ER27-508-000 · 2026-11-16 · Southern California Edison Company

SCE TO Tariff Revisions_Sect205-OSC LL_MARKED

PDF page 1

ATTACHMENT B

Redlined TO Tariff Sheets
Sections 1, 3, 4, 7-10, and 13

PDF page 2

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

TABLE OF CONTENTS

1.  PREAMBLE … 1.1  Transmission Access for Participating TOs … 1.2  Transmission Access for Wheeling Customers … 1.3  Transmission Access for End-Users … 

2.  EFFECTIVE DATE … 
3.  TO DEFINITIONS … 
4.  ELIGIBILITY … 
5.  ACCESS CHARGES AND TRANSMISSION RATES … 5.1  Low Voltage Access Charge … 5.2  Wheeling Access Charge … 5.3  End-User Transmission Rates … 5.4  Transmission Revenue Requirement … 5.5  Transmission Revenue Balancing Account Adjustment (TRBAA) … 

5.6  Transmission Access Charge Balancing Account Adjustment (TRBAA) … 
6.  ANCILLARY SERVICES - APPLICABILITY AND CHARGES … 
7.  BILLING AND PAYMENT … 7.1  End-Users … 7.2  Low Voltage Access Charge Revenues … 7.2.1  Billing Procedure … 7.2.2  Interest on Unpaid Balances … 7.2.3  Default … 7.3  Wheeling and Usage Charge Revenues … 

8.  OBLIGATION TO INTERCONNECT OR CONSTRUCT TRANSMISSION EXPANSIONS &
FACILITY UPGRADES … 8.1  Participating TO Obligation to Interconnect … 8.1.1  Interconnection to Transmission System … 8.1.1.1  Letter Agreement … 8.1.2  Costs Associated with Interconnection … 8.1.3  Interconnection Agreement … 8.1.4  Due Diligence to Construct … 8.1.5  Energization … 8.1.6  Coordination with ISO on Interconnection Requests … 

8.2  Participating TO Obligation to Construct Transmission Expansions or Facility
Upgrades … 8.2.1  Obligation to Construct … 8.2.2  Local Furnishing Participating TO Obligation to Construct … 

8.3  Request for FERC Deference Regarding Need Determination … 
9.  EXPANSION PROCESS … 9.1  Determination of Facilities … 9.1.1  Payment of Facilities Study’s Cost … 

         Tariff Record Proposed Effective Date: 06/15/202102/16/27

                       Version Number: 18.0.0

             Option Code:  A

PDF page 3

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

    9.1.1.1  Market Participant to Pay for Facilities Study … 
    9.1.1.2  Project Sponsor or Project Proponent to Pay for Facilities Study … 
    9.1.1.3  Principal Beneficiaries to Pay for Facilities Study … 
    9.1.2  Payment Procedure … 9.1.3  Facilities Study Procedures … 9.2  Obligation to Build … 9.2.1  Due Diligence to Construct … 9.2.2  Delay in Construction or Expansion … 9.2.2.1  Alternatives to the Original Facility Additions … 

    9.2.2.2  Refund Obligation for Unfinished Facility Additions … 
9.3  Provisions Relating To Transmission Construction On the Systems Of Other
TOs … 9.3.1  Responsibility for Third Party Additions … 9.3.2  Coordination of Third-Party System Additions … 9.3.3  Expansion by “Local Furnishing Participating TOs” … 

10.  INTERCONNECTION PROCESS … 10.1  Applicability … 10.2  Applications … 10.3  Interconnection Application … 10.4  Review of Completed Interconnection Application … 10.5  Notice of Need for System Impact Study … 10.6  System Impact Study Cost Reimbursement … 10.6.1  Cost Reimbursement … 10.6.2  Multiple Parties … 10.7  System Impact Study Procedures … 10.7.1  Procedures Upon Completion of System Impact Study … 

10.8   Notice of Need for Facilities Study … 10.9  Facilities Study Procedures … 10.9.1  Execution of Interconnection Agreement … 10.10  Partial Interim Service … 10.11  Expedited Interconnection Procedures … 

