offer the transmission service, or pursuant to a voluntary offer of such service by a Transmission Owner, is an Eligible Customer under the Tariff . . . ." PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions — E-F (41.0.0). 91 of 515

PDF page 93

Document Accessig a§c: gt-d§gii8-3gqcurnentiili-Ja nrage:aWis/Pgte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 82 -
buildout that may not be necessary if such Eligible Customers are willing and able to take a transmission service that requires fewer Network Upgrades to provide, and therefore may result in lower Network Upgrade costs, than would NITS. Moreover, we find that PJM's Tariff is unjust and unreasonable because it does not address charges related to Co-Located Loads' use of regulation and black start services, which introduces the risk that Co-Located Load may benefit from regulation and black start services without contributing to cost recovery for such services and, thereby, the risk that costs may be allocated entirely to other transmission customers and passed through to residential customers, among others.379  Specifically, the record demonstrates that Co-Located Loads, which are synchronized with the PJM transmission system, use regulation and black start services, as explained below. In addition to regulation and black start services, Co-Located Loads that withdraw energy from the transmission system are taking transmission service.

178. Therefore, as the second part of the replacement rate, we direct PJM to revise its Tariff to create three new transmission services that reflect that Eligible Customers taking service on behalf of Co-Located Loads are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Specifically, we direct PJM to revise its Tariff to allow Eligible Customers seeking to take NITS on behalf of Co-Located Load to take a new interim, non-firm transmission service until all Network Upgrades necessary to provide the requested NITS are complete. We further direct PJM to offer two other new transmission services—a Firm Contract Demand transmission service and a Non-Firm Contract Demand transmission service380—that an Eligible Customer can choose to take on behalf of a Co-Located Load instead of taking NITS. Specific to these new transmission services, we establish paper hearing procedures to determine the just and reasonable rates, terms, and conditions for such services.

379  While the replacement rate we establish in Part IV.B.4 applies to Eligible Customers taking transmission service on behalf of Co-Located Load, we intentionally refer at times only to Co-Located Load, for example, when explaining in our Show Cause findings how Co-Located Load uses certain services. 380 Under this Non-Firm Contract Demand transmission service, we note that an Eligible Customer on behalf of a Co-Located Load may elect to not reserve any amount of transmission service to the extent that the Eligible Customer will not withdraw any electricity from the transmission system. In such a scenario, as discussed below, the Eligible Customer taking the Non-Firm Contract Demand transmission service on behalf of a Co-Located Load will be charged for regulation and black start services, subject to the paper hearing established below. 92 of 515

PDF page 94

Document Accessiccia§c:  4)24cils _ 3Pacumen IF: ilrJ DFAcie:19.?ia/PAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 83 -
179.
Third, we find the existing BTMG rules in the PJM Tariff to be unjust and unreasonable. As discussed below, under the existing Tariff, loads with BTMG are not fully accounted for in resource adequacy planning. As such, the existing BTMG rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning. Thus, as the third part of the replacement rate, we direct PJM to revise its BTMG rules. Recognizing concerns raised in the record about the potential impacts on existing BTMG customers of the Commission changing PJM's BTMG rules, however, we direct PJM to maintain the current BTMG rules for customers that fall below a new MW materiality threshold for the amount of load at a particular electrical location that Network Customers may net using BTMG. We also direct PJM to implement a two-part transition process for retail BTMG, as discussed below, including: (1) the establishment of a three-year transition period; and (2) the ability to grandfather certain entities with existing contracts, as described further below. A materiality threshold for all BTMG should reduce the reliability and resource adequacy risks that large or increasing BTMG may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion.

180.
Finally, because certain aspects of PJM's interconnection procedures do not clearly explain how and where they apply to Interconnection Customers seeking to serve Co-Located Load, we direct several clarifications to PJM's Tariff regarding interconnection procedures for these customers. In addition, we require PJM to file an informational report on several matters related to PJM's Critical Issue Fast Path (CIFP) stakeholder process and PJM's integration of new generation sufficient to serve forecasted large load additions within 30 days of the date of issuance of this order. b. Transmission Service, Regulation and Black Start

181.
The Commission's cost causation principle requires costs to be allocated to those who cause the costs to be incurred and reap the resulting benefits.381  Courts and the Commission have acknowledged that adherence to the cost causation principle does not require that cost allocation methods balance costs and benefits with "exacting

381  See S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41, 87 (D.C. Cir. 2014) ("[T]he Commission's adoption of a beneficiary-based cost allocation method is a logical extension of the cost causation principle[;] under that basic tenet, which we have repeatedly embraced, `costs are to be allocated to those who cause the costs to be incurred and reap the resulting benefits."). See also ICC v. FERC I, 576 F.3d at 476 ("To the extent that a utility benefits from the costs of new facilities, it may be said to have `caused' a part of those costs to be incurred, as without the expectation of its contributions the facilities might not have been built, or might have been delayed."). 93 of 515

PDF page 95

Document Acces-±AaC: g,Ap.i18__ 3 aqcument,i1-1-jd Deta,Re:19,h8/pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 84 -
precision."382  Ultimately, the requirement is met so long as "all approved rates reflect to some degree the costs actually caused by the customer who must pay them[,]"383  and this apportioning is done by ensuring that costs are "allocated in a manner that is at least roughly commensurate with benefits."384

182.
There are significant costs to building, operating, and maintaining the transmission system to provide, as relevant here, transmission service, regulation service, and black start service, including fixed costs such as wires, poles, transformers, and substations, as well as ongoing maintenance and upgrades necessary to maintain reliability and serve load.385  Transmission providers undertake substantial planning and make significant investments to minimize disruptions on the transmission system that may impact generators or force generators to go offline.386

183.
There is significant agreement in the record that Co-Located Loads that are synchronized with the PJM transmission system use and benefit from at least some ancillary services and may be reasonably charged for such benefits.387  The Commission

382  Coal. of MISO Transmission Customers v. MISO, 172 FERC ¶ 61,099, at P 83 & n.228 (2020) (quoting Midwest ISO Transmission Owners, 373 F.3d at 1369).
383  Id. P 82 (quoting KN Energy Inc. v. FERC, 968 F.2d 1295, 1300 (D.C. Cir. 1992)).
384  Mun. Energy Agency of Neb. v. Pub. Serv. Co. of Colo., 189 FERC ¶ 61,099, at PP 41, 46 (2024) (citation omitted), subsequent history omitted; see also Pub. Serv. Elec. & Gas Co., 989 F.3d at 13 (explaining that "although the Commission need not `allocate costs with exacting precision,' the costs assessed against a party must bear some resemblance `to the burdens imposed or benefits drawn by that party') (quoting Midwest ISO Transmission Owners, 373 F.3d at 1368-69).
385  See, e.g., Indicated Transmission Owners March 24 Response at 3.
386  See, e.g., PJM March 24 Response at 42; ITC, Comments, Docket No. AD24-11, at 5 (filed Dec. 9, 2024).
387  See Constellation April 23 Reply Comments at 34 ("[I]t may be appropriate to include some ancillary service charges, such as regulation and black start . . . ."); Constellation May 8 Answer at 14 ("To eliminate any debate and move past what always has been a peripheral issue, Constellation would support generator-contingent co-location rules that included ancillary service charges as part of a replacement rate."); Vistra April 23 Reply Comments at 26 ("Vistra acknowledges that it may be reasonable to charge a co-location configuration for some ancillary services . . . ."); ; Advanced Energy United April 23 Reply Commentsat 19 ("Ultimately, when large co-located loads come online, they will use some ancillary and other wholesale services, and should pay for the 94 of 515

PDF page 96

Document AccessiA a§e: g zgki, _3  gqcumenOrld D,VAile:1918/pte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 85 -
has defined ancillary services as part of the costs of transmission services, specifically as those "that must be offered with basic transmission service under an open access transmission tariff ... [and] needed to accomplish transmission service while maintaining reliability within and among control areas affected by the transmission service."388  Also, as PJM notes, ancillary services "pass through transmission lines."389 184. Regulation service is necessary to provide for the continuous balancing of resources with load and for maintaining scheduled interconnection frequency at 60 cycles per second (60 Hz).39°  The cost of providing regulation service is currently charged or credited to LSEs and wholesale loads based on their pro rata share of the regulation requirements, net of BTMG, for the regulation zone for the hour (but not to be less than zero).391  Regardless of whether a Co-Located Load is drawing energy from the transmission system, Co-Located Loads are unlikely to have a perfect load factor,392  and it will therefore be necessary for PJM to use regulation service to maintain the power balance between the five-minute intervals of the real-time energy market. Depending on the Co-Location Arrangement, variability in the Co-Located Load may be reflected in the generator's net output to the transmission system. Any moment-to-moment variability in services as any customer would."); PIOs April 23 Reply Comments at 25 (". . . [C]o- location arrangements should pay for their share of transmission and ancillary services costs since the transmission system to which co-location arrangements connect deliver blackstart and other critical services to ensure reliability for these co-location arrangements.").

388  City of Holland, Mich. v. Midwest Indep. Transmission Sys. Operator, Inc., 123 FERC ¶ 61,187, at P 21 (2008) (citing Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,705).
389  PJM March 24 Response at 36. 39°  PJM, Intra-PJM Tariffs, OATT, sched. 3 (6.0.0).
391  Id. See also PJM Manual 28. Regulation and Frequency Response Service is accomplished by committing on-line resources whose output is raised or lowered (predominantly through the use of automatic generating control equipment) and by other non-generation resources capable of providing this service as necessary to follow the moment-by-moment changes in load. Each LSE's share of the regulation requirement is based on its total load net of BTMG for the hour (but not to be less than zero). However, as discussed below, we find PJM's existing BTMG netting rules unjust and unreasonable.
392  Load factor refers to "[t]he ratio of the average load to peak load during a specified time interval." U.S. Energy Info. Admin. (EIA), Glossary (last visited Dec. 2025), https://wwvv.eia.gov/tools/glossary/index.php?id=L. 95 of 515

PDF page 97

Document Accede-igft a§e: ?§IN?il8 _ 3 PaCUmenW-i-Jd neta.qe:I.M.8/Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 86 -
the Co-Located Load within real-time market intervals may be absorbed by the transmission system, meaning that unless an Eligible Customer takes transmission service on behalf of the Co-Located Load, there will be no charges for the benefits that this ancillary service provides. This variability will exist even if the Co-Located Load takes no energy from the transmission system. We therefore find that Eligible Customers taking one of the new transmission services on behalf of Co-Located Load must be assessed for regulation service on a gross demand basis at the existing Tariff rate, consistent with the Commission's cost causation principles.

185. Black start service is the ability of generators to start without an outside electric supply or remain operating when disconnected from the transmission system. The revenue requirements of units providing black start service are recovered from transmission customers based on coincident peak load.393  While parties have noted that the generating facilities of some Interconnection Customers serving Co-Located Load may be able to provide black start service,394  many cannot; and even if the generating facility of an Interconnection Customer can provide black start service, as long as it is connected to the transmission system, black start must be coordinated with the system operator to avoid damage to other components of the transmission system.395  Therefore, Co-Located Loads that remain connected to the transmission system through an Interconnection Customer will benefit from black start service in a manner comparable to Network Loads. Further, as parties argue, Co-Located Loads rely on black start service for the restoration of the transmission system.396  We .therefore find that Co-Located Loads benefit from black start service even if they have zero net energy withdrawals and Eligible Customers taking one of the new transmission services on behalf of Co-Located Load must be assessed for this service based on gross demand basis at the existing Tariff rate.

393  PJM, Intra-PJM Tariffs, OATT, sched. 6A (16.1.0).
394  See, e.g., Mainspring April 23 Reply Comments at 11.
395  See, e.g., PJM's March 24 Response at 42-43.
396  See, e.g., Indicated Transmission Owners March 24 Response at 13 n.29. See also PJM March 24 Response at 42 ("The load and generator are connected to and synchronized with the multi-state bulk power system. It is not operating as a micro grid (nor can it if the generating facility is a nuclear unit)."). 96 of 515

PDF page 98

Document Accessigia§q:  gt- g,?118-3Aqcumeq'i ll-Ja
e•19718/
FEed: 10/16/2026
Docket No. EL25-49-000, et al.
- 87 -
c. BTMG
186. We find that circumstances have changed since the Commission approved PJM's retail BTMG rules such that these rules are no longer just and reasonable.397  PJM explains that the BTMG rules were "conceived for, and [have] been implemented for, substantially smaller loads (like a warehouse with solar panels) and not on the scale of large data centers."398  However, large loads, both existing and in the planning stages with PJM, have proliferated in recent years, and PJM has persuasively explained the problems that could occur if Network Customers with large loads were allowed to use the existing BTMG rules in the Tariff.399  For example, PJM explains that "[a]llowing very large loads like data centers to net is problematic because loads in this configuration do not carry reserves."4°°  Such loads must nevertheless be served, however, allowing them to "lean on the PJM system when the co-located generation is on a full or partial outage or if the load exceeds the rating of the co-located generation."401  Importantly, PJM's existing BTMG rules do not limit the amount of qualifying load that a Network Customer may net by using BTMG and do not provide any protections against this potential transmission and resource adequacy planning problem or against the costs of maintaining sufficient resources to serve these loads being shifted onto other customers.402  We therefore find that PJM's BTMG rules are no longer consistent with cost causation principles, because large loads configured in a BTMG arrangement with significant generation will raise cost shifting concerns compared to loads pursuing smaller amounts of netting. We find that PJM's existing BTMG rules may lead to both reliability and

397  See PJM, 107 FERC ¶ 61,113; ISO New England Inc., 173 FERC ¶ 61,198, at P 68 (2020) (finding new entrant rules unjust and unreasonable based on changed circumstances).
398  PJM March 24 Response at 13.
399  See, e.g., Docket No. AD24-11-000, Large Loads Co-Located at Generating Facilities Tr. at 9:2-3 (noting that "large data centers [] need these significant new amounts of energy for their business"); PJM Interconnection, L.L.C., 188 FERC ¶ 61,200, at P 5 (2024) ("PJM explains that the [tariff] proposal [to allocate load adjustments] was spurred by the recent proliferation of data centers that are contributing to large additions of forecasted load concentrated within a specific wholesale metering area."). 4" PJM March 24 Response at 36. 481  Id. at 13 n.5.
402 rs PJM, Intra-PJM Tariffs, OATT, § III.34.2 Netting of Behind the Meter Generation (0.0.0). 97 of 515

PDF page 99

Docurrient AccesgigAaW ?P2-§@?i.18- 3PAcumenWrld Def3ae:1.9Pis/P@te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 88 -
resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning. We clarify that, while the order is limited to Co-Located Loads, this finding applies to all Network Load.

4. Replacement Rate
a. Generation Interconnection Procedures, pro forma GIA,
and Common Service Provisions
187.
We direct PJM to submit a compliance filing to establish rules for Interconnection Customers serving Co-Located Load. As discussed below, we direct PJM to revise the generation interconnection procedures of the Tariff, the pro forma Generation Interconnection Agreement (GIA),403  and Part I, Common Service Provisions, of the Tariff, and Attachment O, Appendix 2 of the Tariff

188.
First, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to revise the generation interconnection procedures of the Tariff In particular, we direct PJM to revise its OATT, VIII, Subpart B, section 403 - Application Rules to add to the list of requirements for a New Service Request that an Interconnection Customer who will use its generating facility to serve Co-Located Load must specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load.404  As part of that compliance filing, we also direct PJM to submit revisions to the generation interconnection procedures to specify any operational procedures or data

403 We note that, as part of reforms to its interconnection process to transition from a serial first-come, first-served study process to a first-ready, first-served cluster study approach, PJM renamed its pro forma ISA to the pro forma GIA. See PJM Interconnection, L.L. C., 181 FERC ¶ 61,162 (2022). The new pro forma GIA applies to interconnection requests subject to the transition period rules and the new rules accepted in the PJM queue reform.proceeding. Interconnection Customers who executed interconnection agreements prior to the transition period executed an ISA. Accordingly, we refer to both ISAs and GIAs in this order, where applicable.
404 An Eligible Customer could be, for example, any person generating electric energy for resale or any retail customer taking unbundled transmission service under certain conditions. For the full definition of Eligible Customer, see Part I.C. For a discussion of how an Eligible Customer may take transmission service on behalf of Co-Located Load, see infra P 189 n.407. 98 of 515

PDF page 100

Document Accessicaa§c:  4:42*21:18-3PAcumentii.lAd atICte:19918/Fate Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 89 -
exchange requirements that PJM deems necessary for Co-Location Arrangements to remedy our finding that its Tariff lacks sufficient clarity or consistency.' 189.

These Tariff revisions, which will apply to all Interconnection Customers requesting to interconnect their generating facilities to the transmission system and seeking to use those facilities to serve Co-Located Load,406  will establish a requirement in the Tariff for the Eligible Customer to be charged for transmission and ancillary services that the Eligible Customer must take on behalf of the Co-Located Load—either NITS or the new transmission services described below in Part IV.B.4.b.iii.407  To the extent that an Interconnection Customer wishes to serve Co-Located Load using its generating facility but not identify an Eligible Customer, then the Interconnection Customer may take steps to terminate its generating facility's interconnection to the PJM transmission system and serve the Co-Located Load fully islanded from PJM's transmission system. 190.

Second, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to revise its pro forma GIA. In particular, we direct revisions to OATT, Part IX, Subpart B GIA to specify that an Interconnection Customer that will use its generating facility to serve Co-Located Load must specify an Eligible Customer that will take transmission service on behalf of the Co-Located Load. We find that this revision will ensure that the charges for transmission and ancillary services taken by Eligible Customers to serve Co-Located Load are appropriately assigned to those Eligible Customers.

191.
Third, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to add a new provision to Part I, Common Service Provisions, 405 For example, PJM explains that "unique operational procedures and data exchange requirements like those proposed in the Susquehanna [Interconnection Service Agreement] should be developed and specified" and that pro forma agreements may require modification to specify, where applicable, the entities that own any Co-Located Load and contact information at the Co-Located Load for use during emergency and non-emergency situations. PJM March 24 Response at 60-62.

406 See PJM Interconnection, L.L. C., 189 FERC ¶ 61,078 at P 87 (Susquehanna) ("This [reliance on a generally applicable document for proposed non-conforming provisions] raises questions regarding whether PJM intends to offer these terms to all similarly situated interconnection customers.").
407 There are several ways that an Eligible Customer could take transmission service on behalf of Co-Located Load. For example, subject to applicable state law, the Eligible Customer could create a corporate intermediary to serve the Co-Located Load, or the Co-Located Load, acting as an Eligible Customer, could request service from the relevant transmission owner directly. 99 of 515

PDF page 101

Document AccessigPSA: 22Q-
18-SD
u ment:Fhla rPaN 9: Mc18/2pAte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 90 -
of the Tariff that requires Interconnection Customers with ISAs or GIAs executed, or requested to be filed unexecuted, prior to the effective date of the revised generation interconnection procedures and pro forma GIA directed in this order that wish to add Co-Located Load or are currently serving Co-Located Load to publicly notify PJM of that addition and identify the Eligible Customer that will take transmission service on behalf of that Co-Located Load. As discussed further below, that Eligible Customer must abide by the terms of the Tariff, including terms regarding transmission service. 192. As a result of these requirements, an Interconnection Customer that requests to interconnect its generating facility to the PJM transmission system, or whose generating facility is already interconnected to the PJM transmission system, and seeks to serve Co-Located Load, or is currently serving Co-Located Load, using its generating facility must specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load, thereby ensuring that the Eligible Customer will be the party responsible for executing a transmission service agreement, which will ensure that the charges for transmission and ancillary services are appropriately assigned. b. Trans mission Services

193. As discussed above, PJM's Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Eligible Customers taking transmission service on behalf of Co-Located Load. Specifically, as above, we find that PJM's Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. The following discussion relates to the types of transmission service that an Eligible Customer taking transmission service on behalf of a Co-Located Load must select from when it requests the required transmission service. We look to cost causation principles to determine what constitutes the Eligible Customer's just and reasonable share of transmission system costs and therefore direct a three-part replacement rate based on the degree to which the Eligible Customer on behalf of Co-Located Load takes transmission and ancillary services. Specifically, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of a Co-Located Load takes one of three transmission services: (1) NITS or a new interim, non-firm transmission service while Network Upgrades to provide full NITS service are constructed, (2) a new Firm Contract Demand transmission service, or (3) a new Non-Firm Contract Demand transmission service. As a part of this compliance obligation, PJM must ensure a transmission service agreement that reflects the rates terms, and conditions of these new transmission service options is available to Eligible Customers.

100 of 515

PDF page 102

Document Accessigi
2A-2-1€1418 -3EKument:Flita EpAg9: iipA 8  / 2  paje Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 91 -
194. With respect to the new transmission services that we require, we establish paper hearing procedures to determine the appropriate rates, terms, and conditions of those services. This Tariff requirement, which will apply to any Eligible Customer taking transmission service on behalf of Co-Located Load, incorporates the existing transmission service structure in the Tariff, which imposes rates, terms, and conditions of transmission service on the Eligible Customer. The Tariff requirements that we establish apply to the relevant Interconnection Customer taking interconnection service and the Eligible Customer taking transmission service on behalf of the Co-Located Load. Eligible Customers, on behalf of the Co-Located Loads that they represent, may choose the transmission services that match their preferred use of the transmission system; however, they must choose at least one of the required transmission services, and may take a combination of the new Firm Contract Demand and Non-Firm Contract Demand transmission services that we direct herein.

i. NITS
195.
First, we note that it continues to be just and reasonable for an Eligible Customer taking transmission service on behalf of Co-Located Load to elect, as one of the required transmission services from which the Eligible Customer must choose, to take NITS.408 As discussed further below, NITS provides significant benefits because a NITS customer gains the right to be served from the transmission system at any time, and PJM and the transmission owners incorporate NITS load into their transmission planning. However, as discussed above, we find that the existing Tariff's BTMG rules are unjust and unreasonable. Thus, Eligible Customers that elect to take NITS on behalf of Co-Located Loads will not be able to use the existing BTMG rules and must instead take NITS on a gross demand basis."9  While we find that NITS charged on a gross demand basis is one just and reasonable transmission service option for Eligible Customers taking transmission service on behalf of Co-Located Loads, it is not the only option. This order establishes new transmission service options that Eligible Customers taking transmission service on behalf of Co-Located Loads may use if they do not wish to take NITS on a gross demand basis.

196.
Consistent with our finding that the existing Tariffs BTMG rules are unjust and unreasonable, we find that it would be unjust and unreasonable to allow Eligible Customers taking transmission service on behalf of Co-Located Loads to take NITS on a net basis. The Commission has previously found that loads that are able to be served in

408  Eligible Customers taking NITS on behalf of Co-Located Load may not combine NITS with any of the other transmission services discussed herein. 409  Eligible Customers taking service on behalf of Co-Located Loads that meet the new criteria discussed below may be able to use the new BTMG rules. 101 of 515

PDF page 103

Dodument Accee-sigPsg 22qq.q-1, 31?p,cument:Flil d rfa'qg9: iipA8/2pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 92 -
part through NITS and in part through behind-the-meter generation41°  shift costs onto other transmission customers.411  Furthermore, the Commission has rejected cost causation arguments made by network customers that sought to lower their load ratio share based on actual use of the transmission system.412  The Commission has explained that "splitting a discrete load is antithetical to the concept of network service" because "a load at a discrete point of delivery cannot be partially integrated—it is either fully integrated or not integrated."413  In addition, the Commission found that a split system creates the potential for a customer to evade some or all of its load ratio share cost responsibility for network services by using behind-the-meter generation during monthly peaks to reduce its load ratio share below its actual, typical monthly peak usage (also called peak shaving), resulting in a rate that is subsidized by other network customers.414 Similarly, in Order No. 890,415  the Commission refused to require transmission providers to allow netting of behind the meter generation against network transmission charges. The Commission explained that its existing policy already provides customers with the opportunity to reduce network service costs to the extent a customer is not relying on the transmission system to meet its energy needs (i.e., by taking PTPS instead of NITS).416 410 Here we reference behind-the-meter generation more broadly, rather than PJM's defined BTMG specifically.

411  Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,259-61.
412  See, e.g., Amtrak, 171 FERC 1161,237 at P 41. See also PJM, 169 FERC ¶ 61,041, at P 60 (2019).
413  Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,262.
414  Id. at 30,260-61. See also East Ky. Power Coop. Inc. v. Louisville Gas & Elec. Co./Ky. Utils. Co., 154 FERC ¶ 61,144, at P 60 (2016) ("[T]he Commission used the `behind-meter-generation' language as an example of transmission customers subject to the provision but it did not explicitly exclude . . . other transmission customers from this provision."). 415  Preventing Undue Discrimination and Preference in Transmission Serv., Order No. 890, 118 FERC ¶ 61,119, at P 1619, order on reh'g, Order No. 890-A, 121 FERC 1161,297 (2007), order on reh'g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh'g, Order No. 890-C, 126 FERC ¶ 61,228, order on clarification, Order No. 890-D, 129 FERC ¶ 61,126 (2009).
416  Id. The Commission also explained that it would review alternative transmission provider proposals for behind-the-meter generation treatment on a case-by-case basis. Id. 102 of 515

PDF page 104

Document AccessigPA 22A2-Y1418- PKument:Fl i l d
ilp48/2p2a5te Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 93 -
197.
Regarding Constellation's argument that it is unduly discriminatory to charge Eligible Customers taking transmission service on behalf of Co-Located Loads for NITS on a gross demand basis to the extent it would charge the same rates to customers who impose different costs on the system,417  we reiterate that while Eligible Customers taking transmission service on behalf of Co-Located Loads must take one of the required transmission services, they may take one of the new transmission services instead of NITS. Therefore, Eligible Customers taking transmission service on behalf of Co-Located Loads that do not wish to be Network Load may seek the alternative transmission services described below. Constellation further argues that charging all Eligible Customers taking transmission service on behalf of large Co-Located Loads for NITS based on a gross demand basis would be unduly discriminatory because it is inconsistent with the treatment of BTMG.418  However, we direct changes to PJM's existing BTMG rules, as described below. In doing so, we decline to address Constellation's alternative proposals to modify the BTMG provisions.419 198.

The Network Load that an Eligible Customer designates when taking NITS on behalf of a Co-Located Load will benefit from the transmission system in the same manner as the Network Load of other NITS customers. The Network Load of the Eligible Customer taking NITS on behalf of a Co-Located Load will gain the right to be served from the transmission system at any time. The Network Load of the Eligible Customer taking NITS on behalf of a Co-Located Load, as any other Network Load, would contribute to the need for costs to be incurred for operation and maintenance of the transmission system, as well as new Network Upgrades to keep the transmission system reliable. Moreover, PJM explains, and we agree, that, if Co-Located Load is Network Load, PJM will include the customer's full load in its models for purposes of procuring capacity and will include Co-Located Load that is Network Load in the load forecast for

417  Constellation April 23 Reply Comments at 31.
418  Id. at 32-33, 39.
419  See FirstEnergy Serv. Co. v. FERC, 758 F.3d 346, 353 (D.C. Cir. 2014) ("The statutory `just and reasonable' standard is the same under section 205 and section 206."); ExxonMobil Oil Corp. v. FERC, 487 F.3d 945, 955 (D.C. Cir. 2007) ("Under the arbitrary and capricious test, our standard of review is `only reasonableness, not perfection.' We need not decide whether the Commission has adopted the best possible policy as long as the agency has acted within the scope of its discretion and reasonably explained its actions."); New England Power Generators Ass 'n v. ISO New England Inc., 153 FERC ¶ 61,222, at P 35 (2015) (explaining that, in setting a just and reasonable replacement rate, the Commission could accept a party's proposal or "implement[] its own solution"). 103 of 515

PDF page 105

Document Acces
4Aq..418 - 31;19Pu ment:Flild iFaiN9: -.LpA8/2pge Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 94 -
purposes of transmission planning.420 Therefore, we find that if an Eligible Customer takes NITS and designates a Co-Located Load as Network Load, the NITS charges an Eligible Customer incurs on behalf of that Co-Located Load will be at least roughly commensurate with the benefits received.

199.
We disagree with parties who argue that Co-Located Loads should only be allowed to take NITS, and that the NITS they must take is on a gross demand basis.421 As discussed further below, we find that the option to take NITS on a gross demand basis is just one part of a just and reasonable replacement rate that also includes the opportunity for Eligible Customers to take on behalf of Co-Located Loads the new Firm or Non-Firm Contract Demand transmission services. As explained below, the record demonstrates that Eligible Customers taking transmission service on behalf of Co-Located Loads are willing and able to limit their energy withdrawals from the transmission system under certain conditions.422  It would be inconsistent with cost causation principles to require Eligible Customers taking transmission service on behalf of Co-Located Loads that limit their energy withdrawals to take NITS on a gross demand basis. Rather, Eligible Customers taking service on behalf of Co-Located Loads should be allowed to choose the transmission service that aligns with their use of the transmission system and therefore aligns the charges for service with the benefits received. Further, we find that requiring an Eligible Customer taking transmission service on behalf of Co-Located Load to take NITS on a gross demand basis would be inefficient. Requiring this could necessitate inefficient and costly transmission buildout and costs paid by transmission customers that may not be necessary if Eligible Customers taking transmission service on behalf of Co-Located Loads are willing to limit their energy withdrawals and take a transmission service that requires fewer Network Upgrades to provide.423

42°  PJM March 24 Response at 39 n.64.
421  See, e.g., NREMC April 23 Reply Comments at 5-6; Indicated Transmission Owners March 24 Response at 16-17; Center April 23 Reply Comments at 27.
422  See infra P 204.
423  See Antora April 23 Reply Comments at 11-12 ("Where a customer could have instead taken curtailable transmission service that allows PJM and/or the EDC to curtail its load if that service were offered, the failure to provide a service option that incorporates load flexibility will directly lead to costs for the interconnecting customer that do not appropriately reflect its flexibility and resulting ability to avoid using high value energy or grid capacity. And it will lead to increased costs for other customers because PJM's transmission and interconnection study processes and operating protocols will apply a lack of headroom in its system based on its assumed need to serve the 104 of 515

PDF page 106

Document Access igPSA. 22q-A.418 _3qpcument:Flit d EFAg:3143A8/2pa3te Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 95 -
ii. Interim, Non-Firm Transmission Service
200. Co-Located Loads are concerned with the speed to interconnect to the PJM transmission system and begin operation. As a result, these types of loads have sought to establish Co-Location Arrangements with existing generating facilities that can begin serving new large Co-Located Loads rapidly.424 In response, and to facilitate more rapid interconnection and operation of Co-Located Loads, PJM and other parties discuss the development of a new transitional service that would allow new Co-Located Load to withdraw electricity from the PJM transmission system earlier than may be otherwise achievable if those new Co-Located Loads could only be designated as Network Load and served once all of the Network Upgrades necessary to provide the requested NITS are complete.425  Therefore, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to create a new interim, non-firm transmission service similar, but not identical, to PJM's proposed option 7. This new interim, non-firm transmission service must allow an Eligible Customer that has requested NITS on behalf of a Co-Located Load to take non-firm transmission service that can be interrupted until the Network Upgrades necessary to provide NITS are complete and the Co-Located Load can be designated as Network Load. We reiterate that this interim, non-firm transmission service should be temporary—only available to Eligible Customers that have requested NITS on behalf of Co-Located Loads that cannot yet be reliably served with NITS—and available only until the necessary Network Upgrades are completed and the Co-Located Load is designated as Network Load. Moreover, this new service would be optional for an Eligible Customer seeking NITS on behalf of a Co-Located Load and would only be available to the extent PJM determines that it can provide some level of interim service reliably. Eligible Customers taking this interim, non-firm transmission service on behalf of Co-Located Loads would pay the NITS rate for the new service, as well as ancillary services charges and charges for black start service, but they would not be charged for generation capacity because, as interruptible entirety of the Network Load at any given moment, despite the fact that the customer is capable of dispatching down pursuant to PJM and/or EDC instructions. This, in turn, will trigger identification of infrastructure upgrades that could have been avoided . . . ."); Constellation April 23 Reply Comments at 20 (". . . [A] NITS-only approach to serving hyperscale data centers and other large new loads will create a need for massive transmission upgrades and impose billions of dollars of costs on existing customers .

.").
424  Show Cause Order, 190 FERC 1161,115 at P 85.
425  See PJM March 24 Response at 18-19; Mainspring April 23 Reply Comments at 13; Constellation April 23 Reply Comments at 55-57; Buckeye April 23 Comments at 9. 105 of 515

PDF page 107

Document Accessigi@V; qqA_,418-31d9c ument:Fl it d rpaqg: iip/q8/2pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 96 -
loads, capacity will not be procured on their behalf until such time as the Network Upgrades are in place to serve them. Once the required Network Upgrades to serve the full gross demand are in place, the Co-Located Load would be designated as Network Load and the Eligible Customer would pay on behalf of the Co-Located Load all Network Load charges. This transmission service may not be combined with the Firm Contract Demand transmission service or Non-Firm Contract Demand transmission service discussed herein.

201.
We find that this new interim, non-firm transmission service will facilitate the timely provision of transmission service to Eligible Customers taking transmission service on behalf of Co-Located Loads, while preserving reliability for other transmission customers. As discussed above, the record in this proceeding suggests that a key driver of Co-Location Arrangements is delays in new large loads obtaining service through the traditional front-of-the-meter load interconnection process.426  This interim, non-firm transmission service would help to address such delays by allowing an Eligible Customer that has requested to take NITS on behalf of a Co-Located Load to, through this new transmission service, receive an interruptible transmission service before the Network Upgrades necessary to designate and serve the Co-Located Load as Network Load are complete. Eligible Customers taking the interim, non-firm transmission service on behalf of Co-Located Loads would avoid paying generator capacity costs in return for their willingness to curtail their withdrawals in advance of emergency conditions (i.e., it will be curtailed before existing firm transmission services and the new Firm Contract Demand Transmission Service).427  This willingness to curtail would potentially allow them to obtain service more quickly. As part of the compliance filing ordered above, we seek briefing on an appropriate point in emergency operations at which to curtail Eligible Customers taking this new interim, non-firm transmission service on behalf of Co-Located Loads; We further note that, when curtailed, Eligible Customers taking this transmission service on behalf of Co-Located Loads may be able to continue to take energy from the Interconnection Customer with which they are co-located if PJM's Tariff otherwise allows.

202.
We note that, unlike in PJM's proposal in option 7, which would allow Eligible Customers taking transmission service on behalf of Co-Located Loads to receive the transitional service until "any resource adequacy supply/demand imbalances associated with the large load addition could be addressed,"428  we instead direct PJM to limit the transitional period to the time needed to complete any Network Upgrades identified in the

426  Indicated Transmission Owners June 3 Answer, Powers Aff. at 16.
427  See infra P 208.
428  PJM March 24 Response at 18-19. 106 of 515

PDF page 108

Document AccessigPSA -2q-Aqq1 8 - 3Q9Cument:Fl i l d  j=1ge:1.971.8/2p-je Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 97 -
study process as necessary to provide the requested NITS. PJM's proposal in option 7 to allow the transitional period to continue until any resource adequacy challenges are addressed is too broad and not sufficiently detailed to direct as a replacement rate. 203.

However, as discussed below, we conclude that additional record evidence is needed to set the appropriate replacement rate, i.e., the terms and conditions for the new interim, non-firm transmission service. Thus, we establish a paper hearing and direct further briefing.

iii. Firm Contract Demand and Non-Firm Contract
Demand Transmission Services
204.
As the record demonstrates, various potential Co-Location Arrangements may use the transmission system to differing extents. Specifically, parties note that some Co-Location Arrangements include system protection facilities that prevent energy withdrawals from the transmission system,429  and parties have demonstrated that some Co-Located Loads are willing and able to control their withdrawals from the transmission system.430  System protection facilities are defined as the equipment, including necessary protection signal communications equipment, required to protect (1) Transmission Provider's Transmission System from faults or other electrical disturbances occurring at the Generating Facility, and (2) the Generating Facility from faults or other electrical system disturbances occurring on Transmission Provider's Transmission System or on other delivery systems or other generating systems to which Transmission Provider's Transmission System is directly connected:431  Instead of system protection facilities, we

429  See, e.g., id. at 13-15.
430  See, e.g., SEIA April 23 Reply Comments at 8 (citing Duke University's Nicholas Institute for Energy, Environment & Sustainability, Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems, https://nicholasinstitute.duke.edu/sites/default/files/publications/rethinking-load- growth.pdf (Duke Study)); id. ("Co-located loads with the ability to curtail or shift demand in coordination with generator output or grid constraints should be treated differently than firm grid-dependent load, as these loads would be capable of reducing their demand on the grid."); Constellation April 23 Reply Comments at 56 ("The Duke Study identifies the significant benefits to the efficient use of the transmission grid and existing capacity when loads can `temporarily reduce (i.e., curtail) its electricity consumption from the grid during [] peak stress periods.') (quoting Duke Study at 5); EDFR April 23 Reply Comments at 9.
431  Federal Energy Regulatory Commission, Pro forma LGIP, § 1 (Definitions) (Aug. 20, 2024), https://www.ferc.gov/media/pro-forma-lgip. See Reform of Generator Interconnection Procs. & Agreements, Order No. 845, 163 FERC ¶ 61,043, at P 367 107 of 515

PDF page 109

Document Accessig#SA: 2A-0,_qti_31;12cument:Flil d  j=)A9: 3'VA 812 Pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 98 -
will use in this order the term special protection scheme, also known as a remedial action scheme. A special protection scheme is a plan designed to detect abnormal system conditions and to automatically take appropriate corrective action, to maintain system stability, acceptable system voltages, and acceptable facility loading. Corrective actions, as applicable here, may address scenarios such as generator runback or load shedding.432 205. As such, PJM and other commenters discuss transmission services that are tailored to Co-Located Loads that have protection schemes to limit their energy withdrawals from the system, and that recognize the reduced impact on the transmission system of such Co-Location Arrangements as compared to traditional Network Load.433  Parties argue that these services will not require PJM to plan the transmission system to serve these Co-Located Loads to the same extent as PJM must plan the transmission system to serve Network Load, possibly reducing the need for new Network Upgrades.434  Parties further argue that Co-Located Loads may be able to receive transmission service faster with use of a new, limited transmission service product than they would if they selected NITS, to the extent that providing NITS would require Network Upgrades that the limited transmission service would not.435  We note that, in general, special protection schemes allow Eligible Customers on behalf of Co-Located Load to effectively limit their withdrawals from the transmission system.436  For these reasons, in these instances where (2018), order on reh'g, Order No. 845-A, 166 FERC ¶ 61,137, order on reh'g, Order No. 845-B, 168 FERC ¶ 61,092 (2019) (discussing system protection facilities in the context of a generating facility not injecting energy onto the transmission system above the requested level of service).

432  PJM Manual 07: PJM Protection Standards, Rev. 5 (eff. Sept. 25, 2025) § 17.1. We recognize that PJM's manual currently does not include excess energy withdrawals as an abnormal system condition.
433  See, e.g., PJM March 24 Response at 13-15, 18-19; Glatz and Silverman April 23 Reply Comments at 12-13; Constellation April 23 Reply Comments at 65; Vistra April 23 Reply Comments at 28.
434  See Enchanted Rock April 23 Reply Comments at 17.
435  See Constellation April 23 Reply Comments at 55-56; EPSA/P3 April 23 Reply Comments at 14.
436  See Constellation April 23 Reply Comments, Herling Aff. ¶ 23 ("The protection system, discussed above, is fully redundant and, while it cannot be guaranteed to never fail, it is unreasonable to treat the failure of both primary and secondary relay system facilities following the loss of a generator as anything other than a third contingency. In fact, when I was directing transmission planning for PJM, I cannot think of an instance in which we treated such a situation otherwise. In practice, protection 108 of 515

PDF page 110

Document AccessigPSP; 2A-Aq_418 _3Qgcument:Flal d rpaN9: j121A8/2p2aJe Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 102 -
because these Eligible Customers will not be able to reduce their load-ratio share to avoid paying transmission costs or capacity costs. Rather, these customers will pay only for the contracted demand, aligning the costs for the Firm Contract Demand transmission service that they take with the benefits they receive.

212.
Should the Eligible Customer taking transmission service on behalf of a Co-Located Load withdraw energy from the PJM transmission system in excess of the contract demand, for example, due to a special protection scheme failure, we direct PJM to apply a penalty rate. The Commission has previously found that transmission customers should be subject to unreserved use penalties in circumstances where a transmission customer uses transmission service in excess of its reserved capacity or if it uses transmission service where it does not have a reservation.443  Further, PJM states that it has observed that special protection schemes can fail, which may result in the Eligible Customer taking unreserved service from the transmission system on behalf of the Co-Located Load!'" We direct parties to brief the appropriate penalty charge for a Firm Contract Demand transmission service customer's unreserved use of the PJM transmission system. We also direct parties to brief the appropriate procedures for PJM to curtail Eligible Customers taking the new Firm Contract Demand transmission service on behalf of Co-Located Loads that withdraw energy in excess of the contract demand and any other remedial action that PJM should take to address withdrawals in excess of the contract demand. We also note that, as discussed in the briefing questions below, PJM will determine the technical and engineering requirements of special protection schemes to help address reliability risks associated with unreserved use of the transmission system.

213.
We find that the new Firm Contract Demand transmission service must have a minimum term of one year, similar to NITS.445  However, generation capacity is typically procured three years in advance in PJM. As such, we find that it is just and reasonable that the terms and conditions for taking the new Firm Contract Demand transmission service must prevent transmission customers from switching between the Firm Contract Demand and Non-Firm Contract Demand transmission services, i.e., must include an anti-toggling mechanism. Otherwise, Eligible Customers taking transmission service on behalf of Co-Located Loads may attempt to switch between the two new transmission services based on expected capacity market conditions. PJM's capacity market includes anti-toggling measures, including the "must-offer" requirement for existing Capacity Resources and the five-year minimum commitment for loads seeking to procure their

443  Order No. 890, 118 FERC ¶ 61,119 at P 834. 444  PJM March 24 Response at 44.
445  See PJM, Intra-PJM Tariffs, OATT, § III.29.2 Application Procedures (2.0.0). 112 of 515

PDF page 111

Document AccessigPA 2g'2-18-3PPcument:Flit d ifkgw: ilp/48/ AMe Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 99 -
the Co-Location Arrangement includes special protection schemes that limit its energy withdrawals, we find that it is a just and reasonable replacement rate to allow an Eligible Customer taking transmission service on behalf of such load to take and be charged for new types of transmission service that are alternatives, and not equivalent, to NITS. 206.

We therefore direct PJM to develop two new transmission services that must be available to Eligible Customers taking transmission service on behalf of Co-Located Loads: (1) Firm Contract Demand transmission service, and (2) Non-Firm Contract Demand transmission service. These new transmission services will serve as permanent alternatives to existing transmission services, unlike the new interim, non-firm transmission service described above in Part IV.B.4.b.ii, and the new transmission services would not require the Co-Located Load to become Network Load. For the Eligible Customer taking transmission service on behalf of a Co-Located Load to be eligible for these new transmission services, the Co-Located Load must be able and willing to prevent or limit its energy withdrawals and must be separately metered from the associated generator. Eligible Customers taking transmission service on behalf of Co-Located Loads would also be able to take a combination of Firm Contract Demand transmission service and Non-Firm Contract Demand transmission service. Because firm transmission service contemplates a reservation and regular withdrawal of energy, Eligible Customers taking transmission service on behalf of Co-Located Loads that will not withdraw energy from the transmission system must take Non-Firm Contract Demand transmission service at 0 MW.

207.
The record assembled to date does not address the appropriate rates, terms, and conditions for these new Firm Contract Demand and Non-Firm Contract Demand transmission services. Thus, we direct further briefing to enable the Commission to set the appropriate replacement rate for these services, as discussed below. Among other topics with respect to this pair of new transmission services available to Eligible Customers taking transmission service on behalf of Co-Located Loads, the Commission directs further briefing on whether the rate paid by an Eligible Customer on behalf of a Co-Located Load taking only a de minimis amount of the new Firm or Non-Firm schemes are regularly employed on the PJM transmission system, and the successful operation of such protective systems is a common observance within PJM."). Proper special protection scheme design is also subject to NERC standards to ensure they do not introduce unintentional or unacceptable reliability risks to the system. Remedial Action Schemes Reliability Standard, Order No. 837, 160 FERC ¶ 61,071 (2017) (approving Reliability Standard PRC-012-2).

Also, as discussed below, we clarify that PJM's necessary study process assesses any special protection scheme that is a part of a Co-Location Arrangement. See infra P 227.

109 of 515

PDF page 112

Document Acc„sigt SP; Z-q"2-
18-31;;IgCLIMent:FlAd rfaqg:11211C1812pge Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 100 -
Contract Demand transmission services should reflect not only (i) charges for regulation and black start service and (ii) the transmission service charges for that de minimis amount of service, but also an additional charge reflecting that the Co-Located Arrangement is physically connected and synchronized to the PJM transmission system and, if so, how that additional charge, including a de minimis threshold, should be determined.

(a) Firm Contract Demand Transmission
Service
208.
Under the new Firm Contract Demand transmission service, Eligible Customers will have the right to request transmission service on behalf of a Co-Located Load up to a specified MW quantity, i.e., the contract demand. The Firm Contract Demand transmission service will have the same reservation and curtailment priority as existing firm transmission services, at the level of the contract demand. However, unlike NITS customers, the Eligible Customer taking Firm Contract Demand transmission service on behalf of the Co-Located Load is not permitted to withdraw energy from the PJM transmission system beyond the contract demand level.437

209.
Eligible Customers taking the new Firm Contract Demand transmission service on behalf of Co-Located Loads will be charged for transmission, ancillary services, and capacity based on the contract demand, with the exception of regulation and black start services.438  As explained above, we agree with parties who argue that all Co-Located Loads rely on regulation and black start services to be served regardless of whether they are drawing energy from the transmission system,439  and we therefore find that Eligible

437  We note an Eligible Customer may combine Firm Contract Demand transmission service with Non-Firm Contract Demand transmission service to withdraw, on an as-available basis, more energy than its firm entitlement.
438  See, e.g., Constellation April 23 Reply Comments at 66 ("Ancillary services should be charged on a gross or net load basis for firm and interruptible configurations, as required to avoid discrimination. For generator-contingent configurations, some charge for regulation or black start service may be appropriate. Energy charges should be assessed based on a net injection or withdrawal of the co-located load generator and load to the transmission system.").
439  See id. at 34 ("[I]t may be appropriate to include some ancillary service charges, such as regulation and black start . . . ."); Vistra April 23 Reply Comments at 27 ("For example, variances in the co-located load, which are seen by the grid as changes in the co-located generator's output, could be viewed as related to the need for regulation service. Co-location configurations with high load variation therefore can be considered to use regulation service."); ACEG April 23 Reply Comments at 2 ("Proposed co-located 110 of 515

PDF page 113

Document Accessigi?A 2Q12111.8-3Q9cument:Flitd IEN9:1:121/118/2pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 101 -
Customers that take the Firm Contract Demand transmission service on behalf of Co-Located Loads must be charged for regulation and black start services based on a gross demand basis, rather than the contract demand.

210.
PJM will only have an obligation to plan for the Network Upgrades necessary to serve Eligible Customers taking this new Firm Contract Demand transmission service on behalf of Co-Located Loads at their contract demand. Because PJM will procure generation capacity on behalf of the Co-Located Load served by Firm Contract Demand transmission service based on their contract demand, we find it is appropriate to charge the relevant Eligible Customer for generation capacity based on the full amount of the Firm Contract Demand transmission service.440  We direct parties to brief the appropriate rate, terms, and conditions for this new Firm Contract Demand transmission service, including whether it would be just and reasonable to apply the current zonal firm PTPS rates to this new transmission service."'

211.
We note that the new Firm Contract Demand transmission service does not raise similar cost shifting concerns as the split system contemplated in Order No. 888-A.442 Firm Contract Demand transmission service customers will be charged based on their contract demand irrespective of usage and therefore will not be able to reduce their load-ratio cost responsibility. Further, PJM will only plan the transmission system and procure generation capacity for the contract demand—not for load growth, like it does for NITS customers—and PJM will have no obligation to serve the Eligible Customer beyond the contract demand. Therefore, we find that allowing Eligible Customers taking transmission service on behalf of Co-Located Loads to take the new Firm Contract Demand transmission service will not cause a cost shift to other transmission customers load arrangements do not always function as truly islanded micro grids, and they may still rely on services such as frequency regulation, voltage support, and black start capability.").

440 As noted in Part IV.B.2.a supra, states have exclusive authority over the allocation of Commission-jurisdictional costs to retail customers, including retail customers that are Co-Located Load. Therefore, states have authority over how the costs for Firm Contract Demand transmission service and other services assigned to an Eligible Customer are allocated among individual retail customers. 441  See PJM, Intra-PJM Tariffs, OATT, sched. 7 (15.0.1). 442  See Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,259 ("The concept of allowing a `split system' or splitting a discrete load is antithetical to the concept of network service. . . . Furthermore, such a split system creates the potential for a customer to "game the system" thereby evading some or all of its load-ratio cost responsibility for network services."). 111 of 515

PDF page 114

Document AccessigPSA 2A-2-418-31d9cument:FlA d EFAgp:i121/48/2pAle Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 103 -
own capacity through the Fixed Resource Requirement alternative. Both measures exist to prevent loads or generators from introducing price volatility or exercising market power by entering and exiting the market from one year to the next based on projected market conditions. We direct parties to brief the appropriate mechanism for such a feature, including the appropriate minimum service period and minimum notice period for discontinuing service for the new Firm Contract Demand and Non-Firm Contract Demand transmission services.

(b) Non-Firm Contract Demand Transmission
Service
214.
As discussed above, we establish a new Non-Firm Contract Demand transmission service to be offered to Eligible Customers taking service on behalf of Co-Located Loads. We recognize that not all Co-Located Loads will necessarily plan to withdraw energy from the transmission system on a regular basis. Eligible Customers taking service on behalf of such loads may, however, still seek to withdraw energy from the transmission system from time to time when transmission capacity is available and not needed by firm customers. For example, an Eligible Customer could seek a transmission reservation for a Co-Located Load in advance for the duration of an expected outage of the associated generator. The new Non-Firm Contract Demand service will provide an option for Eligible Customers seeking to use the transmission system on behalf of a Co-Located Load in this more limited manner, while still charging customers for regulation and black start services, for the reasons discussed above.

215.
We find that the new Non-Firm Contract Demand transmission service must be available during normal operations and curtailed during emergency operations (i.e., it will be curtailed before existing firm transmission services and the new Firm Contract Demand Transmission Service). Under this service, Eligible Customers may reserve transmission service on behalf of a Co-Located Load as needed during normal, non-emergency system operating conditions. Reservations under this service would be available only when there is available transmission capacity, similar to existing non-firm transmission service options in the Tariff. Reservations for this service shall be available for terms ranging from one hour to one month, consistent with the terms available for Non-Firm PTPS in the PJM Tariff's" As noted above, Eligible Customers may use Non-Firm Contract Demand transmission service to make use of the transmission system above their Firm Contract Demand transmission service level, if transmission capacity is available.