11.  UNCONTROLLABLE FORCES AND INDEMNIFICATION … 
11.1  Procedures To Follow if Uncontrollable Force Occurs … 
11.2  Indemnification … 
12.  REGULATORY FILINGS … 12.1  Open Access … 12.2  STRANDED COST RECOVERY … 

13.  CREDITWORTHINESS … 13.1  UDCs, MSSs, and Scheduling Coordinators Using the Participating TO’s Low

Voltage Transmission Facilities … 13.2  End-Users … 

14.  DISPUTES … 
15.  RECOVERY OF RELIABILITY SERVICES COSTS … 
16.  MISCELLANEOUS … 16.1  Notices … 16.2  Waiver … 16.3  Confidentiality … 16.3.1  Maintaining Confidentiality If Not for Public Disclosure … 

    16.3.2  Disclosure of Confidential Information … 

PDF page 4

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

16.4  TO Tariff Supersedes Existing Tariffs … 16.5  Titles … 16.6  Severability … 16.7  Preservation of Obligations … 16.8  Governing Law … 16.9  Appendices Incorporated … 16.10  Conflict With ISO Tariff … 16.11  Conflicting Operating Instructions … 16.12  Self Provision of Ancillary Services … 

APPENDIX I - TRANSMISSION REVENUE REQUIREMENT ....................................................... APPENDIX II - CHARGES FOR WHOLESALE TRANSMISSION SERVICES … 

APPENDIX III – TRANSMISSION RATES FOR END-USE SERVICE … 
APPENDIX IV – RATES FOR CERTAIN ANCILLARY SERVICE BIDS … 
APPENDIX V - NOTICES ............................................................................................................... APPENDIX VI - RELIABILITY SERVICES RATE SCHEDULE ..................................................... APPENDIX VII - INTERCONNECTION PROCEDURES IN EFFECT PRIOR TO JULY 1, 2005 ...

APPENDIX VIII – NOT USED ......................................................................................................... APPENDIX IX – FORMULA RATE ................................................................................................ APPENDIX X – RATE SCHEDULE FOR RECOVERY OF COSTS ASSOCIATED WITH

FACILITIES INSTALLED PURSUANT TO INTERCONNECTION AGREEMENTS.……………..
APPENDIX XI – TRANSMISSION MAINTENANCE AND COMPLIANCE REVIEW … 
APPENDIX XII – STAKEHOLDER REVIEW PROCESS ............................................................... APPENDIX XIII – LETTER AGREEMENT ..................................................................................... APPENDIX XIV -  WEST OF DEVERS FORMULA RATE……………………………… … 

APPENDIX XV – LARGE LOAD INTERCONNECTION PROCEDURES…………………………..

PDF page 5

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

1.  Preamble.
The Participating TO's revenue requirements and applicable rates and charges for transmission access over the ISO Controlled Grid and the terms and conditions for transmission expansion and interconnection are set forth in this TO Tariff and the ISO Tariff.

1.1  Transmission Access for Participating TOs.
Participating TOs are able to participate in the ISO and utilize the entire ISO Controlled Grid to serve their End-Use Customers.  The applicable High Voltage Access Charges and Transition Charges shall be paid by Participating TOs to the ISO pursuant to the ISO Tariff.  If a Participating TO utilizes the Low Voltage Transmission Facilities of another Participating TO, such Participating TO shall also pay the Low Voltage Access Charge of the other Participating TO.

1.2  Transmission Access for Wheeling Customers.
Wheeling allows Scheduling Coordinators to deliver Energy through or out of the ISO Controlled Grid to serve a load located outside the transmission or Distribution System of a Participating TO.  Wheeling Access Charges shall be paid by Scheduling Coordinators to the ISO pursuant to the ISO Tariff.

1.3  Transmission Access for End-Users.
End-Users receive transmission service over the ISO Controlled Grid through the Utility Distribution Company, Small Utility Distribution Company, or MSS OperatorParticipating TO to whose transmission or distribution facilities the End-User is directly connected. Charges to End-Users for access to the ISO Controlled Grid  shall be paid to the

PDF page 6

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

applicable Utility Distribution Company, Small Utility Distribution Company, or MSS OperatorParticipating TO to whose transmission or distribution facilities the End-User is directly connected.

PDF page 7

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

3.  TO Definitions.
Capitalized terms used in this TO Tariff shall have the meanings set out below or in Appendix XV unless otherwise stated.  Capitalized terms used in this tariff and not defined below or in Appendix XV shall have the meanings set out in the ISO Tariff. 3.1

Access Charge.  A charge paid by all UDCs, MSSs and, in certain cases, Scheduling Coordinators, delivering Energy to Gross Load, as set forth in Section 26.1 of the ISO Tariff.  The Access Charge includes the High Voltage Access Charge, the Transition Charge, and the Low Voltage Access Charge.

3.2
Automatic Generation Control (AGC).  Generation equipment that
automatically responds to signals from the ISO’s EMS control in real time to control the power output of electric generators within a prescribed area in response to a change in system frequency, tieline loading, or the relation of these to each other, so as to maintain the target system frequency and/or the established interchange with other areas within the predetermined limits.

3.3
Ancillary Services.  Regulation, Spinning Reserve, Non-Spinning Reserve, Voltage Support and Black Start together with such other interconnected operation services as the ISO may develop in cooperation with Market Participants to support the transmission of Energy from Generation resources to Loads while maintaining reliable operation of the ISO Controlled Grid in accordance with Good Utility Practice.

                        Tariff Record Proposed Effective Date: 05/01/2026

                           Version Number: 16.0.0

Option Code:  A

PDF page 8

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

3.4
Applicable Reliability Criteria.  The reliability standards established by NERC, WECC, and Local Reliability Criteria as amended from time to time, including any requirements of the Nuclear Regulatory Commission.

3.5
Available Transfer Capacity.  For a given transmission path, the capacity rating in MW of the path established consistent with ISO and WECC transmission capacity rating guidelines, less any reserved uses applicable to the path. 3.6

Base Transmission Revenue Requirement.  The Transmission Revenue Requirement before deducting the Transmission Revenue Balancing Account Adjustment (TRBAA) and, for wholesale purposes, before deducting Standby Transmission Revenues.

3.7
Black Start.  The procedure by which a Generating Unit self-starts without an external source of electricity thereby restoring power to the ISO Controlled Grid following system or local area blackouts.

3.8
Business Day.  Monday through Friday, excluding federal holidays and the day after Thanksgiving Day.

3.9
(Omitted)
3.10 Completed Application Date.  The date on which a party submits an Interconnection Application that satisfies the requirements of a Completed Interconnection Application.

3.11 Completed Interconnection Application.  An Interconnection Application that satisfies all of the information and other requirements of Section 10.3 of this TO Tariff.

PDF page 9

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

3.12 Congestion.  A condition that occurs when there is insufficient Available Transfer Capacity to implement all Preferred Schedules simultaneously or, in real time, to serve all Generation and Demand.  “Congested” shall be construed accordingly. 3.13 Congestion Management.  The alleviation of Congestion in accordance with applicable ISO Protocols and Good Utility Practice.

3.14 Converted Rights.  Those transmission service rights as defined in Section 4.3.1.6 of the ISO Tariff.

3.15 CPUC.  The California Public Utilities Commission, or its successor. 3.16 (Omitted)

3.17 Demand.  The rate at which Energy is delivered to Loads and Scheduling Points by Generation, transmission or distribution facilities.  It is the product of voltage and the in-phase component of alternating current measured in units of watts or standard multiples thereof, e.g., 1,000W = 1kW, 1,000kW = 1MW, etc.

3.18 Direct Assignment Facilities.  Facilities or portions of facilities that are owned by the Participating TO necessary to physically and electrically interconnect a particular party requesting Interconnection under this TO Tariff to the ISO Controlled Grid at the point of interconnection.  Direct Assignment Facilities shall be specified in the Interconnection Agreement that governs Interconnection service to such party and shall be subject to FERC approval.

3.19 Dispatch.  The operating control of an integrated electric system to: i) assign specific Generating Units and other sources of supply to effect the supply to meet the relevant area Demand taken as Load rises or falls; ii) control operations and maintenance of high voltage lines, substations, and equipment, including administration

PDF page 10

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

of safety procedures; iii) operate interconnections; iv) manage Energy transactions with other interconnected Control Areas; and v) curtail Demand.