446 See PJM,

Intra-PJM Tariffs, OATT, § 14.1 (1.0.0) ("Non-Firm Point-To-Point
Transmission Service will be available for periods ranging from one (1) hour to one (1) month").

113 of 515

PDF page 115

Document AccessigP.Sg 2A-A41.8 _3gpcument:FlAd rjpa,p: 3121/18/2pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 104 -
216.
Eligible Customers taking the Non-Firm Contract Demand transmission service on behalf of Co-Located Loads will be charged for transmission and ancillary services on an as-reserved contract demand basis, based on the reserved contract demand amount of transmission service (except as noted below). As with the new Firm Contract Demand transmission service, we find that Eligible Customers that take the Non-Firm Contract Demand transmission service on behalf of Co-Located Loads use and therefore should be charged for regulation and black start services based on a gross demand basis, rather than the reserved amount of transmission service. As discussed below, we direct parties to brief the appropriate rate, terms, and conditions for this new Non-Firm Contract Demand transmission service, including whether it would be just and reasonable to apply the current zonal non-firm PTPS rates to this new service.447

217.
In addition, similar to the Firm Contract Demand transmission service, should the Eligible Customer taking the Non-Firm Contract Demand transmission service on behalf of the Co-Located Load make unreserved use of the transmission system by withdrawing energy in excess of its transmission service reservation,448  PJM must apply a penalty rate in such circumstances. We direct parties to brief the appropriate charge for such a penalty, including whether it should be the same as the unreserved use penalty charge applicable to the new Firm Contract Demand transmission service. We also direct parties to brief the appropriate triggers and procedures for PJM to curtail an Eligible Customer taking the new Non-Firm Contract Demand transmission service on behalf of a Co-Located Load when it makes unreserved use of the transmission system by withdrawing energy in excess of its transmission service reservation. 218.

The new Non-Firm Contract Demand transmission service will not include a charge for generation capacity.449  Because it is non-firm transmission service, PJM will not have an obligation to serve Eligible Customers taking this new Non-Firm Contract Demand transmission service on behalf of Co-Located Loads; thus, unlike Network Load, Co-Located Loads on whose behalf Eligible Customers are taking Non-Firm

447  See PJM, Intra-PJM Tariffs, OATT, sched. 8 (14.0.1).
448  As noted above, Non-Firm Contract Demand transmission service will be curtailed during emergency operations and we request briefing on the appropriate procedures to govern the circumstances under which PJM curtails an Eligible Customer taking Non-Firm Contract Demand transmission service on behalf of a Co-Located Load during emergency procedures.
449 Regardless, however, we clarify that this option is distinct from Vistra's proposal to allow a secondary generator that provides occasional, interruptible backup service to a Co-Located Load to also serve as a Capacity Resource. Vistra April 23 Reply Comments at 8, 30. 114 of 515

PDF page 116

Document AccessigPS#: 22qA.418 _ Agcu me nt:Fl il d rp@g: j121/4 8/ 2pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 105 -
Contract Demand transmission service would not be considered for resource adequacy planning purposes. PJM will also have no obligation to include the Co-Located Loads on whose behalf Eligible Customers take such service in its transmission planning.

iv. Paper Hearing on Rates, Terms, and Conditions of
New Transmission Services
219. As discussed above, additional record evidence is needed to set the appropriate replacement rates, terms, and conditions for the new interim, non-firm transmission service, Firm Contract Demand transmission service, and Non-Firm Contract Demand transmission service. Parties should address the following questions with specificity.

(1) What are the appropriate rates, terms, and conditions for the new Firm Contract Demand transmission service, including whether it would be just and reasonable to apply the current zonal firm PTPS charges to this new service and whether it would be just and reasonable and consistent with cost causation to include charges for any of PJM's administrative services?

(2) What are the appropriate rates, terms, and conditions for the new Non-Firm Contract Demand transmission service, including whether it would be just and reasonable to apply the current zonal non-firm PTPS charges to this new transmission service and whether it would be just and reasonable and consistent with cost causation to include charges for any of PJM's administrative services?

(3) As noted above, a Co-Location Arrangement is synchronized to the transmission system.4" Should the rate paid by an Eligible Customer on behalf of a Co-Located Load taking only the new Non-Firm Contract Demand transmission service that elects to not reserve any amount of that service for a period of time (e.g., one month) reflect not only charges for regulation and black start services, but also an additional charge given that regulation and black start services could not be provided without the transmission system? If so, how should that additional charge be determined?

(4) As noted above, a Co-Location Arrangement is synchronized to the transmission system.45' Should the rate paid by an Eligible Customer on behalf of a Co-Located Load taking only a de minimis amount of the new Firm or Non-Firm Contract Demand transmission services reflect not only (i) charges for regulation and black start service and (ii) the transmission service charges 45" See also PJM March 24 Response at 42-43.

451  Id.
115 of 515

PDF page 117

Document AccessigPA qq"Aq.41.8- ARcument:FlAd EFAgp:1121A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 106 -
for that de minimis amount of service, but also an additional charge reflecting that the Co-Location Arrangement is physically connected and synchronized to the PJM transmission system? If so, how should that additional charge be determined?

(5) What is the appropriate penalty charge or other remedial action that PJM should take to address any unreserved use of the PJM transmission system for an Eligible Customer taking Firm Contract Demand transmission service on behalf of a Co-Located Load?

(6) What is the appropriate penalty charge or other remedial action that PJM should take to address any unreserved use of the PJM transmission system for an Eligible Customer taking Non-Firm Contract Demand transmission service on behalf of a Co-Located Load?

(7) What are the appropriate mechanisms for an anti-toggling feature for the Firm Contract Demand transmission service, including the appropriate minimum service period and minimum notice period for discontinuing or modifying the level of service?

(8) What interconnection requirements and operational practices are necessary for special protection schemes to maintain system reliability (e.g. the need for full redundancy of such schemes) in the event that a Co-Located Load itself or its associated generator trips offline?

(9) What communications, alarm, SCADA452  or other requirements are necessary for PJM to monitor Co-Located Load transmission system demand status; ensure that relay settings are consistent with special protection scheme design; and inform system operator action, in order to limit withdrawals from Eligible Customers on behalf of Co-Located Load that exceed the amount of Firm or Non-Firm Contract Demand transmission services?

(10) What other eligibility requirements, e.g., interconnection requirements or operational practices, are necessary for an Eligible Customer to take Firm Contract Demand or Non-Firm Contract Demand transmission service on behalf of Co-Located Load?

452 Supervisory Control and Data Acquisition (SCADA) is a system of remote control and telemetry used to monitor and control the transmission system. See NERC Glossary of Terms at 42, https://www.nerc.com/globalassets/standards/reliability- standards/glossary_of terms.pdf.

116 of 515

PDF page 118

Document AccessigPW 2AA1.418-4eiKument:Flita raN9:::121A8/2pge Filed: 10/16/2023 Docket No. EL25-49-000, et al.

- 107 -
(11) What are the appropriate procedures to govern the circumstances under which PJM curtails an Eligible Customer taking the interim, non-firm

transmission service, Firm Contract Demand transmission service, or
Non-Firm Contract Demand transmission service on behalf of a Co-Located Load during emergency procedures? In particular, can PJM shed all or a

portion of a Co-Located Load on whose behalf an Eligible Customer takes Non-Firm Contract Demand transmission service while continuing to serve all or a portion of a Co-Located Load on whose behalf an Eligible Customer takes Firm Contract Demand transmission service?

220.
PJM must submit its initial brief in Docket No. EL25-49-000 on or before February 16, 2026. The deadline to file responses to PJM's initial brief will be March 18, 2026, and the deadline to file replies to those responses will be April 17, 2026.

v. Behind the Meter Generation (BTMG)
221.
We next turn to the Tariff's BTMG rules.453  Based on our finding above that PJM's BTMG rules are no longer just and reasonable, we direct PJM to revise the Tariff to revise the retail BTMG rules. However, we acknowledge that not all loads using BTMG are large loads that create the reliability and resource adequacy risks described above. We therefore direct PJM, within 60 days of the date of issuance of this order, to propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG. Such a threshold should reduce the reliability and resource adequacy risks discussed above that large loads may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion. We acknowledge that such a materiality threshold will not eliminate the risk identified in this order, but we find that it will ensure that the risk is limited. Parties will have an opportunity to comment on PJM's proposed threshold before we establish this replacement rate. Although we make no finding in this order on a threshold that would be just and reasonable, we note as points of reference that PJM requires any generator larger than 10 MW to be individually metered454  and that the Commission's definition of a small generator is 20 MW.455

453  We clarify that, consistent with the definition in 159,provided above, supra P 164, BTMG is not Co-Located Load.
454  PJM Manual 14G: Generation Interconnection Requests, Rev. 8 (eff. July 26, 2023), § 1.6.2.
455  Order No. 2006, 111 FERC ¶ 61,220 at P 1. 117 of 515

PDF page 119

Document Accessigig'SA 4q-2-%q418-3Q9Curnent:Flita rPaqg9:11/§.8/2p2ale Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 108 -
222.
We clarify we do not direct PJM to change its rules for non-retail BTMG.456 Because non-retail BTMG is already capped, the record does not demonstrate a need for further changes at this time.457  We also recognize concerns raised in the record about the potential impacts of the Commission changing PJM's BTMG rules for existing BTMG customers.458  We thus make several findings and directives about the replacement rate below that are designed to minimize the impact of this transition on existing BTMG customers.

223.
First, we find that it is appropriate to establish a transition period for Network Customers currently using PJM's existing BTMG rules. We thus direct PJM, within 60 days of the date of issuance of this order, to include in its compliance filing Tariff revisions to allow Network Customers already using the BTMG rules to continue to do so for a transition period of three years, which aligns with the timeline to procure replacement capacity in PJM,459  from the date of issuance of this order. We find that this approach reasonably balances concerns about expediently addressing unjust and unreasonable rates with concerns from parties that have relied on the existing Tariff. 224.

Second, while the record indicates that parties desire the continued use of the existing Tariff BTMG rules,46°  we acknowledge the possibility that entities may also have contracted for the specific purpose of effectuating a BTMG arrangement. To the extent an entity is a party to an existing contract for such a purpose, we find that it is

456  PJM defines Non-Retail BTMG as BTMG that is "used by municipal electric systems, electric cooperatives, or electric distribution companies to serve load." PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions — L-M-N (51.0.1) (defining Non-Retail BTMG).
457  Indicated. Transmission Owners March 24 Response at 28 n.6 (". . . [T]he total amount of Non-Retail BTMG in the PJM Region is capped in any specific year and sets a maximum ceiling of 3,000 MW . . . ."); PJM, Intra-PJM Tariffs, OATT, § III.34.3 Netting of Non-Retail Behind the Meter Generation (1.0.0).
458  See, e.g., AMP April 23 Reply Comments at 10-11; PSE&G May 23 Answer at 7.
459  See PJM, Intra-PJM Tariffs, OATT, attach. DD.5, § 5.4(a) Reliability Pricing Model Auctions (10.0.0) ("The Base Residual Auction shall be conducted in the month of May that is three years prior to the start of such Delivery Year."). 460 See, e.g., PSE&G May 23 Answer at 2 ("Second, rules adopted by the Commission should not adversely impact existing customers in PJM who have BTMG and who have long relied upon the netting provisions under the PJM Tariff for purposes of paying wholesale grid services . ."). 118 of 515

PDF page 120

Document AccessigRsp; -2q-Aei41.8-3PKumentAil d rfa'qv: j121;218/2 pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 109 -
appropriate to grandfather such entity so that it may continue using BTMG for the current term remaining under the existing contract.' We thus direct PJM, within 60 days of the date of issuance of this order, to include in its compliance filing Tariff revisions to grandfather entities with existing contracts for the specific purpose of effectuating a BTMG arrangement for the current term remaining under the existing contract. c. Necessary Study Process462  for Existing Interconnection

Customers
225.
Based on our finding above that the PJM Tariff is unjust and unreasonable because it lacks sufficient clarity and consistency with respect to the rules for Co-Location Arrangements, we direct PJM to revise its Tariff to provide sufficient clarity regarding the responsibilities of existing Interconnection Customers seeking to serve Co-Located Load using their generating facilities.

226.
First, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to revise the Tariff to clarify that an existing Interconnection Customer seeking to modify its ISA or GIA to allow its generating facility to serve Co-Located Load, including to reflect any reduction in its CIRs, must follow the necessary study process to effectuate such Co-Location Arrangement. Vistra argues that the Commission should require transmission owners to cooperate in the necessary study process,463  and Indicated Transmission Owners respond that the Commission cannot require transmission owners to participate in a study process as a prerequisite to interconnecting load.464  Vistra's request is unnecessary. As part of the replacement rate in this order, we establish a just and reasonable process to accommodate Co-Location Arrangements, including by requiring the designation of an Eligible Customer to take transmission service on behalf of a Co-Located Load, and thereby reduce concerns raised in the Show Cause Order about how transmission owners approach Interconnection 461 Cf. ISO New England Inc., 121 FERC ¶ 61,097 (2007) (accepting subject to condition proposal including an option for certain customers with existing agreements for grandfathered treatment); ISO New England Inc., 124 FERC ¶ 61,297 (2008) (approving settlement agreement to implement proposal including grandfathering option).

462  Necessary studies "are essentially generator interconnection modification studies." PJM March 24 Response at 7. This process is used for changes "that typically have relatively small MW impacts on [the generator's] ability to deliver less power to the grid than the configuration reflected in an existing service agreement." PJM March 24 Response at 47.
463  Vistra April 23 Reply Comments at 23.
464  Indicated Transmission Owners June 3 Answer at 23. 119 of 515

PDF page 121

Document AccessigSP::
221$_sQpcumentFlild rEqp: ilA.8/2pge Filed: 10/16/2026
Docket No:EL25-49-000, et al.
- 110 -
Customers' requests to use their generating facilities to serve Co-Located Load.465  We also clarify that the above-directed requirement is on the Interconnection Customer with the interconnected generating facility that is seeking to modify its ISA or GIA to use that generating facility to serve Co-Located Load.

227.
Second, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to add to the Tariff a description of the scope of the analysis that it will perform as part of the necessary study process when an Interconnection Customer seeks to use its existing generating facility to serve Co-Located Load, consistent with PJM's discussion of how it conducts necessary studies associated with Interconnection Customers seeking to amend their ISAs or GIAs to use existing generating facilities to serve Co-Located Load, including to reflect any reduction in CIRs.466  This should provide additional clarity and transparency regarding the steps that PJM and Interconnection Customers are taking to maintain transmission system reliability before an existing generating facility can serve Co-Located Load. In response to Antora's concerns,467  we require PJM to describe the information that the Interconnection Customer must provide about the Co-Located Load for purposes of the necessary study. In response to RMI,468  we clarify that PJM's necessary study process, as reflected in the record, assesses any special protection scheme that is a part of a Co-Location Arrangement.469  We disagree with parties such as PIOs who claim that the necessary study process is inappropriate for generation interconnection modification to serve Co-Located Load. PIOs, for example, claim this process is "a poor fit,"47°  but they do not critique PJM's detailed explanation in its Show Cause Response of the scope of its study. We also believe that the Tariff revisions required as part of this compliance filing address some of the transparency concerns that parties have raised about the use of the

465  Show Cause Order, 190 FERC ¶ 61,115 at P 75 ("As such, the record of proceedings before the Commission appear to suggest that Transmission Owners are taking different approaches to performing the steps necessary to accommodate a co-location arrangement and in the transmission service that they are requiring entities to take."). 466  See PJM March 24 Response at 49, 51-53.
467  Antora April 23 Reply Comments at 8.
468 RMI April 23 Reply Comments at 4-5.
469  PJM March 24 Response at 49. 470  PIOs April 23 Response at 9. 120 of 515

PDF page 122

Document Acc„sigiV;
2k2..,
1 8 -ASTUrnent:Filld DFAV: j122/118/2pAte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 111 -
necessary study process, including questions about the scope of the analysis471  and how the necessary study process aligns with other studies.472  To the extent that PJM seeks to enhance the necessary study process, including as it gains experience evaluating requests from Interconnection Customers to modify their interconnection to serve Co-Located Load, PJM may submit such enhancements in an FPA section 205 filing.

228.
Third, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to revise the Tariff to indicate that the Interconnection Customer will be responsible for the costs of any modifications or Network Upgrades that are needed as a result of PJM's study of the change to the ISA or GIA to allow the existing generating facility to serve Co-Located Load, including to reflect any reduction in CIRs, inclusive of all necessary Network Upgrades. This will clarify that costs associated with such Co-Location Arrangements will not be unfairly shifted to other transmission customers. PJM states that it requires Interconnection Customers to complete such upgrades before using their generating facilities to serve Co-Located Load in practice, but this requirement does not appear to be in the Tariff.473  Therefore, as part of this compliance directive, we direct PJM to revise its Tariff to clarify that an existing generator may not commence service to a Co-Located Load until all required Network Upgrades, special protection schemes, and metering are in service.

229.
By directing PJM to revise its Tariff as discussed above, the Tariff will have sufficient clarity and consistency to facilitate Co-Location Arrangements in a just and reasonable and not unduly discriminatory or preferential manner. We note that we are directing a longer compliance timeline for PJM to submit these Tariff revisions related to Interconnection Customers seeking to serve Co-Located Load using existing generating facilities, compared to the compliance timeline described below related to new generating facilities, in order to expeditiously provide Interconnection Customers clarity on the steps that will be needed to bring new generation online to serve Co-Located Loads. 230.

In accordance with the existing rules for removing Capacity Resource status,474  we also clarify that an existing generating facility may not begin serving Co-Located Load

471  OPSI April 23 Reply Comments at 3.
472  Glatz/Silverman April 23 Reply Comments at 7.
473  PJM March 24 Response at 50 ("Service to the co-located load pursuant to the co-located load configuration may not commence until the necessary PJM interconnection service agreement(s) has been fully executed by the parties, filed with and accepted by the Commission, and all required system reinforcements, system protection facilities, and metering are in place.") (emphasis added).
474  See PJM, Intra-PJM Tariffs, OATT, attach. DD.6, § 6.6 Offer Requirement for 121 of 515

PDF page 123

Document Accessig:P,,P; qq-A.18-3P9cument:Flild rpaN9: 31248/2p2ale Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 112 -
that is not Network Load until it has delisted its CIRs for the portion of the generating facility to be designated to serve any Co-Located Load that is not receiving NITS. In order for an existing generator to de-list its CIRs to serve Co-Located Load, the Interconnection Customer must revise its ISA or GIA and bear the cost of all required system upgrades, as noted above.

d. New Generating Facilities Serving Co-Located Load
231.
Next, we discuss several clarifications that we require PJM to make in its Tariff with respect to Interconnection Customers seeking to use new generating facilities to serve Co-Located Load. Such revisions are necessary to clarify the steps such Interconnection Customers must take to effectuate Co-Location Arrangements in a manner that is just and reasonable and not unduly discriminatory or preferential. 232.

First, with respect to Interconnection Customers seeking to use new generating facilities to serve Co-Located Load, we direct PJM to submit, within 30 days of the date of issuance of this order, a compliance filing to revise section 404.A.2.a.v of its Tariff to clarify that PJM shall consider requests for interconnection service below the full generating capability of the generating facility, so that an Interconnection Customer may request interconnection service at a level below its maximum facility output to serve Co-Located Load. We direct PJM to revise any other Tariff provisions consistent with this directive.475  Consistent with PJM's existing Tariff process, an Interconnection Customer seeking to use its generating facility to serve Co-Located Load will be studied at the level of interconnection service requested for the purposes of determining Interconnection Facilities, Network Upgrades, and associated costs, but may be subject to other studies at the full generating capability of the generating facility to ensure the safety and reliability of the transmission system, with the study costs borne by the Interconnection Customer.476  This revision will clarify that an Interconnection Customer seeking to use a new generating facility to serve a Co-Located Load may request only the minimum level of interconnection service it deems necessary to effectuate its Co-Location Arrangement.

233.
Second, we direct PJM to submit, within 30 days of the date of issuance of this order, a compliance filing to revise its Tariff to clarify that Interconnection Customers seeking to use new generating facilities to serve Co-Located Load may use existing procedures to accelerate a new service request if they satisfy the criteria of PJM's Tariff, Capacity Resources (3.0.0); PJM March 24 Response at 58.

475  See Order No. 845, 163 FERC ¶ 61,043 at P 367.
476  PJM, Intra-PJM Tariffs, OATT, § VIII.C.404.A.2.a.v Introduction (1.0.0). 122 of 515

PDF page 124

Document Access1cP.SA: 2A-A41.8-3Pficument:Flil d rjjaN9: j1248/2p_aje Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 113 -
i.e., the request has no cost allocation for Network Upgrades and does not require further studies.'

234.
Third, we direct PJM to submit, within 30 days of the issuance of this order, a compliance filing to revise the Tariff to clarify that an Interconnection Customer seeking to use a new generating facility to serve Co-Located Load may request provisional interconnection service. As the Commission explained in Order No. 845, Interconnection Customers may seek provisional interconnection service when available studies or additional studies as necessary indicate that there is a level of interconnection service that can occur without any additional Interconnection Facilities and/or Network Upgrades, and the Interconnection Customer wishes to make use of that level of interconnection service while the facilities required for its full interconnection request are completed.478 Consistent with PJM's existing Tariff process, whether PJM grants a request for provisional interconnection service is at PJM's discretion based upon its evaluation and the results of available studies.479  This revision will clarify that an Interconnection Customer that requests provisional interconnection service for a new generating facility serving Co-Located Load can enter commercial operation and begin serving the Co-Located Load on an expedited basis, provided such provisional interconnection service is available. We also note that an Interconnection Customer may seek provisional service in combination with a request to interconnect at a level below nameplate capacity. 235.

Fourth, we direct PJM to submit, within 30 days of the date of issuance of this order, a compliance filing to revise section 414 of its Tariff to clarify that an Interconnection Customer seeking to use a new generating facility to serve Co-Located Load at an existing point of interconnection may request Surplus Interconnection Service, if the existing Interconnection Customer at that point of interconnection has made Surplus Interconnection Service available. Consistent with PJM's Tariff, Surplus Interconnection Service is granted if PJM concludes in its Surplus Interconnection Study that no new Network Upgrades are required to accommodate the new generating facility's output at the designated point of interconnection.480  This revision will clarify 477  PJM, Intra-PJM Tariffs, 406, OATT Part VIII.C 406 Decision Point I (1.1.0), § 406.A.2 ("Only New Service Requests that have no cost allocation for Network Upgrades and do not require further studies are eligible for acceleration."); PJM, Intra-PJM Tariffs, 408, OATT Part VIII.C 408 Decision Point II (2.1.0), § 408.A.2.d (stating same).

478  Order No. 845, 163 FERC ¶ 61,043 at P 441.
479  PJM, Intra-PJM Tariffs, ATTACHMENT O.A2.1.4A, OATT ATTACHMENT O.A2.1.4A Other Interconnection Options (2.1.0), § 1.4A.2.
480 Intra-PJM Tariffs, 414, OATT Part VIII.E 414 Surplus Interconnection 123 of 515

PDF page 125

Document Accessigitt; 4-qr2-18-3PPcument:Flitd rFa'qg9:i12_A8/2p-24e Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 114 -
that an Interconnection Customer seeking to use a new generating facility to serve Co-Located Load has the same opportunity to use Surplus Interconnection Service that is available to other new Interconnection Customers.

236.
Lastly, we note that PJM requested guidance on its proposed options, including option 6.481  Noting that we direct PJM to clarify its Tariff with respect to Interconnection Customers seeking to use a new generating facility to serve Co-Located Load, PJM and several commenters state that additional Tariff constructs that accelerate interconnection studies for new generation associated with new Co-Located Loads (PJM proposed option 6) may be just and reasonable.482  We believe that such constructs may help address concerns raised in this proceeding that increasing amounts of new Co-Located Load seeking to be served by an Eligible Customer faster than equivalent generation can come online may create resource adequacy problems.483  As PJM notes,484  additional load on the system requires the addition of generators to serve that load reliably, and a process with accelerated interconnection studies for certain generators with Co-Located Load could timely match new load with needed generation.

e. Informational Report
237.
We also are encouraged that, in August 2025, the PJM Board of Managers (PJM Board) initiated the CIFP stakeholder process to address matters that relate to but that are broader than those involving Co-Location Arrangements, and specifically, "to address the development of reliability-focused solutions to ensure large load additions can continue Service (1.0.0), § 414.B.2.

481  See PJM March 24 Response at 5, 33-34, 53. PJM's option 6 refers to Co-located load that elects to be Network Load and bring its own generation.

482 PJM suggests that one possibility could be to enhance existing provisional interconnection service to accelerate in a non-discriminatory manner the ability of new generation to achieve commercial operation. Id at 17; see also Bloom April 23 Reply Comments at 2 (arguing that an integrated interconnection approach such as that outlined in the Brattle Report attached to Bloom's comments, which "shares some traits with the approach PJM calls New Option 6," could significantly accelerate the interconnection timeline).
483  See, e.g., PJM March 24 Response at 16-17; Market Monitor April 23 Reply Comments at 11; BrightNight April 23 Reply Comments at 9; Ohio FEA April 23 Reply Comments at 4-5; AEU April 23 Reply Comments at 14.
484  PJM March 24 Response at 62. 124 of 515

PDF page 126

Document Ac„„igPSA 2A-A.418-31?Kurnent:FlAd rFaINP:i12..A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 115 -
to be integrated rapidly and reliably, without causing resource inadequacy."485  PJM and stakeholders considered a number of potential reforms designed to accommodate large load additions in an efficient and reliable manner. In PJM's contemplated expedited interconnection process, for example, generation projects that have a contractual commitment to a new large load, in addition to standalone generation that submits a higher readiness deposit to PJM, would be able to access an expedited interconnection pathway, so long as they seek to be Capacity Resources, meet a substantial size threshold, pay a large, non-refundable study deposit, are supported by a state commitment to expedite permitting, and demonstrate three full years of 100% site control, among other criteria. Other reforms considered, and that we highlight here, included, but were not limited to, modifications to PJM's reliability backstop mechanism to expedite PJM's ability to procure generation capacity on a multi-year basis during instances of resource adequacy shortfalls, development of enhanced load forecasting criteria and processes, and rules to enable the more efficient utilization of the transmission system by increasing demand flexibility.

238. Accordingly, we direct PJM to submit in Docket No. EL25-49-000, within 30 days of the date of issuance of this order, a detailed informational report486  on the status of the proposals considered in the CIFP stakeholder process, including—but not limited to—the status of the expedited interconnection process to enable shovel-ready generation projects to serve PJM more quickly, modifications to PJM's reliability backstop mechanism to improve PJM's ability to respond to acute resource adequacy shortfalls, and the development of enhanced load forecasting487  and demand flexibility measures to assist PJM in determining the amount of new capacity that is needed to maintain system reliability. The informational report must include a detailed schedule of key milestones, such as stakeholder or PJM Board votes, that includes the estimated date on which PJM expects to file any such proposals with the Commission. Additionally, as part of this informational report, we direct PJM to identify any problem statements, issue charges, or other ongoing stakeholder processes that aim to increase the pace of adding generating capacity in the PJM region. PJM must provide as detailed a schedule as is feasible on the

485 PJM, Critical Issue Fast Path — Large Load Additions, https://www.pjm.com/committees-and-groups/cifp-lla (last visited Dec. 5, 2025).
486 Upon receipt, the Commission will not act on or notice this informational filing.
487  We note that, on October 20, 2025, PJM submitted a response to then-Chairman Rosner's letter on load forecasting. See supra P 154. PJM should expand on its response to then-Chairman Rosner in the informational report that we direct here by explaining, in detail, any changes or updates to its load forecasting processes that it is considering. 125 of 515

PDF page 127

Document AccessigPSIV;
Appument:Fl il d rEN:1.12A8/2pAte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 116 -
timing of such initiatives, including updates on the stakeholder process and approximate dates of any anticipated filings with the Commission. The informational report also must identify specifically which of these initiatives would support the addition, on an expedited basis, of new generation that is sufficient to serve large loads, like data centers, while meeting PJM's near-term system resource adequacy needs

239.
Finally, given PJM's currently compressed auction schedule, PJM should explain the proposed effective date of any proposal that it intends to file so that the Commission can understand whether any of those proposals could be in place by the 2028/2029 Base Residual Auction (BRA) and subsequent BRAs to attract sufficient new generation to maintain regional resource adequacy.

5. PJM Capacity Market, Reliability, and Resource Adequacy
240.
There is also insufficient evidence in the record to find that the existing Tariff provisions governing capacity market rules, reliability, and resource adequacy are unjust and unreasonable or unduly discriminatory or preferential. In the Show Cause Order, the Commission stated that the Tariff may be unjust and unreasonable and unduly discriminatory or preferential insofar as it lacks rules necessary to provide PJM with sufficient information to perform appropriate analysis to ensure reliable system operations given the characteristics of Co-Location Arrangements.488  Commenters responded with concerns, including that Co-Located Load served entirely behind-the-meter will not be accounted for in PJM's planning processes and that Co-Located Load could unexpectedly appear online after being previously invisible to PJM 489

241.
However, as directed herein, Interconnection Customers choosing to serve Co-Located Load using their generating facilities will be required to identify an Eligible Customer who will take transmission service on behalf of that Co-Located Load. We find that this requirement should address concerns that Co-Located Load would not be visible to PJM or its transmission owners. We further note that Co-Located Load that elects to meet this requirement by taking NITS or the new Firm Contract Demand transmission service through an Eligible Customer will be included in transmission planning and the capacity market.49°  In addition, the Eligible Customer that elects to instead take the Non-Firm Contract Demand transmission service on behalf of

488  See Show Cause Order, 190 FERC ¶ 61,115 at PP 83-86. 489  Indicated Transmission Owners April 23 Reply Comments at 13; PPL April 23 Reply Comments at 10-11; Pennsylvania Commission April 22 Reply Comments at 6. 490 See PJM March 24 Response at 39 n.64; Indicated Transmission Owners March 24 Response, attach. A at 17. 126 of 515

PDF page 128

Document AccessigRSAA: 2.2q-2.1
8- 3?pcument:Flil d rFacw: 31A8/2We Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 117 -
Co-Located Load agrees that it will be curtailed during emergency operations upon PJM's direction, and thus will not be included in transmission planning or in the capacity market.

242.
Because PJM states that Co-Located Loads that elect to be Network Load may participate as a demand response resource under PJM's existing Tariff,4" we find that there is not sufficient evidence to conclude that the existing Tariff is not just and reasonable as it relates to the existing demand response rules. We recognize that PJM acknowledges that there could be an additional review of the PJM Demand Response rules in its stakeholder process,492  which may be further addressed through a future FPA section 205 filing. We also note that the Firm Contract Demand transmission service and Non-Firm Contract Demand transmission service we direct in this order will create opportunities for Co-Located Loads that do not elect to be Network Load to benefit from any ability they have to limit their consumption.

243.
Regarding broader resource adequacy and reliability concerns associated with maintaining sufficient generation to serve Co-Located Load, we reiterate that load growth generally involves resource adequacy and reliability considerations, regardless of whether the new load is Co-Located Load.493  Several commenters, including PJM, acknowledge this fact.494  While the Commission found in the Show Cause Order that the speed at which Co-Located Load can be added to the transmission system may pose particular resource adequacy challenges, especially if Co-Location Arrangements are not adequately and transparently reflected in existing resource adequacy planning mechanisms,495  there is not sufficient evidence to conclude that additional Tariff changes regarding Interconnection Customers electing to use their generating facilities to serve Co-Located Load are needed with respect to capacity market rules, reliability, and resource adequacy to ensure that the PJM Tariff remains just and reasonable. We encourage PJM to continue monitoring capacity market, resource adequacy, and reliability issues as they relate to Co-Location Arrangements to evaluate whether additional Tariff changes may be appropriate.

491  PJM March 24 Response at 19-20.
492  Id. at 20.
493  Show Cause Order 190 FERC ¶ 61,115 at P 85.
494  See, e.g., PJM March 24 Response at 57; Constellation April 23 Reply Comments at 11, 60-61 (citing Patterson Aff. ¶ 15).
495  Show Cause Order 190 FERC ¶ 61,115 at P 85. 127 of 515

PDF page 129

Document Accessig.Pir; 22q-Aqq18  _
m e n t:F1 d ipaq99:i1A8/2pAte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 118 -
6. Motions
244.
In response to the Motion to Stay, we reject the Joint Parties' request to stay the proceeding to allow them to develop through settlement proceedings a new replacement rate that establishes the services an Eligible Customer takes on behalf of Co-Located Load and allocates any costs to such Eligible Customer. Because we have established paper hearing procedures to determine the just and reasonable rates, terms, and conditions for new transmission services, and directed PJM to make related Tariff revisions on compliance, we deny the Motion to Stay.

245.
We note that Vistra moved for clarification in this proceeding regarding the meaning of Susquehanna by April 16, 2025 so that parties could take the Commission's clarification of that order into account when preparing the comments due in this proceeding on April 23, 2025. The Commission issued the Susquehanna Rehearing Order on April 10, 2025 in Docket No. ER24-2172-002, including ruling on Vistra's motion in that proceeding seeking clarification of Susquehanna.496  We thus dismiss as unnecessary Vistra's pending motion in this proceeding.

246.
We partially grant Constellation's Motion insofar as we adopt the finding in the Show Cause Order that the PJM Tariff is unjust and unreasonable and establish a replacement rate.

247.
We disagree with PJM that acting in this proceeding violates applicable case law. PJM selectively quotes Cities of Anaheim for the proposition that adjudication should not supplant a pending rulemaking proceeding, but PJM points to no actual court decision that holds that an agency has violated the Administrative Procedure Act on that basis. We also disagree with parties who argue that acting in this proceeding would prejudge the issues raised in the ANOPR proceeding or otherwise be improper. The Commission has discretion as to whether to proceed via adjudication or rulemaking,497  and we find that it is an appropriate exercise of discretion to act on the PJM co-location proceeding before taking any action in the ANOPR proceeding.

7. Constellation Complaint
248. In the Show Cause Order, the Commission consolidated the new show cause proceeding in Docket No. EL25-49-000 with the complaint filed by Constellation against the PJM Tariff in Docket No. EL25-20-000. As summarized in detail in the Show Cause

496  Susquehanna, 191 FERC ¶ 61,025.
497  /V.L.R.B. v. Bell Aerospace Co. Div. of Textron, Inc., 416 U.S. 267, 294 (1974). 128 of 515

PDF page 130

Document AccessigPSA:  2q7Aq18-3PPcument:FlAd ij1@g: 312.748/2pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 119 -
Order,498  Constellation argued that the Tariff is unjust and unreasonable and unduly discriminatory because it lacks rules for interconnected generators to follow when seeking to serve to end-use load co-located with generation behind the meter in a configuration with system protection facilities to prevent the load from receiving electricity from the transmission system.499  Constellation stated that, in establishing the replacement rate, the Commission should conclude that provisions of the PJM Guidance Document not on file with the Commission (particularly sections 2, 3, 5, and 7) must be incorporated into the Tariff under the rule of reason, which will provide certainty to generators and transmission owners by ensuring that the PJM Guidance Document is applied to all interconnected generators seeking to serve Co-Located Load.500 249. We grant in part and deny in part the complaint. We grant the complaint insofar as we find, as discussed above, that PJM's Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load, including generators serving Co-Located Load in a configuration with special protection schemes to prevent the Co-Located Load from taking energy from the transmission system. We deny the complaint insofar as we direct PJM, as discussed above, to revise the Tariff to establish just and reasonable replacement rates, terms, and conditions for Interconnection Customers serving Co-Located Load. The PJM Guidance Document has been rescinded by PJM,501  and it lacked all terms that we find above are just and reasonable for Interconnection Customers serving Co-Located Load. The Commission orders:

(A)
PJM is hereby directed to submit, within 30 days of the date of issuance of this order, revisions to its Tariff as described in Part IV.B.4.d.

(B)
PJM is hereby directed to submit, within 60 days of the date of issuance of this order, revisions to its Tariff as described in Part IV.B.4.a and Part IV.B.4.c. (C)

PJM is hereby directed to submit, within 60 days of the date of issuance of this order, revisions to modify its Tariff to provide that the Eligible Customer taking transmission service on behalf of a Co-Located Load ensure that the Co-Located Load take one of three transmission services: (1) NITS, as modified in the body of this order,

498  See Show Cause Order, 190 FERC ¶ 61,115 at P 50.
499  Complaint at 1. 50°  Id. at 20. 5" PJM March 24 Response at 33. 129 of 515

PDF page 131

Document AccessigPSIPr 2A-Aqq1,_3Q9cument:Flil d  jpaqg9: j12.11:18/2pge Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 120 -
(2) a new Firm Contract Demand transmission service, or (3) a new Non-Firm Contract Demand transmission service, as discussed in Part IV.B.4.b.

(D)
Paper hearing procedures are established to evaluate the rates, terms, and conditions of the interim, non-firm transmission service, Firm Contract Demand transmission service, and Non-Firm Contract Demand transmission service. (E)

PJM is hereby directed to submit its initial brief in Docket
No. EL25-49-000 on or before February 16, 2026. The deadline to file responses to PJM's initial brief will be March 18, 2026, and the deadline to file replies to those responses will be April 17, 2026.

(F)
PJM is hereby directed to submit, within 60 days of the date of issuance of this order, revisions to the Tariff to: (1) revise the BTMG rules, as discussed in the body of this order; (2) propose a new MW threshold for the amount of load that Network Customers may net by using BTMG, as discussed in the body of this order; and

(3) establish a transition period for Network Customers already using the BTMG rules, as discussed in the body of this order.

(G)
PJM is directed to submit an informational report within 30 days of the date of issuance of this order, as discussed in the body of this order.

(H)
Joint Parties' motion to stay is hereby denied, as discussed in the body of this order.

(I)
Vistra's motion for clarification is hereby dismissed, as discussed in the body of this order.

(J)
Constellation's motion for expedited action is partially granted, as discussed in the body of this order.

130 of 515

PDF page 132

Docum„t A„„sigOP;
iq'Aq418-3PPCument:Flild rFa99:i123/118/2pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 121 -
(K)
The Constellation complaint in Docket No. EL25-20-000 is hereby granted in part and denied in part, as discussed in the body of this order. By the Commission. Commissioner Rosner is concurring with a separate statement attached.

Commissioner Chang is concurring with a separate statement attached.

(SEAL)
Debbie-Anne A. Reese,
Secretary.
131 of 515

PDF page 133

Document AccessigisA: 22q-g418-3gpcument:Fl it d rfaN9: i123A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 122 -
Appendix
Intervenors
Advanced Energy United (AEU)+
AES Corporation*
Alliant Energy Corporate Services, Inc.
Allegheny Electric Cooperative, Inc.+
Alpha Generation, LLC*
Ameren Companies502
American Clean Power Association
American Council on Renewable Energy (ACORE)*+
American Electric Power Service Corporation (AEP)5°3
American Municipal Power, Inc. (AMP)+&
American Petroleum Institute*
Americans for a Clean Energy Grid (ACEG)+
AMP Transmission, LLC*
Antora Energy LLC (Antora)*+
Appalachian Voices
Arevon Energy, Inc.
Arkansas Public Service Commission*
Avangrid, Inc.
Bloom Energy Corporation (Bloom)+
Boston Energy Trading and Marketing LLC
BrightNight Power Marketing, LLC (BrightNight)+
Brookfield Renewable Trading and Marketing LP
Buckeye Power, Inc. (Buckeye)+&
Business Council for Sustainable Energy (BCSE)+A
California Department of Water Resources State Water Project
California Public Utilities Commission
5°2  Ameren Services Company, a wholly-owned subsidiary of Ameren Corporation, moves to intervene on behalf of its affiliated public utility operating companies, Ameren Illinois Company, Ameren Transmission Company of Illinois and Union Electric Company d/b/a Ameren Missouri.

503 AEP moves to intervene on behalf of its affiliates Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian Transmission Company, Inc., AEP Indiana Michigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and AEP West Virginia Transmission Company, Inc.

132 of 515

PDF page 134

Document Accessig1PA: 2AAq18-3rfVCUMent:F11td EPAP:112348/2P2ale Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 123 -
Calpine Corporation (Calpine)
Campbell Energy Advisors, LLC
CEPM Companies504
Center for Biological Diversity (Center)#
Chevron U.S.A. Inc. (Chevron)+
Clean Air Task Force (CATF)#
Clean Energy Buyers Association
Clearway Energy Group LLC*
Consolidated Edison Company of New York, Inc.
Constellation Energy Generation, LLC (Constellation)& Consumers Energy Company

Consumers' Research+
Cooperative Energy
Cordelio Services LLC*
Crete Energy Venture, LLC
Data Center Coalition+
Delaware Municipal Electric Corporation, Inc.
Delaware Public Service Commission (Delaware Commission)*+ Dominion Energy Services, Inc.

DTE Electric Company
Earthjustice
East Kentucky Power Cooperative, Inc.
East Texas Electric Cooperative, Inc.
EDF Renewables, Inc. (EDFR)*+
Edison Electric Institute (EEI)+
Electric Power Supply Association (EPSA)5°5+
Electricity Consumers Resource Council (ELCON)+ Enchanted Rock, LLC (Enchanted Rock)+

Enerwise Global Technologies, LLC (CPower)
ENGIE North America Inc.* (ENGIE)+
Environmental Defense Fund*
Eolian, LP*
Exelon Corporation
Exus Renewables North America (Exus)#
504 Hamilton Liberty LLC, Hamilton Patriot LLC, Lakewood Cogeneration, LP, Essential Power OPP, LLC, Essential Power Rock Springs, LLC, and Cogentrix Energy Power Management, LLC (Cogentrix) comprise CEPM Companies. 5°5  EPSA submitted joint comments with P3 (EPSA/P3). 133 of 515

PDF page 135

Document Accessig?S#;-  a42-Y1418-3Q9cUrnent:Fhtd IPAg9:1123A8/2PAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 124 -
FirstEnergy Transmission Companies5°6
Google Energy LLC
Google LLC
Hamilton Liberty
Idaho Power Company
Illinois Attorney General's Office
Illinois Citizens Utility Board
Illinois Municipal Electric Agency
Indiana Office of Utility Consumer Counselor*
Indicated Transmission Owners507+&
5°6  First Energy Service Company moves to intervene as agent for its affiliates American Transmission Systems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission LLC, Keystone Appalachian Transmission Company, The Potomac Edison Company, Monongahela Power Company and Trans-Allegheny Interstate Line Company.

5°7  Indicated Transmission Owners include: AEP on behalf of Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian Transmission Company, Inc., AEP Indiana Michigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and AEP West Virginia Transmission Company, Inc.; AMP Transmission, LLC; City of Cleveland, Department of Public Utilities, Division of Cleveland Public Power; City of Hamilton, OH; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a Dominion Energy Virginia; Duke Energy Corporation on behalf of its affiliates Duke Energy Ohio, Inc., Duke Energy Kentucky, Inc., and Duke Energy Business Services LLC; Duquesne Light Company; East Kentucky Power Cooperative; Exelon Corporation, on behalf of Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company, Commonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company, and Potomac Electric Power Company; FirstEnergy Service Company, as agent for its affiliates American Transmission Systems, Incorporated; Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission LLC, Keystone Appalachian Transmission Company, The Potomac Edison Company, Monongahela Power Company and Trans-Allegheny Interstate Line Company; Old Dominion Electric Cooperative; PPL Electric Utilities Corporation; Rockland Electric Company; Southern Maryland Electric Cooperative, Inc.; UGI Utilities Inc; and Wabash Valley Power Association, Inc. Dominion Energy Services did not join in the June 3 Answer or the June 27 Answer. Duquesne Light Company did not join in the June 27 Answer.

134 of 515

PDF page 136

Document Accessig-PW -A"Ael.;18-3P9Purnent:Flild M99:13A8/pate Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 125 -
Industrial Energy Consumers of America (IECA)508+
Invenergy Renewables LLC and Invenergy Thermal LLC (Invenergy)509+ ITC Companies510

Joint Parties5"
Klondike Digital Infrastructure LLC
Large Public Power Council
Lee County Electric Cooperative, Inc.
Lincoln Generating Facility, LLC
LS Power Development, LLC (LS Power)
Mainspring Energy, Inc. (Mainspring)+
Maryland Office of People's Counsel (together with New Jersey Division of Rate Counsel, Joint Consumer Advocates)*+

Maryland Public Service Commission
Midwest Generation, LLC
Mississippi Public Service Commission
Monitoring Analytics, LLC, acting in its capacity as the Independent Market Monitor for PJM (Market Monitor)+

National Grid
National Grid Renewables Development, LLC
National Hydropower Association
National Rural Electric Cooperative Association
National Security Experts512+
Natural Resources Defense Council (NRDC)+
Nebraska Public Power District
New Jersey Division of Rate Counsel+
New York State Reliability Council, L.L.C.*
Nextera Energy Transmission MidAtlantic, Inc. (NEET)+
508 IECA filed joint comments with the PJM ICC.
509 Invenergy Renewables LLC and Invenergy Thermal LLC comprise Invenergy. 51°  International Transmission Company d/b/a ITC Transmission, Michigan Electric Transmission Company, LLC, ITC Midwest LLC and ITC Great Plains, LLC comprise ITC companies.

511  Joint Parties is composed of EPSA, P3, Calpine, Cogentrix, Constellation, and LS Power.

512  National Security Experts is composed of John B. Hashem, Robert G. F. Lee, Joseph L. Lengyel, Craig R. McKinley, Benny M. Paulino, Paul Stockton, Chuck Wald, and Darryl D. M. Wong.

135 of 515

PDF page 137

Document Accessigsp::
rpAg:3123/q8/2pAte Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 126 -
North American Electric Reliability Corporation (NERC)*+
Northeast Texas Electric Cooperative, Inc.
Northeastern Rural Electric Membership Corporation (NREMC)+&
Northern Virginia Electric Cooperative, Inc. (NOVEC)+&
NRG Business Marketing LLC
Office of the Ohio Consumers' Counsel
Ohio Federal Energy Advocate (Ohio FEA)+
One Power Company*
Orange & Rockland Utilities, Inc.
Organization of PJM States, Inc. (OPSI)513+"
Pacific Gas and Electric Company (PG&E)514+
Pennsylvania Public Utility Commission (Pennsylvania Commission)+^ PJM&

PJM Industrial Customer Coalition (ICC)+
PJM Power Providers Group (P3)
PPL Electric Utilities Corporation (PPL)+
PSE&G Companies (PSE&G)515+&
Public Citizen, Inc.
Public Interest Organizations (PIOs)516+
513  OPSI noted that the following of its members support its comments: Delaware Public Service Commission, Public Service Commission of the District of Columbia, Illinois Commerce Commission, Indiana Utility Regulatory Commission, Kentucky Public Service Commission, Maryland Public Service Commission, Michigan Public Service Commission, New Jersey Board of Public Utilities, Public Utilities Commission of Ohio, Pennsylvania Commission, Tennessee Public Utility Commission, Virginia State Corporation Commission and Public Service Commission of West Virginia. The North Carolina Utilities Commission did not join in these comments.

514  PG&E submitted joint comments with Southern California Edison (together, California Utilities).

515  Public Service Electric and Gas Company, PSE&G Power LLC and PSE&G Energy Resources & Trade LLC comprise the PSE&G Companies. Comments were filed by Public Service Electric and Gas Company.

516  PIOs is composed of Appalachian Voices, CATF, Earthjustice, EDF, PennFuture, and the Sierra Club. Of the PIOs, PennFuture did not move to intervene. 136 of 515

PDF page 138

Document Accessigsp,: 2A-A_418 _ 3pgcument:Fl il d  Mg9: i12.32 8/2Pte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 127 -
Public Systems"'
Repsol Energy North America Corporation
Rockland Electric Company
RMI# A
San Diego Gas & Electric Company
Shell Energy North America (US), L.P.
Sierra Club
Silver Run Electric, LLC+
Solar Energy Industries Association (SEIA)+
Southern California Edison Company+
Southern Maryland Electric Cooperative, Inc.*
Sustainable FERC Project
Suzanne Glatz and Abraham Silverman (Glatz and Silverman)+^
Talen Energy Corporation (Talen)+&
The Dayton Power and Light Company (AES Ohio)+
The Retail Energy Supply Association
UGI Utilities Inc.
Union of Concerned Scientists (UCS)+
United States Senators518n
Virginia State Corporation Commission (Virginia Commission)*
Vistra Corp. (Vistra)+&
Vote Solar
Wabash Valley Power Association, Inc.
West Virginia Public Service Commission*
* moved to intervene out-of-time
+ filed comments or reply comments
# filed comments out-of-time
^ filed comments without a notice of intervention or motion to intervene & filed an answer

517  Connecticut Municipal Electric Energy Cooperative, Massachusetts Municipal Wholesale Electric Company, and Vermont Public Power Supply Authority comprise Public Systems.

518  United States Senators include Senators Edward J. Markey, Chris Van Hollen, Elizabeth Warren, Peter Welch, Raphael Warnock, Richard Blumenthal, and Adam B. Schiff.

137 of 515

PDF page 139

Document AccessigP
q-Alq18 _31?gcument:Fl-il d riDa g: 3-123/8,8/2p-Ae Filed: 10/16/2026 UNITED STATES OF AMERICA

FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
Docket Nos. EL25-49-000
Allegheny Electric Cooperative, Inc.
EL25-49-001
American Transmission Systems, Incorporated Atlantic City Electric Company

Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative

PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company

Trans-Allegheny Interstate Line Company Transource West Virginia, LLC

UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company

AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.

AEP West Virginia Transmission Company, Inc. Appalachian Power Company

Indiana Michigan Power Company
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Duquesne Light Company
138 of 515

PDF page 140

Document Accessig0PT;
"§.4-18-31;31K UMent:FlAd rPaN9:i123A8/2pge Filed: 10/16/2026
Docket No. EL25-49-000, et al.
2
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
AD24-11-000
Constellation Energy Generation, LLC
EL25-20-000
(Consolidated)
v. PJM Interconnection, L.L.C.
(Issued December 18, 2025)
ROSNER, Commissioner, concurring:
1. Today's order directs reforms that deliver a commonsense outcome: if a new large load wants to connect directly to a power plant and operate in a way that lowers grid costs, we should let it. If the current rules don't let this work in a way that's fair for everyone, we must change those rules to deliver the cost savings that consumers so badly need and ensure reliable electricity for all. Saying no to innovation is not a winning strategy—whether we're trying to win the AI race, bring back American manufacturing, or deliver the reliable and affordable energy on which families and small businesses depend.

2. While today's outcome is commonsense, like so many Commission policies, the order includes a lot of regulatory jargon, which is necessary for technical precision and legal durability. That being the case, I write separately to explain what we are doing and, importantly, why we are doing it.

3. Let's begin by explaining the problem that we are trying to solve. We are trying to meet surging demand while upholding two fundamental values that underpin the 139 of 515

PDF page 141

Document AccessigISA:4q-21-8-APPLIMerlt:Filld  LPaqg :  il-A.8/2Me Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 3
electric industry in our country: first, that all customers have a right to receive electric service on a timely basis, and second, that electric service should be reliable and affordable for all customers. Given the scale of new large loads putting demand on our grid today, it is clear that fostering both of these values requires intervention. Unfortunately, it has become persistently difficult and increasingly expensive to build new grid infrastructure in this country. Because of this, a business-as-usual approach to load growth—planning for generation and load separately—will not suffice to timely meet growing demand while also keeping prices reasonable.

4. Today's order helps break the logjam. It directs PJM to establish new pathways for co-location—directly connecting a large load with the power needed to serve it at the same site—and load flexibility that enable large co-located loads to reduce how much they lean on the grid, while ensuring that they pay their fair share. As a result, PJM can avoid constructing unnecessary transmission upgrades for large loads, reduce strain on the grid, and make power bills cheaper for everyone—including for families and small businesses. And co-located large loads and generators can get online faster and easier than would otherwise be the case. Grid operators like PJM should allow and encourage large loads and generators to pursue these time- and cost-saving co-location arrangements. Here's how we get there.

5. First, today's order directs PJM to create two new transmission services, which we call Firm and Non-Firm Contract Demand Transmission Service. These services allow a load that is co-located with a generator to contract and pay for service from the grid consistent with the load's actual net withdrawals, while ensuring that the load cannot take more service than the contracted amount.

6. For example, consider a 1,000 MW data center that co-locates with a new 900 MW generator. Under PJM's status quo rules, the data center would be required to take the full 1,000 MW of "front-of-meter" transmission service (see Figure 1), despite being directly connected to the co-located generator. Under today's order, the data center has two new options:

a. The data center may elect to purchase Firm Contract Demand Transmission Service if, for example, it plans to take just 100 MW of firm transmission service from the grid and get the remaining 900 MW of energy it needs from the co- located generator (see Figure 2). In turn, PJM will plan enough transmission and procure enough capacity to serve only that 100 MW.

b. The data center may instead elect to purchase Non-Firm Contract Demand Transmission Service if, for example, it only plans to pull energy from the grid temporarily while its co-located generator is undergoing scheduled maintenance (see Figure 3). When the data center chooses non-firm service, PJM will not plan any additional transmission or purchase any capacity to serve that load. 140 of 515

PDF page 142

Document AccesSiII@S
 2A-A61418-3gccument:FlAd ifiq99:ilAi8/2p2Ve Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 4
Under either new transmission service, the co-located load must uphold its side of the bargain by bearing the risk of being curtailed if its usage exceeds what it has contracted for in advance. Therefore, regardless of whether a customer takes the new firm service, the new non-firm service, or some combination of the two, PJM will plan less transmission and procure less generating capacity for the data center, which reduces costs for both the new co-located load and for all other PJM customers and creates the opportunity for both the new generator and the new load to get online more quickly.

7. Second, today's order directs PJM to revise its generator interconnection rules to clarify how both new and existing generators may co-locate with load, with a particular emphasis on accelerating new generation.

8. For new generators, the order directs PJM to clarify that a generator may request a level of service that is consistent with its actual injections to the grid, net of a co-located load. Consider the example above, but in reverse. If a new 1,000 MW generator co- locates with a new 900 MW data center, that generator will be allowed to "reserve" 900 MW to directly serve the data center, and will thus request to inject only 100 MW onto the PJM grid. As a result, new generators with co-located load will need fewer transmission upgrades to access the grid, allowing much-needed electricity to get online more quickly and affordably. Furthermore, the order directs PJM to file these rules for new generator interconnection within 30 days. In sum, these changes will make "bringing your own new generation" co-located with new load cheaper and faster, benefiting the generator, the large load it will serve, and—critically—all other PJM customers.

9. For existing generators, today's order directs PJM to clarify that a generator cannot remove its capacity from the grid to serve a co-located load until all transmission upgrades needed to maintain reliability are in service, with the costs of those upgrades allocated 100% to the existing generator. This means that generators comprising the keystone of today's grid cannot abandon existing customers unless and until those generators and their large load customers—not other ratepayers—construct the transmission upgrades and incur the costs necessary to maintain reliable service for everyone. And under any of the new transmission services, the large load will also pay its fair share for any benefits it continues to draw from the grid after the co-location arrangement is set up.

10. Third, today's order protects existing customers—including families and small businesses—by directing PJM to assign transmission costs to ensure that a co-located load, such as a data center, always pays its fair share. A co-located load that does not withdraw energy from the grid will pay for at least the essential grid services on which it still relies (i.e., regulation and black start services). Meanwhile, a co-located load that has the same right to withdraw energy from the grid as a conventional front-of-meter load will take and pay for the full cost of traditional network transmission service. And for all 141 of 515

PDF page 143

Document Acc„sigtr;
4qAq418-3gSc urrient:Fhld rf)Ag9:i1448/2p2ale Filed: 10/16/2026
Docket No. EL25-49-000, et al.
- 5
options in between, a co-located load will pay a fair rate that is commensurate with its actual usage of the grid, protecting other customers from unfair cost shifting and price increases. Unless a load and its generator are completely disconnected from the grid, they will get benefits from the grid—and today's order ensures that they will pay for those benefits.

11. Fourth, today's order directs PJM to establish a new interim service (see Figure
4) to provide a bridge while the infrastructure needed to serve a large load with traditional front-of-meter network transmission service is being built. This interim service leverages speed in the near-term and unlocks the benefits of a full grid connection in the long-term. It will allow co-located loads and generators seeking front-of-meter service to access the grid faster than they can today. In exchange for increased speed, these loads will bear the risk of being curtailed when the grid is constrained until the transmission upgrades needed to provide service are constructed. But that doesn't mean that the load will always have to shut down completely during peak periods. Rather, if the co-located load is paired with a new generator, and that generator is still waiting to begin its own front-of-meter service, the load can take service directly from the generator in the interim until both "graduate" to full, front-of-meter service. This pathway is important because traditional, front-of-meter network transmission service provides the broadest benefits to both load and generators—a network load can be served by any generator on the grid, and a network generator can sell its power to any customer on the grid.

12. Fifth, today's order encourages further progress on solutions beyond co-location to keep up with growing electricity demand by directing PJM to provide the Commission with a detailed report that describes its ongoing initiatives to reduce both technical and financial barriers to building new generation and efficiently connect large loads. Given PJM's announcement yesterday that its 2027/2028 Base Residual Auction was short of its reliability requirement, the solutions enabled by both today's order and PJM's ongoing initiatives to accelerate new generation are immensely important and urgent. The information PJM will file allows the Commission to monitor PJM's progress and ensure that any further Commission actions on large load issues in the PJM region skate to where the puck is going. To that end, Secretary Wright recently asked the Commission to consider a range of "potential reforms to ensure the timely and orderly interconnection of large loads to the transmission system."519  Although the Secretary's initiative is

519  U.S. Department of Energy, Secretary of Energy, Direction that the Commission Initiate Rulemaking Procedures and Proposal Regarding the Interconnection of Large Loads Pursuant to the Secretary's Authority Under Section 403 of the Department of Energy Organization Act (Oct. 23, 2025). 142 of 515

PDF page 144

Document AcceSsiGRSP 2A-2-%qq-1.8-31?Kument:Flil d ERN9:iv,..18/2pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

- 6
broader than both co-location and PJM, I am pleased that today's order makes major progress on the important matters that he referred to the Commission.

13. Finally, all of the Commission's actions in this proceeding respect the long- standing jurisdictional line between federal and state authority provided by Congress and affirmed by the Supreme Court. Co-located loads will continue to receive a bill for state- regulated retail service just like any other load. Moreover, states retain exclusive jurisdiction to allocate how the costs of FERC-jurisdictional transmission charges are divided between their retail ratepayers, including co-located loads. The difference today's order makes is that utilities and load-serving entities will now have access to new transmission service options that will help lower costs for everyone.

14. Today's order is just the next step on important work that the Commission cannot do alone. I encourage all parties to approach today's order, and the path forward that it directs, with an open mind. Durable consensus requires your collective expertise to implement a solution capable of meeting today's challenges, realizing the historic opportunity that load growth presents, and delivering the reliable and affordable energy on which we all depend. Our country deserves no less.

For these reasons, I vote to approve today's order.
David Rosner
Commissioner
143 of 515

PDF page 145

r
Generator
4
0 to 900 MW
As-available
PJM Grid
1000 MW
As-available
Figure 4: New Interim Network Integration Transmission Service 0 to 900 MW

• Load & Generator get non-firm
As-needed
service ASAP, and convert to
firm service (Fig. 1) when grid
upgrades are complete
tx: O00
t= 00
• Generator can serve load while
awaiting grid connection or
O00
Large Load
when grid is unavailable
Figure 3: New Non-Firm Contract Demand Transmission Service
• Load pays for non-firm
transmission service on an as-
reserved basis
• PJM has no obligation to serve
load if grid is unavailable
• All or portion of the generator
is devoted to co-located load
PJM Grid
a Z2)
 900 MW
Generator
•
0 to 1000 MW
As-available
O
L.=  O00  -=-1
O c:= 00
tz-.  O00
Large Load
Figure 1: "Front-of-Meter" Network Integration Transmission Service
• PJM plans all transmission and
generation to serve load
• Requires more transmission
infrastructure and can take
longer, but provides the
broadest benefits
900 MW
=I
O O00
O
00
O00
PJM Grid
1000 MW
Large Load
Generator
Figure 2: New Firm Contract Demand Transmission Service 900 MW

• Load pays for 100 MW of firm
transmission service
• PJM has no obligation to serve
O
O
O00
load above 100 MW
O
00
O00
• All or portion of the generator
Large Load
is devoted to co-located load
4-
I. PJM Grid
100 MW
•

Generator
Document AccessigiSg qq-2.1
8 _ 31eigcument:Fl i l d rpAp: 31441.8/2pAte Filed: 10/16/2026 Docket No. EL25-49-000, et al.

7
Figures
144 of 515

PDF page 146

Document A„essigPV; 2q7A.18-3PPPUMent:FlAd DI:AP:1124AB/ 2 -Ale Filed: 10/16/2026 UNITED STATES OF AMERICA

FEDERAL ENERGY REGULATORY COMMISSION
Before Commissioners:
PJM Interconnection, L.L.C.
Docket Nos. EL25-49-000
Allegheny Electric Cooperative, Inc.
EL25-49-001
American Transmission Systems, Incorporated Atlantic City Electric Company

Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative

PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company

Trans-Allegheny Interstate Line Company Transource West Virginia, LLC

UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company

AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.

AEP West Virginia Transmission Company, Inc. Appalachian Power Company

Indiana Michigan Power Company
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
145 of 515

PDF page 147

Do6urnent A„„sigsfer; qq418-3g9funient:Flita ifaN9: 31Aq8/2 ge Filed: 10/16/2026 Docket Nos. EL25-49-000, et al.

- 2
Wheeling Power Company
Duquesne Light Company
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
AD24-11-000
Constellation Energy Generation, LLC
EL25-20-000
(Consolidated)
v. PJM Interconnection, L.L.C.
(Issued December 18, 2025)
CHANG, Commissioner, concurring:
1. In today's order, the Commission addresses the rates, terms, and conditions through which Co-Located Loads may take service from the PJM Interconnection, L.L.C. (PJM) system. I write separately to address certain aspects of the Commission's proposed replacement rate and highlight the importance of developing a minimum charge for the new transmission services we establish today.

Today's Order
2. Due to significant delays in PJM's ability to interconnect new generation and load, large loads, including data centers, have preferred co-location arrangements to expedite their access to the PJM system. As today's order discusses, PJM's current tariff does not provide adequate clarity for the rules governing co-location arrangements. With today's 146 of 515

PDF page 148

Document Accessig@SA:  214-Aq418-314cument:FlAd d3aqgp: ilitA8/2pAte Filed: 10/16/2026 Docket Nos. EL25-49-000, et al.

- 3
action, the Commission is providing guidance on how loads and generators may co- locate, including the development of new transmission services that recognize their ability to limit their energy withdrawals from the transmission system. The responsibility for setting these rules sits with the Commission. As we work together to address this issue, we must continue to keep protection of other customers from unnecessary risks and costs at the forefront of our decision making.

3. Today's order represents the first step to developing a package of solutions to address co-location in the PJM footprint. Specifically, by recognizing that controllable Co-Located Loads might use less service from the transmission system than traditional loads in front of the meter, the order's revised transmission service framework may reduce the number of, and costs associated with, future transmission upgrades. The order also helps to clarify how new generation resources may connect to the system on a provisional basis to serve Co-Located Loads.

4. Designing this new co-location framework highlights an essential component of the overall package: how we protect other customers from adverse reliability impacts and unjustified cost shifts. The Commission will ultimately resolve the rates, terms, and conditions of these new services following the paper hearing and compliance processes we direct today. As we consider the record, we will assess how those rates, terms, and conditions facilitate the efficient interconnection of Co-Located Loads, control transmission costs needed to serve them, and protect other customers against unjustified cost shifts.

Need for a Minimum Charge
5. One aspect of the paper hearing is particularly essential to protecting customers against transmission cost shifts under the new framework established through today's order: the need to establish a minimum charge for the Firm and Non-Firm Contract Demand transmission services.

6. The order proposes to establish these two new transmission services for use where the Co-Located Loads can electrically control the amount of energy that they will receive from the PJM system. As the order explains, all Co-Located Loads are synchronized to the PJM transmission system through their generators. All generators, and as relevant here, all generators that are part of Co-Located Arrangements, rely on the PJM transmission system to operate. Without the PJM grid, Co-Located Loads and their associated generators would be islanded. In today's order, neither of the newly developed Contract Demand transmission services requires Co-Located Loads to take any specific quantity of transmission service. In particular, the order contemplates that, under the new Contract Demand transmission services, if the Co-Located Load takes no service, 147 of 515

PDF page 149

Do8iiment Acce6sigisg 2A-g3. 18 _31:39cument:FlAd jj3Ag:31i4./i8/2pAte Filed: 10/16/2026 Docket Nos. EL25-49-000, et al.

- 4
it would pay only for black start and regulation service.' Because the charges for those services only account for the provision of those discrete ancillary services, they do not contribute to the actual cost of building, operating, or maintaining the grid, or the Co- Located Load's explicit reliance on the PJM system. Black start and regulation service charges are nearly inconsequential.2  Thus, just paying black start and regulation service charges does not constitute the Co-Located Loads paying for their "fair share" of the cost of maintaining and operating the transmission system. Furthermore, under such a scenario, a Co-Located Load would not pay for a portion of PJM's administrative costs, which are typically included in transmission service rates, even though the Co-Located Load benefits from services provided by PJM.

7. As a result, absent developing rates that explicitly charge the Co-Located Loads for their synchronization to and reliance on the PJM system, it is possible that a Co- Located Load would not contribute to the costs of operating and maintaining the system. Similarly, if a Co-Located Load takes a de minimis amount of Firm or Non-Firm Contract Demand service, it would pay only a minimal amount of system costs. Such scenarios would fail to recognize the benefits Co-Located Loads receive from the grid and risk shifting system costs to other customers. Simply put, Co-Located Loads electrically connected to the grid (through a co-located generator) benefit from the system and should cover their costs. This is a foundational cost causation principle that the Commission must uphold.

8. In the paper hearing established in today's order, the Commission seeks comments on whether the rates, terms, and conditions for these two new transmission services should reflect a minimum charge that recognizes that, without the transmission system, the Co-Located Load and generators could not operate as envisioned. The paper hearing also seeks briefing on how such a charge should be determined3  and whether PJM administrative services charges should be applied to the new services.4  To ensure the 1  PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at P 206 (2025).

2  According to data from the most recent State of the Markets Report by the PJM Independent Market Monitor, regulation and black start services constituted an average of $159 million and $47.5 million, respectively, for January through September 2024 and 2025, while transmission constituted an average of $10.81 billion for those two years. See PJM Independent Market Monitor, 2025 Q3 State of the Markets Report at 18, https://www.monitoringanalytics.com/reports/PJM_State_of the_Market/2025/2025q3- som-pjm-secl.pdf.
3  PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 at P 219, questions 3 and 4.
4  Id. questions 1 and 2. 148 of 515

PDF page 150

Document AccessigPV; 2A-A.418-31Acument:Flild rpaqp:i1M.8/2p2kte Filed: 10/16/2026 Docket Nos. EL25-49-000, et al.

- 5
Commission has a full and complete record on this issue, I encourage commenters to address the following points and questions in their responses to the paper hearing.

9. First, a just and reasonable replacement rate for the new transmission services should reflect some form of minimum transmission service charge, which would protect other customers against cost shifts resulting from Co-Located Loads that rely upon the transmission system but do not directly or meaningfully contribute to its costs via transmission service payments. This minimum charge would provide a floor to the Co- Located Load's cost responsibilities to pay for a portion of system costs, commensurate with the benefits that the Co-Located Load receives from the system, even where it plans to draw little or no energy from that system. I welcome comments on the need for such a minimum charge, including, but not limited to: (1) whether a Co-Located Load that is synchronized to the grid but does not meaningfully contribute to transmission system costs violates cost causation principles; and (2) whether such minimum charge is necessary for those that choose to take either the Firm and Non-Firm Contract Demand transmission service.

10. Second, I welcome comments on both the rate design and the specific costs to be included in such a minimum charge. For instance, given that all Co-Located Loads rely on the existence of the PJM grid and are synchronized to it, such loads should pay for at least their fair share of the system's operations and maintenance costs. In addition, I welcome comments as to whether Co-Located Loads should bear responsibility for some portion of the capital investments required to ensure the transmission grid continues to reliably serve all customers, and if so, the specific calculation of such charges. Next Steps and Open Issues

11. While today's order is consequential, it is important that we place it in the proper context: it addresses a significant but discrete issue in PJM, and sets out services and guidance for a commercial model that may only be viable in a limited number of states where the co-located generator is eligible under state law to serve Co-Located Load. For states where retail loads must be served by the local electric utility, the model contemplated in this order may not apply, and thus it does not necessarily provide a replicable approach for large loads generally. Therefore, the broader challenge of reliably, efficiently, and fairly interconnecting large loads and the generation needed to serve them remains before the Commission, the states, and industry.

12. Further, today's order does not address the broader reliability challenges impacting the PJM footprint and its customers. While the order directs PJM to clarify options that exist under its current tariff, it does not address the clogged interconnection queue that has driven the interest in co-location in the first place as a way to expedite large loads' access to the grid. Solving this foundational problem will require a durable fix to the interconnection process that helps resources interconnect at a much more 149 of 515

PDF page 151

Do6ument Access igPsier; 22q-A_418-3PRCument:Fhtd LPaqg9:  125/g 8 / 2pge Filed: 10/16/2026 Docket Nos. EL25-49-000, et al.

6
efficient pace. As part of solving this problem, PJM must ensure that the transmission system is built to adequately support the interconnection of new, needed generation. I have a strong preference for durable reforms over one-off fixes.5  Sound investments are driven by good data, comprehensive planning, and disciplined operations. The Commission, states, grid planners and operators, and utilities must balance near-term pressures and incentives with delivering long-term value to the customers we serve. Beyond this proceeding, I am concerned about PJM's ability to procure sufficient resources to reliably serve both new and existing load. PJM's resource adequacy construct must deliver clear price signals while being mindful of ratepayer costs.

13. As we consider further reforms, the Commission's core regulatory principles — most notably open access to the transmission system (including through an efficient interconnection process) — remain the foundation for addressing load growth and related challenges. While reform to existing approaches is likely needed, customers — particularly captive ones — must not bear the cost of a data center-driven infrastructure buildout, and the risks and costs associated with this buildout must not be shifted to small businesses and residential customers.

Conclusion
14. Following the paper hearing and compliance process, the Commission will determine the just and reasonable replacement rates. This process will consider comments regarding the design of these new transmission services, and how to ensure that other customers are protected against unnecessary risks and costs. As we establish new transmission services, it cannot come at the expense of other ratepayers. I look forward to reviewing the record developed in response to today's order while the Commission, the states, PJM, and others work to address the broader reliability and interconnection challenges facing the region.

5  See, e.g., Sw. Pwr. Pool, Inc., 192 FERC ¶ 61,062, at P 3 (2025) (Chang, Comm'r, concurring). 150 of 515

PDF page 152

Document AccessigP SA :  14-Aq18-31Acument:Flild rpa g: 3:125/118/2p2aje Filed: 10/16/2026 Docket Nos. EL25-49-000, et al.

- 7
For these reasons, I respectfully concur. Judy W. Chang

Commissioner
151 of 515

PDF page 153

Doaument AccessigP. SP; 4qq.418-3P9cument:Fhtd. rEqg:1125A.8/2pAte Filed: 10/16/2026 Document Content(s)

EL25-49-000.docx
1
152 of 515

PDF page 154

Case: 26-3621
Document: 1-1
Page: 153
Date Filed: 10/16/2026
ATTACHMENT B
PJM Interconnection, L.L.C. et al.; Notice of Denial of Rehearing By Operation of Law and Providing for Further Consideration, 194 FERC ¶ 62,089 (Feb. 20, 2026).

153 of 515

PDF page 155

Case: 26-3621
Document: 1-1
Page: 157
Date Filed: 10/16/2026
ATTACHMENT C
PJM Interconnection, L.L.C. et al.; Order on Rehearing, Clarification, Compliance Filing, and Paper Hearings, 195 FERC ¶ 61,209 (June 18, 2026).

157 of 515

PDF page 156

Document A„„sigi?iP; qq-2016-398Purnent:Flitd ri=1g9:6125A012pAte Filed: 10/16/2026 194 FERC ¶ 62,089

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
Allegheny Electric Cooperative, Inc.
American Transmission Systems, Incorporated Atlantic City Electric Company

Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative

PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company

Trans-Allegheny Interstate Line Company Transource West Virginia, LLC

UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company

AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.

AEP West Virginia Transmission Company, Inc. Appalachian Power Company

Indiana Michigan Power Company
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Docket Nos. EL25-49-002
154 of 515

PDF page 157

Document AccessigPS : 2A2-V10-3PgPument:FlAd ig@g9:(125i610/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

-2-
Duquesne Light Company
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
Constellation Energy Generation, LLC
v. PJM Interconnection, L.L.C.
AD24-11-001
EL25-20-001
(Consolidated)
NOTICE OF DENIAL OF REHEARING BY OPERATION OF LAW AND
PROVIDING FOR FURTHER CONSIDERATION
(Issued February 20, 2026)
Rehearing has been timely requested of the Commission's order issued on December 18, 2025, in this proceeding. PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025). In the absence of Commission action on a request for rehearing within 30 days from the date it is filed, the request for rehearing may be deemed to have been denied. 16 U.S.C. § 8251(a); 18 C.F.R. § 385.713 (2025); Allegheny Def. Project v. FERC, 964 F.3d 1 (D.C. Cir. 2020) (en banc).

As provided in 16 U.S.C. § 8251(a), the requests for rehearing of the above-cited order filed in this proceeding will be addressed in a future order to be issued consistent with the requirements of such section. As also provided in 16 U.S.C. § 8251(a), the Commission may modify or set aside its above-cited order, in whole or in part, in such manner as it shall deem proper.

Debbie-Anne A. Reese,
Secretary.
155 of 515

PDF page 158

D6cunient A„„sigps#:: 2fi)-2-YRAlo _ Appurnent:Fhld rPag9:61.25A012pAte Filed: 10/16/2026 Document Content(s)

EL25-49-002.docx
1
156 of 515

PDF page 159

Document Accessigi SP: 22q'AgA-18 - 3R8P ument :F rPaq99:0 5/4812P2% -te Filed: 10/16/2026 195 FERC ¶ 61,209

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
Before Commissioners: Laura V. Swett, Chairman; David Rosner, Lindsay S. See,

Judy W. Chang, and David LaCerte.
PJM Interconnection, L.L.C.
Docket Nos. EL25-49-002
Allegheny Electric Cooperative, Inc.
EL25-49-000
American Transmission Systems, Incorporated Atlantic City Electric Company

Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative

PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company

Trans-Allegheny Interstate Line Company Transource West Virginia, LLC

UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company

AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.

AEP West Virginia Transmission Company, Inc. Appalachian Power Company

Indiana Michigan Power Company
158 of 515

PDF page 160

Document AccessigOA -2Aq18-3Q9c ument:Flil d rpAp:6185/4812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 2
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Duquesne Light Company
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
AD24-11-001
Constellation Energy Generation, LLC
EL25-20-001
(consolidated)
v. PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
ER26-1479-000
ORDER ON REHEARING, CLARIFICATION, COMPLIANCE FILING, AND PAPER
HEARING
(Issued June 18, 2026)
1. On December 18, 2025, the Commission issued an order in the show cause proceeding in Docket No. EL25-49-000, et al., pursuant to section 206 of the Federal Power Act (FPA),' finding PJM Interconnection, L.L.C.'s (PJM) Tariff unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to generators serving 1  16 U.S.C. § 824e.

159 of 515

PDF page 161

Dodum„t AccessigPSP; 22q'Agg-18-3Wc Urnent:Flild IF,AgP:6166/C:18/ 2 PAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 3
Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.2

2. The Commission directed PJM to file, within 60 days of the date of issuance of the order, a compliance filing to revise its Tariff to set forth specific terms and conditions that an Interconnection Customer in PJM seeking to serve Co-Located Load must follow to effectuate a Co-Location Arrangement. In addition, the Commission directed PJM to submit in its compliance filing revisions to its Tariff to require that the Eligible Customer taking transmission service on behalf of the Co-Located Load takes one of three transmission services: (1) Network Integration Transmission Service (NITS), including a new interim, non-firm transmission service available until all Network Upgrades necessary to provide the requested NITS are complete (Interim NITS), (2) a new Firm Contract Demand (FCD) transmission service, or (3) a new Non-Firm Contract Demand (NFCD) transmission service.3  The Commission established a paper hearing to determine the just and reasonable rates, terms, and conditions for these new transmission services.

3. The Commission also found the Behind the Meter Generation (BTMG) rules in the Tariff to be no longer just and reasonable, and the Commission directed PJM to submit in its compliance filing revisions to its Tariff to revise the retail BTMG netting rules and to implement a transition process for existing BTMG participants.4

2  PJM Interconnection, L.L. C., 193 FERC ¶ 61,217, at P 2 (2025) (December Order). The December Order defined the Tariff as PJM's Open Access Transmission Tariff (OATT), the Amended and Restated Operating Agreement of PJM, and the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region. See Appendix for tariff records accepted in this order.
3  Capitalized terms used but not otherwise defined in this order have the meanings ascribed to them in the Tariff.
4  PJM defines BTMG as "a generation unit that delivers energy to load without using the Transmission System or any distribution facilities (unless the entity that owns or leases the distribution facilities has consented to such use of the distribution facilities and such consent has been demonstrated to the satisfaction of the Office of the Interconnection); provided, however, that [BTMG] does not include: (i) at any time, any portion of such generating unit's capacity that is designated as a Generation Capacity Resource; or (ii) in an hour, any portion of the output of such generating unit that is sold to another entity for consumption at another electrical location or into the PJM Interchange Energy Market." PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions — A-B (21.0.0) (defining BTMG). 160 of 515

PDF page 162

Document Access igPs#: 4§)-2-VA18-349cument:Fl i l d ra@gp:jip/18/2pAte Filed. 10/16/2026 Docket No. EL25-49-002, et al.

4
4. On January 16, 2026, Exelon and FirstEnergy5  timely filed a request for rehearing of the December Order. On January 20, 2026, Industrials6  timely filed a request for clarification or, in the alternative, rehearing. On January 20, 2026, Constellation Energy Generation, LLC (Constellation) filed a request for clarification or, in the alternative, rehearing. On January 20, 2026, PIOs7  filed a limited request for clarification. On January 20, 2026, Joint Partiess  filed a request for clarification. On February 9, 2026, Andrew Hinz filed a late request for rehearing.

5. On February 23, 2026, in Docket No. ER26-1479-000, PJM filed its second compliance filing as directed by the December Order.

6. On February 23, 2026, in Docket No. EL25-49-000, PJM and the Indicated TOs9 each submitted an initial brief to address the Commission's paper hearing questions with

5  The request for rehearing was filed only by (1) Exelon Corporation (Exelon), on behalf of Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company, Commonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company, and Potomac Electric Power Company; and (2) FirstEnergy Service Company, as agent for its affiliates American Transmission Systems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission LLC, Keystone Appalachian Transmission Company, The Potomac Edison Company, Monongahela Power Company and Trans-Allegheny Interstate Line Company (collectively, FirstEnergy).
6  As to the request for clarification or, in the alternative, rehearing, Industrials are the PJM Industrial Customer Coalition (PJM ICC) and the Industrial Energy Consumers of America (IECA). As to the request for clarification, PIOs are EarthJustice, Environmental Defense Fund, and Sierra Club. 8  As to the request for clarification, Joint Parties are Eolian LP, Antora Energy LLC, and Verrus LLC. 9  We refer to the Indicated PJM Transmission Owners that submitted briefing jointly in the paper hearing as Indicated TOs. The transmission owners that submitted briefing jointly in the paper hearing are: American Electric Power Service Corporation on behalf of its affiliates, Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian Transmission Company, AEP Indiana Michigan Transmission Company, AEP Kentucky Transmission Company, AEP Ohio Transmission Company, and AEP West Virginia Transmission Company; The Dayton Power and Light Company d/b/a AES Ohio; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a Dominion Energy Virginia; Duke 161 of 515

PDF page 163

Document AccessigPA 412-Vbq18-3129..Cument:FlAd rFa'qg9:6166A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 5
respect to the new transmission services. On March 25, 2026, and on April 24, 2026, parties submitted response briefs and reply briefs, respectively.

7. In this order, we address the requests for rehearing and clarification of the December Order, PJM's compliance filing, and the paper hearing on the new transmission services. Pursuant to Allegheny Defense Project v. FERC,1°  the rehearing requests filed in this proceeding may be deemed denied by operation of law. However, as permitted by section 313(a) of the FPA,11  we are modifying the discussion in the December Order and setting aside the order, in part, as discussed below.12  In addition, we are granting, in part, and denying, in part, the requests for clarification.

8. Next, we find that PJM's compliance filing partially complies with the directives of the December Order. As such, we accept in part and reject in part PJM's proposed Tariff revisions, and we direct PJM to file, within 60 days of the date of issuance of this order, a further compliance filing.

9. Finally, in response to the record developed in the paper hearing, we establish as just and reasonable certain rates, terms, and conditions for the new transmission services directed in the December Order (i.e., Interim NITS, FCD transmission service, and NFCD transmission service). We direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff. We also direct the PJM transmission owners to file, within 60 days of the date of issuance of this order, a compliance filing to revise the Tariff.

Energy Business Services, LLC for Duke Energy Kentucky, Inc. and Duke Energy Ohio, Inc.; Duquesne Light Company; East Kentucky Power Cooperative; Exelon; FirstEnergy; PPL Electric Utilities Corporation; Public Service Electric and Gas Company; Rockland Electric Company; and the Southern Maryland Electric Cooperative.

10  964 F.3d 1 (D.C. Cir. 2020) (en bane).
11  16 U.S.C. § 8251(a) ("Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter.").
12  Allegheny Def. Project, 964 F.3d at 16-17. 162 of 515

PDF page 164

Document AccessigPSA 2q-Aggl.8-34@cument:Flild rEN9:61p,A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

6
Contents
I. Background
- 9 -
A. February Order
- 9 -
B. December Order
- 11 -
II. Notice of Filings and Responsive Pleadings
- 14 -
A. PJM's Compliance Filing
- 14 -
B. Paper Hearing on New Transmission Services
- 15 -
III. Procedural Matters
- 16 -
IV. Requests for Rehearing and/or Clarification
- 18 -
A. Jurisdiction
- 19 -
1. Sales for Resale in Interstate Commerce
- 19 -
2. Retail Allocation of Commission-Jurisdictional Rates
- 20 -
3. Retail BTMG
- 22 -
4. Retail Backup Service
- 24 -
B. Show Cause Findings
- 26 -
1. Overview, Transmission Service, Regulation and Black Start
- 26 -
2. Retail BTMG Netting Rules
- 41 -
3. Transmission Service Options for BTMG
- 50 -
C. Replacement Rate
- 52 -
1. Transmission Services
- 52 -
2. Necessary Study Process for Existing Interconnection Customers
- 87 -
3. New Generators Serving Co-Located Load
- 95 -
D. Informational Report
- 97 -
1. December Order
- 97 -
2. Request for Clarification
- 98 -
3. Determination
- 99 -
V. Compliance
- 99 -
A. BTMG Rules
- 99 -
1. Materiality Threshold
- 99 -
2. Grandfathering and Transition Period
 116 -
163 of 515

PDF page 165

Doeument Accessigi Sg 4q-Aq.A18-349..cument:Flil d rpa g9:610/1 8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

7
3. QFs and Cogeneration Facilities
- 121 -
B. Transmission Service
- 127 -
1. December Order
- 127 -
2. PJM Compliance Filing
- 129 -
3. Pleadings
- 130 -
4. Answers
- 131 -
5. Determination
- 132 -
C. Necessary Studies
- 135 -
1. December Order
- 135 -
2. PJM Compliance Filing
- 136 -
3. Pleadings
- 136 -
4. Determination
- 139 -
D. Other
- 143 -
1. December Order
- 143 -
2. RIM Compliance Filing
- 144 -
3. Pleadings
- 147 -
4. Answers
- 150 -
5. Determination
- 150 -
E. Effective Date
- 154 -
1. PJM Compliance Filing
- 154 -
2. Effective Date Pleadings
- 154 -
3. Determination
- 155 -
VI. Paper Hearing
- 155 -
A. Rates, Terms, and Conditions for Firm and Non-Firm Contract Demand
Transmission Service
- 156 -
1. December Order
- 156 -
2. Nature of FCD and NFCD Transmission Services
- 157 -
3. Study Process
- 171 -
4. Rates and Charges
- 179 -
5. Other
- 193 -
B. Additional Charge for Eligible Customers Taking FCD and/or NFCD
Transmission Service
- 199 -
1. December Order
- 199 -
164 of 515

PDF page 166

Document AccessigPV; Z-Q2-VA18-3Q9cument],litd rfi'qg:066A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 8 -
2. Initial Briefs
- 200 -
3. Response Briefs
- 201 -
4. Reply Briefs
- 204 -
5. Answers
- 206 -
6. Determination
- 207 -
C. Interconnection Requirements and Operational Practices for Necessary Control Technologies and/or Protection Systems

- 208 -
1. Initial Briefs
- 208 -
2. Response Briefs
- 209 -
3. Reply Briefs
- 211 -
4. Answer
- 214 -
5. Determination
- 214 -
D. Penalty Charge or Other Remedial Action for New Transmission Services - 218 -
1. Initial Briefs
- 218 -
2. Response Briefs
- 220 -
3. Reply Briefs
- 223 -
4. Answer
- 227 -
5. Determination
- 227 -
E. Anti-Toggling Mechanisms for Firm Contract Demand Transmission Service ....- 237 -

1. Initial Briefs
- 237 -
2. Response Briefs
- 238 -
3. Determination
- 238 -
F. Communications, Alarm, SCADA, or Other Requirements
- 240 -
1. Initial Briefs
- 240 -
2. Response Briefs
- 240 -
3. Determination
- 240 -
G. Curtailment Procedures for Interim NITS and Non-Firm Contract Demand Transmission Service

- 241 -
1. Initial Briefs
- 241 -
2. Response Briefs
- 242 -
3. Reply Briefs
- 243 -
4. Answers
- 244 -
165 of 515

PDF page 167

Dodument AccessigIA: Z--2-136g18-341i)Cument:FlAd rpaqg:6156/q8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 9
5. Determination
 - 244
H. Rates, Terms, and Conditions for Interim NITS
 - 246
1. Initial Briefs
 - 246
2. Response Briefs
 - 247
3. Reply Briefs
 - 250
4. Answers
 - 251
5. Determination
 - 252
I. Annual Report on New Transmission Services
 - 256
J. Proposed Effective Date
 - 258
1. Initial Briefs
 - 258
2. Response Briefs
 - 259
3. Reply Briefs
 - 262
4. Answer
 - 264
5. Determination
 - 264
K.
Additional Arguments
 - 265
1. Behind the Meter Generation
 - 265
2. Reliability Backstop Auction
 - 265
3. Eligible Customer Requirements
 - 267
4. Demand Side Pathways
 - 268
5. Interconnection
 - 269
6. Co-Location Arrangement with Electric Storage Resource
 - 270
I. Background
A. February Order
10. In February 2025, the Commission instituted a new proceeding in Docket No. EL25-49-000 to examine whether the Tariff remains just and reasonable and not unduly discriminatory or preferential without provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to co-location arrangements.13  The February Order defined Co-Located Load as a "'configuration [that] refers to end-use customer load that is physically connected to the facilities of an existing

13  PJM Interconnection, L.L. C., 190 FERC ¶ 61,115, at P 2 (2025) (February Order).
-
166 of 515

PDF page 168

Document AccessigiqSg 22qAq18-3L2@curnent:Flita rFAil: c166A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 10 -
or planned Customer Facility on the Interconnection Customer's side of the Point of Interconnection to the PJM Transmission System.'"14  As in the February Order, when referring to both the Co-Located Load and the associated generator, we will use the term Co-Location Arrangement.

11. As explained in the February Order, Co-Location Arrangements are becoming increasingly common in PJM and, since the issuance of the February Order, entities continue to raise issues involving Co-Location Arrangements with the Commission.15 The Commission set forth, in the February Order, the principles relating to the Commission's jurisdiction over the matters relevant to Co-Location Arrangements.16  The Commission also made several preliminary findings about the justness and reasonableness of the Tariff. First, the Commission found that the Tariff appears to be unjust and unreasonable or unduly discriminatory or preferential because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and

14  Id. P 3 & n.4. We note that, in the February Order, the Commission adopted this definition from the Guidance Document that PJM developed on Co-Located Load. See id. PJM rescinded this document pending Commission guidance in this docket. PJM March 24, 2025 Response at 33. Prior to PJM's transition to its new interconnection process, PJM used the terms Interconnection Customer and Generation Interconnection Customer. The Tariff defines Generation Interconnection Customer as "an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region." PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions - G - H) (9.0.1) (defining Generation Interconnection Customer). The Tariff's new rules for generation interconnection, effective January 3, 2023, utilize the terms Project Developer and Generation Project Developer. The Tariff defines Generation Project Developer as "an entity that submits a Generation Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region." PJM, Intra-PJM Tariffs, OATT, § VIII subpt. A 400 (Definitions G) (0.1.0) (defining Generation Project Developer). For simplicity, in this order, and consistent with the February Order and December Order, the Commission will use the term Interconnection Customer to refer to both the Tariff definitions of Generation Interconnection Customer and Generation Project Developer.
15  See, e.g., PJM Interconnection, L.L.C., 191 FERC ¶ 61,112 (2025) (accepting necessary studies agreement). The February Order consolidated the new show cause proceeding with a pending complaint proceeding in Docket No. EL25-20-000 involving Co-Located Load.
16  February Order, 190 FERC ¶ 61,115 at P 66. 167 of 515

PDF page 169

Document AccessigPA qq2-136A18-3R9.cument:FlAd rpAg9:6166/818/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 11 -
conditions of service that apply to Co-Location Arrangements." In addition, the Commission preliminarily found that this lack of applicable Tariff provisions raises the potential for undue discrimination or preferential treatment.18

12. As to specific concerns raised regarding Co-Location Arrangements, the Commission found that the Tariff may be unjust, unreasonable, unduly discriminatory, or preferential because it does not specify the transmission service that Co-Location Arrangements must take, if any, or otherwise provide a process to ensure that Co-Location Arrangements are paying for the benefits they receive from the transmission system consistent with cost causation principles, which provide that all Commission-jurisdictional rates and charges must "reflect to some degree the costs actually caused by the customer who must pay for them," and that costs must be allocated in a manner that is at least roughly commensurate with the benefits that entity receives.19 The Commission also found that the absence of rates, terms, and conditions of interconnection service specific to Co-Location Arrangements, and, especially regarding studies of the impacts of those arrangements, may render the Tariff unjust and unreasonable or unduly discriminatory or preferentia1.2°  Moreover, the Commission found that the absence of rates, terms, and conditions governing the use and sale of ancillary services and black start services by Co-Location Arrangements may render the Tariff unjust and unreasonable or unduly discriminatory or preferentia1.21  The Commission directed briefing to build a record on these issues as well as a possible replacement rate.

B. December Order
13. In the December Order, the Commission found the Tariff unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf 17  Id. P 74.

18  Id. P 75.
19  Id. PP 74-78 (citing Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1368 (D.C. Cir. 2004); Ill. Corn. Comm'n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009)). 28  Id. P 79. 21  Id. P 82. 168 of 515

PDF page 170

Document AccessigPsp,: Z-§,-2yA18 _3Qpcument:Flil d rg'qg: JR 8/ 2  pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 12 -
of Co-Located Load.22  The Commission explained that the absence of such provisions leaves entities unable to determine what steps they must take to effectuate Co-Location Arrangements and creates uncertainty that has resulted in disparate treatment in PJM because transmission owners have taken different approaches to performing the necessary steps that apply to Interconnection Customers seeking to serve Co-Located Load through a Co-Location Arrangement.23  The Commission found that the absence of such provisions also introduces the risk that Co-Located Load may benefit from regulation and black start services without contributing to cost recovery for such services.24

14. Specifically, the Commission found the Tariff unjust and unreasonable because there is a lack of sufficient clarity or consistency as to the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load.25  As part of the replacement rate, the Commission directed PJM to file revisions to the generation interconnection procedures of the Tariff, including to require an Interconnection Customer who will use its generator to serve Co-Located Load to specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load, and revisions to clarify its Necessary Study process.26  The Commission also directed PJM to revise its Tariff to clarify that an Interconnection Customer seeking to serve a Co-Located Load with a newly interconnecting generator may: (1) request interconnection service at a level below its maximum facility output; (2) use existing procedures in the Tariff to accelerate the study of the interconnection service request if the request has no cost allocation for Network Upgrades and does not require further studies; (3) request provisional interconnection service; and (4) request Surplus Interconnection Service.27

15. The Commission also found the Tariff unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.28  The Commission further found the Tariff

22  December Order, 193 FERC ¶ 61,217 at P 175.
23  Id
24 Id
25 Id. P 176.
26  Id. PP 176, 187-192, 225-230.
27  Id. PP 176, 231-235.
28  Id. PP 177, 193. 169 of 515

PDF page 171

Dod'uthent Accesgig- STerc Z-Q- gg1 8 - 34gcurnent:Flita
6l67/C18/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 13 -
unjust and unreasonable because it does not address charges related to Co-Located Loads' use of regulation and black start services, which introduces the risk that Co-Located Load may benefit from regulation and black start services without contributing to cost recovery for such services and, thereby, the risk that costs may be allocated entirely to other transmission customers and passed through to residential customers, among others.29  The Commission found that NITS charged on a gross demand basis is one just and reasonable transmission service option for Eligible Customers taking transmission service on behalf of Co-Located Loads, but it is not the only option.30  The Commission thus directed PJM to revise its Tariff to create three new transmission services (i.e., Interim NITS, FCD transmission service, and NFCD transmission service) that reflect that Eligible Customers taking service on behalf of Co-Located Loads are willing and able to limit their energy withdrawals from the transmission system under certain conditions.31  Specific to these new transmission services, the Commission established paper hearing procedures to determine the just and reasonable rates, terms, and conditions for such services.32

16. The Commission also found the existing retail BTMG netting rules in the Tariff to be unjust and unreasonable. PJM's existing Tariff allows load serving entities (LSE) that provide service to loads with qualifying BTMG to reduce their costs by netting output from BTMG in the calculation of their peak demand for the purpose of determining NITS charges.33  The Commission explained that these retail BTMG netting rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers' full gross load in transmission and resource adequacy planning.34  Thus, the Commission directed PJM to revise its retail BTMG netting rules.35  In recognizing concerns about the potential impacts on existing BTMG customers, the Commission directed PJM to maintain the current retail BTMG netting rules for customers that fall below a new MW materiality threshold for the amount of load at a particular electrical location that Network Customers may net using BTMG and to implement a two-part transition process

29  Id. P 177. 3°  Id. PP 195-196.
31  Id. PP 178, 200-202, 206, 208-218.
32  Id. PP 178, 194, 203, 207, 219.
33  Id. P 7.
34  Id PP 179, 186.
35  Id. PP 179, 221. 170 of 515

PDF page 172

Document AccessigaV; 22Q-2-VIZ18-31;6ument:Flil d rEN9: W/11812PAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 14 -
for retail BTMG including: (1) the establishment of a three-year transition period; and
(2) the ability to grandfather certain entities with existing contracts.36
II. Notice of Filings and Responsive Pleadings
A. PJM's Compliance Filing
17. Notice of PJM's compliance filing in Docket No. ER26-1479-000 was published in the Federal Register, 91 Fed. Reg. 9849 (Feb. 27, 2026) with interventions and protests due on or before March 16, 2026.

18. Timely motions to intervene were filed by American Forest & Paper Association (AF&PA); PJM Industrial Customer Coalition (PJM ICC); Industrial Energy Consumers of America (IECA); Monitoring Analytics, LLC, acting in its capacity as the Independent Market Monitor for PJM (Market Monitor); LS Power Development, LLC; Enchanted Rock, LLC (Enchanted Rock); Illinois Municipal Electric Agency; American Clean Power Association; New Jersey Division of Rate Counsel; PJM Power Providers Group; American Electric Power Service Corporation; Exelon Corporation; Constellation Energy Generation, LLC (Constellation); Public Citizen, Inc.; East Kentucky Power Cooperative, Inc.; Clean Energy Buyers Association; Edison Electric Institute; Maryland Office of People's Counsel (Maryland OPC); EDF Power Solutions, Inc. (EDFps); Solar Energy Industries Association (SEIA); Advanced Energy United (AEU); Buckeye Power, Inc.; Electric Power Supply Association; Duquesne Light Company; North Carolina Electric Membership Corporation; New Jersey Board of Public Utilities; Appalachian Voices; Pennsylvania Office of Consumer Advocate; Public Service Electric and Gas Company, PSEG Power LLC and PSEG Energy Resources & Trade LLC (collectively, PSEG Companies); Old Dominion Electric Cooperative (ODEC); National Railroad Passenger Corporation (Amtrak); Dominion Energy Services, Inc.; Crusoe Energy Systems, Inc. (Crusoe); Consolidated Edison Company of New York, Inc.; PPL Electric Utilities Corporation (PPL); Rockland Electric Company; Illinois Industrial Energy Consumers; American Municipal Power, Inc. (AMP); Grid Reform; Invenergy Renewables LLC and Invenergy Thermal LLC (Invenergy); Data Center Coalition (DCC); Eastman Chemical Company (Eastman); Northern Virginia Electric Cooperative, Inc. (NOVEC); Vistra Corp. (Vistra); Mainspring Energy; Northeastern REMC; Borough of Chambersburg, Pennsylvania; Capital Power Corporation; Eolian, L.P. (Eolian); Antora Energy, Inc. (Antora); Calibrant Energy (Calibrant); Convergent Energy and Power (Convergent); and Verrus, LLC (Verrus).

19. Motions to intervene out of time were filed by Arkon Energy Hannibal and Office of the Illinois Attorney General.

36  Id PP 179, 221, 223-224. 171 of 515

PDF page 173

Document Acces s igi?it; 22QT2-V.A18 - 3Q9ument:Flit d rpAgp: c;l67A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 15 -
20. Timely comments and/or protests were filed by Eastman; EDFps; Digital Power Network; Vistra; Maryland OPC; AEU/SEIA; Eolian, Antora, Calibrant, Convergent, Mainspring, and Venus (together, Joint Parties); Calibrant, Antora, Convergent, Eolian, and Mainspring (together, BTMG Parties); Invenergy; Energy Artisans, LLC (Energy Artisans); DCC; PJM ICC, IECA, AF&PA (collectively, Industrials) and Amtrak (Industrials/Amtrak); Digital Power Network; Crusoe; AMP; Appalachian Voices; and Constellation.

21. On April 8, 2026, Constellation filed a motion for leave and supplemental protest in this compliance proceeding and in Docket No. ER26-1088-000. On April 14, 2026, Exelon filed an answer to Constellation's motion. On April 24, 2026, Indicated TOs filed a motion for leave to answer and answer to certain protests and comments. On May 8, 2026, the BTMG Parties and Industrials/Amtrak each filed a motion for leave to answer and answer the Indicated TOs' April 24 answer. On May 12, 2026, Eastman filed a motion for leave to answer and answer the Indicated TOs' April 24 answer. On June 3, 2026, Indicated TOs filed a motion for leave to answer and answer.

22. Several parties filed briefs for the paper hearing in Docket No. EL25-49-000 and filed these submissions in this compliance proceeding as well. Specifically, in this compliance proceeding: on March 25, 2026, Enchanted Rock filed its reply brief; on March 26, 2026, Alliance to Save Energy filed comments; and on April 24, 2026, Earthjustice filed its reply brief

B. Paper Hearing on New Transmission Services
23. On February 23, 2026, in Docket No. EL25-49-000, PJM and Indicated TOs each submitted an initial brief On March 25, 2026, response briefs were submitted by: Market Monitor; Geronimo Power, LLC; AEU/SEIA; Constellation; Eolian, Antora, Calibrant, Convergent, Mainspring, Venus, and U.S. Energy Storage Coalition (collectively, Joint Co-Location Developers); Vistra; ODEC; Enchanted Rock; Indicated TOs; Industrials/Amtrak; NOVEC; DCC; and Alliance to Save Energy (Alliance). On April 24, 2026, reply briefs were submitted by: Earthjustice; ODEC; PJM; Maryland OPC; Constellation; Indicated TOs; Joint Co-Location Developers; and Industrials/Amtrak. On May 7, 2026, Enchanted Rock filed a motion for leave to answer and answer to PJM's reply brief On May 11, 2026, Constellation filed a motion for leave to answer and answer to PJM's and Indicated TOs' reply briefs. On May 21, 2026, Geronimo Power filed a motion for leave to answer and answer to PJM's and Indicated TOs' reply briefs. On May 28, 2026, Indicated TOs filed a motion for leave to answer and answer to various reply briefs and Constellation's May 11 answer.