3.20 Distribution System.  The distribution assets of a TO, UDC, or MSS. 3.21 Eligible Customer.  (i) Any utility (including Participating TOs, Market Participants and any power marketer), Federal power marketing agency, or any person generating Energy for sale or resale; Energy sold or produced by such entity may be Energy produced in the United States, Canada or Mexico; however, such entity is not eligible for transmission service that would be prohibited by Section 212(h)(2) of the Federal Power Act; and (ii) any retail customer taking unbundled transmission service pursuant to a state retail access program or pursuant to a voluntary offer of unbundled retail transmission service by the Participating TO.

3.22 Encumbrance.  A legal restriction or covenant binding on the Participating TO that affects the operation of any transmission lines or associated facilities and which the ISO needs to take into account in exercising Operational Control over such transmission lines or associated facilities if the Participating TO is not to risk incurring significant liability.  Encumbrances shall include Existing Contracts and may include:  (1) other legal restrictions or covenants meeting the definition of Encumbrance and arising under other arrangements entered into before the ISO Operations Date, if any; and (2) legal restrictions or covenants meeting the definition of Encumbrance and arising under a contract or other arrangement entered into after the ISO Operations Date. 3.23 End-Use Customer or End-User.  A purchaser of electric power who purchases such power to satisfy a Load directly connected to the ISO Controlled Grid or to a Distribution System and who does not resell the power.

PDF page 11

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

3.24 Energy.  The electrical energy produced, flowing or supplied by generation, transmission or distribution facilities, being the integral with respect to time of the instantaneous power, measured in units of watt-hours or standard multiples thereof, e.g., 1,000 Wh = 1kWh, 1,000 kWh = 1MWh, etc.

3.25 Entitlements.  The right of the Participating TO obtained through contract or other means to use another entity's transmission facilities for the transmission of Energy.

3.26 Existing Contracts.  The contracts which grant transmission service rights in existence on the ISO Operations Date (including any contracts entered into pursuant to such contracts) as may be amended in accordance with their terms or by agreement between the parties thereto from time to time.

3.27 Existing Rights.  The transmission service rights and obligations of non- Participating TOs under Existing Contracts, including all terms, conditions, and rates of the Existing Contracts, as they may change from time to time under the terms of the Existing Contracts.

3.28 Expedited Interconnection Agreement.  A contract between a party which has submitted a Request for Expedited Interconnection Procedures and the Participating TO under which the Participating TO agrees to process, on an expedited basis, the Completed Interconnection Application of such party and which sets forth the terms, conditions, and cost responsibilities for such interconnection.

3.29 Facilities Study Agreement.  An agreement between a Participating TO and either a party requesting Interconnection to the ISO Controlled Grid, Market Participant, Project Sponsor, or identified principal beneficiaries pursuant to which the party

PDF page 12

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

requesting such Interconnection, Market Participants, Project Sponsor, or identified principal beneficiaries agrees to reimburse the Participating TO for the cost of performing or reviewing a Facilities Study.

3.30 Facility or Facilities Study.  An engineering study conducted to determine required modifications to the Participating TO’s transmission system, including the estimated cost and scheduled completion date for such modifications that will be required to provide needed services.

3.31 FERC.  The Federal Energy Regulatory Commission or its successor. 3.32 FPA.  Parts II and III of the Federal Power Act, 16 U.S.C. § 824 et seq., as they may be amended from time to time.

3.33 FTR (Firm Transmission Right).  A contractual right, subject to the terms and conditions of the ISO Tariff, that entitles the FTR Holder to receive, for each hour of the term of the FTR, a portion of the Usage Charges received by the ISO for transportation of energy from a specific originating Zone to a specific receiving Zone and, in the event of an uneconomic curtailment to manage Day-Ahead congestion, to a Day-Ahead scheduling priority higher than that of a schedule using Converted Rights capacity that does not have an FTR.