24. On December 29, 2025, American Clean Power Association filed a motion to intervene out of time in this proceeding. On January 12, 2026, Vitol, Inc. filed a motion to intervene out of time in this proceeding. On January 13, 2026, Pennsylvania Office of 172 of 515

PDF page 174

Document AccessigPV; Z-qAq18-31:?Kument:Flild
e: j67A8/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 16 -
Consumer Advocate filed a motion to intervene out of time in this proceeding. On January 16, 2026, Voltus, Inc. filed a motion to intervene out of time in this proceeding. On January 16, 2026, Emerald AI submitted comments out-of-time in Docket No. EL25-49-000. On January 26, 2026, Andrew D. Hinz filed a motion to intervene out of time and comments. On March 20, 2026, Amtrak and AF&PA each filed a motion to intervene out of time in this proceeding. On March 25, 2026, Calibrant, Convergent, Venus, and U.S. Energy Storage Coalition filed a motion to intervene out of time in this proceeding.

III. Procedural Matters
25. Pursuant to Rule 214 of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.214 (2025), the notices of intervention and timely, unopposed motions to intervene in Docket Nos. ER26-1479-000 and EL25-49-000 serve to make the entities that filed them parties to these proceedings.

26. Pursuant to Rule 214(d) of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.214(d), we grant the late-filed motions to intervene in Docket Nos. ER26-1479-000 and EL25-49-000 given these entities' interests in the proceedings, the early stage of the proceedings, and the absence of undue prejudice or delay. Interventions in Docket No. EL25-49-000 are prospective only and such entities may not challenge the December Order.

27. We note that Venus did not intervene until after the December Order. When, as here, late intervention is sought after the issuance of a dispositive order, the prejudice to other parties and burden upon the Commission of granting the late intervention may be substantial. Thus, movants bear a higher burden to demonstrate good cause for granting such late intervention.37  Venus indicates the proceeding has changed significantly with the initiation of the paper hearing proceeding.38  We do not find this explanation to be sufficient to meet the higher burden to show good cause for granting intervention following a dispositive order. As discussed above, we grant Venus's motion to intervene as-of the filing date (March 25, 2026); however, we dismiss it to the extent Venus joins Eolian and Antora in the request for clarification of the December Order.39

37  PJM Interconnection, L.L.C., 167 FERC ¶ 61,209, at P 24 (2019); PJM Interconnection, L.L.C., 157 FERC ¶ 61,193, at P 10 (2016).
38  Reply Brief of Joint Co-Location Developers and Motion to Intervene Out-of-Tome of Calibrant, Convergent, U.S. Energy Storage Coalition, and Venus at 6.
39  PJM Interconnection, L.L.C., 157 FERC ¶ 61,193 at P 10; Pac. Gas & Elec. Co., 100 FERC ¶ 61,097, at P 5 (2002). 173 of 515

PDF page 175

Dodument AccessigissA: qq-Aggis _3ppcument:FlAd EpAg9:616748/2p-Ate Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 17 -
28. Rule 213(a)(2) of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.213(a)(2) (2025), prohibits an answer to a protest or answer unless otherwise ordered by the decisional authority. We accept the answers submitted in Docket Nos. EL25-49-000 and in ER26-1479-000, as well as Constellation's supplemental protest, because they have provided information that assisted us in our decision-making process.

29. On February 2, 2026, Constellation filed a motion for leave and answer to Exelon and FirstEnergy's request for rehearing. On February 12, 2026, Exelon and FirstEnergy filed an answer in opposition to that motion. On February 19, 2026, the Pennsylvania Office of Consumer Advocate filed a motion for leave to answer and answer in support of Industrials' request for clarification or rehearing.40  On February 5 and March 9, 2026, respectively, Market Monitor and PJM filed answers and motions for leave to answer Constellation's request for clarification or rehearing. On February 20 and March 24, 2026, Constellation filed motions for leave and answers to, respectively, Market Monitor's and PJM's answers. Rule 713(d) of the Commission's Rules of Practice and Procedure41  prohibits an answer to a request for rehearing.42  Accordingly, we deny these motions and we reject these answers filed by Constellation, Exelon and FirstEnergy, Pennsylvania Office of Consumer Advocate, Market Monitor, and PJM.43

30. On February 9, 2026, Andrew Hinz filed a request for rehearing. Pursuant to section 313(a) of the FPA,44  an aggrieved party must file an application for rehearing within 30 days after the issuance of the Commission's order; in this case, that deadline is

40  Pennsylvania Office of Consumer Advocate is not a party to this proceeding with respect to rehearing or clarification of the December Order and therefore may not file an answer to a request for rehearing or clarification.
41  18 C.F.R. § 385.713(d)(1) (2025).
42  Id
43  We note that the Pennsylvania Office of Consumer Advocate's, Market Monitor's, and PJM's motions and answers responded to requests for clarification and, in the alternative, rehearing. Because the Commission has discretion in how to characterize pleadings and examines the substance of pleadings, we construe these pleadings as ultimately functioning in substance to respond to requests for rehearing and thus treat them as such. Sw. Power Pool, Inc., 182 FERC ¶ 61,083, at P 14 (2023).
44  16 U.S.C. § 8251(a). 174 of 515

PDF page 176

Document AccessigPSA:  Z%2YR18-3Q9cument:Flit d
VA8/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 18 -
no later than 5:00 PM U.S. Eastern Time45  on January 19, 2026. Because the 30-day rehearing deadline is a statutory requirement, it cannot be waived or extended." Therefore, we reject Andrew Hinz's request for rehearing as untimely.

IV. Requests for Rehearing and/or Clarification
31. As discussed further below, we sustain our finding that the Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.47  We also sustain our finding that the Tariff is unjust and unreasonable because it does not include transmission services that reflect the willingness and ability of an Eligible Customer taking service on behalf of a Co-Located Load to limit its energy withdrawals from the transmission system under certain conditions.48  As a replacement rate, we continue to direct PJM to establish the new transmission services discussed in the December Order."

32. We also set aside, in part, the December Order; we find that requiring Eligible Customers taking transmission service on behalf of load with BTMG to take NITS, without the option to instead take such alternative transmission services, would be unjust and unreasonable for the same reasons we made the same finding in the December Order with respect to Eligible Customers taking transmission service on behalf of Co-Located Load. As a replacement rate, we direct PJM to revise its Tariff to extend the new transmission services to Eligible Customers taking service on behalf of load with BTMG.

45  The Commission's regular business hours end at 5:00 p.m., U.S. Eastern Time. 18 C.F.R. § 375.101(c) (2025); 18 C.F.R. § 385.2003(c) (2025); FERC, eFiling User Guide (May 23, 2024), https://wwvv.ferc.gov/media/efiling-user-guide. 46  See, e.g., City of Campbell v. FERC, 770 F.2d 1180, 1183 (D.C. Cir. 1985) ("The 30-day time requirement of the [FPA] is as much a part of the jurisdictional threshold as the mandate to file for a rehearing."); Bos. Gas Co. v. FERC, 575 F.2d 975, 977-98, 979 (1st Cir. 1978) (describing identical rehearing provision of Natural Gas Act as "a tightly structured and formal provision" and holding that "[n]either the Commission or the courts are given any form of jurisdictional discretion").
47  December Order, 193 FERC ¶ 61,217 at P 159.
48 Id 49  Id. P 160. 175 of 515

PDF page 177

Document AccessigPsg q-Q,-23„eR18 _31_299ument:FlAd  yaqg9: 6167/6.8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 19 -
33. We also continue to find that PJM's retail BTMG netting rules are unjust and unreasonable.5°  We continue to direct PJM to revise the Tariff's retail BTMG netting rules.51  We also set aside, in part, the December Order; we find that it is just and reasonable to allow certain cogeneration Qualifying Facilities (QFs) that are Network Customers to be able to net by using BTMG, without being subject to the new materiality threshold, if they demonstrate that they are integrated with load such that, when their generating facility trips offline, the load follows.

34. We also continue to direct PJM to clarify its interconnection procedures and agreements to ensure that it is clear to both new and existing Interconnection Customers how to interconnect in a Co-Location Arrangement.52

A. Jurisdiction
1. Sales for Resale in Interstate Commerce
a. December Order
35. In the December Order, the Commission found that several aspects of Co-Location Arrangements fall squarely within the jurisdiction of the states. In particular, the Commission affirmed that "states have authority over their generation resource mix, including through their siting authority" and further explained that "[t]his authority means that which generating facilities are sited and allowed to serve Co-Located Load is also a question of state law."53  In addition, the Commission "decline[d] in this proceeding to comprehensively address jurisdictional matters regarding the interconnection of retail loads served through a Co-Location Arrangement to the interstate transmission system."54

b. Request for Clarification and/or Rehearing
36. Constellation requests that the Commission clarify that the Commission has jurisdiction over the wholesale sale of energy by a generator to a retail supplier even if the retail supplier then resells that energy to a Co-Located Load. Constellation states that 5°  Id P 186.

51  Id. PP 221-224.
52  Id P 161.
53  Id. P 169.
54  Id. P 170. 176 of 515

PDF page 178

Document A„eseigPsP; 2A,-.qqls-31?gcurnent:Flitd PeN9:j67A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 20 -
the December Order is unclear in that it states that "states have authority over their generation resource mix, including through their siting authority" and that "which generating facilities are sited and allowed to serve Co-Located Load is also a question of state law."55  Constellation explains that generators often do not serve Co-Located Load directly and instead sell electricity at wholesale to an entity, such as a retail supplier, that will then engage in the ultimate retail sale to the Co-Located Load. In such circumstances, Constellation argues that such sales for resale are exclusively within the Commission's jurisdiction.56

c. Determination
37. In response to Constellation's request for clarification or rehearing, we reiterate that, where a generator sells electricity at wholesale in interstate commerce to another entity that then resells that electricity at retail to a Co-Located Load, the generator's sale for resale is exclusively within the Commission's jurisdiction.57  Thus, state authority does not extend to the wholesale sale of energy by a generator to a retail supplier, regardless of the specific type of ultimate retail customer. However, as the Commission explained in the December Order, both "which generating facilities are sited" and which generating facilities are "allowed to serve Co-Located Load" are "question[s] of state law."58

2. Retail Allocation of Commission-J urisdictional Rates
a. December Order
38. In the December Order, the Commission held that "states have exclusive jurisdiction over how the costs assigned to Eligible Customers on behalf of Co-Located Load taking Commission-jurisdictional transmission services," including the new transmission services, "are allocated to individual retail consumers that are Co-Located Load, just as states have exclusive jurisdiction over how to allocate the costs of all

55  Constellation Request for Clarification or Rehearing at 6-7 (citing December Order, 193 FERC ¶ 61,217 at P 169) (emphasis in original).
56  Id. at 6-7 (citing 16 U.S.C. § 824(b)(1); Orangeburg v. FERC, 862 F.3d 1071, 1086-87 (D.C. Cir. 2017)).
57  Orangeburg, 862 F.3d at 1086-87 ("FERC—not state commissions—has `exclusive authority to regulate the . . . sale at wholesale of electric energy in interstate commerce.") (quoting New Eng. Power Co. v. N.H., 455 U.S. 331, 340 (1982)).
58  December Order, 193 FERC ¶ 61,217 at P 169. 177 of 515

PDF page 179

Dod„„t
A„„sigPSA
: 22cfAQA18-3g9cUrnent:Fhtd rPAP:6167/18/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 21 -
Commission-jurisdictional rates (including for energy, capacity, and transmission) among retail customers, including allocating costs among different classes of retail customers."59 b. Request for Clarification and/or Rehearing

39. Constellation requests that the Commission clarify that states do not have unlimited authority over how to allocate the costs of all Commission-jurisdictional rates and that they cannot use their authority over retail allocation to indirectly regulate the interconnection of generators serving Co-Located Load.6°  For example, Constellation claims that a state cannot impose via the exercise of its jurisdiction over retail sales a requirement that attempts to prohibit a transaction that the Commission says is permitted." Constellation asserts that some utilities have asked their state commission for authority to condition retail service in the state on the load's acceptance of a Transmission Security Agreement that calculates its security requirement based on a gross NITS rate despite the fact that the Commission has said that other rates must be made available.62  Constellation argues that the December Order is unclear in that it provides that "states have exclusive jurisdiction over how to allocate the costs of all Commission-jurisdictional rates (including for energy, capacity, and transmission) among retail customers, including allocating costs among different classes of retail customers."63 c. Determination

40. In response to Constellation's request, we deny clarification and sustain the December Order. In the December Order, the Commission appropriately explained that "states have exclusive jurisdiction over how to allocate the costs of all Commission-jurisdictional rates (including for energy, capacity, and transmission) among retail customers, including allocating costs among different classes of retail customers."64 On the other hand, we note that states "may not seek to achieve ends, however legitimate, through regulatory means that intrude on FERC's authority over interstate wholesale

59  Id. P 167. 6°  Constellation Request for Clarification or Rehearing at 8 (citing Hughes v. Talen Energy Mktg., LLC, 578 U.S. 150, 164-65 (2016); Nantahala Power & Light Co. v. Thornburg, 476 U.S. 953, 966 (1986)). 61  Id
62  Id
63  Id at 7 (citing December Order, 193 FERC ¶ 61,217 at P 167).
64  December Order, 193 FERC ¶ 61,217 at P 167 (emphasis added). 178 of 515

PDF page 180

Document AccessigPS# 2A.Ag18-34Pcument:Flald EPA P: J67/48/ 2p2 te Filed: 10/16/2026 Docket No. EL25,49-002, et al.

- 22 -
rates . . . ."65  While Constellation frames its request around the jurisdictional findings in the December Order, Constellation raises a specific matter that is not the subject of and is otherwise outside the scope of this proceeding, i.e., the terms of transmission security agreements. We nonetheless reiterate that: (1) Eligible Customers taking transmission service on behalf of Co-Located Load must have the option to take one of three transmission services, i.e., NITS or Interim NITS, FCD transmission service, or NFCD transmission service;66  and (2) while it remains just and reasonable for an Eligible Customer taking transmission service on behalf of Co-Located Load to take NITS charged on a gross demand basis,67  an Eligible Customer may instead choose to take another transmission service.68

3. Retail BTMG
a. December Order
41. In the December Order, the Commission found that circumstances have changed since the Commission approved PJM's retail BTMG netting rules such that these rules are no longer just and reasonable. In particular, the Commission found that PJM's existing retail BTMG netting rules do not limit the amount of qualifying load that a Network Customer may net by using BTMG and do not provide any protections against potential transmission and resource adequacy planning problems or against the costs of maintaining sufficient resources to serve these loads being shifted onto other customers.69 The Commission concluded that PJM's retail BTMG netting rules are no longer consistent with cost causation principles because large loads configured in a BTMG arrangement with significant generation will raise cost-shifting concerns compared to loads pursuing smaller amounts of netting.70

65  Hughes v. Talen Energy Mktg., LLC, 578 U.S. 150, 164.
66  December Order, 193 FERC ¶ 61,217 at P 193.
67  M P 195.
68  Id. P 199.
69  Id. P 186.
70  Id 179 of 515

PDF page 181

Document AccessigPSP:: 2A-2.1,6A-18 _3Rgcument:Flit d rPa g9:6168/18/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 23 -
b. Request for Clarification and/or Rehearing
42. Industrials argue that the Commission failed to explain and justify its assertion of jurisdiction over "retail BTMG that merely offsets retail load."71  Industrials contend that "retail BTMG [is not within] the Commission's jurisdiction over the transmission of electric energy in interstate commerce" because "[b]y definition, BTMG is produced by a generation unit `that delivers energy to load without using the Transmission System.'"72 Industrials assert that the Commission's finding "necessarily entails piercing the retail meter veil, which serves as the bright-line boundary of the Commission's statutory authority."73  Industrials further maintain that the Commission failed to provide a well-reasoned basis for the assertion of jurisdiction over the configurations of retail customers whose BTMG is not selling wholesale power and is not using the transmission system.74  Industrials argue that, here, "retail BTMG involves neither jurisdictional sales nor jurisdictional transmission."75

c. Determination
43. We disagree with Industrials that the BTMG netting rules are outside of the Commission's jurisdiction. Industrials misunderstand the December Order as targeting retail sales from BTMG or the delivery of energy from BTMG to load, but this is not the case. The BTMG netting rules instead allow PJM to calculate the charges for

71  Industrials Request for Clarification or Rehearing at 39.
72  Id at 40 (citing PJM, Intra-PJM Tariffs, OATT, § I.1 (Definitions — A-B) (22.0.0)).
73  Id
74  Id at 40-41 (citing Nat'l Ass 'n of Regul. Util. Comm'rs v. FERC, 475 F.3 d 1277, 1280 (D.C. Cir. 2007); Detroit Edison Co. v. FERC, 334 F.3d 48, 53 (D.C. Cir. 2003)).
75  Id at 41-42. 180 of 515

PDF page 182

Document A„e„igP
SA
AA41 -18-34P
ument:Flild rPaqiT: jp/118/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 24 -
transmission service in interstate commerce.76  The calculation of such transmission charges is squarely within the Commission's jurisdiction under the FPA.77

4. Retail Backup Service
a. December Order
44. In the December Order, the Commission required that PJM modify its Tariff to require that an Eligible Customer taking transmission service on behalf of a Co-Located Load take one of three transmission services: (1) NITS or Interim NITS; (2) FCD transmission service; or (3) NFCD transmission service.78

b. Request for Rehearing
45. Exelon and FirstEnergy contend that the Commission's new FCD and NFCD transmission services infringe on state retail authority, asserting that the states, not the Commission, have jurisdiction to decide when and in what circumstances retail load will be curtailed, and how utilities should charge and treat retail customers in those circumstances.79  Exelon and FirstEnergy claim that, for example, states might require the provision of backup service to retail customers who lost supply from their contracted supplier, would regulate the distribution system costs associated with such service that would be charged to the retail customer, and would regulate the costs and terms of the backup service.80  Exelon and FirstEnergy assert that the Commission's order appears to create a new federal construct because it defines the extent and terms of backup service to

76  PJM, Intra-PJM Tariffs, OATT, § III, § 34.2 (Netting of Behind the Meter Generation) (0.0.0); see December Order, 193 FERC ¶ 61,217 at P 7 ("[T]he Tariff allows load serving entities . . . that provide service to loads with qualifying BTMG to reduce their costs by netting output from BTMG in the calculation of their peak demand for the purpose of determining NITS charges.") (emphasis added).
77  Orangeburg, 862 F.3d at 1086-87 ("FERC—not state commissions—has `exclusive authority to regulate the transmission . . . of electric energy in interstate commerce.") (quoting New Eng. Power Co., 455 U.S. at 340); Calpine Corp. v. FERC, 702 F.3d 41, 50 (D.C. Cir. 2012) ("[T]he regulation of transmission charges is undoubtedly within FERC's jurisdiction . . . .").
78  December Order, 193 FERC ¶ 61,217 at P 193.
79  Exelon and FirstEnergy Request for Rehearing at 53.
80 Id. 181 of 515

PDF page 183

Document AccessigP.SP; qq'20§A18-3g€6Urnent:Filtd IPA.99:6168A8/2 pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 25 -
retail customers who lose their contracted retail power supplier.8I  Exelon and FirstEnergy argue that the Commission's new transmission services lack the limitation in the Commission's wholesale demand response programs, which allow states to prohibit retail consumers from participating in wholesale demand response.82

c. Determination
46. We are not persuaded by Exelon and FirstEnergy's assertions that FCD and NFCD transmission services infringe on state retail authority. In the December Order, the Commission held that Eligible Customers taking transmission service on behalf of a Co-Located Load must have the option to take one of three transmission services:

(1) NITS or Interim NITS; (2) FCD transmission service; or (3) NFCD transmission service.83  Exelon and FirstEnergy do not explain how FCD and NFCD transmission services define the extent and terms of backup service to retail customers who lose their contracted power supplier and cite no specific aspect of the December Order that does so.84  As such, we find that Exelon and FirstEnergy fail to demonstrate that the Commission's replacement rate regulates the terms of retail service." 81  Id. at 53, 55.

82  Id. at 54 (citing FERC v. EPSA, 577 U.S. 260, 275 (2016)).
83  December Order, 193 FERC ¶ 61,217 at P 193.
84  FPA section 313(a) requires that an "application for rehearing shall set forth specifically" its grounds. 16 U.S.C. § 8251(a) (emphasis added). We follow Commission practice, with which courts have agreed, and reject arguments, like this one, on rehearing lacking sufficient specificity. PJM Interconnection, L.L.C., 171 FERC ¶ 61,040, at P 22 (2020); see also Ind. Util. Regul. Comm'n v. FERC, 668 F.3d 735, 736 (D.C. Cir. 2012); LA Storage, LLC, 182 FERC 1161,026, at P 25 & n.75 (2023). 85  Exelon and FirstEnergy argue that the Commission's new transmission services lack the limitation in the Commission's wholesale demand response programs, which allows states to prohibit retail consumers from participating in wholesale demand response. Exelon and FirstEnergy Request for Rehearing at 54 (citing FERC v. EPSA, 577 U.S. at 275). The considerations that led the Commission to include that "opt-out" in the rulemakings that led to Order Nos. 719 and 745, such as a confluence of federal and state jurisdiction with respect to demand response, are not present in this proceeding. Moreover, the Commission was not required to include the "opt-out" even in those rulemakings. See Nat'l Ass 'n of Regul. Util. Comm'rs v. FERC, 964 F.3d 1177, 1187 (D.C. Cir. 2020) ("But because FERC has the exclusive authority to determine who may 182 of 515

PDF page 184

Document AccessigPSK 2A-2-1§g18-349cument:Flild Ifai@v:d43A8, 2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 26 -
B. Show Cause Findings
1. Overview, Transmission Service, Regulation and Black Start
a. December Order
47. As relevant here, the Commission found in the December Order that the Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load. The Commission also found that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.86

b. Request for Rehearing
48. Exelon and FirstEnergy argue that the Commission did not meet its burden under FPA section 206 to show that the existing PJM Tariff is unjust and unreasonable.87 Exelon and FirstEnergy argue that the Commission provides no evidentiary support for its finding that the Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.88 Exelon and FirstEnergy allege that the Tariff already has provisions explaining how to serve load in PJM and the Commission does not even mention them.89

49. Exelon and FirstEnergy dispute that the Constellation Complaint supports the Commission's finding of uncertainty.90  Exelon and FirstEnergy contend that the actual participate in the wholesale markets, the Supremacy Clause—not Order No. 841— requires that States not interfere.").

86  December Order, 193 FERC ¶ 61,217 at P 177.
87  Exelon and FirstEnergy Request for Rehearing at 13.
88  Id. at 14 (citing December Order, 193 FERC 4561,217 at P 175).
89  Id. at 15 (discussing and citing Tariff provisions).
90  Id. 183 of 515

PDF page 185

Document AccessigSP:: qqA,A18-3Q9cUlTlent:Filtd EPag9:6168/18/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 27 -
situation described in the Constellation Complaint giving rise to the purposed uncertainty revealed that "any delay resulted from a decision made by Constellation in its attempt to bypass retail service requirements and to obtain service in violation of Illinois law."91 Exelon and FirstEnergy argue that, if any clarification was necessary, the Commission has now clarified that Co-Location Arrangements must be properly metered and designate and involve transmission service to an Eligible Customer. Exelon and FirstEnergy allege that service can proceed in an orderly fashion. Exelon and FirstEnergy argue that the Commission ignored record evidence that customers' load service requests proceed on a timely basis when customers take service through an Eligible Customer.92  Exelon and FirstEnergy also maintain that Talen Energy's recent changes to its Co-Location Arrangement with Susquehanna Nuclear, LLC show that the Tariff works.93

50. Exelon and FirstEnergy next challenge the Commission's finding that the Tariff is unjust and unreasonable because it does not include transmission services that reflect that an Eligible Customer taking service on behalf of a Co-Located Load that is willing and able to limit its energy withdrawals from the transmission system under certain conditions.94  Exelon and FirstEnergy allege that there is no evidence that the cost of NITS deters service or impacts data center development. Exelon and FirstEnergy also argue that there is no evidence to support the Commission's statement that requiring NITS could necessitate inefficient and costly transmission buildout and costs paid by transmission customers that may not be necessary if Eligible Customers taking transmission service on behalf of Co-Located Loads are willing to limit their energy withdrawals and take a transmission service that requires fewer Network Upgrades.95 Exelon and FirstEnergy maintain that charging load on a contract demand basis does not change the physical and engineering impacts of the load.96  Exelon and FirstEnergy acknowledge that installing systems to limit grid usage might change system impacts and the need for upgrades, but there is nothing in the record demonstrating that such systems are more beneficial for Co-Located Load than other loads or that such systems warrant

91  Id. at 15-16 (citing Constellation, Docket No. EL25-20-000, Complaint, Ex. 5, attach. 1).
92  Id at 17.
93  Id. at 17-18 (citing PJM, Docket No. ER24-2172-000, Amended ISA, attach. A, Schedule F, Part F.4 (filed June 3, 2024)).
94  Id. at 18 (citing December Order, 193 FERC ¶ 61,217 at P 159).
95  Id. at 19 (citing December Order, 193 FERC ¶ 61,217 at P 199).
96  Id. 184 of 515

PDF page 186

Document Acce„ig@A i'211. 8 - 34@cument:Flita rPAP: c1448/2Date Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 28 -
the use of different ratemaking principles for Co-Located Load as compared to other loads.97  Exelon and FirstEnergy argue that system impacts may be reduced when a load is located near a generator, but that is true whether the load contracts with remote generation or an abutting generator. Exelon and FirstEnergy assert that the study process can determine how to site to reduce transmission upgrades for the customer using the customer's gross load.

51. Exelon and FirstEnergy argue that the Commission provides no support for its statement that Co-Located Loads may be able to receive transmission service faster with use of a new, limited transmission service product than they would if they selected NITS, to the extent that providing NITS would require Network Upgrades that the limited transmission service would not.98  Exelon and FirstEnergy assert that the transmission system is affected even when no net power is withdrawn from the system.99  Exelon and FirstEnergy contend that the Commission endorses an unsound approach by suggesting that loads that do not withdraw from the system can be interconnected on a fast track without studying physical impacts.

52. Exelon and FirstEnergy highlight the Commission's statement that, while the Commission finds that NITS charged on a gross demand basis is one just and reasonable transmission service option for Eligible Customer taking transmission service on behalf of Co-Located Loads, it is not the only option.100  Exelon and FirstEnergy state that the Commission itself acknowledges that the existing service options are feasible and just and reasonable, but the Commission merely wants more options. Exelon and FirstEnergy argue that when the Commission finds a tariff not unjust and unreasonable under the first prong of FPA section 206, as it suggests here, the Commission does not need to set a remedy.

53. Exelon and FirstEnergy disagree with the Commission's assessment that Co-Located Loads merit a different rate based on the combination of transmission system burdens and benefits. Exelon and FirstEnergy first state that Co-Located Loads benefit from regulation and black start, as the Commission recognized.10' Exelon and FirstEnergy argue that transmission interconnections provide an avenue for data center loads to readily acquire back-up power when co-located generators are not available.

97  Id. at 19-20.
98  Id at 20 (citing December Order, 193 FERC ¶ 61,217 at P 205).
99  Id. at 21.
100  Id at 22 (citing December Order, 193 FERC ¶ 61,217 at P 195). 101 Id at 30 (citing December Order, 193 FERC ¶ 61,217 at PP 209, 219). 185 of 515

PDF page 187

Document Acc„sicIPA: 2A-AQq18 -3Q9cUrnent:FlAd rPaqg?:6,168/618/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 29 -
Exelon and FirstEnergy argue that, based solely on these uses of the transmission system, Co-Located Loads have no greater claim to preferential rates than other similarly situated transmission customers. Exelon and FirstEnergy argue that the Commission failed to consider the many advantages to Co-Located Loads when they connect to the transmission system. For example, Exelon and FirstEnergy assert that, if the project were islanded instead of grid connected, all back-up generation would sit idled when not needed, forgoing significant revenues from selling surplus power into the wholesale market. Exelon and FirstEnergy also allege that it is very difficult to supply islanded generation with black start and regulation.m2

54. Exelon and FirstEnergy argue that the Commission failed to respond to arguments about the unique aspects of co-location with nuclear plants. Exelon and FirstEnergy state that a nuclear facility must be interconnected to the grid as a Nuclear Regulatory Commission licensing obligation, and thus a Co-Location Arrangement with a nuclear unit depends on the grid.'03  Exelon and FirstEnergy assert that, in a Co-Location Arrangement with a nuclear unit, Co-Located Load depends on services such as regulation, voltage support, black start, and other ancillary services delivered over the grid all the time because nuclear units cannot provide these services.104 c. Determination

55. On rehearing, we sustain the Commission's finding in the December Order that the Tariff is unjust and unreasonable!" First, we continue to find that the Tariff does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load " 2  Id at 31.

103 Id at 32-33 (citing Exelon, Docket No. EL25-20-000, Comments, attach. 1, 11-13, 16)).

104  Id at 32 (citing Exelon, Docket No. EL25-20-000, Comments, attach. 1, ¶¶ 14-19)). 105 December Order, 193 FERC ¶ 61,217 at PP 175-177. As discussed in the December Order, we continue to find the Tariff also unjust and unreasonable in additional related ways—for example, we continue to find that the Tariff is unjust and unreasonable because it does not address charges for black start and regulation service to Eligible Customers taking transmission service on behalf of Co-Located Load. Id. P 159. We do not interpret Exelon and FirstEnergy, however, to be disputing this finding. Separate portions of this order address our findings in this proceeding that additional aspects of the Tariff are unjust and unreasonable. 186 of 515

PDF page 188

Document Accessig@g 2A'AqA1.8-3Q@cument:lita rFAV:6143A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 30 -
and Eligible Customers taking transmission service on behalf of Co-Located Load.10' Second, we continue to find that the Tariff does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.107

56. Substantial evidence supports the Commission's finding that the Tariff lacks sufficient clarity as to the rules governing Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.108  There is significant support in the record for this finding.109  In particular, PJM recognizes that its Tariff lacks sufficient clarity in this area!" We also find persuasive the comments in the record from a range of stakeholders reflecting the uncertainty facing entities seeking to effectuate Co-location Arrangements within PJM.111

1°6 Id P 175.
1°71d. P 177.
108  Id PP 175-176. 1°9  Id. P 176 n.376. 110 PJM March 24, 2025 Response at 32 (noting that its "Tariff provisions d[o] not contemplate the type of arrangements at issue in this docket"); id at 35 ("The extent to which netting [rules under the Tariff] could . . . apply to co-located data center load is not clear at this time."); see also Vistra April 23, 2025 Reply Comments at 11 (arguing that PJM has "effectively conceded" that the Tariff does not contain sufficient clarity).
111  See Constellation May 8, 2025 Answer at 3-9 (collecting record support and concluding "[i]n sum, the record in this proceeding unequivocally supports the . . . finding that the PJM Tariff lacks clear co-location rules"); AEU April 23, 2025 Reply Comments at 19 ("Loads and generators pursuing [C]o-[L]ocation [A]rrangements need clarity as to how these arrangements will be studied, and how those studies will be evaluated. There must be a level of uniformity and detail outlining study requirements to ensure regulatory certainty for large loads and new generation and storage resources seeking to serve large loads. This level of uniformity is currently lacking in PJM's interconnection procedures and cost allocation methodology . . . ."); Electric Power Supply Association (EPSA)/PJM Power Providers Group (P3) April 23, 2025 Reply Comments at 2 ("EPSA and P3 agree with the Commission that PJM needs to establish tariff provisions and rules to accommodate the array of [C]o-[L]ocated [L]oad arrangements that will facilitate the timely and effective integration of large loads locating in the region."); DCC April 23, 2025 Reply Comments at 7 (".. . [T]he Commission should direct PJM to develop clear, enforceable tariff language that affirms 187 of 515

PDF page 189

Document AccessigPSg qq-2.-VA-18-349cument:Flibd EPaggp: 6168A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 31 -
57. Further, there has been significant confusion and dispute over what rules govern Co-Location Arrangements in PJM. As the Commission found in the December Order, the absence of clear tariff provisions creates uncertainty that has resulted in disparate treatment of potential Co-Location Arrangements in PJM, where transmission owners have taken different approaches to performing the necessary steps that apply to Interconnection Customers seeking to serve Co-Located Load through a Co-Location Arrangement, leading to no consistent understanding of entities' responsibilities with respect to their planned Co-Location Arrangements.112  Further, in 2024, PJM developed a now-rescinded "Guidance Document," which included non-binding guidance for generators and loads seeking to enter into Co-Location Arrangements"3—further suggesting that PJM's existing Tariff did not provide sufficient clarity resulting in a lack of consistent understanding among stakeholders. Indeed, parties have raised varying interpretations of the rules that apply to Co-Location Arrangements across Commission proceedings.114

the permissibility of multiple co-location configurations, including those where load is served directly from a generation resource located on or near the same site. Tariff clarity is essential to reduce unnecessary disputes, avoid case-by-case confusion, and enable transmission providers to process interconnection and load addition requests efficiently and predictably.").

112  December Order, 193 FERC ¶ 61,217 at P 175 & n.375 (citing Constellation, Complaint, Docket No. EL25-20-000 (filed Nov. 22, 2024); Baltimore Gas & Electric Company and PECO Energy Company, Petition for Declaratory Order, Docket No. EL24-149-000 (filed Sept. 30, 2024); Constellation April 23, 2025 Reply Comments at 4 n.4). 113  PJM, PJM Guidance on Co-Located Load (Mar. 22, 2024) (updated Apr. 17, 2024), https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/pjm- guidance-on-co-located-load.pdf.
114  For instance, an amended ISA to which PPL was a party stated that "The Co-Located Load is not Network Load, and it is intended that the Co-Located Load will never consume capacity and/or energy from the PJM Transmission System." PJM Interconnection, L.L.C. (Susquehanna), Amended Susquehanna ISA, Docket No. ER24-2172, Schedule F, Part F (filed June 3, 2024); see also, e.g., PJM Interconnection, L.L.C., 189 FERC ¶ 61,078, at PP 14, 26 (2024). On the other hand, there are allegations in the record that Exelon has delayed work on Constellation's requests to co-locate load with certain of its generators due to Exelon's concerns that such requests are not allowed under the Tariff without arranging for wholesale 188 of 515

PDF page 190

Document AccessigPSA:  2AA4516-349cument:Flitd rFas@g9: jd8A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 32 -
58. In fact, based on our review of the Tariff, the Tariff indeed does not contain provisions specifying the rules governing Co-Location Arrangements.' For instance, the Tariff lacks provisions specifying: the terms and conditions for Interconnection Customers seeking to use their generators to serve Co-Located Load;116  that an Interconnection Customer who will use its generator to serve Co-Located Load must designate an Eligible Customer who will take transmission service on behalf of the Co-Located Load;117  the rules governing transmission service—including the rates, terms, and conditions of that service—taken by an Eligible Customer on behalf of Co-Located Load;118  and the charges for black start and regulation service to Eligible Customers taking transmission service on behalf of Co-Located Load!" In sum, due to the absence of these provisions, the Tariff lacks sufficiently clear answers to important questions about how to effectuate Co-Location Arrangements.

59. The finding that the Tariff is unjust and unreasonable due to the lack of sufficient clarity is bolstered by several factors. First, the lack of sufficient clarity leaves entities unable to determine what steps they can or must take to effectuate or administer Co-Location Arrangements of various configurations.12°  Interconnection Customers seeking to use their generators to serve Co-Located Load have no means of knowing their responsibilities with respect to serving Co-Location Arrangements and the terms and conditions that apply to these arrangements.121  Without an Eligible Customer designated to take transmission service on behalf of a Co-Located Load, the Tariff lacks a mechanism to address and ensure proper charges for situations in which a Co-Located Load withdraws energy from the transmission system.122  Second, an absence of transmission or retail distribution service. February Order, 190 FERC ¶ 61,115 at PP 51,

75. 115  December Order, 193 FERC ¶ 61,217 at P 175.
"6  Id P 176.
" 7  Id.
118 I d.; see also, e.g., id. P 175. 119 Id. P 177; see also id PP 159, 181-185. 120 Id. P 175.
121  Id. P 176.
122  Id Indeed, Exelon and FirstEnergy concede that they agree that "[a]n Eligible Customer serving a co-located load must be designated because it is the Eligible 189 of 515

PDF page 191

Document AccessigPSA:  qq-2-Vg18-3P8cument:Fhtd rEN9: 6169A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 33 -
sufficient clarity in these circumstances creates regulatory uncertainty, thus undermining a "central purpose" of the FPA—"predictability."I23  Third, the lack of sufficient clarity leads here to the potential for undue discrimination, preferential treatment, or otherwise unjustifiable disparate conduct. As discussed above, disparate treatment has occurred in PJM, where transmission owners have taken different approaches to addressing Co-Location Arrangements.124  Finally, the lack of sufficient clarity introduces the risk that costs related to Co-Location Arrangements may not be allocated consistent with cost causation principles because, for instance, Eligible Customers taking transmission service on behalf of Co-Located Load could benefit from regulation and black start services without contributing to cost recovery for such services, thus risking that costs may be allocated entirely to other transmission customers and passed through to residential customers, among others.125  In total, these factors are magnified by the facts that Co-Location Arrangements are becoming increasingly common in PJM, entities continue to raise issues involving Co-Location Arrangements with the Commission,I26  and Co-Location Arrangements may include large amounts of load and generation. Given these ramifications and consistent with precedent,127  the Commission appropriately found that the lack of sufficient clarity in the Tariff has rendered it unjust and unreasonable. Customer that seeks and obtains transmission service and pays for it." Exelon and FirstEnergy Request for Rehearing at 2.

123  PJM Power Providers Grp. v. FERC, 96 F.4th 390, 401-02 (3d Cir. 2024) (describing a central purpose of the filed rate doctrine: predictability). Ensuring predictability ultimately supports a primary purpose of the FPA, "encourag[ing] the orderly development of plentiful supplies of electricity . . . at reasonable prices." Pub. Utils. Comm'n of Cal. v. FERC, 367 F.3d 925, 929 (D.C. Cir. 2004) (quoting NAACP v. FPC, 425 U.S. 662, 670 (1976); see EPSA, 577 U.S. at 290 ("The statute aims to protect `against excessive prices' and ensure effective transmission of electric power." (citations omitted)).

124  December Order, 193 FERC ¶ 61,217 at P 175; February Order, 190 FERC ¶61,115 atP 75.
125  December Order, 193 FERC ¶ 61,217 at P 177; see also id. PP 181-185. 126  Id P 4.
127  E.g., Invenergy Transmission LLC v. Midcontinent Indep. Sys. Operator, Inc., 193 FERC ¶ 61,033, at P 53 (2025) (finding tariff unjust and unreasonable because it did not address when and how certain transmission projects are incorporated into a transmission planning model and because existing provisions lacked "sufficient specificity and certainty"); PJM Interconnection, L.L.C., 167 FERC 1161,030, at PP 22, 41, 59 (2019) ("[W]e find that the PJM Operating Agreement is unjust and unreasonable 190 of 515

PDF page 192

Document Ac„„ig@g 2A-Aqq1.8 - 3P9P-Inlent:Filtd IPa@g9: je9/11812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 34 -
60. Notwithstanding the Commission's findings, Exelon and FirstEnergy argue that because the Tariff provides for NITS and point-to-point service (PTPS)—with terms governing them—"[t]here is no inability to determine how to serve [co-located] load in PJM."128  Yet, the existence of provisions governing NITS and PTPS does not undermine our findings that the Tariff both lacks sufficient clarity and does not contain provisions specifying the rules governing Co-Location Arrangements. The applicability, operation, and/or interpretation of the cited general provisions (among others) with respect to Eligible Customers taking transmission services on behalf of Co-Located Load and Co-Location Arrangements are the issues that, in part, give rise to the lack of sufficient clarity we target here.

61. Next, Exelon and FirstEnergy respond to the Commission's citation of the Constellation Complaint by blaming "any delay" giving rise to uncertainty on Constellation.129  But this response misunderstands the Commission's reasoning. The Commission cited the Constellation Complaint as one piece of evidence to demonstrate that there is "no consistent understanding" of the rules governing Co-Location Arrangements. 130

62. Similarly, Exelon and FirstEnergy allege that "in 2025, [Commonwealth Edison Company] received more than 25 customer service applications for large load service, representing new load in excess of 20 GW" and "[t]here is no suggestion in the record that any customer is encountering problems with those requests."131  Beyond the fact there is no representation that any of those applications relate to Co-Located Load, this limited set of applications before a single Transmission Owner does not demonstrate because it fails to provide a sufficient level of clarity regarding the permissible components of energy market cost-based offers"); N.Y. Indep Sys. Operator, Inc., 162 FERC ¶ 61,107, at PP 160, 173 (2018) ("We find this difference in definitions to be unclear and, therefore, unjust and unreasonable"); Dominion Energy Mktg., Inc., v. ISO New Eng. Inc., 155 FERC ¶ 61,121, at P 17 (2016) ("We find that [the] existing Tariff is unclear as to whether new incremental capacity and existing capacity at the same generating station must submit a composite offer in order to participate in [a capacity auction]. As a result of this lack of clarity, the Tariff fails to provide adequate notice of what the requirement is and, thus, we find the Tariff is unjust and unreasonable.").

128  Exelon and FirstEnergy Request for Rehearing at 14-15.
129  Id. at 15-16. 13°  December Order, 193 FERC ¶ 61,217 at P 175.
131  Exelon and FirstEnergy Request for Rehearing at 17. 191 of 515

PDF page 193

Document AccessigPfr; 4c)AQA18-3R8..Cument:FlAd rpAg:6169/48/2 pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 35 -
sufficient clarity even if those requests "proceed on a timely basis.i132  As explained above, the Commission continues to be concerned about disparate treatment by different Transmission Owners in this context.133

63. Exelon and FirstEnergy also state that in one proceeding pertaining to Co-Located Load, a load and generator entered into a "front-of-the-meter" arrangement and thus "conceded that PEW Network Service works . . . and is a service upon which all customers may rely."134  A decision in one proceeding to abandon a Co-Location Arrangement does not undermine the Commission's finding that there is a lack of sufficient clarity related to Co-Location Arrangements writ large (and, in fact, might support it).

64. Finally, Exelon and FirstEnergy contend that "No the extent clarification was needed, the Commission has now clarified . . . that these arrangements must be properly metered and must designate and involve transmission service to an Eligible Customer."135 This argument is misplaced. Exelon and FirstEnergy's argument that the replacement rate should be narrower—that only part of it would be sufficient—should be directed not to the finding that the Tariff is unjust and unreasonable but to the determination of a just and reasonable replacement rate. Further, the portions of the replacement rate that Exelon and FirstEnergy reference—requiring proper metering and involving transmission service to an Eligible Customer—do not resolve the Commission's concerns as to a lack of sufficient clarity in the Tariff. For example, the Commission found a lack of sufficient clarity as to the terms and conditions for Interconnection Customers seeking to use their generators to serve Co-Located Load.136

65. We also continue to find that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.137  Requiring Eligible Customers taking 132  Id.

133  See supra notes 114, 126.
134  Exelon and FirstEnergy Request for Rehearing at 17-18 (discussing the proceedings in Docket Nos. ER24-2172-000 and ER24-2171-001).
135  Id. at 16-17.
136  December Order, 193 FERC ¶ 61,217 at P 176.
137 Id. P 177; see also S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41, 64-68 (D.C. Cir. 2014) (explaining that to find a practice unjust and unreasonable, the Commission need not rely on "empirical evidence" and can rely on "reasonable economic 192 of 515

PDF page 194

Document Acce„igPV; 22.A18-1.29cument:Flild JEN9:0,48/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 36 -
transmission service on behalf of Co-Located Load to take NITS, without the option to instead take such alternative transmission services, is economically inefficient. Here, the record demonstrates that some Eligible Customers taking service on behalf of Co-Located Loads are willing and able to limit their energy withdrawals. With only the current services offered, having found that Eligible Customers taking NITS will be charged based on gross load, prospective Eligible Customers taking transmission service on behalf of Co-Located Load would have to take a transmission service that does not reflect the load's willingness and ability to limit use of the transmission system—which is an inefficient result. The Commission has long recognized that providing differentiated service options can produce more efficient results because customers can choose the service that is most closely tailored to their specific needs, rather than a one-service-fits-all approach.138  Requiring Eligible Customers taking service on behalf of Co-Located Loads to take NITS creates an unacceptable risk of more costly Network Upgrades that would be unnecessary if such Eligible Customers were willing and permitted to take a transmission service that reflects Co-Located Loads that are willing propositions" "likely enough to be within the Commission's authority" and noting that the use of words such as "might, may, or could" does not make its determination legally deficient (internal quotation marks omitted)).

138  See, e.g., Integration of Variable Energy Res., Order No. 764, 139 FERC ¶ 61,246, at PP 2, 22, order on reh'g & clarification, Order No. 764-A, 141 FERC ¶ 61,232 (2012), order on clarification & reh'g, Order No. 764-B, 144 FERC ¶ 61,222 (2013) (explaining that the Commission sought "to provide all transmission customers the option of using more frequent transmission scheduling intervals within each operating hour, at 15-minute intervals," which will allow them "the flexibility to adjust their transmission schedules, thus limiting their exposure to imbalance charges" and lead to "more efficient utilization of transmission and generation resources"); Standardization of Generator Interconnection Agreements & Procs., Order No. 2003, 104 FERC ¶ 61,103 (2003), order on reh'g, Order No. 2003-A, 106 FERC ¶ 61,220, at P 534, order on reh'g, Order No. 2003-B, 109 FERC ¶ 61,287 (2004), order on reh'g, Order No. 2003-C, 111 FERC ¶ 61,401 (2005), aff'd sub nom. Nat'l Ass 'n of Regul. Util. Comm 'rs v. FERC, 475 F.3d 1277 (D.C. Cir. 2007) (explaining that "an Interconnection Customer that elects to be studied for Network Resource Interconnection Service has the option also to be studied for Energy Resource Interconnection Service and proceed with Network Resource Interconnection Service or a lower level Interconnection Service whereby only certain Network Upgrades will be completed" and finding that "[t]his option thus allows the Interconnection Customer to avoid having to fund Network Upgrades that it does not need"). 193 of 515

PDF page 195

n6aufnent Accessigi
qq-2-13§g-1.8-3P8ument:Filtd rPa,q09:6169/1 8/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 37 -
and able to limit their energy withdrawals.139  We further reiterate that there is support in the record for the foregoing analysis.14°

66. On rehearing, Exelon and FirstEnergy dispute the Commission's finding that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking transmission service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions."1  First, Exelon and FirstEnergy argue that "there is no evidence that the cost of paying for Network Service deters service or has any impact whatsoever on development of data centers" because "data center development interest in PJM is overwhelming.59142 But the Commission was not required to show that its FPA section 206 step one findings would have a particular effect on data centers. Instead, as explained in the prior paragraph, the Commission's findings relate to economic and other harms from a lack of transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system.143  In any event, we continue to reason that requiring Eligible Customers taking transmission service on behalf of Co-Located Load to take NITS does have a negative impact relative to transmission services that reflect these loads' willingness and ability to limit energy withdrawals. These negative impacts could include unnecessary Network Upgrade costs, which cause an unjust and unreasonable increase in transmission rates. The assertion that "development interest" in data centers may currently be high, or will remain high if Eligible Customers taking transmission service on behalf of Co-Located Loads that are willing and able to limit their withdrawals from the transmission system are required to take NITS on a gross basis, does not address the counterfactual at issue (i.e., requiring Eligible Customers taking transmission service on behalf of Co-Located Load to take NITS relative to transmission services that reflect these loads' willingness and ability to limit energy withdrawals).

67. Second, Exelon and FirstEnergy contend that the Commission has no evidence144 to support the risk of "costly and inefficient transmission system buildout" under NITS

139  December Order, 193 FERC ¶ 61,217 at PP 177, 199, 205. 140  Id. PP 199 & n.423, 205, 434; see also PP 160, 177-178. 141  Exelon and FirstEnergy Request for Rehearing at 18. 142  Id at 18-19.
143  December Order, 193 FERC ¶ 61,217 at P 177.
144  Exelon and FirstEnergy Request for Rehearing at 19-20 (citing, among other things, December Order, 193 FERC ¶ 61,217 at P 199). 194 of 515

PDF page 196

Document AccessigPV; 2qA C7R18-3Q9curnent:FlAd LFasqg: jegA 8 / 2PAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 38 -
compared to "fewer Network Upgrades" and "lower Network Upgrade costs" under an alternative service.145  To the contrary, the Commission has provided a robust rationale for this risk, as explained above. Exelon and FirstEnergy state that "network studies are based on physics and engineering" so NITS cannot "impose[] unnecessary transmission upgrade costs."'" We agree with the premise that studies are based on physics and engineering, but not the conclusion. Many Network Upgrades are caused by the amount of MW flow on the transmission system but certain Network Upgrades are not (e.g., they may be caused by stability or voltage-related issues).147  Therefore, as Exelon and FirstEnergy concede, under a transmission service designed to reflect load's willingness and ability to limit energy withdrawals, "if the load installs systems aimed at limiting its use of the grid, those might change the system impacts and need for upgrades."'" Conversely, NITS requires PJM to plan the transmission system to deliver power to load, l49  even if that load does not intend to ever withdraw power from the system, which could result in unnecessary Network Upgrades. Exelon and FirstEnergy also claim that "[t]he fact that a load is located near a generator may well reduce system impacts . . .

145  December Order, 193 FERC ¶ 61,217 at P 177. 146  Exelon and FirstEnergy Request for Rehearing at 19.
147  Exelon and FirstEnergy additionally contend that "even when no net power is being withdrawn from the system . . . the transmission system is affected and needed by the load—indeed, the Commission agreed with this proposition when it found that co- located loads do utilize load-following based on gross rather than net load." Id at 19-21. Again, we do not find that the need for Network Upgrades is based only on withdrawals; instead, we find that reducing the amount of MW flow can lead to the need for fewer or less costly Network Upgrades. The December Order does not promote ignoring impacts when no net power is being withdrawn. 148  Id at 19-20. We note that Exelon and FirstEnergy also state that "the same can be said for similar systems applied to other loads. Nothing in the record [supports] that such systems are more beneficial for co-located load projects than for any other load [or] the use of different ratemaking principles when such installations are in place. To the contrary, . . . the Commission has consistently rejected arguments that different ratemaking should be applied even where there are physical limits to the amount of transmission system use." Id. We understand these arguments as directed to the replacement rate, and thus we address them below. To the extent they are directed to the Commission's FPA section 206 step one finding, we disagree for the same reasons stated below. 149 PJM, Intra-PJM Tariffs, OATT, § III, § 28.2 (Transmission Provider Responsibilities) (1.0.0). 195 of 515

PDF page 197

Document Accessigl?sg 2A-206,A18 _399curnent:Flil d tpa g9: (-31,9A8, 2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 39 -
regardless of whether the load has contracted with the generator it abuts, or with remote generation."15°  This assertion ignores the fact that a new transmission service reflecting willingness and ability to limit energy withdrawals could further reduce system impacts-for instance through the "systems aimed at limiting [the] use of the grid" that Exelon and FirstEnergy reference. I51  We similarly disagree with Exelon and FirstEnergy's claim that a new transmission service would not "alter what must be studied in assessing the physics and engineering of any proposed new configuration." 52 Studies for a customer taking a new transmission service that limits the amount of energy that may be withdrawn would reflect that limitation.153  Such potential transmission service could alter the level of steady-state transmission system usage studied (i.e., the "physics") and the design of the physical facilities, necessary control technologies, and/or protection systems needed to effectuate that arrangement compared to a traditional Network Customer (i.e., the "engineering"), contrary to Exelon and FirstEnergy's assertions.

68. Third, Exelon and FirstEnergy assert that the Commission contradicted itself in finding the Tariff unjust and unreasonable in lacking alternative transmission services because the Commission also stated that "`it continues to be just and reasonable for an Eligible Customer taking transmission service on behalf of Co-Located Load to elect, as one of the required transmission services from which the Eligible Customer must choose, to take NITS.'"154  The Commission did not find that current set of transmission service options is just and reasonable. Instead, the Commission stated, it continues to be just and reasonable for such an Eligible Customer "to elect" NITS "as one of the required 150 Exelon and FirstEnergy Request for Rehearing at 20.

151  Id. at 19-20. Exelon and FirstEnergy likewise claim that Co-Location Arrangements "will have the same potential benefit regardless of whether there is a contractual supply arrangement with a nearby generator and regardless of whether it pays for transmission service based on net or gross load." Id. at 21. This assertion again misses the key distinction. Under a new alternative transmission service reflecting willingness and ability to limit energy withdrawals, there could be fewer or less costly Network Upgrades if the Eligible Customer can select a lower (but otherwise satisfactory) level of demand.

152  Id. at 20.
153  Exelon and FirstEnergy state that "[t]here is simply no evidence" for an argument that a new transmission service could speed access to service. Id. But the Commission's findings are not based on speeding access to service or creating "fast-track interconnection." Id. at 20-21.
154  Id. at 21-22 (quoting December Order, 193 FERC ¶ 61,217 at P 195). 196 of 515

PDF page 198

Document Acc„sigPsP; 226`0`618-3Wcurnent:Filtd IPA99:616971 8 2PAe Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 40 -
transmission services."155  But it is unjust and unreasonable for that set of options to lack the alternatives the Commission discussed.156

69. Fourth, Exelon and FirstEnergy argue that the Commission's finding that the Tariff is unjust and unreasonable because it lacks alternative transmission service options misunderstands the benefits and burdens "to co-located projects of being interconnected to the grid."157  The Commission did not find, however, that Co-Located Loads could receive no benefits from or place no burdens on the transmission system. Instead, the Commission found that the Tariff was unjust and unreasonable because it did not reflect the features of Co-Location Arrangements that make the existing transmission service options unacceptable.15°  An Eligible Customer taking transmission service on behalf of Co-Located Load must be charged for the benefits received from and the burdens placed on the transmission system—but that does not mean the status quo is not unjust and unreasonable. Co-Located Load may be able to reduce the benefits received from and the burdens placed on the transmission system if it is willing and able to limit energy withdrawals. We do not dispute, and indeed continue to find, that Co-Located Loads do receive benefits even if they have zero net energy withdrawals, specifically from regulation and black start services.159  The Commission's finding that the Tariff is unjust and unreasonable does not preclude the recognition of those benefits.

70. Finally, Exelon and FirstEnergy maintain that the Commission's "finding that the existing PJM Tariff is [unjust and unreasonable] is arbitrary and capricious because the Commission failed to consider the unique issues that attend co-location with nuclear plants."16°  This argument is misplaced. The Commission found that the Tariff is unjust and unreasonable for, in part, the two reasons discussed above.16I  In particular, the Commission found the Tariff unjust and unreasonable because it does not include an option for Eligible Customers on behalf of Co-Located Loads to take transmission services that reflect their willingness and ability to limit their energy withdrawals from

155  December Order, 193 FERC ¶ 61,217 at P 195 (emphasis added). 158 Id. P 177.
157  Exelon and FirstEnergy Request for Rehearing at 30-32; see also id. (discussing various benefits and burdens). 158  December Order, 193 FERC ¶ 61,217 at P 177.
159  Id. P 185. 160 Exelon and FirstEnergy Request for Rehearing at 32-33. 161 December Order, 193 FERC ¶ 61,217 at PP 176, 177. 197 of 515

PDF page 199

Document A„„sigP
SA qq25"218-348cu ment.F11td Ii3ag:6169A8/ 2 pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 41 -
the transmission system. The fact that a nuclear generator in a Co-Location Arrangement might be dependent on the transmission system because that nuclear generator cannot operate without a robust interconnection to the transmission system, or cannot load follow, does not undermine these core findings. Exelon and FirstEnergy attempt to use these facts to conclude that the Co-Located Load is effectively using the transmission system in a similar manner to a load served by remote resources. We disagree because, regardless of load following, the energy used by the Co-Located Load is provided (at least in part) by its Co-Located Generator, not via the transmission system. Eligible Customers on behalf of Co-Located Loads that are served by a Co-Located Generator that is a nuclear generator should be permitted to take transmission services that reflect that they are willing and able to limit their withdrawals from the transmission system under certain conditions. To the extent a nuclear generator that is part of a Co-Location Arrangement operates differently than other Co-Located Generators, that is an issue that may be assessed in subsequent study processes, or simply by the nuclear generator itself, as the Interconnection Customer (not the Eligible Customer) in determining whether and how to enter into a Co-Location Arrangement.

2. Retail BTMG Netting Rules
a. Scope and Adequate Notice
i. December Order
71. The Commission found that PJM's retail BTMG netting rules are no longer just and reasonable and clarified that this finding applies to all Network Load.162

ii. Request for Clarification and/or Rehearing
72. Citing the Administrative Procedure Act (APA) and Commission Rule 209, Industrials argue that changes to retail BTMG netting rules are outside the scope of the February Order.163  Industrials assert that the February Order set the scope of the proceeding and limited it to Co-Located Load and Co-Location Arrangements, thus excluding BTMG. Industrials argue that no part of the February Order included the possibility of the Commission's BTMG netting findings in the December Order. Industrials allege there are important distinctions between Co-Location Arrangements and BTMG, particularly that a BTMG arrangement is a retail load-modification

162 Id. P186.
163  Industrials Request for Clarification or Rehearing at 22 (citing 5 U.S.C. § 706; 18 C.F.R. § 385.209 (2025)); see also 5U U.S.C. § 554. 198 of 515

PDF page 200

Document AccessigPA:  2q-Aegi.8-31?@c ument:FlAd rfasq99: ja9A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 42 -
construct, whereas a Co-Location Arrangement is a wholesale-system-impacting load integration construct.'"

iii. Determination
73. We disagree with Industrials that changes to retail BTMG netting rules are beyond the scope of this proceeding because the Commission provided adequate notice as to those changes.

74. Under the APA, an agency setting a matter for hearing must provide parties with adequate notice of the issues that would be considered, and ultimately resolved, at that hearing.165  Under Commission Rule 209(b), "an order to show cause will contain a statement of the matters about which the Commission is inquiring, and a statement of the authority under which the Commission is acting. The statement is tentative and sets forth issues to be considered by the Commission."'66

75. While Industrials allege that the Commission in the February Order "set the scope of the proceeding to Co-Located Load,"167  the Commission did no such thing. The February Order contains no finding limiting the proceeding's scope to "Co-Located Load." Instead, the February Order also expressly raises, among many other topics, relevant generation configurations16S  and overall addresses issues that attend to load with on-site or otherwise nearby generation, which logically includes BTMG.'69 164  Industrials Request for Clarification or Rehearing at 22-26.

165  N. Va. Elec. Coop., Inc. v. FERC, 945 F.3d 1201, 1205 (D.C. Cir. 2019); 5 U.S.C. § 554(b)(3) (establishing notice requirement for adjudications). 166  18 C.F.R. § 385.209(b).
167  Industrials Request for Clarification or Rehearing at 22. 168  February Order, 190 FERC ¶ 61,115 at P 79. 169  Id. P 76 (discussing concerns related to generation and load being "likely to use or benefit from the transmission system in different ways depending on how they are configured" and giving examples such as "Network Load may co-locate with a generator that is not a grid resource and that either serves the load as an off-grid backup or that reduces the Network Load's consumption during peak hours" (emphasis added)). 199 of 515

PDF page 201

Document AccessigsiP:: 2-A-A6g48 _3Qpcument:Flil d rEN: gp/q.8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 43 -
76. In any event, Industrials themselves acknowledge that the Commission's briefing questions in fact specifically included BTMG.170  In particular, the Commission asked parties to address "how co-located loads are similar to or disparate from other types of arrangements where load and generation share the same point of interconnection (such as Behind the Meter Generation[)]."171  This question reflects that the Commission would consider BTMG configurations in determining a just and reasonable replacement rate. Industrials contend that the Commission's reference to "other arrangements" in this question shows that retail BTMG and Co-Located Load are distinct concepts, but Industrials' claims are belied by their assertions in their reply comments to the February Order that BTMG configurations and Co-Location Arrangements identically impact the transmission system.I72  And regardless of their similarity, the Commission's briefing question raises the subject of the treatment of BTMG. Additional briefing questions in the February Order also sufficiently raise the subject of BTMG. The Commission directed parties to submit briefing on transmission services, including potential changes to the rates, terms, and conditions of NITS to accommodate Co-Location Arrangements.173  PJM's retail BTMG netting rules are part of PJM's rates, terms, and conditions for NITS.174  Finally, the Commission also asked "whether portions of the Guidance Document may serve as a just and reasonable and not unduly discriminatory or preferential replacement rate,"175  and that document states, "[i]f the co-located Customer Facility elects to be designated as [BTMG], it will be allowed to net the co-located load directly against the output of the co-located Customer Facility."176  We thus find that the February Order provided adequate notice that the Commission would consider PJM's BTMG netting rules as part of this proceeding.

77. The record developed in response to the February Order further reflects that Industrials had notice and an opportunity to address changing PJM's retail BTMG netting 17°  Industrials Request for Clarification or Rehearing at 25.

171 February Order, 190 FERC ¶ 61,115 at P 88 (briefing question a.iv). 172 PJM ICC and IECA April 23, 2025 Reply Comments at 9.
173 February Order, 190 FERC ¶ 61,115 at P 88 (briefing question b.iv).
174  PJM, Intra-PJM Tariffs, OATT, § III, § 34.2 (Netting of Behind the Meter Generation) (0.0.0).
175  February Order, 190 FERC ¶ 61,115 at P 88 (briefing question a.iii).
176 PJM, PJM Guidance on Co-Located Load (Mar. 22, 2024) (updated Apr. 17, 2024), https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/pjm- guidance-on-co-located-load.pdf. 200 of 515

PDF page 202

Document AccessigPV; 2%Aftg1.8-346cument:Flild  rFas@gp: (4)/118/2pAte Filed 10/16/2026 Docket No. EL25-49-002, et al.

- 44 -
rules. While Industrials attempt to minimize the briefing questions as "scarcely mention[ing]" BTMG among a large number of topics in the February Order, PJM submitted detailed concerns that the retail BTMG netting rules were no longer just and reasonable in direct response to the February Order.177  And parties debated the merits of PJM's concerns in reply comments.178  All parties, including Industrials, had an opportunity to rebut PJM's claims before the Commission could weigh the evidence on this matter. As courts have explained, subsequent briefing on a topic serves as evidence of adequate notice as to that topic.'"

b. Whether PJM's Retail BTMG Rules Are Unjust and
Unreasonable
i. December Order
78. In finding that PJM's retail BTMG netting rules are no longer just and reasonable, the Commission explained that circumstances had changed since the Commission approved PJM's rules in 2004.180  The Commission stated that PJM explains that the BTMG netting rules were "conceived for, and [have] been implemented for, substantially smaller loads (like a warehouse with solar panels) and not on the scale of large data

177  PJM March 24, 2025 Response at 34 ("The co-located load arrangements at issue here, large data centers, could be viewed as similar to BTM Generation that currently exists under PJM's Tariff (as reflected in Ex. A, Option 3). But as explained herein, the BTM Generation paradigm does not fit co-location arrangements particularly well because it was not designed with large load co-location in mind."); id at 36-37 ("In sum, discussions in the record regarding PJM's BTM Generation rules raise questions about the status of those rules. PJM is open to exploring . . . whether the 20-year-old method of allocating costs pursuant to the BTM Generation netting rules remains consistent with cost causation principles.").
178  Compare AMP April 23, 2025 Reply Comments at 10 ("The record provides no basis to revisit the current PJM Tariff provisions addressing BTMG."), with Northeastern Rural Electric Membership Corporation (NREMC) April 23, 2025 Reply Comments at 5 ("Additionally, simple netting of generation against load could allow these facilities [i.e., data centers] to avoid most, if not all, costs by netting out to zero as the entire load is supplied by the co-located generator, despite the co-located loads reliance and benefit from the grid. This would shift costs and burdens unfairly to other users, violating core principles of just and reasonable ratemaking."). 179  N. Va. Elec. Coop., Inc., 945 F.3d at 1206. 180 December Order, 193 FERC ¶ 61,217 at P 186 (citing PJM, 107 FERC ¶ 61,113 (2004) (2004 BTMG Order)). 201 of 515

PDF page 203

Document AccessiglPg 2A-2306,A-1s - 311;9c ument:Fl il d  dpAg:(27,0A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 45 -
centers."181  However, the Commission stated that large loads, both existing and in the planning stages with PJM, have proliferated in recent years, and PJM has persuasively explained the problems that could occur if Network Customers with large loads were allowed to use the existing BTMG netting rules in the Tariff.182  The Commission stated that, for example, PJM explains that "[a]llowing very large loads like data centers to net is problematic because loads in this configuration do not carry reserves."183  The Commission stated that such loads must nevertheless be served, however, allowing them to "lean on the PJM system when the [BTMG] is on a full or partial outage or if the load exceeds the rating of the [BTMG].13184 The Commission emphasized that PJM's existing BTMG netting rules do not limit the amount of qualifying load that a Network Customer may net by using BTMG and do not provide any protections against this potential transmission and resource adequacy planning problem or against the costs of maintaining sufficient resources to serve these loads being shifted onto other customers.185  The Commission found that PJM's BTMG netting rules are no longer consistent with cost causation principles, because large loads configured in a BTMG arrangement with significant generation will raise cost-shifting concerns compared to loads pursuing smaller amounts of netting. The Commission found that PJM's existing BTMG netting rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.

ii. Request for Clarification and/or Rehearing
79. Industrials argue that the Commission erred by failing to address prior precedent on cost causation and failing to demonstrate that the existing BTMG netting rules were

181  Id. (quoting PJM March 24, 2025 Response at 13). 182 7.

la (citing Docket No. AD24-11-000, Large Loads Co-Located at Generating Facilities Tr. at 9:2-3 (noting that "large data centers [] need these significant new amounts of energy for their business"); PJM Interconnection, L.L.C., 188 FERC ¶ 61,200, at P 5 (2024) ("PJM explains that the [tariff] proposal [to allocate load adjustments] was spurred by the recent proliferation of data centers that are contributing to large additions of forecasted load concentrated within a specific wholesale metering area.")).

183  December Order, 193 FERC ¶ 61,217 at P 186 (quoting PJM March 24, 2025 Response at 36). 184  Id. (quoting PJM March 24, 2025 Response at 13 n.5).
185  Id (citing PJM, Intra-PJM Tariffs, OATT, § III, § 34.2 (Netting of Behind the Meter Generation) (0.0.0)). 202 of 515

PDF page 204

Document Ac„„igPSP; 2qAqA18-3R9cUrnent:Filtd rEq99:W 912pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 46 -
unjust and unreasonable.186  Industrials contend that Commission precedent established the "actual use" principle, which holds that "actual use" of the transmission system is a just and reasonable approach for assessing transmission charges that comports with cost causation.187  Industrials argue that the Commission here abandons the "actual use" principle by finding BTMG netting unjust and unreasonable.188  According to Industrials, the December Order also "creates an unreasonable split between those who manage costs by managing load and those who manage costs by investing in generation."189  "In other words," Industrials contend, "the effect of the `gross load' approach is unduly discriminatory, because it allows `actual use' to govern NITS costs for some (i.e., load-only customers), but not for others (i.e., those who have invested in retail behind-the-meter generation)."190  Industrials acknowledge that "[i]f standby fees or other charges need to be considered in accordance with cost-causation principles, the Commission may explore those," but argue that "eliminating altogether the assessment of charges based on `actual use' is unduly discriminatory and fails to reckon with well-established Commission precedent."1"

186  Industrials Request for Clarification or Rehearing at 34; see also id. at 5, 19-20.
187  Id. at 35-36 (citing 2004 BTMG Order, 107 FERC 1161,113, at P 4 (finding "no transmission or distribution facilities are used to deliver energy from the generating unit to the load"); Occidental Chem. Corp. v. PJM Interconnection, 102 FERC ¶ 61,275, at P 14 (2003) (Occidental) ("Access charges for use of PJM's transmission system should be allocated to network customers based on a network customer's actual use of PJM's system, consistent with the principle of cost causation."); PJM Interconnection, L.L.C., 167 FERC ¶ 61,268, at P 23 (2019) (PJM) (affirming Commission's conclusion in Occidental that Network Customers' charges for use of PJM's transmission system should be allocated based on a Network Customer's actual use of PJM's system); ISO New Eng., Inc., 178 FERC 41161,086, at P 51 (2022) (ISO-NE) (finding just and reasonable ISO New England Inc.'s proposal to exclude from the Monthly Regional Network Load served by unregistered BTMG and the portion of the output of a Generator Asset that serves load located behind the same retail customer meter and assign Regional Network Service charges to Network Customers based on each Network Customer's actual use of the system)).
188  Industrials Request for Clarification or Rehearing at 35-37.
189  Id at 37.
190  Id. at 37-38. 191  Id. at 38. 203 of 515

PDF page 205

Document Accessigi@sg 2,Q"2P-Aii3-3PRcument:Filtd rPAg: gpA_8, 2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 47 -
80. Industrials argue that the Commission did not develop a sufficient record on which to base its determinations on BTMG netting rules in the Tariff.192  Industrials give several examples of "real-life facility configurations" that will face substantial harms or be undercompensated under a "gross load" approach.193  Industrials argue that, without a well-developed record, the Commission may not be able to fully recognize the cost causation implications of the removal of all netting rules.

iii. Determination
81. We disagree with Industrials that the Commission failed to address prior precedent in the December Order or show that PJM's retail BTMG netting rules were unjust and unreasonable.194  The Commission in the December Order summarized its decision approving PJM's retail BTMG netting rules, including the finding in the 2004 BTMG Order accepting the BTMG netting rules that "charges for use of PJM's transmission system should be allocated to network customers based on a network customer's actual use of PJM's system, consistent with the principle of cost causation."195  We recognize that the Commission's 2004 BTMG Order relied upon Occidental for the proposition that NITS charges should be based on actual use,196  and that, after 2004, the Commission has relied upon Occidental and/or the 2004 BTMG Order to support similar findings.197  But the Commission in the December Order did not find that it is no longer just and unreasonable to ever allocate transmission charges based on actual use. Rather, the Commission found that PJM's retail BTMG netting rules are no longer consistent with cost causation principles for a specific reason, that is, because large loads configured in a BTMG arrangement with significant generation will raise cost-shifting concerns

192  Id at 26; see also id at 6.
193  Id at 27-31; see also id at 4-5.
194  Id at 34-38.
195  December Order, 193 FERC ¶ 61,217 at P 7 (quoting 2004 BTMG Order, 107 FERC ¶ 61,113 at P 28); Id P 186 (citing 2004 BTMG Order, 107 FERC ¶ 61,113).
196  2004 BTMG Order, 107 FERC ¶ 61,113 at P 28 (citing Occidental, 102 FERC ¶ 61,275).
197  See PJM, 167 FERC ¶ 61,268 at P 23 (discussing Occidental for the proposition that the Commission has found that RTOs and transmission owners must recognize load reductions from interruptible load programs in computing billing determinants); ISO-NE, 178 FERC ¶ 61,086 at P 51 (finding just and reasonable ISO New England's proposal to charge Network Customers based on actual use of the system). 204 of 515

PDF page 206

Document AccessigRA kAgAi8-34@cument:Flild rENP:g60A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 48 -
compared to loads pursuing smaller amounts of netting.198  The Commission thus explained that these PJM retail BTMG netting rules, while previously consistent with cost causation principles at the time the Commission approved them, were rendered unjust and unreasonable by a change in circumstances. In further support of its finding that these rules are no longer just and reasonable, the Commission found that PJM's existing retail BTMG netting rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.199  The Commission orders relying on actual use principles that Industrials cite do not reflect the problems currently posed in PJM by large loads configured in a BTMG arrangement.m

82. We also disagree with Industrials that the Commission did not develop a sufficient record on which to base its determination in the December Order on PJM's retail BTMG netting rules.201  As discussed above, the Commission adequately supported its findings that PJM's retail BTMG netting rules are no longer just and reasonable. Importantly, the Commission relied on evidence submitted by PJM detailing problems that could occur if Network Customers with large loads were allowed to use the existing retail BTMG netting rules in the Tariff.202  Other parties raised similar concerns in the record."3

83. Industrials instead raise concerns that the Commission's decision results in significant economic harm to entities who have used PJM's retail BTMG netting rules

198 December Order, 193 FERC ¶ 61,217 at P 186. 189  Id.; see PJM, Intra-PJM Tariffs, OATT, § III, § 34.2 (Netting of Behind the Meter Generation) (0.0.0). 200 See, e.g., ISO-NE, 178 FERC ¶ 61,086 at P 8 (explaining that, decades ago, behind-the-meter generation was typically larger on-site generation connected to industrial load, but since then, behind-the-meter generation has evolved with increasing amounts of widely distributed behind-the-meter generation that is below 5 MW, such as solar photovoltaic generation).
201  Industrials Request for Clarification or Rehearing at 26-27.
202  December Order, 193 FERC ¶ 61,217 at P 186 ("For example, PJM explains that "[a]llowing very large loads like data centers to net is problematic because loads in this configuration do not carry reserves.") (quoting PJM March 24, 2025 Response at 36). 203 Id.

P 73 ("NREMC argues that large Co-Located Loads paired with BTMG
present significantly greater operational risks than traditional BTMG arrangements because they lack adequate reserves.") (citing NREMC April 23 Reply Comments at 5). 205 of 515

PDF page 207

Document Accessigi?SP; qq-AX18-3R99UMent:FlAd
812
e
g,0,6Ate Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 49 -
and the Commission may not have fully recognized the cost causation implications of the removal of all netting rules.204  We find these concerns unpersuasive for several reasons. First, we believe Industrials' argument concerns how the Commission fashions a replacement rate that determines the extent to which entities may be able to continue to rely on netting,205  not to the Commission's finding that the existing rate in PJM is no longer just and reasonable.

84. Second, as the Commission explained in the December Order in its determination on transmission services, NITS charges based on gross load for Network Load are roughly commensurate with the benefits received because Network Load has the right to be served from the transmission system at any time.206  The Commission's decision to revise PJM's retail BTMG netting rules may increase transmission charges for Network Customers who have used PJM's retail BTMG netting rules, but this change better aligns the benefits and costs for these customers and addresses cost-shifting concerns because it reflects the fact that they must be served even when their retail BTMG is on outage.207

85. Third, as discussed elsewhere in this order, we set aside the December Order in part and permit Eligible Customers taking transmission service on behalf of load served by BTMG to have the option to take the new transmission services set forth in the December Order. Therefore, Eligible Customers taking transmission service on behalf of load served by BTMG will, at minimum, not be required to take NITS on a gross load basis but will have the option to take and be charged for different transmission services.

86. Fourth, we note that Industrials offer six examples involving specific BTMG arrangements that could be financially harmed by the removal of PJM's retail BTMG netting rules. As discussed above, to the extent these BTMG arrangements are financially harmed, that implicates the Commission's decision to set a replacement rate as to the extent to which such entities may continue to net going forward. Also, as discussed below, we set aside the December Order in part and direct PJM to exempt certain cogeneration facilities from, revised retail BTMG netting rules where the facilities may be integrated with load such that, when their generator trips offline, the load follows (rather than withdrawing energy from the transmission system), as such facilities would not present the cost shift, reliability, or resource adequacy concerns discussed in the

204 Industrials Request for Clarification or Rehearing at 27. 2°5  See supra Part IV.C.1.c. 2°6  December Order, 193 FERC ¶ 61,217 at P 198.
207  See id. P 186 (finding that PJM's retail BTMG netting rules raise cost-shifting concerns due to large loads configured in BTMG arrangements).
206 of 515

PDF page 208

Document A„„sigPV; 2AACg18-34Pcurnent:Flihd 1J e: g.4);71812PAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 50 -
December Order.208  To the extent that any of the facilities discussed in Industrials' six examples could demonstrate that they do not present such concerns, they may fall within the exemption that we direct PJM to submit as part of the compliance filing discussed below.209

87. We also disagree with Industrials that the December Order unduly discriminates against Network Customers who manage costs by investing in generation as compared to Network Customers who manage costs by managing load. Undue discrimination prohibited by the FPA can occur when similarly situated customers are treated differently.210 Here, Industrials fail to show that the December Order results in differential treatment because Network Customers are subject to charges for NITS based on gross load whether or not they have associated generation, with the exception of the materiality threshold for retail BTMG discussed below. In addition, the December Order neither addresses nor limits Network Customers' ability to manage load, whether or not they have associated generation.

3. Transmission Service Options for BTMG
a. December Order
88. As explained above, the Commission found that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.211

89. The Commission found that PJM's retail BTMG netting rules were no longer just and reasonable, explaining that these rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers

208 m
209 See, e.g., Industrials Request for Clarification or Rehearing at 27 ("Because the manufacturing process requires steam produced for generation, the bulk of the load can remain online only if generation is operational. If the generation goes down, the load will largely cease as well.").
210 Cal. Indep. Sys. Operator Corp., 193 FERC ¶ 61,117, at P 33 (2025).
211  December Order, 193 FERC ¶ 61,217 at P 193. 207 of 515

PDF page 209

Document AccessigI SA: 4q- obis -3g9curnent:Fiild rijaq99:gbo/e18/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 51 -
using BTMG but does not consider such customers in transmission and resource adequacy planning.212

b. Request for Clarification and/or Rehearing
90. Industrials request clarification that the new transmission services must be made available to Eligible Customers taking transmission service on behalf of load-only customers with BTMG.213  Industrials argue that Eligible Customers taking transmission service on behalf of load-only customers with BTMG should also be allowed to benefit from the new transmission services.214

c. Determination
91. We set aside, in part, the December Order. In addition to the finding in the December Order that the Tariff is unjust and unreasonable as to Eligible Customers taking transmission service on behalf of Co-Located Load, we also find that the Tariff is unjust and unreasonable because it does not include transmission services that reflect that Eligible Customers taking transmission service on behalf of load with BTMG are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Requiring Eligible Customers taking transmission service on behalf of load with BTMG to take NITS, without the option to instead take such alternative transmission services that reflect their willingness and ability to limit their energy withdrawals, would be unjust and unreasonable for the same reasons we made the same finding with respect to Eligible Customers taking transmission service on behalf of Co-Located Load.215  For purposes of this order, then, we use the term Eligible Load to refer to Co-Located Load216  and/or load with BTMG.217  We also direct PJM to file, within 60 days of the date of issuance of this order, a definition for Eligible Load, or other comparable Tariff revisions to implement these directives, and to revise its definition of BTMG to allow Eligible Customers taking transmission service on behalf of

212 Id.P186.
213  Industrials Request for Clarification or Rehearing at 13-14.
214 Id
215  See supra Part IV.B.1.c (discussing further the Commission's finding in the December Order that the Tariff is unjust and unreasonable as to Eligible Customers taking transmission service on behalf of Co-Located Load).
216  See supra P 10.
217  See supra note 4. 208 of 515

PDF page 210

Document Ac„ssigPsg 2A-ARA18_349curnent:FlAd rPaN9:goo,48, 2pge Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 52 -
load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions to take the new transmission services, consistent with this order. All Eligible Customers taking one of the new transmission services on behalf of Eligible Load will be subject to the requirements discussed below, including, but not limited to, operational requirements such as necessary control technologies and/or protection systems as discussed in part VI.C and penalty charges and other remedial actions as discussed in part VI.D.

C. Replacement Rate
1. Transmission Services
a. NITS
i. December Order
92. As relevant here, the Commission found that NITS must be taken on a gross basis.218

ii. Request for Clarification
93. PIOs request clarification of the December Order regarding cost allocation issues. PIOs argue that, given the unprecedented volume and scale of large load requests, the Commission should evaluate whether existing transmission rate designs remain just and reasonable. PIOs state that the Commission held in the December Order that Co-Located Load taking NITS would be responsible for costs that are "roughly commensurate" with benefits because zonal NITS rates include upgrades and operations and maintenance costs. PIOs argue that this rate design relies on a standard assuming that load growth is incremental and widely distributed, however, whereas discrete large-load pockets trigger multi-million dollar reliability solutions.219

94. PIOs contend that a significant "payer gap" can emerge because customers pay only in proportion to billing determinants rather than by the incremental costs that they trigger. PIOs provide the example of a transmission project portfolio approved in the 2024 Regional Transmission Expansion Plan (RTEP) Window 1 that will cost $5.08 billion and state that if a 1,000 MW data center represents 7% of the zone's peak determinants, it would contribute only $203 million and leave a $4.877 billion gap for unrelated regional and zonal customers to pay. PIOs therefore request that the Commission clarify how "roughly commensurate" cost allocation is evaluated when a

218  December Order, 193 FERC ¶ 61,217 at P 195.
219  PIOs Request for Clarification at 7. 209 of 515

PDF page 211

Document Accessigisp; qq-Aeg,18 _3Qacument:Firl d  daN:g..61/C18/2 pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 53 -
discrete driver's pro-rata contribution is minimal compared to the infrastructure it necessitates. PIOs also argue that the Commission should require PJM and the PJM transmission owners to provide transparent reporting for major projects that compares incremental cost causation against pro-rata billing determinant recovery.220

iii. Determination
95. We deny the request for clarification.221  In the December Order, the Commission found that NITS must be taken on a gross basis.222  The Commission did not address cost allocation for Network Upgrades needed to accommodate NITS (or related reporting requirements) and we decline to do so here, finding those issues to be sufficiently distinct from the immediate issues in this proceeding and outside the scope of this proceeding. In any event, we note that these issues would be better addressed in a separate proceeding in which a record could be developed on these technical topics.223

b. New Transmission Services
96. In the December Order, the Commission—having found the Tariff unjust and unreasonable because it lacked relevant provisions with sufficient clarity and transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals—addressed a just and reasonable replacement rate.224

220  Id at 7-8.
221  PIOs' request for clarification is titled and presented as a request for clarification, id. at 1, and we treat it as such, noting that it does not meet the Commission's requirements for requests for rehearing. 18 C.F.R. § 385.713(c)(2); Pub. Serv. Co. of Colo., 190 FERC ¶ 61,128, at P 24 (2025).
222  December Order, 193 FERC ¶ 61,217 at P 195.
223  See Mobil Oil Expl. & Prod. Serv. v. United Distrib. Cos., 498 U.S. 211, 230-31 (1991) ("An agency enjoys broad discretion in determining how best to handle related, yet discrete, issues in terms of procedures."); Tenn. Valley Mun. Gas Ass 'n v. FERC, 140 F.3d 1085, 1088 (D.C. Cir. 1998) (the Commission has "broad discretion to determine when and how to hear and decide the matters that come before it"); Stowers Oil & Gas Co., 27 FERC ¶ 61,001, at 61,001 (1984) ("The Commission, like other agencies, is generally master of its own calendar and procedures.").
224  December Order, 193 FERC ¶ 61,217 at P 193. 210 of 515

PDF page 212

Document AccessigiqW 42-YR1 8 - 34@cument.Filtd rEN9:g.61A8/2p,,aje Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 54 -
97. The Commission directed PJM to submit a compliance filing to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of a Co-Located Load takes one of three transmission services: (1) NITS or Interim NITS,

(2) a new FCD transmission service, or (3) a new NFCD transmission service.225  The Commission also established paper hearing procedures to determine the appropriate rates, terms, and conditions of the new transmission services.226  The Commission stated that Interim NITS is a new interim, non-firm transmission service, which allows an Eligible Customer that has requested NITS on behalf of a Co-Located Load to take non-firm transmission service that can be interrupted until the Network Upgrades necessary to provide NITS are complete and the Co-Located Load can be designated as Network Load.227

98. The Commission stated that, under the FCD transmission service, Eligible Customers will have the right to request transmission service on behalf of a Co-Located Load up to a specified MW quantity, i.e., the contract demand. The Commission stated that the FCD transmission service will have the same reservation and curtailment priority as existing firm transmission services, at the level of the contract demand. However, the Commission stated that, unlike Network Customers, the Eligible Customer taking the FCD transmission service on behalf of the Co-Located Load is not permitted to withdraw energy from the PJM transmission system beyond the contract demand leve1.228

99. The Commission stated that the new NFCD transmission service will be provided during normal operations, on an as-available basis, and curtailed during emergency operations (i.e., it will be curtailed before existing firm transmission services and the new FCD transmission service). The Commission stated that, under this service, Eligible Customers may reserve transmission service on behalf of a Co-Located Load as needed during normal, non-emergency system operating conditions. The Commission stated that reservations under this service would be available only when there is available transmission capacity, similar to existing non-firm transmission service options in the Tariff  229

225 m
226  M P 194.
227 Jd. P 200. 228 Jd. P 208. 229  /d. P 215. 211 of 515

PDF page 213

Dockiment AccessigP.V; qQ,18-.349curnent:Flild if)Ag:4A 8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 55 -
i. BTMG
(a) Requests for Clarification and/or Rehearing
100. As to a replacement rate covering Eligible Customers taking transmission service on behalf of load-only customers with BTMG, Industrials request clarification that the new transmission services must be made available to those customers.23°  Industrials argue that Eligible Customers taking transmission service on behalf of load-only customers with BTMG should also be allowed to benefit from the new transmission services.231

(b) Determination
101.
As explained above, we set aside, in part, the December Order and find that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking transmission service on behalf of loads with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Consistent with this new determination, we now direct PJM to revise its Tariff to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. 102.

Specifically, we direct PJM to submit a compliance filing, within 60 days of the date of this order, to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of Eligible Load takes one of three transmission services:

(1) NITS or Interim NITS, (2) FCD transmission service, or (3) NFCD transmission service.232  We find that it is just and reasonable for an Eligible Customer taking transmission service on behalf of Eligible Load to elect, as one of the required transmission services from which the Eligible Customer must choose, to take NITS for the same reasons we made that finding with respect to Eligible Customers taking transmission service on behalf of Co-Located Loads.233

103.
Eligible Customers, on behalf of the Eligible Loads that they represent, may choose the transmission services that match their preferred use of the transmission 230 Industrials Request for Clarification or Rehearing at 13-14.

231m
232  They must choose at least one of the required transmission services and may take a combination of the FCD and NFCD transmission services.
233  December Order, 193 FERC ¶ 61,217 at PP 195, 198. 212 of 515

PDF page 214

Document AccessigRSg 2-k2-18-34@cument:Flild jpaqp:g61A812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 56 -
system; however, they must choose at least one of the required transmission services, and may take a combination of the FCD and NFCD transmission services. In addition, in instances where load with BTMG includes necessary control technologies and/or protection systems that limit its energy withdrawals, we find that it is a just and reasonable replacement rate to allow an Eligible Customer taking transmission service on behalf of Eligible Load to take and be charged for new types of transmission service that are alternatives, and not equivalent, to NITS: FCD and NFCD transmission services.234

ii. Undue Discrimination
(a) Requests for Clarification and/or Rehearing
104.
Exelon and FirstEnergy argue that the Commission granted an undue preference to Co-Located Loads in requiring new forms for transmission services.235  Exelon and FirstEnergy charge that the Commission failed "to explain why system protection schemes installed in [non-Co-Located Load] configurations would not provide similar benefits and be deserving of preferential rates."236  Exelon and FirstEnergy contend that the totality of the burdens and benefits of grid interconnection justify charging Co-Located Load the same rate as all other transmission customers. Exelon and FirstEnergy assert that the Commission's new transmission service reduces the share of embedded costs for Co-Located Loads compared to all other users who receive the same benefits.

105. Industrials request clarification that the new transmission services must be made available to load-only customers with load flexibility, minimal retail BTMG, or no retail BTMG.237  Industrials contend that this clarification would reduce the risk of undue discrimination because "[m]any large load customers can curtail their load at key times and control the amount of transmission service they use and when they use it."238 Industrials also argue that this clarification would avoid potential cost shifts that would occur if similarly situated customers were given different options depending only on whether they have small generators on site. Industrials assert that this clarification would

234  See id. P 205.
235  Exelon and FirstEnergy Request for Rehearing at 36-39.
236  Id at 38.
237  Industrials Request for Clarification or Rehearing at 13 ("Such an approach would align with the natural gas industry's long history of large gas consumers electing how much service they purchase."); see also id. at 6-7.
238  Id at 14. 213 of 515

PDF page 215

Document A„essigPA 22q-Agg1.8-3g9 Urnent:Flild
g_61A8/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 57 -
extend the optionality of the new transmission services to retail BTMG and load-only customers.239  Lastly, Industrials argue that this clarification could make the PJM transmission planning process more efficient.24°

(b) Determination
106. As an initial matter, we dismiss the argument that the new transmission services would be unduly discriminatory or preferentia1.241  First, we dismiss this argument for lack of finality. Rule 713(b) of the Commission's Rules of Practice and Procedure permits requests for rehearing "of any final decision or other final order in a proceeding."242 A final decision is one that imposes an obligation, denies a right, or fixes some legal relationship as a consummation of the administrative process.243  The December Order did not make a final decision on the rates, terms, and conditions for the new transmission services.244  Instead, the Commission found that "additional record evidence is needed" and set these issues for paper hearing procedures.245  Setting a matter

239  Id. at 14-15. 24°  Id at 15. 241  Exelon and FirstEnergy Rehearing Request at 19-20, 30-31, 36-39, 52-53; Industrials Request for Clarification or Rehearing at 13-14. Further, as discussed above, we set aside the December Order, in part, and find in this order that it is just and reasonable for Eligible Customers taking transmission service on behalf of load with BTMG to take one of three transmission services: (1) NITS or Interim NITS, (2) FCD transmission service, or (3) NFCD transmission service. We therefore do not address whether it would be unduly discriminatory or preferential if the replacement rate were to not allow Eligible Customers taking transmission service on behalf of load with BTMG to take those services.
242  18 C.F.R. § 385.713(b); see also 16 U.S.C. § 8251(a) (stating that parties "aggrieved by an order issued by the Commission in a proceeding . . . may apply for a rehearing within thirty days after the issuance of such order").
243  Reliable Automatic Sprinkler Co., Inc. v. Consumer Prod. Safety Comm'n, 324 F.3d 726, 731 (D.C. Cir. 2003) ("Final agency action `mark[s] the consummation of the agency's decision making process' and is `one by which rights or obligations have been determined, or from which legal consequences will flow'") (quoting Bennett v. Spear, 520 U.S. 154, 178 (1997)).
244  December Order, 193 FERC ¶ 61,217 at P 219.
245 id. 214 of 515

PDF page 216

Document Accessig@SP; 2q-Aqtql.8-34@ument:Flild ifa'qg:g.61A8/ pate Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 58 -
for paper briefing "is interlocutory: it constitutes a procedural step that does not impose an obligation, deny a right, or fix some legal relationship as a consummation of the administrative process."246  Without a final decision on the rates, terms, and conditions for the new transmission services, it is "premature" to argue or evaluate on rehearing whether those as-yet-undeveloped services would be unduly discriminatory.247 At bottom, "the claimed harms are based on speculation regarding potential action that the Commission could take, rather than any action the Commission has actually taken."248 Accordingly, because Commission action is not final and is to be succeeded by further Commission action, we dismiss the undue discrimination argument.249

107. In any event, we also dismiss the undue discrimination argument for the independent reason that it is outside the scope of this proceeding. This proceeding addresses Eligible Customers taking transmission service on behalf of Eligible Load with associated generation, such as through Co-Location Arrangements and BTMG

246  Algonquin Gas Transmission, LLC, 175 FERC ¶ 61,150, at PP 1, 5-8 (2021); see also Kan. Elec. Power Coop., Inc., 181 FERC ¶ 61,017, at P 10 (2022) (finding that, because "the Commission found that its preliminary analysis indicated that the Formal Challenge and Complaint raised issues of material fact that could not be resolved on the record before the Commission and are more appropriately addressed in hearing and settlement judge procedures," "here, Commission action is not final and is to be succeeded by further Commission action," thus "a request for rehearing may be dismissed"); City of Hamilton, Ohio, 82 FERC ¶ 61,349, at 62,359 (1998) ("Setting this matter for a trial-type hearing does not impose an obligation, deny a right, or fix some legal relationship as a consummation of the administrative process.").
247  Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8; see also, e.g., F.T.C.
v. Standard Oil Co. of Cal., 449 U.S. 232, 244 n.11 (1980) (Standard Oil) (explaining the fact that a "challenge may be mooted in adjudication warrants the requirement that [party] pursue adjudication, not shortcut it"); MediNatura, Inc. v. Food & Drug Admin., 998 F.3d 931, 939 (D.C. Cir. 2021); CSX Transp., Inc. v. Surface Transp. Bd., 774 F.3d 25, 30 (D.C. Cir. 2014) (explaining that it is a "good sign" that action is non-final when further agency processes may eliminate need for review).

248  Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8.
249  See, e.g., Cove Mountain Solar, LLC, 179 FERC ¶ 61,179, at P 7 (2022) (dismissing, in part, rehearing request on finality grounds because the Commission had established hearing and settlement judge procedures); Westlands Transmission, LLC, 177 FERC ¶ 61,175, at P 4 (2021); BridgeTex Pipeline Co., LLC, 164 FERC ¶ 61,111, at PP 10-12 (2018); Pac. Gas & Elec. Co., 162 FERC ¶ 61,246, at PP 6-7 (2018); Talen Energy Mktg., LLC, 158 FERC ¶ 61,077, at PP 3-4 (2017). 215 of 515

PDF page 217

Document AccessigPs,er ; qq-Ag-18_39,99ument:FlAd rfa' ..9:,?_61A8/2 p%-te Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 59 -
arrangements.25°  In an order issued concurrently, the Commission is initiating a separate show cause proceeding in Docket No. EL26-67-000 to address, among other things, whether the Tariff remains just and reasonable and not unduly discriminatory or preferential without provisions addressing transmission services that reflect flexible large loads251  that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Accordingly, it is beyond the scope of this proceeding—and within the scope of the separate proceeding—to argue that the new transmission services should be extended to Eligible Customers taking transmission service on behalf of flexible large loads. We thus dismiss this argument as outside the scope of this proceeding.252  The Supreme Court has made clear that the Commission "enjoys broad discretion in determining how best to handle related, yet discrete, issues in terms of procedures."253  The Supreme Court has "expressly approved a[] . . . Commission decision to treat [an] issue separately where a different proceeding would generate more appropriate information and where the agency was addressing the question"254—as is true as to the other proceeding. As courts have further recognized, "[w]hile the statute requires the Commission to act upon a finding that rates . . . are unjust or unreasonable, it nowhere mandates that having made such a finding with respect to a discrete issue, the Commission must reopen and reevaluate all other aspects of the filed rate."255  Here, while the Commission addresses Co-Location Arrangements and BTMG, those findings do not necessitate that the Commission reevaluate transmission services that Eligible Customers take on behalf of other types of load.256

250  See, e.g., December Order, 193 FERC ¶ 61,217 at P 2.
251  Flexible large loads are a subset of large loads that are not co-located with generation but that are willing and able to limit their use of the transmission system under certain conditions.
252  See PJM Interconnection, L.L.C., 126 FERC ¶ 61,030, at P 16 (2009); see also La. Pub. Serv. Comm'n v. Entergy Corp., 169 FERC ¶ 61,179, at P 9 (2019); N.Y. Indep. Sys. Operator, Inc., 127 FERC ¶ 61,042, at P 26 (2009); Union Elec. Co., 113 FERC ¶ 61,320, at P 8 (2005); Cal. Indep. Sys. Operator Corp., 113 FERC ¶ 61,133, at P 24 (2005).
253  Mobil Oil, 498 U.S. at 230-31; see supra note 226. 254  Mobil Oil, 498 U.S. at 230-31.
255  Colo. Off of Consumer Couns. v. FERC, 490 F.3d 954, 956 (D.C. Cir. 2007).
256  Industrials Request for Clarification or Rehearing at 6-7, 13-14. 216 of 515

PDF page 218

Document AccessigPSg 2A-2§A18-3Q@Cument:Flil d rFa'Np:g.61A812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 60 -
108.
In any event, while we dismiss the undue discrimination argument for the reasons explained above, we address the argument below to provide clarification to the parties. As relevant here, Industrials argue that it is unduly discriminatory for "load-only customers with load flexibility" to not be eligible for the new transmission services.257 Industrials contend this creates undue discrimination "between customers with generation and customers without generation," who Industrials state "can curtail their load at key times and control the amount of transmission service they use and when they use it."258 We refer in this subsection to these "load-only customers with load flexibility," as described by Industrials, as "flexible loads."

109.
The Commission "has wide discretion to determine what constitutes undue discrimination."259  Discrimination is undue when there is a difference in rates or terms between similarly situated entities that is not justified by some legitimate factor.26° "[D]istinct operating characteristics" can render entities not similarly situated.261  Here, a relevant distinct operating characteristic is that Eligible Load has an associated generator (Co-Located Generator or BTMG) as part of the Co-Location Arrangement or load configured with BTMG, and flexible load does not. The presence of these associated generators is a material factor in analyzing eligibility for the new transmission services. We anticipate, based on the record here, that Eligible Customers taking transmission

257  Id. at 13-14.
258  Id. More generally, Industrials argue that the new transmission services should be extended to all transmission customers. Id. Because we dismiss the undue discrimination argument as nonfinal and outside of scope, we need not address the argument that the new transmission services should be extended to all transmission customers (an even broader, and thus less similar, category). Moreover, we have, in the December Order and in this order, sufficiently discussed eligibility for the new transmission services, including by explaining that it is not unduly discriminatory to limit the new transmission services to Eligible Customers taking transmission service on behalf of Eligible Load, such that we need not further address extending the services to all transmission customers.
259  Mo. River Energy Servs. v. FERC, 918 F.3d 954, 958 (D.C. Cir. 2019) (citation modified). For purposes of the undue discrimination analysis in this order, when we refer to Eligible Customers taking transmission service on behalf of Eligible Load as not similarly situated to Eligible Customers taking transmission service on behalf of flexible load, we are referring to Eligible Customers only insofar as they take transmission service on behalf of specific Eligible Loads or flexible loads. 260 Sw. Power Pool, Inc., 192 FERC 1161,058, at P 175 (2025).
261  Sw. Power Pool, Inc., 193 FERC ¶ 61,198, at P 82 (2025). 217 of 515

PDF page 219

Do6urnent Accessigsp; q-q2 g-18 _3112ument:Fl-il d rrAg9: (261/8,8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 61 -
services on behalf of Eligible Loads would rely regularly in whole or in part on their associated generators, not on the transmission system, while Eligible Customers taking transmission services on behalf of flexible loads generally would rely entirely on the transmission system, even as they sometimes shift the amount of energy they take. This dynamic creates different transmission system usage, which is relevant to transmission services, charges, and planning.262

iii. Contract Demand
(a) Request for Rehearing
110. Exelon and FirstEnergy argue that the Commission has departed from decades of precedent that NITS is based on the entire gross load of the Network Customer, and the Commission failed to adequately explain its departure.263  Exelon and FirstEnergy highlight, for example, the Commission's statement that it would be inconsistent with cost causation principles to require Eligible Customers taking transmission service on behalf of Co-Located Loads that limit their energy withdrawals to take NITS on a gross demand basis.264  Exelon and FirstEnergy allege that the Commission recognized that

262  For the reasons in this Part, we also reject Industrials' request for clarification on this issue. Industrials Request for Clarification or Rehearing at 13-14.
263  Exelon and FirstEnergy Request for Rehearing at 22-26 (citing Nat'l R.R. Passenger Corp. v. PPL Elec. Utils. Corp., 173 FERC ¶ 61,043 (2020) (Amtrak); Fla. Power & Light, 113 FERC ¶ 61,290 (2005), order on reh'g, 116 FERC ¶ 61,012 (2006), aff'd, 264 F. App'x 4 (D.C. Cir. 2008) (Florida Power & Light); Idaho Power Co., 106 FERC ¶ 61,329 (2004) (Idaho Power); Ameren Servs. Co. v. Prairieland Energy Inc., 131 FERC ¶ 61,125 (2010) (Ameren); Ariz. Pub. Serv. Co., 151 FERC ¶ 61,191 (2015) (APS); Preventing Undue Discrimination & Preference in Transmission Serv., Order No. 890, 118 FERC ¶ 61,119, order on reh'g, Order No. 890-A, 121 FERC ¶ 61,297 (2007), order on reh'g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh'g, Order No. 890-C, 126 FERC ¶ 61,228, order on clarification, Order No. 890-D, 129 FERC ¶ 61,126 (2009); Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Servs. by Pub. Utils.; Recovery of Stranded Costs by Pub. Utils. & Transmitting Utils., Order No. 888, FERC Stats. & Regs. ¶ 31,036 (1996) (cross-referenced at 75 FERC ¶ 61,080), order on reh'g, Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 (cross-referenced at 78 FERC ¶ 61,220), order on reh'g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), order on reh'g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff'd in relevant part sub nom. Transmission Access Pol'y Study Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff'd sub nom. N.Y. v. FERC, 535 U.S. 1 (2002).
264  Exelon and FirstEnergy Request for Rehearing at 28 (citing December Order, 193 FERC ¶ 61,217 at P 199). 218 of 515

PDF page 220

Document AccessigP.Sir; 2.q-4Qq18-31:Ncumert:Fhtd rpaqp:g.61/4812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 62 -
these customers use the transmission system for some services, such as regulation and black start, but for the customer not to use the system for other services makes the customer partially integrated, contrary to Order No. 888-A.265  Exelon and FirstEnergy contend that the Commission has consistently rejected attempts to create a new third type of transmission service by parties whose reasons are exactly the same as the reasons the Commission used to justify its decision to establish Contract Demand transmission service based on net load, such as the notion that Co-Located Loads impose less burden on the grid. Exelon and FirstEnergy argue that the assessment of NITS is not based on actual use, that Network Customers pay the full rate but NITS charges are allocated based on contribution to system peak.266  Exelon and FirstEnergy contend that Network Load needs to be able to call on service regardless of actual usage and utilities have an obligation to serve that load.

(b) Determination
111. We continue to find that it is just and reasonable to charge for FCD and NFCD transmission services based on the contract demand.267  We disagree with Exelon and FirstEnergy's arguments that the Commission erred in not requiring the new FCD and NFCD transmission services be charged on a gross load basis and that this decision violates precedent.268  As an initial matter, Exelon and FirstEnergy appear to suggest that the charges for these services would be based "on actual use" or "on net . . . load."269  As explained in the December Order, however, transmission customers taking the new FCD or NFCD transmission service would "be charged based on their contract demand irrespective of usage."27°  We continue to find that this is a just and reasonable alignment of costs and benefits.271  In particular, for the new FCD transmission service, because transmission customers taking this service would agree to limit withdrawals to the 265  Id. at 24.

266  Id. at 26-29 (citing Indicated TOs June 3, 2025 Answer, Powers Decl.).
267  December Order, 193 FERC ¶ 61,217 at P 2.
268  Exelon and FirstEnergy Request for Rehearing at 22-30.
269 m 270  December Order, 193 FERC ¶ 61,217 at PP 211, 216 ("Eligible Customers taking the [NFCD] transmission service on behalf of Co-Located Loads will be charged for transmission and ancillary services on an as-reserved contract demand basis, based on the reserved contract demand amount of transmission service (except as noted[)].").
271  Id. 219 of 515

PDF page 221

Dodurikent AccesigPSK 22q'2116%18  _ 3Q99u me n t:Fl
rp~ge:Agq8/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 63 -
contract demand through the mandatory implementation of necessary control technologies and/or protection systems, PJM would only plan the transmission system, procure generation capacity, and be obligated to provide transmission service up to that contract demand.272  Similarly, for the new NFCD transmission service, PJM would only be obligated to provide transmission service up to the reserved contract demand when there is sufficient available transmission capacity to provide the requested service.273  If the transmission customers taking the new FCD and NFCD transmission services were charged for that service on a gross load basis, they could be charged for more load than PJM is obligated to plan for, procure generation capacity for, or otherwise serve when transmission capacity is available. And—because these customers would be charged based on their contract demand irrespective of usage—they would be unable to avoid load-ratio cost responsibility by modifying their load at a particular time.274 112. Exelon and FirstEnergy argue that the new contract demand transmission services are inconsistent with Commission precedent.275  Exelon and FirstEnergy contend that the Commission in the December Order contravened Order No. 888-A, in which the Commission rejected the notion of Network Customers "partially integrat[ing]" or "splitting a discrete load" because "such a split system creates the potential for a customer to game the system thereby evading some or all of its load-ratio cost responsibility for network services."276  We continue to find that the new contract demand transmission services do not violate Order No. 888-A.277  Most simply, Order No. 888-A rejected splitting load between NITS and PTPS at the same point of delivery.278  That kind of splitting between transmission services at the same point of delivery remains barred under the December Order: Eligible Customers also cannot split

272 Id.; see also id. PP 215-216 (explaining that an Eligible Customer taking NFCD transmission service may reserve service as needed when the service is available, and the Eligible Customer will be charged on an as-reserved contract demand basis).
273  Id; see also id. PP 215-216 (explaining that an Eligible Customer taking NFCD transmission service may reserve service as needed when the service is available, and the Eligible Customer will be charged on an as-reserved contract demand basis).
274 Id. P 211.
275  Exelon and FirstEnergy Request for Rehearing at 22-30.
276  Id at 23-24 (quoting Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,259) (internal quotation marks omitted). 277  December Order, 193 FERC ¶ 61,217 at P 211.
278  Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260. 220 of 515

PDF page 222

Document Accessig0Sg 2A-ArRl 8 - 3Q9c ument:Fht d rFi@fie: g.4118/2pAte Filed: 10116/2026 Docket No. EL25-49-002, et al.

- 64 -
load between NITS and FCD or NFCD transmission service at the same point of delivery. Further, under the new contract demand services, load is neither split nor partially integrated. Instead, load is capped at contract demand and Eligible Customers taking transmission service on behalf of Co-Located Loads are charged for that contract demand, irrespective of usage. Moreover, the rationale underlying Order No. 888-A— gaming—is also not present here.279  The new contract demand transmission services will help avoid a cost shift to other transmission customers because Eligible Customers will not be able to reduce their load-ratio share to avoid paying transmission costs or capacity costs because their amount of FCD transmission service is fixed.28°

113. Exelon and FirstEnergy further argue that the Commission contravened Order No. 888-A "[b]ecause the Commission has recognized that the [contract demand transmission service] customers use the transmission system for some services (such as load following and black start)," which would render those customers "partially integrated."28I  We disagree. Receiving ancillary services, such as regulation and black start, does not "integrate" a transmission customer into the transmission network—and particularly not in the manner that NITS does. Specifically, Order No. 888-A clarified that a "request for network service is a request for the integration of a customer's resources and loads,"282  and a PTPS customer is not integrated, as recognized by Order

279  Id. 288  December Order, 193 FERC ¶ 61,217 at P 211. We also note that the Commission justified its findings in Order No. 888-A by discussing "several fundamental operational problems associated with allowing partial network service." Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260. Those operational problems are not raised or present here because neither FCD nor NFCD transmission service are based on the Eligible Customer's load ratio. Further, Exelon and FirstEnergy suggest that the December Order is inconsistent with Order No. 890. Exelon and FirstEnergy Request for Rehearing at 25-26 (citing Order No. 890, 118 FERC ¶ 61,119, order on reh'g, Order No. 890-A, 121 FERC ¶ 61,297, order on reh'g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh'g, Order No. 890-C, 126 FERC 1161,228, order on clarification, Order No. 890-D, 129 FERC ¶ 61,126). While they do not cite a particular portion, they appear to be referring to a section that reiterates the already discussed portion of Order No. 888-A. Order No. 890, 118 FERC ¶ 61,119 at P 1619 (citing Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260-61). Our findings as to Order No. 888-A thus apply to Exelon and FirstEnergy's citation to Order No. 890. 281  Exelon and FirstEnergy Request for Rehearing at 24.
282  Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260. 221 of 515

PDF page 223

Dodument Accessigi SP? 4"2-Yq.g18-3RP.cument:Flald IFA99-  e?..82,48/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 65 -
No. 888-A.283  Nonetheless, PTPS customers pay for and use ancillary services, including regulation service. Therefore, whether an Eligible Customer taking transmission service on behalf of Co-Located Load could receive ancillary services and/or black start service has no bearing on whether it is "integrated" as a Network Customer.

114. Exelon and FirstEnergy also argue that the December Order is inconsistent with other Commission precedent.284  These cases do not undermine the December Order. In several cited cases, Network Customers chose to take NITS and sought to receive the benefits of NITS, specifically the right to withdraw energy from the transmission system when their own resources were not available, while arguing that they should be charged a lower rate based on their usage.285  For example, Amtrak relied on the transmission system when the nearby generator was not available, and sought to maintain that arrangement and ability to withdraw energy to meet its gross load at any time, while paying NITS.286  Here, the new FCD and NFCD transmission services set up new obligations and benefits—as well as charges on that new basis.287  For example, under 283  Id at 30,259-60 (presenting binary of "fully integrated or not integrated"—with full NITS or no NITS, respectively—in opposition to "partially integrated," which would include NITS and PTPS).

284  Exelon and FirstEnergy Request for Rehearing at 23-30 (citing Amtrak, 171 FERC 1161,237, order on reh 'g, 173 FERC 1161,043 (2020); Florida Power & Light, 113 FERC 1161,290, order on reh g, 116 FERC 1161,012, aff'd, 264 F. App'x 4; Idaho Power, 106 FERC ¶ 61,329; Ameren, 131 FERC ¶ 61,125; APS, 151 FERC ¶ 61,191).
285  E.g., Amtrak, 173 FERC ¶ 61,043 at P 12 ("What Amtrak seeks to do is carve out from network service charges the power supplied by Safe Harbor. Such an outcome is impermissible under the PJM Tariff and inconsistent with the nature of NITS.").
286  See id P 13 (rejecting Amtrak's rehearing request and explaining that "Amtrak seeks the ability to select when it will use and pay for NITS (i.e., only when inflows occur through PPL's Manor Substation")).
287  December Order, 193 FERC ¶ 61,217 at PP 208, 210, 211, 212. Indeed, the December Order also responds to new circumstances not present in the cited cases— namely, the proliferation of potential Co-Location Arrangements. Even if the cited cases were controlling here, we find these new circumstances would warrant the Commission's decision to charge for FCD and NFCD transmission services based on the contract demand. 222 of 515

PDF page 224

Document AccessigPS#; qq-Aeg18-3R@cument:Fl-Ad IEN9:(W.748/2p2aje Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 66 -
FCD transmission service, the Eligible Customer can rely on the service only up to the level of its contract demand.288

115. In particular, Exelon and FirstEnergy maintain that the December Order is inconsistent with Florida Power & Light, which they characterize as standing for the proposition that "the gross load construct [i]s most appropriate," "even in the case of physical impossibility of serving the entire load."289  As an initial matter, there is no "physical impossibility exception"29°  in the December Order because the new FCD and NFCD transmission services are based on legally capped demand, not "physical impossibility."29' Specifically, while in Florida Power & Light the "physical impossibility" was a constraint on the transmission system, which prevented the entire load from being served by the transmission system,292  no such physical constraint on the transmission system exists for an Eligible Customer taking FCD and/or NFCD transmission service on behalf of a Co-Located Load. Rather, such Eligible Customers may elect to take transmission service at a contract demand level less than the amount of the entire load and commit to limiting their withdrawals from the transmission system to the contract demand level. Regardless, in Florida Power & Light, the Commission only discussed "physical impossibility" in dicta.293  In that discussion, the Commission

288  Id. We further reiterate that the absence of this type of option is unjust and unreasonable. Id. P 177.
289 E.g., Exelon and FirstEnergy Request for Rehearing at 24-25. 298  Florida Power & Light, 113 FERC ¶ 61,290 at P 7. 291  December Order, 193 FERC ¶ 61,217 at PP 208, 210, 211, 212. To the extent Exelon and FirstEnergy characterize their argument addressed in this Part as directed toward our "unjust and unreasonable" findings and not the replacement rate, Exelon and FirstEnergy Request for Rehearing at 22-23, we reject this argument based on the same substantive reasons included in this Part.
292  Florida Power & Light, 113 FERC ¶ 61,290 at PP 7-8.
293  Id. The Commission began by generally rejecting the prospect of alternative proposals from individual customers because of the potential administrative and undue discrimination concerns with setting individual-customer-specific rates (but the Commission did approve the prospect of alternative proposals from utilities). Id. P 6. In other words, the cited adjudications, see, e.g., Exelon and FirstEnergy Request for Rehearing at 23-25; see also id at 27, are additionally inapposite here to the extent they involved proceedings where only individual customers that claimed to limit their use of the transmission system sought to alter the rates, terms, and conditions of its transmission service and obtain rates and terms for themselves. 223 of 515

PDF page 225

Document AccessigsA: 4q-A6-,A-18-3c9cument:Filla rPAg9: gEg48/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 67 -
nonetheless did not even rule out the prospect of considering "physical impossibility" in a more generally applicable setting where the impossibility could be administered, verified, and backed by technological and legal constructs—rather than on an ad hoc basis due to a transmission customer's mere assertions that it was particularly deserving of a specially-designed and administered service.294

iv. Alleged Alternatives to FCD and NFCD
Transmission Services
(a) Request for Rehearing
116. Exelon and FirstEnergy contend that the Commission "fail[ed] to demonstrate that [the new transmission services] are just and reasonable" because there are already existing mechanisms for customers to reduce load or use other generation in order to reduce withdrawals.295  Exelon and FirstEnergy maintain that PJM's demand response rules are available to Co-Located Loads and the Commission fails to explain why such rules are inadequate here. Indeed, Exelon and FirstEnergy assert, the Commission stated that those rules are just and reasonable for Co-Located Loads taking NITS.

(b) Determination
117.
We do not find Exelon and FirstEnergy's argument availing. The mere fact that there may be preexisting mechanisms in the Tariff to accomplish something (even assuming that they are equivalent, which we do not) does not mean that adding an additional mechanism is not just and reasonable. Exelon and FirstEnergy offer no justification or citation to support the proposition that having multiple provisions targeted at similar objectives is not just and reasonable.

118.
Further, demand response operates differently from the contract demand transmission services. In the first place, demand response is not a transmission service. And demand response presents a different set of benefits and burdens—NFCD transmission service would be curtailed earlier than demand response resources would be called on and can be instructed to curtail without any notification (unlike most demand response resources).296  FCD transmission service, on the other hand, is a firm transmission service with the same curtailment priority as existing firm transmission

294  Florida Power & Light, 113 FERC ¶ 61,290 at PP 7-8.
295  Exelon and FirstEnergy Request for Rehearing at 36-37.
296  December Order, 193 FERC ¶ 61,217 at P 215; see also infra Part VI.G.4. 224 of 515

PDF page 226

Document A„„sigPV; ZAZ*18-34Pcurnent:Flita ?AV:4 748/2We Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 68 -
services, at the level of contract demand.297  In addition, PJM would not plan for any future load growth for either FCD or NFCD transmission service once the contract demand level of each transmission service is established. As to Interim NITS, that transmission service serves a different function than demand response because it allows Eligible Customers to begin taking a limited, non-firm transmission service on behalf of Co-Located Load before the transmission system is capable of reliably providing NITS at their requested level.

v. Protection Systems
(a) Request for Rehearing
119.
Exelon and FirstEnergy argue that the Commission's emphasis on protection systems is arbitrary and capricious because it is in tension with the Commission's open access policies. Exelon and FirstEnergy assert that generators have an interest in designing captive arrangements where customers cannot access alternative supply, which is contrary to the Commission's open access policies in Order No. 888.298  Exelon and FirstEnergy argue that generators will convert their interconnection facilities into transmission assets and then install relay systems that make load captive to its generation.299  Exelon and FirstEnergy view this arrangement as akin to the problem of transmission owners using their control of transmission facilities to refuse to deliver energy produced by competitors or to deliver competitors' power on less favorable terms.300

120. Exelon and FirstEnergy argue that the Commission erred in minimizing the fact that protection systems can and have failed.30' Exelon and FirstEnergy point out that the Commission recognizes that protection systems fail, and to address this risk, directed PJM to apply a penalty rate for the new transmission services. But Exelon and FirstEnergy allege that assessing penalties after the fact does not remediate the reliability implications of faulty protection systems. Exelon and FirstEnergy also argue that protection systems "do not protect the grid from real impacts that occur even when there

297  December Order, 193 FERC ¶ 61,217 at P 208. 298  Exelon and FirstEnergy Request for Rehearing at 39-40.
299  Id. at 40. 388  Id (citing N.Y. v. FERC, 535 U.S. at 8-9). 301  Id. at 39-41. 225 of 515

PDF page 227

Document AccessigPSA 22q-AA18  _ 31:29c u men t:Fl
d
gA8/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 69 -
is consumption by a co-located customer but no net withdrawal, such as the impacts of load and voltage spikes and oscillations."3°2

(b) Determination
121.
We address both arguments in turn. First, the contemplated use of necessary control technologies and/or protection systems is not inconsistent with the Commission's open access policies. Co-Location Arrangements are voluntary. The December Order does not mandate that any Co-Located Load or Co-Located Generator enter into a Co-Location Arrangement. In other words, contrary to Exelon and FirstEnergy's assertions, the Commission is not forcing any entity into being a captive customer, as they would have the option to connect to the transmission system and take NITS like any other Network Customer.

122.
Second, we dismiss the argument regarding protection system failure and the risks they address for lack of finality.303  The December Order did not make a final decision on required technology and what appropriate remedies would be for failure of that technology.304  Instead, the December Order set those issues for paper hearing procedures.3°' In any event, the Commission recognized that protection systems, like many technologies, in rare instances can fail; accordingly, the Commission ordered paper briefing on technical requirements to address reliability risks and remedial actions.306  We also note that it is possible that the remedial actions could remediate the reliability implications of such a failure. Further, whatever risks are not avoided by a facility's necessary control technologies and/or protection systems will be studied in the relevant study processes.

3°2  Id at 39.
3°3  See supra P 106.
3°4  December Order, 193 FERC ¶ 61,217 at P 177.
3°5  Id. P 178.
3°6  Id P 212.
226 of 515

PDF page 228

Document AccessigPV; 2-442-VA18-349cument:FlAd rfasqv:g.w.8/2ppe Filed: 10116/2026 Docket No. EL25-49-002, et al.

- 70 -
vi. Benefits of FCD and NFCD Transmission Services
(a) Request for Rehearin
123.
Exelon and FirstEnergy allege that the Commission is wrong to suggest that FCD and NFCD transmission services will promote efficiency or change siting.307  Exelon and FirstEnergy argue that planning and siting depend on physics and engineering of the grid, not whether transmission service is charged on a gross or net load basis. Exelon and FirstEnergy argue that the Commission's decision to require FCD and NFCD transmission services does not change how the study process should work. Exelon and FirstEnergy warn that, "[i]f transmission providers are forced to pretend a 500 MW load is only 50 MW, or even that it is zero . . . it will threaten reliability and resource adequacy."308  Exelon and FirstEnergy maintain that no loads should be taken out of the broader planning process, and there is no support for the suggestion that regional planning needs are reduced because of FCD and NFCD transmission services. Exelon and FirstEnergy argue that the Commission's decision on PJM's retail BTMG netting rules and the Commission's concerns about resource adequacy and cost shifting cannot be reconciled with the Commission's proposed structure for the new transmission services.309

124.
Exelon and FirstEnergy state that the Commission failed to point to any other tariff where these new transmission services have been required by the Commission.310

(b) Determination
125. As an initial matter, we dismiss this argument for lack of finality.311  The December Order did not make a final decision on the rates, terms, and conditions for the new FCD and NFCD transmission services.312  Instead, the Commission found that "additional record evidence is needed" and set these issues for paper hearing

307  Exelon and FirstEnergy Request for Rehearing at 47-48. 3" Id at 48.
309  Id. at 48-49.
310  Id. at 36.
311  See supra P 106.
312  December Order, 193 FERC ¶ 61,217 at P 219. 227 of 515

PDF page 229

Document Accessigi?p; 2,q-2q:&18 _31_26)9ument:Fl il d  L'p:(26g8,8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 71 -
procedures.313  Without a final decision on the rates, terms, and conditions for the new FCD and NFCD transmission services, it is "premature" to argue or evaluate on rehearing whether those as-yet-undeveloped services would affect efficiency or siting.314 126. In any event, while Exelon and FirstEnergy appear to direct this argument toward the replacement rate, we addressed these topics in our discussion of the Commission's FPA section 206 step one finding above. In short, we continue to find that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions—and that this lack of such transmission services is economically inefficient.315  We direct the new FCD and NFCD transmission services as a just and reasonable way to address this issue (among others). And, while siting choices can reduce the need for Network Upgrades, that fact does not undermine our finding that requiring Eligible Customers taking service on behalf of Co-Located Loads to take NITS for these loads leads to an unacceptable probability of inefficient outcomes by requiring more or more costly Network Upgrades than would potential new FCD and NFCD transmission services.316  We similarly reiterate that the need for many Network Upgrades are caused by the amount of MW flow on the transmission system even though the need for certain Network Upgrades are not (e.g., they may be caused by stability or voltage-related issues).317  Therefore, as Exelon and FirstEnergy concede, under a transmission service that reflects willingness and ability to limit energy withdrawals, "if the load installs systems aimed at limiting its use of the grid, those might change the system impacts and need for upgrades."318  Likewise, while PJM will only plan the transmission system for FCD transmission service based on the level of contract demand as a matter of transmission capacity, PJM will still be able to consider the gross load for analyzing certain issues such as stability and short circuit.319

313  Id
314  Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8.
315  December Order, 193 FERC ¶ 61,217 at P 177.
316  Id. PP 177, 199, 205.
317  See Exelon and FirstEnergy Request for Rehearing at 47-48.
318  Id. at 19-20; see also id. at 48.
319  December Order, 193 FERC ¶ 61,217 at P 210. 228 of 515

PDF page 230

Document Acc„sigPV;
4qAqq18 -3999UMent:Filtd gage:
812
to Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 72 -
127.
The Commission's findings related to retail BTMG netting are not inconsistent with the findings related to the new FCD and NFCD transmission services.320  The Commission stated that "the existing BTMG netting rules in the PJM Tariff [are] unjust and unreasonable" because, "under the existing Tariff, loads with BTMG are not fully accounted for in resource adequacy planning."321  The Commission explained that "[s]uch loads must nevertheless be served, however, allowing them to lean on the PJM system when the [BTMG] is on a full or partial outage or if the load exceeds the rating of the [BTMG]."322  Eligible Customers taking service on behalf of Co-Located Load will be treated differently under FCD and NFCD transmission services—"PJM will have no obligation to serve the Eligible Customer beyond the contract demand."323 128.

Exelon and FirstEnergy argue that the Commission failed to point to any other tariff where these new transmission services have been required by the Commission.324 This argument is irrelevant because the Commission need not point to another FPA section 206 proceeding where the Commission set an identical replacement rate in order to set a replacement rate.

vii. Reliability and New Transmission Services
(a) Request for Rehearing
129.
Exelon and FirstEnergy argue that the Commission overlooked important reliability concerns in establishing new transmission services, including that loads impact the system even when there is no net power draw on the system.325  Exelon and FirstEnergy assert that gross load is being followed by resources on the grid at all times, thus impacting the system. Exelon and FirstEnergy assert that the Commission has not explained how reliability planning should proceed when large loads may be incentivized to exceed their contract demand limit for transmission service. Exelon and FirstEnergy contend that the Commission overlooked resource adequacy risks in establishing Interim NITS. Exelon and FirstEnergy allege that it is unclear how it will be determined that load may be served reliably and the Commission failed to give PJM guideposts to make

320  See Exelon and FirstEnergy Request for Rehearing at 48-49.
321  December Order, 193 FERC ¶ 61,217 at P 179.
322  Id P 186.
323 1d P 211.
324  Exelon and FirstEnergy Request for Rehearing at 36; see also id at 27, 29, 35.
325  Id at 49-51. 229 of 515

PDF page 231

Document Accessig@g 2A2-Vg18-3Q9cument:Flild rj:1@g:ge3A 812We Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 74 -
prohibit PJM or the transmission owners from performing any particular studies that may be necessary or mandate that the level of contract demand would be the only impact studied. For example, when PJM or the transmission owners consider factors unrelated to the contract demand of the Co-Located Load, the December Order did not preclude use of the complete dynamic or EMT model of the Co-Located Load, regardless of what level or type of transmission service the Eligible Customer has requested. 132. On Interim NITS, specifically, the Commission established paper hearing procedures on "What are the appropriate procedures to govern the circumstances under which PJM curtails an Eligible Customer taking the interim, non-firm transmission service . . . on behalf of a Co-Located Load during emergency procedures?"332  The Commission thus did not make a final decision on this issue either. In any event, the Commission stated that said Interim NITS "would only be available to the extent PJM determines that it can provide some level of interim service reliably."333

viii. Major Questions Doctrine
(a) Request for Rehearing
133. Exelon and FirstEnergy assert that the Commission's replacement rate violates the major questions doctrine.334  Exelon and FirstEnergy argue that the Commission has no authority under FPA section 206 to provide unduly preferential treatment to a certain category of customers, but that the Commission established a replacement rate favoring Co-Located Load without reasoned explanation.

(b) Determination
134. We disagree with Exelon and FirstEnergy that the December Order violates the major questions doctrine. The major questions doctrine applies in certain "extraordinary cases" involving an agency action that results in a "transformative expansion" of its authority—especially over issues of great "economic and political significance."335  In

332  December Order, 193 FERC ¶ 61,217 at P 219.
333  Id. P 200.
334  Exelon and FirstEnergy Request for Rehearing at 52.
335 W. Va. v. EPA, 597 U.S. 697, 721, 724 (2022) (citations and quotations omitted). 231 of 515

PDF page 232

Document Acce:
2,6)-206,q18 _39pcument:Fl il d  yaN9:(263iC18/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 73 -
such a determination. Exelon and FirstEnergy state that it is unknown how and by what standards load would be curtailed and whether curtailment is an adequate response to the need to follow gross load moment-by-moment, and thus the transmission service options cannot be just and reasonable.

130.
Exelon and FirstEnergy argue that, as to Interim NITS, the Commission has not accounted for reliability risks, not knowing when or how curtailments would be implemented, as the Commission has asked for briefing on when Eligible Customers taking this service would be curtailed.326  Exelon and FirstEnergy express concern that future state legislation may create inconsistencies among Co-Located Load in different states.

(b) Determination
131.
We dismiss these arguments for lack of finality.327  The December Order did not make a final decision on several issues relevant to this argument.328  Instead, the Commission found that "additional record evidence is needed" and established paper hearing procedures on: the rates, terms, and conditions for the new transmission services; interconnection requirements and operational practices for special protection schemes; the communications, alarm, SCADA,329  or other requirements necessary for PJM to monitor Co-Located Load transmission system demand status, ensure that relay settings are consistent with special protection scheme design, and inform system operator action in order to limit withdrawals that exceed the amount of contract demand; and the procedures to govern circumstances under which PJM curtails an Eligible Customer taking the three new transmission services.33°  Without a final decision on these issues, it is premature to argue or evaluate on rehearing whether the Commission overlooked important reliability concerns in establishing the new transmission services.331  In any event, as to the new FCD and NFCD transmission services, the December Order did not

326  Id at 37.
327  See supra P 106.
328  December Order, 193 FERC ¶ 61,217 at P 219.
329  Supervisory Control and Data Acquisition (SCADA) is a system of remote control and telemetry used to monitor and control the transmission system. See NERC Glossary of Terms 42, https://www.nerc.com/globalassets/standards/reliability- standards/glossary_of terms.pdf. 33°  December Order, 193 FERC ¶ 61,217 at P 219.
331  See Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8. 230 of 515

PDF page 233

Document AccessigPSIet; 22qI:o6A18-31:29,9ument:Filtd rPag9: g63A8/2PAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 75 -
such "extraordinary cases," courts might "hesitate before concluding that Congress meant to confer such authority.i336

135.
We conclude that this proceeding is not an "extraordinary case" such that the December Order does not implicate the major questions doctrine. In West Virginia v. Environmental Protection Agency, the U.S. Supreme Court identified a number of indicators that tend to identify a case as extraordinary, none of which are present here. First, the December Order does not involve a "transformative expansion" of the FPA or a reimagining of the Commission's long-held interpretation of that statute.337  Instead, the Commission acted, as it has previously, by finding that an existing practice was unjust and unreasonable and proceeding to establish a just and reasonable replacement rate.338 Second, the December Order does not entail the use of an "ancillary" or "little-used backwater" statutory provision.339  To the contrary, FPA section 206 is central to the Commission's authority over the rates for transmission service in interstate commerce.34° Third, the Commission did not in the December Order act outside of the Commission's typical area of "comparative expertise. 341  Indeed, the Commission's regulation of the 336  Id. at 721 (citations and quotations omitted).

337  See id. at 724-25 (finding that an agency's failure to invoke the asserted power in the past indicates that the major questions doctrine might apply).
338  See, e.g., N.Y. v. FERC, 535 U.S. 1 (upholding Commission's exercise of its FPA section 206 authority in its landmark Order No. 888, which established the pro forma OATT and established new transmission services); S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41 (upholding Commission's exercise of its authority under FPA section 206 to remedy deficiencies in existing transmission planning practices).
339  W. Va. v. EPA, 597 U.S. at 724, 730. 340 See EPSA, 577 U.S. at 290 ("ensur[ing] effective transmission of electric power" is one of the "core objects" of the FPA"); /V. Y. v. FERC, 535 U.S. at 7 ("[Section] 205 of the FPA prohibited . . . unreasonable rates and undue discrimination with respect to any transmission . . . subject to the jurisdiction of the Commission, and [section] 206 gave the [Commission] the power to correct such unlawful practices.") (quotations and citations omitted); Bldg. for the Future Through Elec. Reg'l Transmission Plan. & Cost Allocation, Order No. 1920, 187 FERC ¶ 61,068 (2024), order on reh'g and clarification, Order No. 1920-A, 189 FERC ¶ 61,126, at P 175 (2024) ("FPA section 206 sets forth core Commission regulatory authority to remedy unjust and unreasonable rates, and practices affecting rates, for the transmission of electric energy in interstate commerce."), order on reh'g and clarification, Order No. 1920-B, 191 FERC ¶ 61,026 (2025). 341  W. Va. v. EPA, 597 U.S. at 729. 232 of 515

PDF page 234

Document AccessigPSA 2PAQ418-399cumentAild  jaq99: ge3A812ppe Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 76 -
rates, terms, and conditions of transmission service in interstate commerce sits at the core of the Commission's expertise.342  Fourth, the December Order does not assert authority in a manner of great "economic and political significance."343  Instead, the December Order makes important but discrete changes to the manner in which a subset of transmission customers take and pay for certain transmission services. 136.

In any event, Exelon and FirstEnergy argue that the replacement rate violates the major questions doctrine only insofar as it exceeds the Commission's jurisdiction or is unduly discriminatory or preferentia1.344  As explained above, the replacement rate does neither.

c. BTMG
i. Qualifying Facilities
(a) December Order
137.
The Commission directed PJM to revise the Tariff to revise the retail BTMG netting rules.345  The Commission directed PJM to propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG but to otherwise phase-in the elimination of netting. Specifically, the Commission directed PJM to allow Network Customers already using the retail BTMG netting rules to continue to do so for a transition period of three years.346  Further, the Commission directed PJM to grandfather entities with existing contracts for the specific purpose of effectuating a BTMG arrangement for the current term remaining under the existing contract.347

342  See S.C. Pub. Serv. Auth. v. FERC, 762 F.3d at 49-54 (summarizing the Commission's history of reforms to the rates, terms and conditions of interstate transmission service).
343  W. Va. v. EPA, 597 U.S. at 721. 344  Exelon and FirstEnergy Request for Rehearing at 52.
345  December Order, 193 FERC ¶ 61,217 at P 221.
346  Id. P 223.
347  Id. P 224. 233 of 515

PDF page 235

Document Accessig:PSP: 2
2q)QA18.-.3[289urnent:F1.1.1d EPa..g:g.63/18/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al. -

- 77 -
(b) Request for Clarification and/or Rehearing
138. Industrials request clarification on whether cogeneration QFs under the Public Utility Regulatory Policies Act of 1978 (PURPA) will be provided access to back-up and maintenance power at just and reasonable rates and be credited for capacity based on the reliability of their generating units.348  Industrials contend that many QFs are cogeneration facilities, and that strong operational and financial incentives exist for cogeneration facilities to operate efficiently. Industrials state that Commission regulations require certain QFs to meet specified efficiency standards and thus should be encouraged.349  Thus, Industrials argue that many QFs operate with a high capacity factor and reliably during transmission peaks. Industrials accordingly seek clarification on whether and how the December Order will apply to cogeneration QFs. Industrials contend that the removal of netting rules will "directly harm large American manufacturing facilities that have invested substantial resources into developing and maintaining on-site generation."3' °  Industrials add that removing netting rules may contradict Commission regulations that require back-up and maintenance services for cogeneration QFs. Further, Industrials argue that FCD and NFCD transmission services do not appear to account for forced generation outages. For these reasons, Industrials request that the Commission clarify that cogeneration QFs are exempt from the "gross load" approach or that PJM must include a reasonable "Back-up Power" transmission option that retail BTMG customers, including QFs, can purchase.351

(c) Determination
139.
As discussed below, in response to the Industrials' request for clarification, we clarify and set aside, in part, the December Order.

140.
First, we clarify that the December Order's replacement rate does not change any obligation under the Commission's PURPA regulations regarding QFs' access to supplementary, back-up, maintenance, and interruptible power. The replacement rate applies only to Network Customers' usage of NITS under the Tariff, and nothing in the replacement rate undoes the requirement in 18 C.F.R. § 292.305(b)(1) that, as to QFs, "each electric utility shall provide . . . Supplementary power, Back-up power,

348  Industrials Request for Clarification or Rehearing at 10; see also id. at 5.
349  Id. at 11 (citing 18 C.F.R. § 292.205 (2025)). 350 Id.
351  Id at 11-13. 234 of 515

PDF page 236

Document Accessig@V; 22q-A4;18- 3Q9cument:FlA d rFai@w: A3A812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 78 -
Maintenance power, and Interruptible power."352  While Industrials suggest that removing netting rules may contradict Commission regulations that require back-up and maintenance services for cogeneration QFs, Industrials do not explain how the replacement rate results in Industrials no longer being entitled to back-up and maintenance power under the Commission's regulations. In addition, Industrials do not explain why it is necessary for the Commission to adopt a change to "credit [QFs] for capacity based on the reliability of their generating units."353

141.
Second, we set aside, in part, the December Order's directive that PJM establish a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG.354  We find that it is just and reasonable to allow certain cogeneration QFs that are Network Customers to be able to net by using BTMG, and to be exempt from the new MW threshold, as discussed below. In the December Order, the Commission found that PJM's retail BTMG rules are no longer consistent with cost causation principles because large loads configured in a BTMG arrangement with significant generation will raise cost-shifting concerns compared to loads pursuing smaller amounts of netting.355  Moreover, the Commission found that PJM's existing retail BTMG rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.356  We find that there is not sufficient reason, and nor do Industrials articulate such a reason on rehearing, to believe that these concerns are inapplicable to cogeneration QFs categorically. 142. However, we recognize, based on the record, that there may be certain industrial cogeneration QFs that may be integrated with load such that, when their generator trips offline, the load follows (rather than withdrawing energy from the transmission system). For example, as Industrials explain as to certain industrial cogeneration QFs, "if the generator goes offline, the load promptly follows because the manufacturing facility

352  18 C.F.R. § 292.305(b)(1) (2025).
353  Industrials Request for Clarification or Rehearing at 10.
354  December Order, 193 FERC ¶ 61,217 at P 221.
355  Id. P 186.
356  Id. To the extent the Commission's clarification on this issue conflicts with the requested clarification, we otherwise disagree with Industrials' request to the extent Industrials request rehearing in the alternative. See Industrials Request for Clarification or Rehearing at 2. 235 of 515

PDF page 237

Dodument AccesdigPtr; 22Wogg-18-3C9.9Urnent:FlIld IPAP:g 63A8/ 2 P-Ate Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 79 -
cannot function without the steam output from the generation process."357  We therefore direct PJM, within 60 days of the date of issuance of this order, to submit on further compliance a process to exempt certain cogeneration QFs from the new retail BTMG netting rules if they demonstrate that they are integrated with load such that, when their generating facility trips offline, the load follows, and they thus do not present the reliability or resource adequacy concerns discussed in the December Order. In developing its compliance proposal, PJM must ensure that the requirements for a cogeneration QF to make this demonstration are not unduly burdensome.

ii. Capacity Obligations
(a) December Order
143. The Commission found that PJM's existing retail BTMG netting rules may lead to both reliability and resource adequacy risks because PJM is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.358  The Commission directed PJM to propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG.359  The Commission explained that such a threshold should reduce the reliability and resource adequacy risks that large loads may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion.

(b) Request for Clarification and/or Rehearing
144. Industrials seek clarification that the removal of BTMG netting rules will only be applicable to transmission and specified ancillary services, not to capacity obligations. Industrials represent that the determination of retail customers' capacity tags is made by individual electric distribution companies and that large industrial and institutional users have a variety of configurations and approaches to meeting their capacity requirements.36°  Industrials contend that the Commission did not analyze the impact of

357  Industrials Request for Clarification or Rehearing at 11.
358  December Order, 193 FERC ¶ 61,217 at P 186.
359  Id. P 221. 360  Industrials Request for Clarification or Rehearing at 15-16. 236 of 515

PDF page 238

Document AccessigPSA 2Agg18-349c
urnent:Flita.
s?-03 A8/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 80 -
the BTMG rule changes on retail customers' capacity obligations or address alternate capacity products that a retail customer with BTMG could elect.36'

(c) Determination
145. We deny Industrials' clarification request and sustain the December Order. The Commission's determination that PJM's retail BTMG netting rules are no longer just and reasonable rested on a finding that PJM's existing retail BTMG netting rules may lead to reliability and resource adequacy risks.362  The Commission set a replacement rate to reduce the resource adequacy risks identified in the record.363  We recognize that requiring PJM to revise its retail BTMG netting rules may affect capacity obligations,364 but in the absence of this reform, the resource adequacy problems arising from PJM's existing retail BTMG netting rules would persist because PJM remains obligated to serve transmission customers using BTMG but under the existing rules does not consider such customers in resource adequacy planning.365  As to Industrials' concerns about the impact of the retail BTMG netting rule changes on retail customers, we agree with Industrials that the RAA provisions Industrials cite directly apply to LSEs, not retail customers' capacity obligations,366  and we note that, as part of our replacement rate, we established a grandfathering provision such that existing entities may be able to continue netting for the remainder of a contract entered into for the purpose of effectuating a BTMG arrangement.367  This grandfathering provision may also limit the impacts of the changes to PJM's retail BTMG netting rules upon some entities' capacity obligations. In addition, as discussed above, we set aside, in part, the December Order and direct PJM to revise its Tariff to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Thus, Eligible Customers taking transmission service on behalf of load with BTMG that 361  Id. at 16.

362  December Order, 193 FERC ¶ 61,217 at P 186.
363  Id. P 221.
364  See, e.g., PJM, Intra-PJM Tariffs, RAA, Schedule 8 (Determination of Unforced Capacity Obligations) (5.3.0).
365  December Order, 193 FERC ¶ 61,217 at P 186.
366  See, e.g., PJM, Intra-PJM Tariffs, RAA, Schedule 8 (Determination of Unforced Capacity Obligations) (5.3.0).
367  December Order, 193 FERC ¶ 61,217 at P 224. 237 of 515

PDF page 239

Document Accesgigi SA '- 1s3oqg-18-3P8curnent:FliLa PaNP: A3,8i8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 81 -
are willing and able to limit their energy withdrawals from the transmission system under certain conditions may elect to take FCD and/or NFCD transmission service, which could reduce capacity obligations in comparison to a BTMG arrangement where the Eligible Customer elects to take NITS.368

iii. Unlawful Taking of Private Property
(a) December Order
146. In the December Order, the Commission directed PJM to revise the retail BTMG netting rules in the Tariff.369

(b) Request for Clarification and/or Rehearing
147. Industrials argue that the Commission's BTMG findings effectuate an unlawful taking of private property without providing just compensation, in violation of the Fifth Amendment of the United States Constitution. Industrials contend that there is a "per se taking[]" because "the owner is deprived of `all economically beneficial us[e]' of the property due to the government action."37°  Industrials assert that certain manufacturing facilities with on-site generation would be "completely uneconomic."371  Separately, Industrials contend that there is a regulatory taking under the factors outlined in Penn Central Transportation Co. v. New York City.372  In particular, Industrials state that the BTMG netting findings will cause, in some instances, devastating economic impacts "but perhaps not total deprivation."373  Industrials also argue that the BTMG netting findings

368  Id. P 211 ("PJM will only plan the transmission system and procure generation capacity for the contract demand—not for load growth, like it does for NITS customers— and PJM will have no obligation to serve the Eligible Customer beyond the contract demand."); id. P 218 ("The new Non-Firm Contract Demand transmission service will not include a charge for generation capacity.").
369  Id. P 221. 370  Industrials Request for Clarification or Rehearing at 31-32 (quoting Lingle v. Chevron U.S.A., 544 U.S. 528, 538 (2005)).
371  Id. at 32 (listing examples).
372  Id at 33 (citing Penn. Cent. Transp. v. City of IV. Y, 438 U.S. 104, 124 (1978)).
373  Id. at 33-34. 238 of 515

PDF page 240

Document AccessigPS1P; Z42-VA1E3-34gcurnent:FlAd rfAgp: e7.6314812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 82 -
upset investment-backed expectations and do not "promote or facilitate a public program or public good to justify the economic interference."374

(c) Determination
148. As an initial matter, we dismiss Industrials' argument that the Commission's BTMG findings effectuate an unlawful taking of private property for lack of finality.375 The December Order did not make a final decision on the applicability and design of the revised retail BTMG netting rules.376  In particular, the Commission stated that it "ma[d]e no finding in this order on a threshold" "for the amount of load at a particular electrical location that Network Customers may net by using BTMG."377  It would thus be premature to argue or evaluate on rehearing whether those as-yet-undeveloped retail BTMG netting rules effectuate an unlawful taking.378

149.
In any event, the Commission has an obligation under the FPA to ensure that the rates, terms, and conditions of jurisdictional service are just and reasonable. As the Commission found in the December Order, circumstances have changed since the Commission approved PJM's retail BTMG netting rules such that these rules are no longer just and reasonable.379  The Commission therefore is establishing a just and reasonable replacement rate. And, as the Courts have held, in the context of setting rates, terms, and conditions for jurisdictional service, what is just and reasonable is not a taking.38°  Instead, in establishing a just and reasonable replacement rate, the Commission is balancing the respective rights and obligations of the parties and will determine that

374  Id.
375  See supra P 106.
376  December Order, 193 FERC ¶ 61,217 at P 221.
377  Id.
378  Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8.
379  December Order, 193 FERC ¶ 61,217 at P 186. 380 See In re Permian Basin Area Rate Cases, 390 U.S. 747, 770 (1968) ("[T]he just and reasonable standard of the Natural Gas Act coincides with the applicable constitutional standards and any rate selected by the Commission from the broad zone of reasonableness permitted by the Act cannot properly be attacked as confiscatory.") (punctuation and citations omitted); see also N.Y. Indep. Sys. Operator, Inc., 151 FERC ¶ 61,075, at P 63 (2015). 239 of 515

PDF page 241

Document Accessig#g
2-kAg-18-3p@cument:Flild
rpaqg9:MC18/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 83 -
appropriate replacement rate through the course of the paper hearing and compliance proceedings.381

iv. Materiality Threshold
(a) December Order
150. The Commission directed PJM to propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG.382  The Commission stated that parties would have an opportunity to comment on PJM's proposed threshold before we establish this replacement rate.383

(b) Request for Clarification and/or Rehearing
151. Industrials seek clarification that any retail BTMG materiality threshold implemented will be sufficiently high to permit traditional manufacturers and institutional customers to continue to net generation, consistent with actual use of the transmission system.384  Industrials argue that a threshold of at least 200 MW would appropriately recognize the major energy investments most existing industrial and institutional loads have made over decades, consistent with the "actual use" principle, without making

381  N.Y. Indep. Sys. Operator, Inc., 151 FERC ¶ 61,075 at P 63 (citing Jersey Cent. Power & Light Co. v. FERC, 810 F.2d 1168, 1191 (D.C. Cir. 1987) (en banc) (Starr, J. concurring) (("Unlike garden-variety takings, the requirements of the Takings Clause are satisfied in the rate regulatory setting when justice is done, that is to say the striking of a reasonable balance between competing interests.")); see also supra P 137 (describing the materiality threshold, phase-in, and grandfathering), PP 141-142 (setting aside the December Order in part to allow certain cogeneration QFs to continue to net).
382  December Order, 193 FERC ¶ 61,217 at P 221.
383  Id.
384  Industrials Request for Clarification or Rehearing at 16. 240 of 515

PDF page 242

Document Accessig@Sg 2A-2-Vt418-3Q@cument:FlA d Ifa'gg:A4A8/2p23-te Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 84 -
uneconomic their resource adequacy contributions.385  Industrials contend that this threshold would still address the primary concern driven by new large loads.386 152. To the extent the Commission does not grant clarification, Industrials argue that the MW materiality threshold, transition period, and grandfathering provision fail to correct the asserted defects created in the December Order.387  While Industrials "welcome exemptions as helpful," they describe those policies as "the exception that proves the rule."388  Industrials contend that the threshold could create unintended consequences such as perverse incentives to make on-site generation projects smaller, undue discrimination via a bright-line threshold, or a limit that is too low.389  Industrials suggest that, rather than an arbitrary threshold, the Commission should maintain its traditional netting approach but find alternative means to ensure that standby or backup costs are addressed for very large loads. Industrials recommend that if the Commission pursues a mandatory threshold, it should choose a multi-pronged threshold aligned with the drivers of current transmission demand and the reliability risks posed.39°  Specifically, Industrials argue, the Commission should set the threshold high enough to permit traditional manufacturers and industrial loads to continue netting—such as 200 MW.39'

385  Id. at 16 & n. 23 ("We understand that industrial combined heat and power . . . units may, in certain cases, exceed 200 MW. Given the Administration's interest in reshoring American manufacturing and the pressing need to keep long-established generation units economic, 200 MW may be insufficient.").
386  Id at 16-17.
387  Id at 42.
388 id
389  Id at 42-43 (stating also that "[n]either a MW-based threshold nor a grandfathering provision correct jurisdictional deficiencies" and the Commission should "find alternative means to ensure that standby or backup costs are addressed for very large loads"). 39°  Id. at 43. 391  Id. at 43-44. 241 of 515

PDF page 243

Document Accessigi S,9; qq-A6,A18-3Rwument:Flild
gb4A6/2p2Ve Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 85 -
(c) Determination
153.
As an initial matter, we dismiss Industrials' argument that any retail BTMG materiality threshold implemented will be insufficiently high for lack of finality.392  The December Order did not make a final decision on the materiality threshold to be used in the revised the retail BTMG netting rules.393  In particular, the Commission stated that it "ma[d]e no finding in this order on a threshold" "for the amount of load at a particular electrical location that Network Customers may net by using BTMG."394  It would thus be premature to argue or evaluate on rehearing whether that as-yet-undeveloped retail BTMG materiality threshold be insufficiently high.395

154.
In response to the Industrials' arguments on rehearing regarding the MW threshold, transition period, and grandfathering provision, we continue to find that this three-pronged approach as to a replacement rate is just and reasonable.396  As an initial matter, we note that Industrials primarily take issue with the Commission's decision to set a MW threshold, alleging it is arbitrary and may be unduly discriminatory.397  We disagree. We recognize that no threshold may be perfect, but the Commission has discretion in drawing administrative lines it deems necessary,398  and we continue to believe that a threshold is not only necessary for the reasons set out in the December Order, but also that we can exercise reasonable discretion to set a threshold consistent with the Commission's intent to reduce the concerns raised by PJM's existing retail BTMG netting rules. As the Commission explained in the December Order, "such a threshold should reduce the reliability and resource adequacy risks [] that large loads may

392  See supra P 106.
393  December Order, 193 FERC ¶ 61,217 at P 221.
394  Id
395  Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8.
396  December Order, 193 FERC ¶ 61,217 at PP 221-224.
397  Industrials Request for Clarification or Rehearing at 16-17, 42-43.
398 See Vonage Holdings Corp. v. FCC, 489 F.3d 1232, 1242 (D.C. Cir. 2007) ("It is true that an agency may not pluck a number out of thin air when it promulgates rules in which percentage terms play a critical role. When a line has to be drawn, however, the Commission is authorized to make a `rational legislative-type judgment.' If the figure selected by the agency reflects its informed discretion, and is neither patently unreasonable nor `a dictate of unbridled whim,' then the agency's decision adequately satisfies the standard of review.") (citation and internal quotation marks omitted). 242 of 515

PDF page 244

Document AccessigRSA:  2z421qql 8 - 34cu me nt:F1 1.1  IPAP:g54/1 8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 86 -
pose to PJM, while also allowing Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion."399  The Commission also acknowledged that such a materiality threshold "will not eliminate the risk" identified in the December Order, but found that it "will ensure that the risk is limited."400  As the Commission explained in the December Order, an important part of the problem is that "PJM's existing retail BTMG netting rules do not limit the amount of qualifying load that a Network Customer may net by using BTMG."401  We also note that, as discussed above, we set aside, in part, the December Order's elimination of BTMG netting as to certain cogeneration QFs. In addition, we note that above we set aside, in part, the December Order and extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, thereby providing such customers the option to elect to take a transmission service that matches their preferred use of the transmission system.4°2 Lastly, we note that, while Industrials suggest the Commission find an alternative approach to a mandatory threshold to ensure that standby or backup costs are addressed for "very large loads,"403  they fail to support their request with any specificity.404

399  December Order, 193 FERC ¶ 61,217 at P 221.
400 Id. 4°1  Id. P 186. 4°2  Id. P 194 (stating that "Eligible Customers, on behalf of the Co-Located Loads that they represent, may choose the transmission services that match their preferred use of the transmission system"). 4°3  Industrials Request for Clarification or Rehearing at 43. 4°4  FPA section 313(a) requires that an "application for rehearing shall set forth specifically" its grounds. 16 U.S.C. § 8251(a) (emphasis added). We follow Commission practice, with which courts have agreed, and reject arguments on rehearing, such as this one, lacking sufficient specificity. PJM Interconnection, L.L.C., 171 FERC ¶ 61,040 at P 22; see also Ind Util. Regul. Comm'n, 668 F.3d at 736; LA Storage, LLC, 182 FERC ¶ 61,026 at P 25 & n.75. 243 of 515

PDF page 245

Document AccessigP Sp;  22PP2-%QA18 - 3R 891-I ment :F ill
W4418/2 P2Ve Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 87 -
2. Necessary Study Process for Existing Interconnection Customers
a. Treatment of Capacity Interconnection Rights (CIRs) for
Co-Located Generators
i. December Order
155. The Commission found that an existing generator may not begin serving Co-Located Load that is not Network Load until it has de-listed its CIRs for the portion of the generator to be designated to serve any Co-Located Load that is not receiving NITS.4°5  A capacity resource's CIRs are rights to inject generation as a Generation Capacity Resource into the transmission system at the Point of Interconnection.406

ii. Request for Clarification and/or Rehearing
156.
Constellation argues that the December Order appears to require a capacity resource to delist its CIRs even when the capacity resource remains fully capable of serving the grid during capacity emergencies.407  Constellation explains that generators and Co-Located Load may seek contractual arrangements in which the generator will serve the grid rather than the Co-Located Load during a capacity emergency and the Co-Located Load will either curtail or rely on backup generation. Constellation claims that it would be inconsistent with PJM's existing rules to require delisting in these circumstances. According to Constellation, PJM's existing rules only require a capacity resource entering an external sale to delist its CIRs when the resource "has a financially and physically firm commitment to an external sale of its capacity.'5408 157.

Constellation therefore seeks clarification that the December Order does not require a capacity resource to delist its CIRs to serve a Co-Located Load that is taking NFCD transmission service if PJM can verify that the Co-Located Load has no contractual right to energy from the generator during a capacity emergency and that the Co-Located Load has the ability either to curtail or draw on back-up power.4°9 4°5  December Order, 193 FERC ¶ 61,217 at P 230.

406 PJM Interconnection, L.L.C., 168 FERC ¶ 61,155, at P 7 n.15 (2019).
407 Constellation Request for Clarification or Rehearing at 3 (citing December Order, 193 FERC ¶ 61,217 at P 230). 4°8  Id. at 4 (quoting PJM, Intra-PJM Tariffs, OATT, attach. DD.6 § 6.6) (emphasis in original). 4°9  Id at 4-5 (referring to "the ability to (i) interrupt and/or (ii) turn on back-up diesels or other back-up power or draw on batteries when transmission under the 244 of 515

PDF page 246

Document AccessigPsg qq-Aeg -18-349cument:FlAd LPAg?:g04A812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 88 -
Constellation argues that the Commission could require the Co-Located Load to disclose information regarding its protective relay scheme and its interruptible commitment and could impose penalties on the Co-Located Load for failure to comply with its commitment.

158.
To the extent that the Commission does not grant clarification, Constellation seeks rehearing. Constellation argues that requiring a capacity resource to delist its CIRs in these circumstances would be a failure of reasoned decision making.410 Constellation also argues that it would be unduly discriminatory to require a capacity resource serving a Co-Located Load to delist for entering into an interruptible commitment but not to require capacity resources to delist before making other non-firm commitments.41'

iii. Determination
159.
We deny Constellation's request for clarification and sustain the December Order's finding that an existing generator may not begin serving Co-Located Load that is not Network Load until it has delisted its CIRs for the portion of the generator to be designated to serve any Co-Located Load that is not receiving NITS.412 160. Constellation proposes a scenario in which an Eligible Customer taking NFCD transmission service on behalf of Co-Located Load would not be allowed to withdraw power from the transmission system during emergency conditions and the Eligible Customer would guarantee that it would further curtail its demand in order to allow the Co-Located Generator to provide energy to the system. NFCD transmission service governs when an Eligible Customer may withdraw energy from the transmission system, but it does not govern the firmness of any bilateral agreement to supply energy between the Co-Located Load and the Co-Located Generator. We understand Constellation's scenario to be one in which the Co-Located Load—when relying on the Co-Located Generator—does not schedule its power by relying on FCD or NFCD transmission service.

non-firm contract demand service is interrupted and the co-located generator is serving the grid").

410 Id. at 6 (citing Elec. Consumers Res. Council v. FERC, 747 F.2d 1511, 1513-14 (D.C. Cir. 1984)). 411  Id. (citing 5 U.S.C. § 706(2)(A); Consol. Edison of N.Y., Inc. v. FERC, 45 F.4th 265 (D.C. Cir. 2022)).
412  December Order, 193 FERC ¶ 61,217 at P 230. 245 of 515

PDF page 247

Dodument AccessigPSA -qr23x6,618-3Q99urnent:Filtd JEN?: W-64 ,618/2p to Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 89 -
161.
Under Constellation's scenario, the Co-Located Generator would not be capable of meeting its entire capacity requirement. In addition to the requirement to perform during emergencies, Generation Capacity Resources are required to offer into the Day-Ahead Market throughout the delivery year.413  Constellation's proposal would allow a Generation Capacity Resource to violate this requirement and provide an inferior capacity product (compared to other Generation Capacity Resources) for the same capacity payment. We thus deny Constellation's request for clarification and sustain the December Order.

162.
We also reject Constellation's argument that Generation Capacity Resources engaged in non-firm external bilateral transactions are not required to delist their CIRs and are comparable.414  A Generation Capacity Resource engaged in a non-firm external bilateral transaction must still make offers into PJM's day-ahead market.415 b. Cost Responsibility for Network Upgrades

i. December Order
163. In the December Order, the Commission required PJM to revise its Tariff to expressly indicate that the Interconnection Customer will be responsible for the costs of any modifications or Network Upgrades that are needed as a result of PJM's study of the change to the Interconnection Service Agreement (ISA) or Generation Interconnection Agreement (GIA) to allow the existing generator to serve Co-Located Load, including to reflect any reduction in CIRs, inclusive of all necessary Network Upgrades. The Commission found that this change will clarify that costs associated with such Co-Location Arrangements will not be unfairly shifted to other transmission customers. The Commission further directed PJM to revise its Tariff to clarify that an existing generator may not commence service to a Co-Located Load until all required Network Upgrades, special protection schemes, and metering are in service.416

413  Under the Tariff, a capacity resource is required to offer its Installed Capacity (ICAP) equivalent of the resource's cleared Unforced Capacity (UCAP) into the PJM energy markets every day if not on outage or derated. PJM, Intra-PJM Tariffs, OATT, attach. K, app. § 1.10 (Scheduling) (46.1.1), § 1.10.1A(d).
414  Constellation Request for Clarification or Rehearing at 6.
415 wri• Intra-PJM Tariffs, OATT, attach. K, app. § 1.10 (46.1.1), § 1.10.1A(d).
416  December Order, 193 FERC ¶ 61,217 at P 228; see also id. P 176 (summarizing same). 246 of 515

PDF page 248

Document AccessigRA qq-Agg318-34iiscument:Flild rEN?:gb4A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

-90-
ii. Request for Rehearing
164.
Exelon and FirstEnergy challenge the Commission's directive that an
Interconnection Customer seeking to serve Co-Located Load using an existing generator must bear the costs of all Network Upgrades.417  Exelon and FirstEnergy contend that the Commission has departed, without explanation, from its policy that all transmission customers share the embedded costs of the transmission system, including Network Upgrade costs, consistent with cost causation principles.418  Exelon and FirstEnergy assert that this policy is sensible because all loads benefit from the transmission network, including Co-Located Load. Exelon and FirstEnergy argue that the Commission acknowledges that Co-Located Load benefits from the transmission network as a whole because the Commission found Co-Located Load relies on regulation and black start.419 Exelon and FirstEnergy contend that regulation and black start cannot be delivered in isolation: they depend on diverse resources around the grid transmitting power over transmission lines, on other operating reserves and voltage support services, and on Network Upgrades. Exelon and FirstEnergy also argue that the December Order is internally inconsistent and discriminatory because it preserves NITS as a just and reasonable approach, but the NITS funding model conflicts with the proposed assignment of costs to Co-Located Load.42°

165.
Exelon and FirstEnergy assert that the Commission should not erode its rolled-in rate policy and identify several consequences of such erosion.421  First, Exelon and FirstEnergy contend that, if Co-Located Loads need only pay for incremental investment, they avoid paying for the broader system on which they depend, resulting in other customers paying a forced subsidy.422 Exelon and FirstEnergy express concern that, once a Co-Located Load fulfills its responsibility for funding certain upgrades, prohibitions on "and" pricing mean the Co-Located Load would not be responsible for further transmission service payments even though the transmission system requires maintenance. Second, Exelon and FirstEnergy argue that the Commission's approach creates challenges akin to those in the generator interconnection space, such as the potential for future Co-Located Load customers to trigger significant upgrades, and

417  Exelon and FirstEnergy Request for Rehearing at 42-43.
418  Id at 42.
419  Id. at 43. 42°  Id. at 44.
421  Id at 44-47.
422  Id at 45. 247 of 515

PDF page 249

Document Accessigi SP; qq-2-V?g-18 - 3R9cUrnent:FlAd IPAP: g64 /81812PAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 91 -
incentives for speculative behavior and Point of Interconnection shopping.423  Third, Exelon and FirstEnergy argue that significant up-front requirements could hinder economic development for Co-Located Load customers that are not data centers.

iii. Determination
166. We sustain the December Order's requirement that an Interconnection Customer will be responsible for the costs of any modifications or Network Upgrades that are needed to allow the existing generator to serve Co-Located Load, including to reflect any reduction in CIRs, inclusive of all necessary Network Upgrades.424  We disagree with Exelon and FirstEnergy's argument that the Commission created a "new paradigm" as to Interconnection Customers' cost responsibility for Network Upgrades needed to accommodate modifications those customers make to their own generators.425  To the contrary, the Commission directed PJM to revise the Tariff to expressly state that Interconnection Customers have this cost responsibility in order to "clarify that that costs

associated with such Co-Location Arrangements will not be unfairly shifted."426  In other words, even without this revision to improve the Tariff's clarity, this requirement was the preexisting one. The Tariff provides that an Interconnection Customer is responsible for the costs of additions to the Transmission System that are required to accommodate modifications to the generator.427  For example, apart from Co-Location Arrangements, if an Interconnection Customer decreased the capacity of a generator due to technological changes at that facility, the Interconnection Customer would be responsible for the costs of Network Upgrades needed to accommodate that decrease.428  This requirement

423  Id at 46.
424  December Order, 193 FERC ¶ 61,217 at P 228.
425  Exelon and FirstEnergy Request for Rehearing at 42-47.
426  December Order, 193 FERC ¶ 61,217 at P 228 (emphasis added).
427 PJM, Intra-PJM Tariffs, pt. IX, subpt. B, app. 2 (2.0.0), § 3.4(b) (Modification Costs) ("Project Developer shall be responsible for the costs of any additions, modifications, or replacements to the Interconnection Facilities and Transmission Owner Upgrades or the Transmission System that are required, in accord with Good Utility Practice and/or to maintain compliance with Applicable Laws and Regulations or Applicable Standards, in order to accommodate additions, modifications, or replacements made by Project Developer to the Generating Facility or Merchant Transmission Facility or to the Project Developer Interconnection Facilities."); see also, e.g., id. Attachment O, Appendix 2, § 3.4(b) Modification Costs (0.0.0).
428  Id Part IX.B, Appendix 2, § 3.4(b) Modification Costs (2.0.0). 248 of 515

PDF page 250

Document Access igPsg 22q-Arqg-18 _39Kument:Fl il d rFai@v: g.64/48/22-,Ate Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 92 -
likewise applies to Interconnection Customers seeking to modify their interconnection to serve Co-Located Load if the attendant decrease in energy injected to the transmission system necessitates Network Upgrades. Accordingly, if the Commission had not directed the revision at issue here, Interconnection Customers would still bear the cost responsibility at issue—the Commission simply acted to improve the clarity of the Tariff on this topic. Exelon and FirstEnergy thus attack a requirement in the Tariff that the Commission approved before this proceeding and that the Commission did not change in this proceeding.

167.
For the same reason, Exelon and FirstEnergy are incorrect in arguing that the Commission "depart[ed] from prior precedent" with a requirement that "differs from the approach taken in the PJM Tariff."429  As explained, the Commission did not change the preexisting Tariff regime. In any event, despite their assertion, Exelon and FirstEnergy do not include citations to precedent addressing this topic.43°

168.
Exelon and FirstEnergy also misunderstand the requirement they criticize. Exelon and FirstEnergy characterize the Commission's directive as ordering that "[C]o-[L]ocated [L]oad must self-fund any needed transmission upgrades."431  The cost responsibility at issue, however, is limited to existing Interconnection Customers and pertains only to the specified Network Upgrades related to their own modifications.432  In short, the Commission did not direct that Co-Located Load would self-fund Network Upgrades. Their criticisms of the clarification that the Commission directed to the current Tariff are thus flawed. The Commission specifically stated that the requirement to self-fund any needed Network Upgrades was appropriate because when "an Interconnection Customer seek[s] to serve Co-Located Load using an existing generating facility" "existing transmission customers" must be "protect[ed]" "from bearing the cost of Network Upgrades required for an Interconnection Customer to begin serving Co-Located Load."433  Otherwise, costs could be "unfairly shifted" based on the conduct of

429  Exelon and FirstEnergy Request for Rehearing at 42, 44. 430  In the relevant section of Exelon and FirstEnergy's rehearing request, they do cite several cases and orders that do not address this topic. For example, Exelon and FirstEnergy cite Coalition of MISO Transmission Customers v. FERC, 45 F.4th 1004, 1009 (D.C. Cir. 2022), for a general statement of cost causation principles and they cite two orders regarding load-ratio share for NITS. Id. at 42-47 & nn.110-111.
431  Id. at 42.
432  PJM, Intra-PJM Tariffs, pt. IX, subpt. B, app. 2, (2.0.0), § 3.4(b) (Modification Costs).
433  December Order, 193 FERC ¶ 61,217 at P 176 (emphasis added). 249 of 515

PDF page 251

Document Accessig#ir; 2A-2-18-349curnent:Flild rPA99:g5,c18/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

-.93 -
Interconnection Customers.434  The entity responsible for causing the need for the Network Upgrade costs is therefore the relevant Interconnection Customer, and Exelon and FirstEnergy are incorrect to assert that a "load pays" framework should apply here.435 It is the conduct of the Interconnection Customer that triggers the Network Upgrades at issue.

169.
Exelon and FirstEnergy nonetheless contend that "[C]o-[L]ocated [L]oad should be charged for the benefits it receives from the grid and for the burdens it places upon the grid."436  Exelon and FirstEnergy further give the example of the use of regulation and black start services.437  The December Order appropriately addressed such use. The December Order determined, for example, that Eligible Customers serving Co-Located Loads that seek to rely on the transmission system to the same extent as Network Customers will continue to be eligible to take NITS, billed on a gross demand basis; Eligible Customers can take and pay for the new contract demand transmission services that reflect a Co-Located Load's ability to limit withdrawals from the transmission system; and Eligible Customers taking transmission service on behalf of Co-Located Load must be assessed charges for regulation and black start services on a gross demand basis, to ensure appropriate cost recovery for such services.438  In sum, the findings we discuss here related to Interconnection Customer cost responsibility do not disturb the Commission's findings addressing appropriate charges for transmission service—an obligation on Eligible Customers not Interconnection Customers.

170.
Exelon and FirstEnergy also argue that the Commission improperly assessed "cost causation" because it "randomly applied" "cost responsibility" "only to cases where the added load is served through an existing generator interconnection facility."439  As explained above, however, the Commission simply applied the existing Tariff. The

434  Id. P 228.
435  Exelon and FirstEnergy Request for Rehearing at 43; see also id. at 43-44 n.113 (stating that the December Order "departs from th[e] longstanding approach" of "rolling the costs of load-driven network upgrades into transmission rates").
436  Id. at 43; see also id. at 45-46; id. at 47 (stating that "it should not be assumed that large loads will trigger system upgrades with costs in excess of what they would otherwise contribute to the system if they paid traditional network rates based on their load-share ratio").
437  Id at 43.
438  December Order, 193 FERC ¶ 61,217 at P 160.
439  Exelon and FirstEnergy Request for Rehearing at 44. 250 of 515

PDF page 252

Document AccessigPV:
I.8. 349cumentAi l d ig@g?:g.65/118/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 94 -
Commission likewise affirmed the allocation of cost responsibility to the parties that cause the costs—the Interconnection Customers—who do so through their conduct in modifying their existing arrangement.44°  Accordingly, we disagree with Exelon and FirstEnergy's assertion that these costs should instead be spread "to all network customers." In PJM, the costs of Network Upgrades are directly assigned to the interconnection customer—referred to as participant funding.441 In its Order No. 2003 compliance proceeding, PJM explained that "the `but for' provisions of the PJM tariff . . . require an Interconnection Customer to pay 100 percent of the Network Upgrades that must be made for the Interconnection Customer to connect to the PJM grid."442  In PJM, Interconnection Customers are also responsible for the costs of any changes to the transmission system that are required to accommodate additions, modifications, or replacements made by the Interconnection Customer to the generator or its interconnection facilities.443  The Commission's directive thus adheres to Commission precedent and the Tariff and also does not conflict with (or change) "the Network Service funding model."444

171.
We also find unavailing the "several issues" Exelon and FirstEnergy contend the Commission's determination created.445  We find each speculative and unsupported by evidence. More specifically, Exelon and FirstEnergy assert that the Commission is improperly accounting for a "benefit to other customers to include new [C]o-[L]ocated [L]oads in the pool of payers for the existing transmission network."446  Yet as explained above, the December Order establishes a set of transmission service options that ensures that Eligible Customers taking service on behalf of Co-Located Loads are allowed to 440 Indeed, Exelon and FirstEnergy acknowledge that "exiting incumbent generators" cause the relevant costs by referring to "transmission upgrade costs they cause by serving [C]o-[L]ocated [L]oad." Id.

441  PJM Interconnection, L.L. C., 108 FERC ¶ 61,025, at P 20 (2004).
442 Id. P 19. PEVI's current generator interconnection rules include similar "but for" provisions. See PJM, Intra-PJM Tariffs, pt. VIII, subpt. C, § 404 (1.0.0), § 404(A)(5) (Cost Allocation for Network Upgrades).
443  PJM, Intra-PJM Tariffs, pt. IX, subpt. B, app. 2, § 3.4 (2.0.0), § 3.4(b) (Modification Costs).
444  Exelon and FirstEnergy Request for Rehearing at 44.
445  Id at 45-47 (including argument that the Commission's "approach creates challenging dynamics like those we have seen in the generator interconnection space").
446  Id. at 45-46. 251 of 515

PDF page 253

Docuinent AccessigPA:  qq2-VA18-3Racument:plild DPaN9: g65A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 95 -
choose the transmission service that aligns with their use of the transmission system and therefore aligns the charges for service with the benefits received. Exelon and FirstEnergy's conjecture that "significant up-front requirements could hinder economic development"447  disregards the voluntary nature of Co-Location Arrangements, which reflect an additional opportunity for developers to consider.

3. New Generators Serving Co-Located Load
a. December Order
172. In the December Order, the Commission found that the Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.448  Pertinent to new generators, the Commission directed PJM to revise its Tariff to clarify that PJM shall consider requests for interconnection service below the full generating capability of the generator, so that an Interconnection Customer may request interconnection service at a level below its maximum facility output to serve Co-Located Load;449  that Interconnection Customers seeking to use new generators to serve Co-Located Load may use existing procedures to accelerate a new service request if the request has no cost allocation for Network Upgrades and does not require further studies;45°  that an Interconnection Customer seeking to use a new generator to serve Co-Located Load may request provisional interconnection service;451 and that an Interconnection Customer seeking to use a new generator to serve Co-Located Load at an existing Point of Interconnection may request Surplus Interconnection Service, if the existing Interconnection Customer at that Point of Interconnection has made Surplus Interconnection Service available.452

447  Id. at 46-47.
448  December Order, 193 FERC ¶ 61,217 at P 159.
449  Id. P 232. 45°  Id. P 233.
451  Id. P 234.
452  Id. P 235. 252 of 515

PDF page 254

Document Accessig#V; •A'Aqq18-3P9cUrnent:Flitd
f--8/2Pe Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 96 -
b. Request for Clarification
173.
Joint Parties request the Commission clarify that a Co-Located Load may nominate a net withdrawal limit in the same manner that it may nominate a net injection limit when requesting new or modifying existing interconnection service.453  Joint Parties argue that the Commission found that creating new transmission services is necessary to ensure that Co-Located Loads pay only for the services they use and to avoid costly and inefficient transmission system buildout, and that the same logic "should compel complementary reforms to the generator interconnection process, because that process also may evaluate withdrawals from the Co-Located Load and therefore may also result—absent clarification—in `costly and inefficient transmission system buildout."454 Joint Parties argue that clarification is necessary to realize the Commission's intent of ensuring that Co-Located Loads do not pay for services that they do not use and do not trigger Network Upgrades that they do not need. Joint Parties explain that, to the extent PJM performs interconnection service study steps involving withdrawal assumptions from both the storage facility and the Co-Located Load, those steps "must allow the interconnection customer to provide for limits to the injection and withdrawal rights for the generation and co-located load facilities reflecting the proposed integration of those facilities."455  Joint Parties clarify that they recommend against the Commission requiring Co-Located Load be included in the interconnection study process, as the timing of the load interconnection process may not match.456

174.
Joint Parties argue that, without clarification, PJM may assume that the Co-Located Load and the charging load of the storage resource create overlapping grid impacts, when both could be managed to limit the overall withdrawal of the resource and avoid withdrawing energy when doing so would create grid impacts that necessitate Network Upgrades. Joint Parties explain that, while the December Order recognizes that "co-located resources" can limit withdrawals and prevent unnecessary transmission buildout, Joint Parties argue the order applies this logic only to transmission service and not interconnection service.457  Joint Parties contend that not applying this logic to interconnection service would reduce the benefits of creating the non-firm transmission

453  Joint Parties Request for Clarification at 2-3, 5 (citing December Order, 193 FERC ¶ 61,217 at P 232).
454  Id at 3 (citing December Order, 193 FERC ¶ 61,217 at P 177).
455  Id. at 5-6.
456  Id at 8 n.20.
457  Id. at 10 (citing December Order, 193 FERC ¶ 61,217 at P 199). 253 of 515

PDF page 255

Document AccessigPsA: -%,.z.36 q-18 _3Q9cument:Flit d
k5A8/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 97 -
service.458  Joint Parties request that the Commission require PJM to specify what information about the Co-Located Load is required for the purposes of the new service request study process, similar to the Commission's requirement about the Necessary Study process, to ensure that PJM does not include overlapping load and energy storage withdrawals.459

c. Determination
175.
We deny Joint Parties' request for clarification. Joint Parties' request misconstrues the findings in the December Order that the Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load.46°  The December Order did not require PJM to integrate into the interconnection study process operating assumptions of both a Co-Located Load and electric storage resources that are part of a Co-Location Arrangement. PJM has already committed to studying the electric storage resources of Interconnection Customers as charging during off-peak periods, consistent with PJM's fuel-based dispatch assumptions set forth in its planning criteria."'

D. Informational Report
1. December Order
176.
In the December Order, the Commission directed PJM to submit in Docket No. EL25-49-000, within 30 days of the date of issuance of the December Order, a detailed informational report addressing, among other things "the development of enhanced load forecasting . . . measures to assist PJM in determining the amount of new capacity that is needed to maintain system reliability."462

455  Id at 9-10.
459  Id at 8 (citing December Order, 193 FERC ¶ 61,217 at P 227). 460 December Order, 193 FERC ¶ 61,217 at P 159. 461  PJM Interconnection, 195 FERC ¶ 61,031, at P 180 (2026) (accepting PJM's proposal, in relevant part, in compliance with the Commission's Order No. 2023 interconnection reforms).
462  December Order, 193 FERC ¶ 61,217 at PP 237-239. 254 of 515

PDF page 256

Document AccessigiPg 2A-2-Vgi 8 - 3Q9c ument:Flil d EpAg9: g.65A. 8 / 2  PAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 98 -
2. Request for Clarification
177. PIOs request clarification as to how the Commission intends to respond to or otherwise use information provided in the record regarding PJM's load forecasting practices. PIOs further request that any subsequent order from the Commission address the issues raised in the record regarding the continuing and ongoing deficiencies in PJM's load forecasting process. PIOs explain that PJM is using these load forecasts as inputs in the upcoming Base Residual Auction and RTEP and argue that, without a specific Commission directive, PJM is unlikely to timely resolve issues that PIOs allege exist with the load forecasts.463  PIOs note that the Commission required PJM to provide an informational filing that includes an update regarding the development of "enhanced load forecasting" and acknowledge that the Commission stated that it "will not act on or notice this informational [Ming.59464

178.
PIOs note that Commissioner Rosner submitted a letter to PJM about load
forecasting in September 2025 and take issue with PJM's October 2025 response.465 According to PIOs, PJM's response to this letter does not require or specify a particular methodology for forecasting large loads, without which PIOs allege that LSEs and Electric Distribution Companies will continue to report data with widely varying accuracy and that load forecasts will remain uncertain. PIOs also argue that PJM's response fails to identify a way for PJM to address the double counting of data centers or to enable PJM to respond dynamically to significant updates to load forecasts.466 179. PIOs contend that recent events have validated their concerns regarding the accuracy of PJM's load forecasts. For example, according to PIOs, PJM staff have acknowledged that the 2026 forecast would likely reflect a decrease in forecasted load for that time period in light of an update to how PJM implements load adjustments. Given the alleged inaccuracy of PJM's load forecasts, and because PJM uses its load forecasts to essentially set the demand curve for capacity obligations, for reliability studies, and to support the RTEP, PIOs question how these processes remain just and reasonable without significant revisions to PJM's load forecasting practices.467

463  PIOs Request for Clarification at 2-3. 464  Id at 2 (citing December Order, 193 FERC ¶ 61,217 at P 238 & n.486).
465  Id at 4-5.
466  id.
467  Id at 5-7. 255 of 515

PDF page 257

Document Accessig; gq-230§A18-3P9c ument:FlAd
g.s5A812pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 99 -
3. Determination
180.
We deny the request for clarification. The directive in the December Order to PJM to file an informational report that includes load forecasting represents the Commission's actions in this proceeding related to load forecasting.468 The Commission will review the informational report in its normal course and remains committed to monitoring PJM's load forecasting. Separately, we note that in the order that we are issuing concurrently in Docket No. EL26-67-000, we direct PJM to show cause as to why its Tariff remains just and reasonable without sufficiently clear and consistent Tariff provisions that address the application process for requesting transmission service to Eligible Customers on behalf of large loads and the study procedures for studying the provision of transmission service to Eligible Customers on behalf of large loads, including a non-refundable application fee and sufficient readiness requirements that escalate at distinct phases of the study process to deter duplicative or speculative requests for transmission service (e.g., meaningful milestones and/or financial commitments).

V. Compliance
A. BTMG Rules
1. Materiality Threshold
a. December Order
181.
The Commission found that PJM's existing retail BTMG netting rules were no longer just and reasonable and directed several changes, including directing PJM to propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG.469  The Commission found that a materiality threshold would reduce the reliability and resource adequacy risks that large loads may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion. The Commission noted "as points of reference that PJM requires any generator larger than 10 MW to be individually metered and that the Commission's definition of a small generator is 20 MW."47°

468  December Order, 193 FERC ¶ 61,217 at PP 237-239.
469  Id. P 221. The Commission did not direct PJM to make any changes to its rules for Non-Retail BTMG, finding that the record did not demonstrate the need for changes given that Non-Retail BTMG is already capped. Id. P 222. 47°  Id. P 221 (citing PJM Manual 14G: Generation Interconnection Requests, Rev. 8 (eff. July 26, 2023), § 1.6.2; Standardization of Small Generator Interconnection 256 of 515

PDF page 258

Document AccessigRgg 2A -2-Vgl 8 _ 3Q9cUMent:Flitd
g 65A81 2 PAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 100 -
b. PJM Compliance Filing
182.
PJM proposes to modify the existing Tariff definition of BTMG and add a new definition for Retail BTMG to establish a materiality threshold for Retail BTMG.471  PJM explains that the current Tariff definition of BTMG includes both Retail and Non-Retail BTMG, but the Tariff only specifically defines Non-Retail BTMG.472  Therefore, PJM proposes to separately define Retail BTMG as BTMG that is used to serve a retail load served by a Network Customer located at the same electrical location, where such generation has a cumulative nameplate rating of no greater than 50 MW.473  PJM also proposes to clarify in the Tariff that Retail BTMG may not be part of a Co-Located Load configuration. PJM argues that this clarification is necessary "to avoid unexpected and unintended hybrid scenarios mixing BTMG and the new transmission service products."474

183.
PJM states that the proposed materiality threshold, along with other exclusions discussed below, will avoid the "unintended consequence of causing Retail BTMG resources to prematurely cease operations and discontinue investment in grid-enhancing backup generation," which may otherwise impact system reliability.475  PJM argues that a lower threshold of 10 or 20 MW would likely exclude Retail BTMG with limited impact on the transmission system in comparison to Co-Located Load coming online today. Agreements & Procs., Order No. 2006, 111 FERC ¶ 61,220, at P 1, order on reh'g, Order No. 2006-A, 113 FERC ¶ 61,195 (2005), order granting clarification, Order No. 2006-B, 116 FERC ¶ 61,046 (2006)).

471  Compliance Transmittal at 6-7 (citing December Order, 193 FERC ¶ 61,217 at P 179).
472  Id. at 5-6 (citing PJM, Intra-PJM Tariffs, pt. I, Definitions A-B (24.0.0), Behind The Meter Generation; PJM, Proposed Tariff, PJM, pt. I, Definitions L-M-N (52.0.0), Non-Retail Behind The Meter Generation). PJM explains Non-Retail BTMG is BTMG used to net load through a distribution system. PJM clarifies that no substantive changes are proposed to the Non-Retail BTMG netting rules, but PJM does propose clarifying Tariff edits to avoid confusion with the new retail BTMG netting rules. Id. at 7, 15-16.
473  Id. at 7.
474  Id. at 18.
475  Id. at 12. 257 of 515

PDF page 259

Document Acc„sigISP:: qq-Aqg1.8 - 3c9curnent:Filla IEN9: g-65 A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 101 -
PJM also contends that many of the lower MW generators would not be willing to enter the interconnection queue due to age and the potential cost of Network Upgrades.476 184.

PJM also proposes to exclude on-site backup generation at the same electrical location as the retail load that can only be used to serve such retail load during conditions that may threaten the integrity or reliability of the PJM region or the regional power system from the 50 MW materiality threshold, arguing that to do otherwise would disincentivize retail customers from installing backup generation that would improve reliability.477  PJM notes that the Department of Energy recently issued an order during Winter Storm Fern directing PJM to direct backup generation resources to operate before taking certain emergency actions.478  PJM states that exempting backup generation from the materiality threshold will ensure this reliability tool remains available. Finally, PJM states that a materiality threshold based on the size of the generator that may qualify as Retail BTMG, rather than the amount of load that may net, establishes a clear and bright line for what can continue qualifying as Retail BTMG, given that the size of a load may fluctuate.479

185. PJM states that, should the Commission not accept PJM's proposal regarding grandfathering, discussed below, PJM requests the Commission to allow a higher interim initial materiality threshold for the start of the transition period to avoid causing Retail BTMG to cease operations and exacerbate the resource adequacy issues in PJM.48°  PJM states that, should the Commission take this path, PJM would commit to reviewing additional data on the size and extent of existing Retail BTMG to inform a final threshold.

c. Pleadings
i. Size of Threshold
186.
Constellation argues that PJM's proposed 50 MW materiality threshold for BTMG is too high and urges the Commission to either reject it or require modifications to

476  Id at 12-13.
477  Id at 13 (citing US Department of Energy, Order No. 202-26-06 (Jan. 26, 2026), https://www.energy.gov/documents/doe-order-no-202-26-06-pjm).
478  Id at 13-14 (citing US Department of Energy, Order No. 202-26-06).
479  Id at 13-14. 480 Id at 14-15 (noting PJM ICC's request for a 200 MW threshold in PJM ICC's Request for Clarification or Rehearing, Docket No. EL25-49-000, et al., at 44). 258 of 515

PDF page 260

Document Access igf?Sg 42-WA 8-34@cument:Flil d  ERN
e?-e5/48 /2 PAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 102 -
address undue discrimination against Co-Located Loads. Constellation argues that this threshold will allow a significant number of loads with BTMG to take advantage of unjust and unreasonable netting and include backup generation as offsetting BTMG, but deny such treatment to Co-Located Load, despite there being no physical, technical, or economic reason why a netting construct should apply differently for customers with BTMG or with Co-Located Generators. Constellation argues that PJM has not provided any explanation for why the proposed threshold is relevant to reducing the reliability and resource adequacy risks that large or increasing BTMG may pose to PJM and argues that PJM's justifications for the threshold are unsupported.481

187. Other parties argue that PJM's proposed threshold is too low.482 Industrials/Amtrak argue that a threshold of at least 200 MW would better capture the large loads driving reliability and cost-shifting concerns, while maintaining the existing retail BTMG netting rules that promote smaller resource adequacy investments, and avoid economic damage to industrial, institutional, and transportation sectors. Industrials/Amtrak argue that a 200 MW threshold is also appropriate because PURPA defines small generation for non-cogeneration QFs as 80 MW or smaller, meaning large generation must be greater than 80 MW. Industrials/Amtrak also argue that this threshold would simplify the transition process by eliminating most grandfathering issues and bolstering resource adequacy and grid efficiency, thereby avoiding inefficient transmission investment. Industrials/Amtrak argue that a 200 MW threshold would respect the importance of onshoring manufacturing and support Amtrak's operations, because Amtrak relies on more than 50 MW of retail BTMG, generated at 25 Hz, to provide energy supply and the only black start capability to the south end of Amtrak's Northeast Corridor traction power system.483

188.
Energy Artisans also support a 200 MW materiality threshold.484  Energy Artisans argue that, for sites that exceed this higher threshold, the Commission should require PJM to use the proposed Interim NITS because it would provide PJM with a "safety

481  Constellation Protest and Comments on Compliance Filing at 9-11.
482  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 9, 25; Crusoe Comments on Compliance Filing at 4; Eastman Protest and Comments on Compliance Filing at 6; EDFps Comments on Compliance Filing at 4; Energy Artisans Protest of Compliance Filing at 1; DPN Comments on Compliance Filing at 4.
483  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 9, 25, 31, 33, 39.
484  Energy Artisans Protest of Compliance Filing at 2. 259 of 515

PDF page 261

Document Accessigi?SP; 'q-A§:g-18-31;29Cument:Flild rFa'q99: (2,6/C18/2pAte Filed: 10/16/2026_ Docket No. EL25-49-002, et al.

- 103 -
switch" to manage reliability during peak emergencies without forcing expensive upgrades or disconnection on industrial users.

189.
Eastman similarly argues that, if the Commission does not maintain netting for BTMG facilities like Eastman's Kingsport facility, the Commission must establish a threshold of at least 200 MW on a permanent basis. Eastman explains that its Kingsport facility has generation with a nameplate capacity of 194 MW, but that it cannot withdraw that amount of energy through its interconnection with Kingsport Power and could not operate solely on electric power from the grid. Eastman argues that imposing an arbitrarily low materiality threshold would eliminate the grid benefits that its BTMG facilities have provided.485

190.
Industrials/Amtrak and Eastman argue that setting the threshold too low will increase costs for many existing loads with BTMG and make a lot of existing BTMG uneconomic.486  Industrials/Amtrak argue that even if load with BTMG were to have that generation participate in the PJM markets, there is no guarantee of that generation earning sufficient revenue to make up for the loss of netting, especially as transmission upgrades may be required to interconnect the generation. Industrials/Amtrak also argue that setting the threshold too low will force substantial burdens on existing customers to become Commission-regulated public utilities, secure PJM membership, and undertake related credit and risk requirements. Moreover, Industrials/Amtrak argue, a low threshold would remove the incentive to operate efficiently and during stressed system conditions, as well as create additional work for PJM staff to study BTMG that must either go through the interconnection queue or deactivate. Industrials/Amtrak contend that retirement of existing BTMG would increase demand and transmission planning needs in the near term, resulting in higher transmission rates.487  Energy Artisans argue that PJM's proposed 50 MW materiality threshold is an arbitrary cap that ignores the capital-intensive investments made by large-scale industrial facilities.488 191.

Industrials/Amtrak argue that BTMG can provide benefits to the transmission system, including reducing large loads on the system, congestion, and transmission

485  Eastman Protest and Comments on Compliance Filing at 6.
486  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 7; Eastman Protest and Comments on Compliance Filing at 6.
487  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 15, 25-26, 28.
488  Energy Artisans Protest of Compliance Filing at 1. 260 of 515

PDF page 262

Document Accessigi@V; 2A
18-34 ument:FlAd rpaN: g66/11812PAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 104 -
system build out, as well as operating during system emergencies.489  EDFps argues that BTMG can reduce grid congestion, avoid queue delays, lower Network Upgrade needs, and provide economic and community benefits such as tax revenues and jobs.49° 192.

Crusoe argues that while the 50 MW threshold aligns with PJM's definition of large load additions, this threshold is not a bright-line test for what constitutes a reliability risk. Crusoe contends that the materiality threshold should be flexible to account for the fact that Co-Location Arrangements can vary significantly and should be scaled in proportion to the load served. Crusoe argues that a lower threshold risks forcing existing BTMG resources offline during the transition period, which would increase burden on the grid by converting currently netted load into Network Load. Crusoe claims that BTMG arrangements benefit the transmission system by serving load on a streamlined basis, avoiding generator interconnection queue delays, and reducing the need for Network Upgrades.491

193.
Energy Artisans also contend that the 50 MW materiality threshold is unduly discriminatory because it establishes a 50 MW nameplate cap for retail BTMG while maintaining a 3,000 MW regional cap for Non-Retail BTMG.492  In the absence of demonstrated negative impacts from existing BTMG configurations, Energy Artisans claim that the 50 MW materiality threshold is a pretext for cost-shifting. 194. EDFps argues that PJM's proposed 50 MW threshold is arbitrary and will disincentivize large loads from installing their own generation and thereby stifle innovation. EDFps contends that the threshold will instead incentivize the development of smaller loads, as well as segmented loads close in proximity to avoid the threshold, leading to inefficient and redundant construction of interconnection facilities. EDFps notes that the "optimal sizing of Retail BTMG" for an artificial intelligence data center, for example, would be higher than 50 MW and that the threshold would force new large loads to develop grid-connected resources instead of BTMG resources.493  EDFps argues that this threshold would result in generation going through the interconnection process unnecessarily.

489  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 6. 49°  EDFps Comments on Compliance Filing at 2, 4.
491  Crusoe Comments on Compliance Filing at 4-5.
492  Energy Artisans Protest of Compliance Filing at 2.
493  EDFps Comments on Compliance Filing at 4. 261 of 515

PDF page 263

Document A„eesigl.; qCP2f6q1.8 -
age: g.563.8/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 105 -
195.
EDFps argues the materiality threshold should instead be 100% of the load size at the electrical location, "combined with operational safeguards and appropriate transmission charges."494  Specifically, EDFps proposes that retail BTMG larger than 50 MW would still be permitted to net generation against load for the purposes of energy and capacity market settlements, but would pay transmission and/or distribution network charges on a gross basis.495

196.
DPN similarly argues that PJM's proposal may be too restrictive for digital infrastructure projects, many of which operate at scales well above 50 MW, and that behind-the-meter configurations can provide a viable pathway to speed-to-power. Additionally, DPN argues, the Commission should not require projects to rely on a framework that may compound PJM's already significant queue and study delays without greater justification. DPN argues that the Commission should require PJM to better justify why 50 MW is the appropriate threshold at this stage and whether a higher threshold, at least on an interim basis, would better accommodate current uncertainty while PJM and the Commission continue to refine their understanding of large load impacts.496

197.
AEU/SEIA claim that PJM's proposal to require site-located generation to enter the interconnection queue is unjust and unreasonable. AEU/SEIA assert that PJM requires BTMG arrangements that exceed the materiality threshold or do not qualify for grandfather status to transition to a Co-Location Arrangement, which entails pursuing a full interconnection agreement with PJM. AEU/SEIA contend that there is no benefit to subjecting these projects to the standard queue process as they do not require deliverability and will rarely trigger Network Upgrades. AEU/SEIA requests that PJM be encouraged to establish a streamlined, expedited process for resources that do not intend to export to the grid, which would allow PJM to maintain visibility while minimizing delays for non-exporting resources.497

ii. PJM Proposal to Tie Threshold to Generator
Nameplate Rating
198.
Several parties urge the Commission to reject PJM's proposal to base the materiality threshold on the amount of generation that can be netted rather than load,

494  Id at 1-2.
495  Id. at 4-5.
496  DPN Comments on Compliance Filing at 4-5.
497  AEU/SETA Limited Protest of Compliance Filing at 11-13. 262 of 515

PDF page 264

Document Accessig@V; 4Q2-W48 - 349cument:FlAd rpai@p:g6A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 106 -
arguing that this proposal is inconsistent with the December Order.498  BTMG Parties argue that the scale of the reduction in load (i.e., what PJM considers and plans for versus what PJM may actually need to serve) determines whether the potential for resource adequacy problems and cost shifts are problematic—not the nameplate of the generation used to effect the load reduction.499  Similarly, Industrials/Amtrak argue that nameplate capacity does not necessarily reflect the actual capability of BTMG, such as, for example, a steam system where the generation output is limited by the steam system's capability.5°° 199. BTMG Parties further argue that such a nameplate generation-based threshold is unjust, unreasonable, and unduly discriminatory because it would also unnecessarily constrain commercial opportunities to serve loads with BTMG without better protecting reliability or commensurate reductions in resource adequacy or cost-shift risks and would treat differently BTMGs with similar resource adequacy and cost-shift impacts. BTMG Parties argue that accepting PJM's proposal would violate notice requirements and that the metering, telemetry, and control capabilities already deployed for existing BTMG resources demonstrate that BTMG can reliably comply with the operational requirements necessary to implement a netting-based threshold.501

200.
BTMG Parties argue that, in the alternative, the Commission should require PJM to increase its proposed nameplate rating-based materiality threshold for retail BTMG eligibility to 200 MW to preserve opportunities for load to realize the commercial benefit of sizing nameplate generation above the amount of load that a retail customer seeks to net while still achieving the Commission's aim of limiting resource adequacy impacts and cost-shift concerns.5°2

201.
AEU/SEIA argue that PJM's proposed threshold is inconsistent with how PJM assesses capacity accreditation in the capacity market and lacks the necessary flexibility to accommodate resource diversity and hybrid configurations such as storage paired with solar. AEU/SEIA add that there are a number of reasons that, in a BTMG configuration, the generator's nameplate capacity exceeds the customer's netting. AEU/SEIA contend

498  BTMG Parties Joint Protest of Compliance Filing at 1, 4-5; Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 34-35 (citing December Order, 193 FERC ¶ 61,217 at P 179); AEU/SETA Limited Protest of Compliance Filing at 3. See also Earthjustice Reply Briefing at 24.
499  BTMG Parties Joint Protest of Compliance Filing at 6. 500 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 35.
501 BTMG Parties Joint Protest of Compliance Filing at 2, 6-12. 5°2  Id at 2, 12-13. 263 of 515

PDF page 265

Document A„es'sig#SA:  4q-2YA18-3P9cUrnent:FlAd 1130_99: g-56 A8/2pte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 107 -
that a reasonable approach would be to permit facilities to exceed 50 MW nameplate capacity provided the customer's netting is limited to 50 MW, and the facility uses approved telemetry and automated system controls.503  Appalachian Voices argues that PJM's compliance filing is unclear as to whether it will apply the 50 MW materiality threshold to all generation or to each individual generator at a single customer site.504 202.

Industrials/Amtrak state that, if the Commission opts for a generation-based materiality threshold, they support PJM's proposal on backup generation.505 Industrials/Amtrak explain that emergency backup generation is often sized similarly to other on-site generation to function as a full backup power source and provides additional generation options in emergency conditions, such as the Department of Energy's recent statement regarding the operation of private, behind-the-meter generation during Winter Storm Fern.5" EDFps argues that the Commission should direct PJM to clarify that battery energy storage systems and hybrid systems functioning in a load-following, non-exporting capacity manner during a curtailment event qualify under the "backup generation" exception from the materiality threshold for the revised retail BTMG netting rules and can continue to serve the load regardless of their size.507

iii. PJM Proposal to Disqualify Network Customers
Above the Materiality Threshold
203.
Several parties argue that the Commission should allow netting up to the amount of the materiality threshold, rather than disqualifying a customer from netting for any amount of load if its BTMG exceeds the threshold.508  Industrials/Amtrak argue that this allowance would be more consistent with the December Order, reduce discrimination concerns, and avoid incentivizing loads to reduce the size of their generation to ensure

503 AEU/SEIA Limited Protest of Compliance Filing at 4-5.
504 Appalachian Voices Limited Protest of Compliance Filing at 4 (citing Compliance Transmittal at 11-12). 5°5  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 10. 5°6  Id. at 40-41 (citing U.S. Department of Energy, Emergency Order No. 202-26-06). 5°7  EDFps Comments on Compliance Filing at 8.
508 Id. at 9, 34; Eastman Protest and Comments on Compliance Filing at 7; Energy Artisans Protest of Compliance Filing at 2; EDFps Comments on Compliance Filing at 5. 264 of 515

PDF page 266

Document Access igPSP; 2A-21§A1.8 - 349c ument:FlAd  raqi3: g.66A 8 / 2  p_4;e Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 108 -
netting eligibility.'" Industrials/Amtrak contend that PJM's proposal would distort investment decisions, produce outcomes disconnected from actual system needs, harm resource adequacy, and harm economic development opportunities in PJM.51° 204.

Energy Artisans contend that by rejecting a hybrid BTMG and Co-Location approach, under which facilities could net up to the materiality threshold, PJM would force large loads off of BTMG status and onto the grid.5" EDFps disagrees with PJM that allowing netting up to the amount of the materiality threshold would lead to additional metering costs, noting that grandfathered entities and those below the threshold would not incur any such costs. EDFps also argues that it should be up to individual entities whether the additional cost for metering is worth exceeding the threshold. EDFps states that load served by a retail BTMG resource would be required to purchase NFCD transmission service up to the amount covered by the retail BTMG and FCD transmission service for the remainder of the load and could not lean on the system.512

iv. Answers
205.
Indicated TOs argue that PJM's proposed 50 MW materiality threshold strikes the appropriate balance between allowing continued use of retail BTMG and limitations to ensure reliability. Indicated TOs agree with PJM that 50 MW is reasonable because it aligns with the PJM Board's definition of large load additions, preserves existing treatment for smaller and longstanding retail BTMG arrangements, and avoids sweeping in retail customers whose grid impacts are comparatively limited. Indicated TOs argue that PJM reasonably based the threshold on generator size because generator capacity is static.513

206.
Industrials/Amtrak argue that the Indicated TOs fail to substantiate their position with any evidence in support of the 50 MW threshold, and do not address any of the arguments for a 200 MW or greater threshold. Industrials/Amtrak contend that load under 200 MW, particularly industrial and institutional load, is not driving current 509  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 9-10. 51°  Id at 36.

511  Energy Artisans Protest of Compliance Filing at 2.
512  EDFps Comments on Compliance Filing 2, 6-7.
513  Indicated TOs April 24 Answer at 2-3. 265 of 515

PDF page 267

Document Accessigsg 2A-2.vg-18 _3p.pcument:Flit d rfa'qg9: gp/q8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 109 -
reliability challenges.514  Eastman contends that the Indicated TOs' answer inappropriately lumps together all industrial BTMG facilities, ignoring that not all loads using BTMG create reliability and resource adequacy risks.515  BTMG Parties argue that Indicated TOs' defense of a nameplate-based threshold is non-responsive to the BTMG Parties' argument because the sole question before the Commission is compliance.516 Indicated TOs respond that PJM's 50 MW threshold is reasonable and should be accepted.517  Indicated TOs further argue that the Commission did not preclude a generation-based threshold, as it provided points of reference based on generator size, not the size of the load.518  Indicated TOs lastly allege that parties conflate the two issues of the materiality threshold and the grandfathering provision, and that the need for an adequate grandfathering provision is not a convincing reason to increase the size of the materiality threshold.

d. Determination
207.
We accept in part, and reject in part, PJM's compliance filing with respect to the BTMG materiality threshold. Specifically, we accept as just and reasonable PJM's proposal to set the materiality threshold at 50 MW and to exclude on-site backup power from that threshold. However, we reject PJM's proposal to apply the threshold to the cumulative nameplate capacity of generation that is used to serve a retail load served by a Network Customer located at the same electrical location, rather than to the total amount of load that can be netted at that electrical location, because this proposal does not comply with the Commission's directives in the December Order.519  We thus direct PJM to file, within 60 days of the date of this order, a compliance filing to revise its proposed s" Industrials/Amtrak Answer at 3-4 (citing Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 25).

515  Eastman Answer at 2 (citing December Order, 193 FERC ¶ 61,217 at P 107).
516  BTMG Parties Answer at 2-3.
517  Indicated TOs June 3 Answer at 3.
518  Id. at 4.
519  We therefore reject Proposed Tariff, § I.1 Definitions R-S (Retail Behind The Meter Generation) (46.0.0) and § VIII.A 400, Definitions R (Retail Behind The Meter Generation) (7.0.0). We accept Proposed Tariff, § I.1 Definitions A-B (Behind The Meter Generation) (24.0.0); § III.34.2 (Netting of Retail Behind the Meter Generation) (1.0.0); § 111.34.3 (Netting of Non-Retail Behind The Meter Generation) (2.0.0); § VII.A 300, Definitions B (Behind The Meter Generation) (2.0.0); and § VIII.A 400, Definitions B (Behind The Meter Generation) (2.0.0). 266 of 515

PDF page 268

Document AccessigPA 2A2-VA18-349cument:Flild E N9: g. tg 8  / 2  p2qte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 110 -
definition of Retail BTMG in its Tariff to permit a Network Customer to net up to 50 MW of load that it is serving using BTMG at a particular electrical location. 208.

In the December Order, the Commission explained the materiality threshold as follows: "Such a threshold should reduce the reliability and resource adequacy risks discussed above that large loads may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion."52°  Based on the record here, we find that a threshold of 50 MW is just and reasonable and preferable to the 200 MW threshold that some commenters propose because a 50 MW threshold will ensure that PJM plans its transmission system and procures sufficient capacity resources to serve a greater percentage of the load that, in the event that the BTMG that typically serves it is unavailable, PJM would be nonetheless obligated to serve. As such, we find that PJM's proposed 50 MW materiality threshold is more likely to help maintain resource adequacy and reliability relative to a larger threshold.52I  Whereas Constellation argues that PJM's proposed materiality threshold of 50 MW is too high and unsupported, we agree with PJM that 50 MW strikes a reasonable balance between a lower threshold, which may restrict netting more than necessary to respond to resource adequacy concerns, and a higher threshold, which would fail to address the resource adequacy concerns identified in the December Order.522 209.

In response to protesters' concerns that the proposed materiality threshold of 50 MW is too low and will result in significant economic consequences to existing BTMG arrangements,523  we note that the Commission addressed this concern in the 52°  December Order, 193 FERC ¶ 61,217 at P 221.

521  See id. P 186 ("We find that PJM's existing BTMG rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.").

522  See Vonage Holdings Corp. v. FCC, 489 F.3d at 1242; ExxonMobil Gas Mktg. Co. v. FERC, 297 F.3d 1071, 1085 (D.C. Cir. 2002) ("We are generally `unwilling to review line-drawing performed by the Commission unless a petitioner can demonstrate that lines drawn . . . are patently unreasonable, having no relationship to the underlying regulatory problem.") (citations omitted).
523  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 27-28 (alleging economic damage to retail customers); DPN Comments on Compliance Filing at 4 (expressing concern that 50 MW risks foreclosing pathways for digital infrastructure projects "through imposing additional barriers to utilization"); Eastman Protest and Comments on Compliance Filing at 6 ("the proposed threshold would remove the economic benefits that Eastman has relied on to continue operating its BTMG at the 267 of 515

PDF page 269

Document Accessigri
qq-2.vg-1 _ 31R9.9 umen t:F 1
d  EFAg9: gpiel.  / 2  pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 111 -
December Order and established separate mechanisms—a transition period of three years for Network Customers currently using PJM's retail BTMG netting rules and grandfathering for certain entities in a BTMG arrangement—in recognition of the potential impacts for existing BTMG customers of a change in the retail BTMG netting rules.524  While we recognize the concerns raised in this record that adopting any limitations on netting may have economic consequences for individual Network Customers, we must balance those concerns against the Commission's finding that PJM's retail BTMG netting rules are unjust and unreasonable due to the reliability, resource adequacy, and cost-shifting concerns they create.525  As discussed above, the materiality threshold primarily serves to reduce reliability and resource adequacy risks that large loads may pose to PJM, and we find that PJM's proposed 50 MW materiality threshold strikes a reasonable balance between mitigating those risks and limiting the costs associated with doing so.

210.
We decline to require Eligible Customers seeking NITS on behalf of load with BTMG to take Interim NITS for load above the materiality threshold, as Energy Artisans request. Energy Artisans appear to contemplate taking a combination of Interim NITS and NITS at the same Point of Delivery, which is not permitted.526  However, we note that such customers may take Interim NITS, as discussed in Part IV.527 211.

We also disagree with arguments that the materiality threshold should be higher to ensure that BTMG resources have an incentive to operate efficiently.528  This concern Kingsport facilities . . . ."); Energy Artisans Protest of Compliance Filing at 1 ("PJM's proposal to implement a 50 MW `Materiality Threshold' for Retail BTMG is an arbitrary cap that ignores the long-term, capital-intensive investment cycles of large-scale industrial facilities.").

524  December Order, 193 FERC ¶ 61,217 at PP 222-224.
525 Id. P 186.
526  Energy Artisans Protest of Compliance Filing at 2 ("For sites exceeding this 200 MW threshold, the Commission should direct PJM to utilize the proposed [Interim NITS] under the new Part XI of the Tariff.").
527  See supra Part IV.C.1.b.i (extending the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions).
528  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 7, 16, 25, 32. 268 of 515

PDF page 270

Document Acc„sigRSg 2Aegi 8- 3QgicUMent:FlAd rFai@g9: AE18/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 112 -
does not overcome the Commission's finding that large amounts of netted Network Load present reliability and resource adequacy risks. When BTMG operates during peak or emergency conditions, it may enhance resource adequacy in the short term by lowering the demand on the system, but when it fails to operate (which, despite any incentive to operate, is possible), the result would be that PJM would have an obligation to serve the load that such BTMG typically serves without having planned adequate transmission facilities or procured sufficient capacity resources to fulfill that obligation. The Commission found that risk unjust and unreasonable in the December Order.529 212.

We also disagree with Energy Artisans that a 50 MW materiality threshold is unduly discriminatory because it establishes a 50 MW cap for Retail BTMG while maintaining a 3,000 MW regional cap for Non-Retail BTMG.53°  The materiality threshold and the cap on Non-Retail BTMG function differently—the Non-Retail BTMG cap is a region-wide cap on the amount of load that may net using Non-Retail BTMG,531 whereas the materiality threshold for Retail BTMG is on the amount of load that may net at a particular electrical location.532

213.
We acknowledge EDFps' concern that a 50 MW materiality threshold on Retail BTMG could encourage the development of smaller loads combined with smaller generators, and force new large loads to develop resources interconnected to the transmission system instead of BTMG resources.533  As the Commission explained in the December Order, the Commission eliminated retail BTMG netting to prevent large loads from using the retail BTMG netting rules; the Commission agreed with PJM that allowing large loads to net is problematic because such loads do not carry reserves and are able to rely on the transmission system when the BTMG is not sufficient to meet the load.534  EDFps' alternative proposal would not remedy this concern because it would continue to net BTMG for the purposes of capacity market settlements.535

529  December Order, 193 FERC ¶ 61,217 at P 186. 530 Energy Artisans Protest of Compliance Filing at 2.
531  See PJM, Intra-PJM Tariffs, OATT, § III, § 34.3 (Netting of Non-Retail Behind The Meter Generation) (1.0.0).
532  December Order, 193 FERC ¶ 61,217 at P 221.
533  EDFps Comments on Compliance Filing at 3-4.
534  December Order, 193 FERC ¶ 61,217 at P 186.
535  EDFps Comments on Compliance Filing at 4-5. 269 of 515

PDF page 271

Document Adcessigii,-; 2-Actg-18 _3pp_cument:FlAd rj38. g9: A7/0.8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 113 -
214.
Further, we find AEU/SEIA's assertion that requiring BTMG arrangements that exceed the materiality threshold or do not qualify for grandfather status to transition to a Co-Location Arrangement, which entails pursuing an interconnection agreement with PJM, is unjust and unreasonable is an untimely request for rehearing of the December Order. In the December Order, the Commission found that PJM's existing retail BTMG netting rules are unjust and unreasonable because they may lead to both reliability and resource adequacy risks in PJM.536  The Commission then directed PJM to revise its retail BTMG netting rules to establish a new MW materiality threshold for the amount of load at a particular electrical location that Network Customers may net using BTMG and to implement a transition process that includes the ability to grandfather certain entities with existing contracts.537  Because AEU/SEIA's assertion challenges the Commission's finding that PJM's existing retail BTMG netting rules are unjust and unreasonable and the related compliance directives—and not whether PJM complied with those directives—we find that it is an untimely request for rehearing of the December Order and dismiss it on that basis.538

215.
However, we agree with protesters that PJM's proposal to design the materiality threshold for netting based on whether the "generation has a cumulative nameplate rating of no greater than 50 MW" fails to comply with the Commission's directive in the December Order. Specifically, the Commission directed PJM to "propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG."539  As such, PJM's proposal to instead apply the materiality threshold to the cumulative nameplate capacity of the generation used by a Network Customer to serve retail load located at the same electrical location is facially inconsistent with the December Order.

216.
PJM alleges that its proposal to apply its proposed materiality threshold based on the cumulative nameplate capacity of the generation is consistent with or superior to the Commission's directive to limit reliability and resource adequacy risks. In particular, PJM alleges that its proposal is consistent with the Commission's points of reference to various generator sizes, as well as the recognition that BTMG is defined as a generation unit rather than a load. We find PJM's arguments unpersuasive. While the Commission

536  December Order, 193 FERC ¶ 61,217 at P 179 (finding that "the existing BTMG rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning").
537  Id. P 179.
538 Louisville Gas & Elec. Co., 185 FERC ¶ 61,120, at P 39 (2023).
539  December Order, 193 FERC ¶ 61,217 at P 221 (emphasis added). 270 of 515

PDF page 272

Document AccessigP; 221.8-349cu
rnent:Flita LFP:gb7A8/2pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 114 -
referenced examples of generator sizes in the December Order, those examples were in reference to an unambiguous threshold for the amount of load that a Network Customer may net.5" In addition, while BTMG is defined as a generation unit, that fact alone is not a reason to propose to apply the materiality threshold to a Network Customer based on the amount of generation at the same electrical location rather than applying that threshold to the amount of load that may be netted at that location. Lastly, PJM avers that, whereas load sizes can fluctuate, the nameplate capacity of a generator provides a bright line for purposes of qualifying for netting. This argument too is unpersuasive, because regardless of whether a Network Customer's load increases or decreases over time, the 50 MW materiality threshold we approve today makes clear how much of the load at a-single electrical location a Network Customer may net using BTMG. 217.

We also agree with protesters that PJM's interpretation of the December Order as prohibiting any netting when a Network Customer exceeds the materiality threshold is incorrect.541  PJM supports its interpretation by pointing to the Commission's directive in the December Order that PJM "maintain the current BTMG rules for customers that fall below a new MW materiality threshold," but PJM reads this language out of context.542 Read in full context, the Commission's replacement rate for BTMG in the December Order only involves setting a new materiality threshold "for the amount of load at a particular electrical location that Network Customers may net by using BTMG," which the Commission further stated would "allow[] for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion."543  Thus, we find that the Commission's directive in the December Order allows for netting of load up to the newly established materiality threshold.

218.
Moreover, the Commission expressly states that a materiality threshold "for all BTMG should reduce the reliability and resource adequacy risks that large or increasing 540 Id ("Although we make no finding in this order on a threshold that would be just and reasonable, we note as points of reference that PJM requires any generator larger than 10 MW to be individually metered and that the Commission's definition of a small generator is 20 MW.") (footnotes omitted).

541  Compliance Transmittal 10-11 ("[T]he proposal is based on an interpretation of the compliance directive that demands an `all or nothing' approach to Retail BTMG qualification—meaning that a Retail BTMG cannot both net up to a certain threshold but still potentially have generation and load above that threshold which cannot be net"); see Eastman Protest and Comments on Compliance Filing at 7; Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 34.
542  Compare December Order, 193 FERC ¶ 61,217 at P 179, with id. P 221.
543  Id. P 221 (emphasis added). 271 of 515

PDF page 273

Document AcceesigPSA 2k2VAI.8-39991-Iment:Fhld rPaq99: ?-67A 812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 115 -
BTMG may pose to PJM."544  To use an example similar to that provided by the BTMG Parties, PJM's proposal would prohibit a Network Customer serving 50.1 MW of load using BTMG from netting any load, but it would allow a Network Customer serving 50 MW of load using BTMG to net all of that 50 MW of load, even though they have virtually identical resource adequacy impacts on the transmission system.545  We find that this outcome would be unduly discriminatory and conflict with the December Order.546 We also note that protesters persuasively dispute PJM's suggestion that its proposal helps load with BTMG avoid incurring significant costs and compliance risks if their arrangements exceed the materiality threshold.547  We agree with EDFps that Network Customers should decide whether the costs and requirements associated with complying with the revised retail BTMG netting rules are appropriate or cost-effective for their business when determining whether to maintain or pursue BTMG arrangements.548 219.

In response to EDFps' request that the Commission clarify that electric storage resources and hybrid resources qualify for the back-up exemption, we note that PJM's retail BTMG netting rules do not restrict what resources may qualify as back-up generation, but instead specify only that the generation must be at the same electrical location as the retail load and that it can only be used to serve such retail load during conditions that may threaten the integrity or reliability of the PJM Region or the regional power system.549

220.
Accordingly, we direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff consistent with the Commission's directive in the December Order and our determination here. Specifically, we reject PJM's

544  Id. P 179.
545  BTMG Parties Joint Protest of Compliance Filing at 10.
546  December Order, 193 FERC ¶ 61,217 at P 221 ("Such a threshold should reduce the reliability and resource adequacy risks discussed above that large loads may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion.").
547  See, e.g., BTMG Parties Joint Protest of Compliance Filing at 11 n.20 ("PJM does not provide any factual support for these assertions, and these statements do not match BTMG Parties' experience as developers of BTMG in PJM.").
548  EDFps Comments on Compliance Filing at 7.
549  Id., pt. VIII, Subpart A, section 400 Definitions R (definition of Retail Behind the Meter Generation) (7.0.0). 272 of 515

PDF page 274

Document AccessigiPg 2A-AltAl8-349cument:Flil d rpAp:g7A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 116 -
proposed definition of Retail Behind The Meter Generation55°  and direct PJM to submit a compliance filing modifying the Tariff to instead create a materiality threshold that allows Network Customers to net from their Network Load up to 50 MW of load served by using BTMG at a single electrical location.

2. Grandfathering and Transition Period
a. December Order
221. The Commission directed PJM to establish a transition period of three years for Network Customers currently using PJM's existing retail BTMG netting rules.551  The Commission also directed PJM to include in its compliance filing revisions to grandfather entities with existing contracts for the specific purpose of effectuating a BTMG arrangement for the current term remaining under the existing contract.552  The December Order did not direct any changes to Non-Retail BTMG.553

b. PJM Compliance Filing
222.
PJM proposes to modify the existing Tariff definition of BTMG and add a new definition for Retail BTMG to implement a three-year transition period and provide the ability to grandfather certain entities with existing contracts.554  Specifically, PJM proposes that any existing retail BTMG with a contract that was entered into as of the date of the December Order would be permitted to remain eligible to net against Network Loads as Retail BTMG irrespective of the materiality threshold through the term of the contract.555  PJM explains that this proposal could include a wide variety of contracts, including "utility contracts, fuel contracts, maintenance contracts, and more."556  PJM 55°  PJM, Proposed Tariff, § I.1 Definitions R-S (Retail Behind The Meter Generation) (46.0.0) and § VIII.A 400, Definitions R (Retail Behind The Meter Generation) (7.0.0).

551  December Order, 193 FERC ¶ 61,217 at P 223.
552  Id. P 224.
553  Id. P 222.
554  Compliance Transmittal at 6-7 (citing December Order, 193 FERC ¶ 61,217 at P 179).
555  Id. at 8.
556  Id 273 of 515

PDF page 275

Document AccessigPsne:: qq-Aqq-18 _3R9curnent:Flit d tiDA99: g37/18/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 117 -
further proposes that this exemption would encompass existing renewal or extension rights recognized under any existing contracts to "avoid interference with such reliance expectations upon which investment decisions likely have been made . . . ."557  PJM states that if the Commission accepts its proposal, it will explore with stakeholders whether manual language should be developed to help elaborate on what types of agreements may qualify.558

c. Pleadings
i. Comments
223.
AEU/SEIA ask the Commission to reject PJM's proposal to transition existing retail BTMG through December 18, 2028 and instead extend the transition period until the effective date of PJM's compliance filing to avoid harming projects already underway. AEU/SEIA allege that setting the grandfathering date earlier than the effective date for the new co-location pathways would leave a problematic gap for projects that were moving forward in good faith and exacerbate uncertainty. AEU/SEIA argue that any project "in process" as of the transition date should be eligible for grandfathering if it has made significant progress toward completion though not fully operational.5' 9  Otherwise, AEU/SEIA allege, PJM's proposal will result in significant stranded assets.

224.
Similarly, BTMG Parties argue that the deadlines for the transition period and grandfathering eligibility will exclude retail customers that recently finalized or will imminently finalize projects while providing limited system benefit. BTMG Parties argue that PJM should be required to instead use the date of a Commission order acting on PJM's filing, or, at minimum, 180 days from the December 18, 2025 date of the Co-Location Order (June 16, 2026), as the date from which the grandfathering and transition period run. BTMG Parties argue that this date would better afford a workable transition for market participants that does not penalize developers for attempting to develop resources during a historic resource adequacy crisis in PJM.56° 225.

AEU/SEIA also ask the Commission to clarify that the types of agreements that may qualify for PJM's proposal include utility interconnection study agreements, engineering, procurement, and construction contracts, and any form of binding agreement

557  Id. at 9.
558  Id. at 9 n.32. 559  AEU/SETA Limited Protest of Compliance Filing at 7-9. 560  BTMG Parties Joint Protest of Compliance Filing at 2-3, 13-16. 274 of 515

PDF page 276

Document AccessigPV; 2AA%q18-349curnent:Flita EFAV: A7A8/2PAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 120 -
d. Determination
231.
We find that PJM's proposed Tariff revisions comply with the directives in the December Order.'"

232.
First, we find that PJM complies with the directive to revise its Tariff to allow Network Customers already using the retail BTMG netting rules to continue to do so for a transition period of three years from the date of issuance of the December Order.572 AEU/SEIA and BTMG Parties express concern that such a transition period unfairly harms entities that were planning to finalize arrangements in order to use PJM's retail BTMG netting rules. But these parties did not seek rehearing of the Commission's decision in the December Order to establish a transition period to minimize the impact on existing BTMG customers. In that order, the Commission explicitly directed PJM to "allow Network Customers already using the BTMG rules to continue to do so for a transition period of three years . . . from the date of issuance of this order."573  Thus, we find that AEU/SEIA's and BTMG Parties' arguments constitute untimely requests for rehearing of the December Order.574  However, even if these arguments were properly before us, AEU/SEIA and BTMG Parties offer no suggested transition period to encompass certain potential BTMG customers in a manner that would not be arbitrary.575 233.

Second, we find that PJM complies with the directive to revise its Tariff to grandfather entities with existing contracts that effectuate a BTMG arrangement for the 571  See PJM, Proposed Tariff, § I.1 Definitions R-S (Retail Behind The Meter Generation) (46.0.0) and § VIII.A 400, Definitions R (Retail Behind The Meter Generation) (7.0.0).

572  December Order, 193 FERC ¶ 61,217 at P 223; PJM, Compliance Filing, attach. B (defining Retail BTMG to provide "for a transition period through December 18, 2028" for Retail BTMG "used to serve a retail load served by a Network Customer to net load prior to December 18, 2025.").
573  December Order, 193 FERC ¶ 61,217 at P 223.
574  See, e.g., Louisville Gas & Elec. Co., 185 FERC ¶ 61,120 at P 39; ISO New Eng. Inc., 132 FERC ¶ 61,098, at P 12 (2010) ("The Commission has held that requests to alter a compliance filing in a manner that differs from the order requiring the compliance filing constitute a collateral attack on the order requiring the compliance filing.").
575  See BTMG Parties Joint Protest of Compliance Filing at 15 (characterizing a "limited class of BTMG developers that were very close to finalizing their projects"). 277 of 515

PDF page 277

Document Access igRSA 2qX;1 8 - 3Pg'cument:Flild rg@gp:?_67/4812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 118 -
between the load and the BTMG developer.561  Otherwise, AEU/SEIA warn, developers face the risk of delay and additional regulatory burdens that could remove projects underway.

226.
Industrials/Amtrak support PJM's proposal to grandfather existing contracts, noting that BTMG customers operate under diverse agreements, some of which renew year to year, which should be eligible for grandfathering. Industrials/Amtrak also argue that grandfathering rules and status should be clear, broadly construed, and easily confirmed for existing BTMG customers to ensure stability and regulatory certainty.562 227.

AEU/SEIA argue that PJM's proposal is unjust and unreasonable because it is not clear as to whether grandfathering status applies to the site itself or the generator asset. AEU/SEIA suggest that grandfathering the generation while allowing these existing customers to pursue additional BTMG below the materiality threshold is a logical extension of PJM's observation that additions below the materiality threshold would have little or no impact. AEU/SEIA argue that clarifying that customers with grandfathered BTMG have a "clean slate" to pursue additional BTMG up to the materiality threshold would also allow existing customers to help address PJM's resource adequacy and infrastructure needs. AEU/SEIA contend that many existing customers have neither the desire nor the economic incentive to pursue co-location and that, for smaller projects, PJM's full interconnection process will be too costly and complex.563  Eastman similarly requests that the Commission require PJM's grandfathering provision to apply to BTMG facilities rather than the service agreement. Otherwise, Eastman argues, a BTMG facility could lose its grandfathered status if the relevant service agreement is modified because, for example, the facility was modified to become more efficient.564

228.
Industrials/Amtrak argue that most BTMG differs from the large loads that the Commission addressed in the December Order. Specifically, Industrials/Amtrak argue that BTMG is not new, is not the cause of the changed circumstances, and does not present the reliability risks posed by large, inverter-based loads.565  Further, Industrials/Amtrak contend, new large loads differ from BTMG in that new large loads do not have substantial cogeneration, do not generally operate large motors that can help

561  AEU/SEIA Limited Protest of Compliance Filing at 7-8.
562  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 10, 39.
563  AEU/SEIA Limited Protest of Compliance Filing at 9-11.
564  Eastman Protest and Comments on Compliance Filing at 7.
565  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 6-7, 13; see also Energy Artisans Protest of Compliance Filing at 1. 275 of 515

PDF page 278

Document Accessigisp: qq,Aqg-18 _3Qp_cument:Flil d
?7,618/2 pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 119 -
with stability on the grid, can turn off and on nearly instantaneously, and can reach sizes well beyond traditional BTMG and the 200 MW threshold proposed by

Industrials/Amtrak. Industrials/Amtrak further claim the December Order "did not find that BTMG rules were unjust and unreasonable as used by manufacturers with cogeneration, other QFs (which are size limited under PURPA), or even traditional `large' loads with BTMG … 39566

Answers
229.
Indicated TOs argue that PJM's materiality threshold should be paired with grandfathering provisions that appropriately recognize that customers have relied on retail BTMG netting rules and eliminating such rules could cause financial harm. Indicated TOs therefore propose several additions and clarifications to PJM's proposal. First, Indicated TOs argue that grandfathering treatment should extend to all projects that are not yet in service and would have been eligible for retail BTMG treatment, but have made "substantial progress towards completion.i567  Indicated TOs also argue that the exclusion regarding existing contracts should be construed broadly to cover a wide range of contracts and recognition of renewal rights in those contracts. Indicated TOs argue that existing retail BTMG arrangements that have been physically in service and operating for a significant period of time should be grandfathered to avoid disrupting long-standing arrangements. 568

230.
BTMG Parties and Industrials/Amtrak agree with Indicated TOs that
grandfathering should extend to projects that would have been eligible for retail BTMG treatment but for the imposition of the materiality threshold and have made substantial progress toward completion in order to protect the investment-backed expectations of PJM customers (and the BTMG developers) and to ensure just and reasonable rates. BTMG Parties and Industrials/Amtrak also argue that the existing contract exception should be construed broadly to cover a wide range of contracts.'" BTMG Parties also argue that arrangements that have been physically in service and operating for a significant period of time should be grandfathered.57°

566  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 14 (emphasis in original).

567  Indicated TOs April 24 Answer at 3.
568  Id at 3-4.
569  BTMG Parties Answer at 2-4; Industrials/Amtrak Answer at 6-7.
57°  BTMG Parties Answer at 4.
276 of 515

PDF page 279

Document A„essigPSP; 2A r:g-1.8-3R.9CUrnent:Flild rEN9:?-67A.8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 121 -
current term remaining under the existing contract.576  In response to concerns from AEU/SEIA and BTMG Parties, we clarify that the Tariff proposal applies to a contractual arrangement—for which generation used to serve retail load served by a Network Customer to net load is the subject—"that was in effect as of December 18, 2025." Therefore, entities with projects that have contractual arrangements "in place, even if they are not yet fully operational" by December 18, 2025 may qualify under the Tariff proposa1.577  In addition, in response to AEU/SEIA, we clarify that the types of agreements that may qualify under PJM's proposal may include engineering, procurement, and construction contracts, and we encourage PJM, as it states in its transmittal, to explore developing language in its manuals on what other types of agreements may qualify.578  Moreover, in response to AEU/SEIA and Eastman, who raise overlapping concerns about whether grandfathering applies to the generator, we clarify that it does apply to the generator, as the Tariff proposal on grandfathering reflects.579  In further response to Eastman, parties to an existing BTMG contract could modify the agreement to, for example, make the facilities more efficient—provided that the modification is not prohibited by the existing contract and does not fundamentally alter the contractual arrangement that was in effect as of December 18, 2025. And in further response to AEU/SEIA, we clarify that customers with BTMG within the scope of this grandfathering provision may also avail themselves of the new materiality threshold to net up to 50 MW of load served by a Network Customer because this threshold applies to a particular electrical location.

3. ()Fs and Cogeneration Facilities
a. PJM Compliance Filing
234. PJM proposes that the new materiality threshold should not apply to any QF over 50 MW serving as Retail BTMG as of the date of the December Order. PJM

576  December Order, 193 FERC ¶ 61,217 at P 224; PJM, Compliance Filing, attach. B (defining Retail BTMG to include "any generation used to serve a retail load served by a Network Customer to net load if it is the subject of a contractual arrangement (including but not limited to a bilateral agreement or interconnection agreement) that was in effect as of December 18, 2025 through the end of the term of such agreement, which may be renewed or extended per the terms of such agreement"). 577  AEU/SEIA Limited Protest of Compliance Filing at 7.
578  Compliance Transmittal at 9 n.32.
579  PJM, Compliance Filing, attach. B (defining Retail BTMG in part to include "any generation used to serve a retail load served by a Network Customer to net load if it is the subject of a contractual arrangement . . ."). 278 of 515

PDF page 280

Document AccessicIPP; 22q-2-1§A18-349cument:Flitd rfs@v: ?JAB/2 p_e,te Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 122 -
acknowledges that the December Order does not reference PURPA, yet because the December Order was issued against the backdrop of PURPA, "PJM interprets the Commission's [grandfathering] compliance directive as allowing the extension of legacy treatment" to such facilities. PJM states that some of the QFs impacted by this exemption are cogeneration facilities that provide economic and energy efficiency benefits.58°  In support of its proposal, PJM notes that QFs have size limitations and cogeneration QFs must meet efficiency requirements.581  PJM explains that BTMG with existing contractual arrangements or QF status have been in place without any known operational issues to date, and so should be allowed to continue netting under their existing arrangements.582

b. Pleadings
235. Industrials/Amtrak argue that QFs should be eligible for retail netting for their full load, but the eligibility should not be linked to QF status as of the date of the order.583 Industrials/Amtrak explain that, without retail netting, QFs may be denied the backup service to which they are entitled under PURPA. Industrials/Amtrak argue that for cogeneration QFs, "the BTMG netting construct aligns with their efficient, reliable energy production configurations, matching the intent of Congress and the [Commission]."584  Industrials/Amtrak argue that QFs have stronger operational and financial incentives to operate reliably and efficiently than other generators and must meet certain efficiency standards. However, Industrials/Amtrak note that many resources eligible to be QFs have not maintained QF status because PURPA permits the Commission to deem certain QFs as having sufficient market access that it removes (for those QFs) the utility's obligation to purchase excess power generated by the QF. Industrials/Amtrak explain that many customers with QFs were required by this status change to secure interconnection service and market-based rate authority to sell excess energy into the PJM markets.585  Industrials/Amtrak argue this "history should not limit 58°  Compliance Transmittal at 9-10.

581  Id. at 10 (citing 16 U.S.C. § 824a-3; 18 C.F.R. § 292.204 (2025)).
582 m
583  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 8, 17.
584  Id at 8.
585  Id at 8, 20, 22. 279 of 515

PDF page 281

Document AccessigP.SA: 22q-Aggi8 _3pRcument:Flil d rfAp:gp/q.8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 123 -
the ability of retail customers with cogeneration facilities to avail themselves of retail BTMG netting for energy production behind the retail meter."586

236.
Industrials/Amtrak argue that the BTMG netting rules ensure QFs have access to backup power to which they are entitled by PURPA, at rates that are not based upon an assumption that forced outages or other reductions in electric output by all QFs on the system will occur simultaneously, during system peak, or both.587  Industrials/Amtrak contend that the FCD or NFCD transmission services would not be sufficient to replace netting, because the FCD transmission service is calculated on the maximum the load might draw from the grid when the QF would only use the system sporadically, and NFCD transmission service must be scheduled in advance. Industrials/Amtrak also argue that these services do not align with the costs or risk profile of cogeneration QFs, such that, without netting, QF customers may lose their ability to manage costs even if their load and generation are synchronized or they never rely on transmission services, creating a cost-causation gap.588

237.
Industrials/Amtrak argue that exempting QFs is appropriate and consistent with the goals of the December Order because the Commission did not address PURPA. Industrials/Amtrak also argue that no circumstances have changed with regards to QFs, which have been operating similarly for decades, and that PJM acknowledges that existing retail BTMG arrangements with QFs have been in place without operational issues. Industrials/Amtrak further argue that QFs contribute to resource adequacy and reliability because some are limited in their use of the transmission system by the integration between the load and generation.589

238.
Eastman argues that the proposed changes to BTMG netting ignore the operational realities of facilities like Eastman's Kingsport facility, which uses its on-site electrical generation not only to provide electric power but also steam necessary for industrial processes at the facility. Eastman explains that if the Kingsport facility is unable to generate power, it also cannot generate steam, which reduces the industrial output and the need for additive power from the grid. Eastman claims that during periods of grid stress, the Kingsport facility is more likely to support the grid than to create operational

586  Id at 22.
587  Id at 19.
588  Id at 20-21.
589  Id at 17-19, 21. 280 of 515

PDF page 282

Document AccessigIPP; 2721.8.-349cument:Fhla IFAV:43A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 128 -
Interim NITS may not be combined with the FCD transmission service or NFCD transmission service.

249.
With respect to FCD and NFCD transmission services, the Commission found these services should be permanent transmission services available to Eligible Customers taking transmission service on behalf of Co-Located Load.61°  The December Order provided that the Co-Located Load must be able and willing to prevent or limit its energy withdrawals and must be separately metered from the associated generator. The December Order also stated that Eligible Customers taking transmission service on behalf of Co-Located Loads may take a combination of FCD transmission service and NFCD transmission service, but that Eligible Customers taking transmission service on behalf of Co-Located Loads that will not withdraw energy from the transmission system must take NFCD transmission service at 0 MW. The Commission also found that Eligible Customers taking either service on behalf of Co-Located Load would be charged for regulation and black start services based on gross demand, rather than the reserved amount of transmission service."'

250.
The Commission found that FCD transmission service should have the same reservation and curtailment priority as existing firm transmission services at the level of the contract demand and be charged for transmission, ancillary services, and capacity based on the contract demand, with the exception of regulation and black start services."' The Commission explained that PJM would only have an obligation to plan for the Network Upgrades necessary to serve Eligible Customers taking this new FCD transmission service on behalf of Co-Located Loads at their contract demand, and that PJM would procure capacity for these customers and should charge them based on their contract demand.613  The Commission further found that FCD transmission service should have a minimum term of one year and that PJM should propose an anti-toggling mechanism for Eligible Customers switching between FCD and NFCD transmission services.614

251.
With respect to NFCD transmission service, the Commission found the service should be available during normal operation and curtailed during emergency operations, similar to existing non-firm transmission service options. The Commission found the 610  Id. P 206.

611  Id PP 209, 216.
612  Id PP 208-209.
6131d P 210.
6141d P 213.
285 of 515

PDF page 283

Document A„essigt?Sc; 2q-AZ418-349cument:Flita rFal@P: A8A 8  / 2 ppe Filed: 10/16/2026 Docket No. EL25-49-Q02, et al.

- 124 -
constraints. Therefore, the Commission should allow BTMG facilities like the Kingsport facility to continue to net.59°

c. Answer
239.
Industrials/Amtrak note that many of the customers impacted by the change in BTMG netting rules are QFs under PURPA, subject to efficiency standards (and for non-cogeneration QFs, size limits).591

d. Determination
240.
Consistent with our determination on rehearing,592  PJM must submit a further compliance filing that includes a process to exempt certain cogeneration QFs from the new retail BTMG netting rules if they demonstrate that they are integrated with load such that, when their generating facility trips offline, the load follows. We therefore reject PJM's compliance filing as it relates to QFs. Specifically, we reject PJM's proposal to exempt from the materiality threshold all QFs serving as retail BTMG as of the date of the December Order.593  PJM has not demonstrated that all load with BTMG that is either designated, or eligible to be designated, as a QF is meaningfully distinguishable from load with other categories of BTMG for purposes of the concerns and directives discussed in the December Order.

241.
In the December Order, the Commission found that PJM's retail BTMG netting rules could create resource adequacy and reliability risks because PJM is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.594  The Commission found that PJM's existing retail BTMG netting rules do not limit the amount of qualifying load that a Network Customer may net by using BTMG and do not provide any protections against this potential transmission and resource adequacy planning problem or against the costs of maintaining sufficient resources to serve these loads being shifted onto other 590 Eastman Protest and Comments on Compliance Filing at 5, 8.

591  Industrials/Amtrak Answer at 3, 5-6.
592  See supra Part IV.C.1.c.i.
593  Compliance Transmittal at 9; PJM, Proposed Tariff, § I.1 Definitions R-S (Retail Behind The Meter Generation) (46.0.0) and § VIII.A 400, Definitions R (Retail Behind The Meter Generation) (7.0.0).
594  December Order, 193 FERC ¶ 61,217 at P 186. 281 of 515

PDF page 284

Document Accessigg;22q-Aqq-18 _3Q9cUrnellt:Flild rjjAg9: W.08A8/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 125 -
customers.595  The Commission did not distinguish in its determination between load served by QFs that are BTMG and load served by other categories of BTMG. 242.

PJM argues that some QFs may have economic benefits and are energy efficient, but PJM does not demonstrate that loads served by QFs that are BTMG do not cause the concerns the Commission discussed in the December Order.596  Nor does PJM demonstrate why these loads are not similarly situated to other loads served by other categories of BTMG.

243.
PJM also notes that QFs have size limitations and cogeneration QFs must meet efficiency requirements.597  However, the Commission in the December Order directed a materiality threshold because netting a smaller amount of load does not raise the same level of resource adequacy and reliability concerns as netting above the threshold.598 PJM does not demonstrate why the materiality threshold should apply differently to load served by QFs that are BTMG and load served by other categories of BTMG. Further, efficiency requirements are not unique to QFs—other generators may have efficiency requirements for other reasons or meet similar efficiency targets on their own. PJM has not demonstrated why such requirements are a meaningful consideration in whether to apply disparate treatment to load served by QFs that are BTMG and load served by other categories of BTMG. Industrials/Amtrak similarly argue that QFs contribute to resource adequacy and reliability because some are limited in their use of the transmission system due to the integration between the load and generation.599  However, as Industrials/Amtrak acknowledge, this is only true of some QFs, and above we have recognized that a particular subgroup, cogeneration QFs, warrant different treatment. 244.

Industrials/Amtrak also argue that it is not clear whether QFs will have access to the FCD or NFCD transmission services.6m  As discussed supra, Eligible Customers taking transmission service on behalf of Co-Located Loads, as well as Eligible Customers taking transmission service on behalf of a load with BTMG, may elect to take FCD

595  Id.
596  See Compliance Transmittal at 10 (broadly asserting that BTMG arrangements with QF status have been netting within PJM without known operational issues to date).
597  Compliance Transmittal at 10 (citing 16 U.S.C. § 824a-3; 18 C.F.R. § 292.204).
598  December Order, 193 FERC ¶ 61,217 at P 221.
599  Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 18-19,
21. 6"  Id at 20.
282 of 515

PDF page 285

Document AcceSSiII21S
qq-2-1qA18-3RKument:FlAd EFAv:gtg
8/2p,ate Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 126 -
and/or NFCD transmission services."' While we acknowledge that Industrials/Amtrak also argue that these new transmission services will not replace netting,602 our determination herein to allow Eligible Customers taking transmission service on behalf of loads with BTMG to take transmission service based on contract demand rather than NITS should they so choose could help such Eligible Customers to manage costs if they infrequently rely on transmission service or can reserve needed transmission service in advance (such as when the QF that serves them is on a planned maintenance outage). 245. Industrials/Amtrak argue that without retail netting, QFs may be denied access to backup service at rates that are not based upon an assumption that forced outages or other reductions in electric output by all QFs on the system will occur simultaneously, during system peak, or both, as required by PURPA. Under the Commission's PURPA regulations, the rates at which a host utility provides backup service must be just and reasonable and (1) shall not be based upon an assumption (unless supported by factual data) that forced outages or other reductions in output by all QFs on an electric utility's system will occur simultaneously, or during system peak, or both; and (2) shall consider the extent to which scheduled outages of the QF can be usefully coordinated with scheduled outages of the utility's facilities.603  The Commission's directive in the December Order to PJM to revise its Retail BTMG netting rules implicates the terms of the Tariff for the provision of transmission service, specifically NITS, not back-up service. Therefore, Industrials'/Amtrak's concern regarding backup service appears to conflate rates for sales of back-up power and rates for transmission service, rendering the concern misplaced. As is already the case elsewhere, such as in Midcontinent Independent System Operator, Inc. (MISO),6°4  NITS transmission rates in PJM, going forward, will be based on gross demand during the system peak. Because this directive from the December Order has no bearing on the rates at which a host utility provides backup service to QFs, it necessarily does not conflict with the requirement in the Commission's PURPA regulations that the rates for such backup service not assume all QFs are on forced outage.

601 See supra Part IV.B.3.c.
602 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 20.
603 18 C.F.R. § 292.305(c). 604 See Midwest Indep. Transmission Sys. Operator, Inc., 106 FERC ¶ 61,073, at P 26 (2004) ("[MISO]'s proposal to base Network Service charges for delivery of station power on the basis of coincident-peak output is not consistent with its OATT or with Commission precedent. Accordingly, [MISO] should include load served by behind-the-meter generation, including station power load met through on-site self-supply, in Network Load when it charges for Network Service."). 283 of 515

PDF page 286

Document Ac„ssigi Sier; qq-AqA18-312991-Irnent:FlAd rPA99: 4A812pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 127 -
246.
With respect to Eastman's arguments, Eastman appears to reference a
cogeneration facility, which uses its on-site electrical generation to provide not only electric power but also steam necessary for industrial processes at the facility.605  Because we set aside, in part, the December Order and find that certain cogeneration QFs should be exempted from the replacement rate upon a demonstration that they do not present the reliability or resource adequacy concerns discussed in the December Order, Eastman's concern appears to be addressed.606

B. Transmission Service
1. December Order
247.
The Commission directed PJM to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of a Co-Located Load takes one of three transmission services: (1) NITS or Interim NITS, (2) a new FCD transmission service, or

(3) a new NFCD transmission service.607  The December Order set many of the terms and conditions of these services for paper hearing procedures.608

248.
The December Order stated that Interim NITS must allow an Eligible Customer that has requested NITS on behalf of a Co-Located Load to take non-firm transmission service that can be interrupted until the Network Upgrades necessary to provide NITS are complete and the Co-Located Load can be designated as Network Load.G09  The Commission also found that this service should be temporary, available only to Eligible Customers that have requested NITS on behalf of Co-Located Loads that cannot yet be reliably served with NITS and only until the necessary Network Upgrades are completed and the Co-Located Load is designated as Network Load. The December Order further stated that Interim NITS would be optional for an Eligible Customer seeking NITS on behalf of a Co-Located Load and only available to the extent PJM determines that it can provide some level of interim service reliably. The Commission found that Eligible Customers should pay the NITS rate for this service, as well as ancillary services charges and charges for black start service, but they will not be charged for generation capacity because, as interruptible loads, capacity will not be procured on their behalf until such time as the Network Upgrades are in place to serve them. The Commission clarified that

605 Eastman Protest and Comments on Compliance Filing at 5.
606 See supra Part IV.C.1.c.i.c.
607 December Order, 193 FERC ¶ 61,217 at P 193. 6°8 Id. P 194. " 9 Id. P 200. 284 of 515

PDF page 287

Document AccessigPA 2A-A64,-18 _ 3gpcument:FlAd rpaqg: 43/q8/ 2 PAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 129 -
service should be available for terms ranging from one hour to one month and charged based on as-reserved contract demand.615  The December Order clarified that PJM should not include NFCD transmission service loads in its transmission or resource adequacy planning.616

2. PJM Compliance Filing
252.
PJM clarifies that the compliance filing only includes the organizational Tariff changes needed to implement the Commission's compliance directives regarding creating new transmission services and that the majority of the changes will be determined through the paper hearing.617  First, PJM submits several "shell" Tariff sheets, including a new Part XI governing the new transmission services, new Attachment F-3A for the service agreement for Eligible Customers taking NITS or Interim NITS on behalf of a Co-Located Load, and Attachment F-4 for the service agreement for Eligible Customers taking FCD transmission service or NFCD transmission service on behalf of a Co-Located Load.618  PJM states that it will file the full text of these sections upon the Commission's decision following the conclusion of the paper hearing.619 253.

PJM states that it further proposes modifications to Tariff Part III, governing NITS, to clarify that an Eligible Customer taking transmission service on behalf of Co-Located Load must take a transmission service or take steps to disconnect the load from the transmission system.G20  PJM also proposes new language clarifying that an Eligible Customer taking transmission service on behalf of a Co-Located Load may not take NITS or Interim NITS at the same time as FCD or NFCD transmission service.621 Finally, PJM proposes that Co-Located Load that is not served by an Eligible Customer 6151d. PP 215-216.

6161d. P 218.
617 Compliance Transmittal at 18-19.
618  Id at 19-21.
619  Id at 21. 628  Id. at 22.
621  Id at 22-23. 286 of 515

PDF page 288

Document Accessig@A -AA§A18-346cument:Flild
?„1A 812
e Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 130 -
taking transmission service on its behalf "must take all necessary steps to disconnect from the Transmission System."'

3. Pleadings
254.
EDFps supports PJM's proposed framework for the new transmission services.623 Constellation requests modifications to PJM's proposed Tariff revisions for Interim NITS, including: (1) replacing a load's "option to seek" Interim NITS with an "option to take"; (2) revising section 28.1 of the Tariff to clarify that Interim NITS is available to Eligible Customers taking service on behalf of Co-Located Load; and (3) revising section 29.1 of the Tariff to clarify that the required conditions to receive NITS also apply to Interim NITS.624

255.
Crusoe argues that PJM's proposal in the paper hearing does not answer critical questions such as how the initial contract demand quantity is determined, whether contract demand quantities can be adjusted as Co-Located Load grows in phases, or how PTPS interacts with Co-Location Arrangements where both generation and load sit on the developer's side of the Point of Change in Ownership.625

256.
Crusoe supports Interim NITS as a workable, near-term solution to allow load to operate on the transmission system while a Co-Located Generator and/or retail BTMG is still being built and interconnected.626  Crusoe claims, however, that PJM's proposed approach appears to treat a new Co-Located Generator as equivalent to a Network Resource prior to it receiving such status. On that basis, Crusoe speculates that PJM may intend to prevent a Co-Located Generator or retail BTMG from supplying energy to Co-Located Load during a grid curtailment event if that load is being served via Interim NITS. Crusoe contends that this prohibition would create a disincentive to large load customers using Interim NITS as an option for speedy interconnection. 257.

DCC similarly alleges that PJM's proposal to prohibit customers from relying on a Co-Located Generator during curtailment events makes the proposal unworkable and without practical value. DCC also requests that PJM define the trigger, scope, and sequence of Interim NITS curtailment with respect to the operational limits identified in 622 PJM, Proposed Tariff, Part HI (NITS) (4.0.0).

623  EDFps Comments on Compliance Filing at 8.
624  Constellation Protest and Comments on Compliance Filing at 18-19.
625  Crusoe Comments on Compliance Filing at 8.
626  Id at 6. 287 of 515

PDF page 289

Document Acces s
2A,Aeg-18 _ 3112pcument:FlA d rpAg9: A8A8/ 2 pAte Filed: 10/16/2026
Docket No. EL25-49-002, et al.
- 131 -
the study and should not be able to curtail load for unrelated, broader resource adequacy concerns.627

258.
Joint Parties argue that the Commission should reject PJM's proposed Tariff revisions that preclude retail loads served by BTMG from taking the new transmission services and otherwise limit eligibility for the new transmission services to load that is connecting to a generator with interconnection rights. Joint Parties argue that these retail loads are similarly situated to Co-Located Loads in their willingness and ability to limit their energy withdrawals from the transmission system under certain conditions.628 259.

DCC argues that PJM's proposal does not provide clear timelines for customers to be transitioned from Interim NITS to NITS.629  DCC expresses concern that, without clear timelines, Interim NITS could persist indefinitely, creating uncertainty for customers making long-term investments.

4. Answers
260.
Indicated TOs argue that the Commission should reject requests to reject or defer action on PJM's proposal to limit the new transmission services to Co-Located Load, because, Indicated TOs contend, the December Order limited such services to Eligible Customers taking transmission service on behalf of Co-Located Load. Indicated TOs argue that there is no evidence in the record to support that load-only customers should be entitled to use the new transmission services, which Indicated TOs explain are tied to generator-specific attributes that load-only customers do not share, such as an associated generator, separate metering from the generator, and the ability and willingness to prevent or limit withdrawals through the Co-Location Arrangement itself.63° 261.

Indicated TOs state they do not oppose the requested clarification that Interim NITS customers be permitted to continue serving on-site load with a Co-Located Generator during a curtailment event, provided that PJM implements safeguards to ensure that any such operation does not result in unreserved use of the transmission system or otherwise compromise reliability.63I

627  DCC Comments on Compliance Filing at 6-7.
628  Joint Parties Protest of Compliance Filing at 10.
629  DCC Comments on Compliance Filing at 8. 630 Indicated TOs April 24 Answer at 6-7. 631  Id at 7-8. 288 of 515

PDF page 290

Document AccessigPV; Z4-2-VAI.8 -3413c umentAil d rFAii: e4 /E18/2pAe Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 132 -
262.
BTMG Parties argue that the record contains ample evidence to support extending new transmission service eligibility to all customers willing and able to limit withdrawals from the grid, including load-only customers served by BMTG or otherwise able to consume flexibly.632  BTMG Parties contest Indicated TOs' claim that there is absolutely no evidence in the record, noting that the Commission relied on Antora's comments explaining that its thermal battery technology provides for an inherently flexible, low-load factor load, whether or not co-located with generation.633  BTMG Parties argue that the ability to inject to the grid is not required to enable a load to limit withdrawals from the transmission system, and that the Commission should require PJM to tailor new transmission service eligibility more closely to the Commission's justification in issuing the Co-Location Order, namely the willingness and ability to limit withdrawals from the transmission system under specified circumstances.634  BTMG Parties contend that if a load is able to meet technology-neutral technical requirements to demonstrate reliable curtailment eligibility, it should be allowed to take the new transmission services.

5. Determination
263.
We accept PJM's compliance filing with respect to outlining new transmission services in the Tariff, noting that, as discussed above in Part IV.B.3, we set aside, in part, the December Order and direct PJM to submit further compliance to revise its Tariff to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.635  We find that PJM complies with the directive in the December Order to modify its Tariff to require that an Eligible Customer taking transmission service on behalf of Co-Located Load takes one of three transmission services: (1) NITS or Interim NITS, (2) a new FCD

632  BTMG Parties Answer at 8.
633  Id. at 5-6 (citing December Order, 193 FERC ¶ 61,217 at P 199).
634  Id. at 8-9.
635  Specifically, we accept Proposed Tariff, § III.28.1 (Scope of Service) (2.0.0); § III.29.1 (Conditions Precedent for Receiving Service) (4.0.0); § III.29.2 (Application Procedures) (4.0.0); § III.31.6 (Annual Load and Resource Information Update) (4.0.0); Part XI (Transmission Services Available for Eligible Customers Taking Service on Behalf of Co-Located Loads) (0.0.0); attach. F-3A (Service Agreement for Regional Network Integration Transmission Service And/or Interim Regional Network Integration Transmission Service (For Co-Located Load)) (0.0.0); and attach. F-4 (Service Agreement For Contract Demand Transmission Service (For Co-Located Load)) (0.0.0). 289 of 515

PDF page 291

Document AccessigI SA :  q -23.0gA18 - 3129c ument:Flil d rpaqg:gb-9/118/2pAte Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 133 -
transmission service, or (3) a new NFCD transmission service.636  We acknowledge PJM's statement that it filed on compliance only a limited number of the changes directed in the December Order, given the number of issues set to be resolved through the paper hearing.

264.
However, we reject the Tariff provisions proposing that Co-Located Load that is not served by an Eligible Customer taking transmission service on its behalf "must take all necessary steps to disconnect from the Transmission System."637  We find this provision duplicative of PJM's proposed changes to Part VIII, Subpart B, section 403(A)(1)(r)(iv), which specify that "[t]o the extent that a Project Developer seeks to serve Co-Located Load using its generating facility but not identify an Eligible Customer, then the Project Developer must terminate its generating facility's interconnection to the Transmission System and serve the Co-Located Load fully islanded from the Transmission System."

265.
We reject Constellation's request to direct PJM to modify its proposed tariff language such that a load has an "option to take" Interim NITS instead of an "option to seek" Interim NITS.638  We acknowledge, as Constellation notes, that the December Order stated that "[t]his new interim, non-firm transmission service must allow an Eligible Customer that has requested NITS on behalf of a Co-Located Load to take non-firm transmission service that can be interrupted until the Network Upgrades necessary to provide NITS are complete . . . ."639  However, the December Order also stated that Interim NITS "would only be available to the extent PJM determines that it can provide some level of interim service reliably.51640 We accept PJM's proposal and clarify that Interim NITS is an option but not a right, as it is available to an Eligible Customer taking transmission service on behalf of Co-Located Load only to the extent that PJM determines it can be provided reliably. Constellation appears to request that the Commission require PJM to provide Interim NITS regardless of this reliability limitation, which would not be just and reasonable or consistent with the December Order. We reject Constellation's other requested clarifications on the required conditions to receive Interim NITS as not required for PJM to comply with the December Order. Further, because PJM proposes to create a new Tariff section governing Interim NITS,

636  December Order, 193 FERC ¶ 61,217 at P 193.
637  PJM, Proposed Tariff, Part III (General) (4.0.0).
638  Constellation Protest and Comments on Compliance Filing at 18-19.
639  December Order, 193 FERC ¶ 61,217 at P 200. 640 Id 290 of 515

PDF page 292

Document AccessigPW 2Q2-11 8 - 3R9cUrnent:Filtd IFA£1:4/118  2paje Filed: 10/16/2026 Docket No. EL25-49-002, et al.

- 134 -
Constellation has not shown why it is necessary to add details regarding Interim NITS to the existing Tariff sections addressing NITS."'

266.
In its comments on the compliance filing, Crusoe makes several misplaced arguments about the illustrative tariff PJM submitted in the paper hearing.642 Crusoe argues that PJM's illustrative tariff does not explain how the initial contract demand quantity is determined. It is not clear what Crusoe means, given that the purpose of FCD and NFCD transmission services is to allow an Eligible Customer taking service on behalf of Co-Located Load to request a specific contracted amount of transmission service.643  The initial level of transmission service will thus be determined in the first instance by the requesting Eligible Customer. PJM will evaluate those requests pursuant to its study process, which we address below.644  Crusoe also argues that PJM does not explain how PTPS interacts with Co-Location Arrangements where both the generator and load sit on the Interconnection Customer's side of the Point of Change in Ownership. However, this arrangement appears to refer to PJM's proposed change to the definition of Co-Located Load, which we reject herein.645

267.
Crusoe's request for clarification as to how phased-in load will be treated under FCD and NFCD transmission services is addressed below in Part VI.A.2. Crusoe and DCC also make arguments about curtailment rules or procedures for Eligible Customers taking Interim NITS on behalf of Co-Located Load, and that issue is addressed below in Part VI.G. Finally, comments urging the Commission to reject PJM's compliance filing for failing to make the new transmission services available to Eligible Customers on behalf of non-Co-Located Loads are untimely requests for rehearing. These commenters argue for a modification of the December Order, not that PJM has failed to comply with it.646  However, we address related arguments on rehearing of the December Order above in Parts IV.B.3 and IV.C.1.b.ii.

641  Compliance Transmittal at 19-20.
642  Crusoe Comments on Compliance Filing at 8. To accompany its initial brief on paper hearing, PJM submitted an illustrative tariff with proposed rates, terms, and conditions for the three new transmission services.
643  See December Order, 193 FERC ¶ 61,217 at PP 208, 216.
644  See infra Part VI.A.3.
645  See infra Part V.D.5.a.
646  See, e.g., ISO New Eng. Inc., 132 FERC ¶ 61,098 at P 12 ("The Commission has held that requests to alter a compliance filing in a manner that differs from the order 291 of 515