3.34 FTR Holder.  The owner of an FTR, as registered with the ISO.
3.35 Generating Unit.  An individual electric generator and its associated plant and apparatus whose electrical output is capable of being separately identified and metered or a Physical Scheduling Plant that, in either case, is: (a) located within the ISO Control Area; (b) connected to the ISO Controlled Grid, either directly or via interconnected

PDF page 13

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

transmission, or distribution facilities; and (c) that is capable of producing and delivering net Energy (Energy in excess of a generating station’s internal power requirements). 3.36 Generation.  Energy delivered from a Generating Unit.

3.37 Good Utility Practice.  Any of the practices, methods, and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period, or any of the practices, methods, and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety, and expedition.  Good Utility Practice is not intended to be any one of a number of the optimum practices, methods, or acts to the exclusion of all others, but rather to be acceptable practices, methods, or acts generally accepted in the region.

3.38 Gross Load.  Gross Load is all Energy (adjusted for distribution losses) delivered for the supply of End-User Loads directly connected to the transmission facilities or Distribution System of the Participating TO.  Gross Load shall exclude the portion of the Load of an individual End-Use Customer of the Participating TO that is served by a Generating Unit that: (a) is located on the customer's site or provides service to the customer's site through over-the-fence arrangements as authorized by Section 218 of the California Public Utilities Code; (b) is a qualifying small power production facility or qualifying cogeneration facility, as those terms are defined in the FERC's regulations implementing Section 201 of the Public Utility Regulatory Policies Act of 1978; (c) was serving the customer's Load on or before March 31, 2000; and (d) secured Standby Service from the Participating TO under terms approved by a Local

PDF page 14

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

Regulatory Authority or FERC, as applicable, as of March 31, 2000 and continues to secure Standby Service from the Participating TO or can be curtailed concurrently with an outage of the Generating Unit serving the Load.

3.39 High Voltage Access Charge.  A component of the Access Charge determined by the ISO and assessed to the Participating TO under Section 26.1 of the ISO Tariff. 3.40 High Voltage Existing Contracts Access Charge.  A charge for access to the ISO Controlled Grid under certain specified Existing Contracts to be paid by the Existing Contract holder to the Participating TO.  Such rate shall be calculated by dividing the High Voltage Transmission Revenue Requirement applicable to wholesale customers by the sum of Edison’s twelve monthly retail system peak demands measured at the ISO Controlled Grid level, consistent with such revenue requirement. 3.41 High Voltage Transmission Facility.  A transmission facility under the operational control of the ISO that is owned by the Participating TO or to which the Participating TO has an Entitlement that is represented by a Converted Right and that operates at a voltage at or above 200 kilovolts, and supporting facilities, and the costs of which are not directly assigned to one or more specific customers. 3.42 High Voltage Transmission Revenue Requirement.  The portion of the Participating TO's TRR associated with and allocable to the Participating TO's High Voltage Transmission Facilities and Converted Rights associated with High Voltage Transmission Facilities.

3.43 High Voltage Utility-Specific Rate.  The Participating TO's High Voltage Transmission Revenue Requirement divided by the Participating TO's forecasted Gross Load.

PDF page 15

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

3.44 High Voltage Wheeling Access Charge.  The Wheeling Access Charge
assessed by the ISO associated with the recovery of the Participating TOs' High Voltage Transmission Revenue Requirements in accordance with Section 26.1 of the ISO Tariff.

3.45 (Omitted)
3.46 Interconnection.  Transmission facilities, other than additions or replacements to existing facilities that: i) connect one system to another system where the facilities emerge from one and only one substation of the two systems and are functionally separate from the ISO Controlled Grid facilities such that the facilities are, or can be, operated and planned as a single facility; or ii) are identified as radial transmission lines pursuant to contract; or iii) produce Generation at a single point on the ISO Controlled Grid; provided that such interconnection does not include facilities that, if not owned by the Participating TO, would result in a reduction in the ISO’s Operational Control of the Participating TO’s portion of the ISO Controlled Grid.

3.47 Interconnection Agreement.  A contract between a party requesting
Interconnection and the Participating TO that owns the transmission facility with which the requesting party wishes to interconnect.

3.48 Interconnection Application.   An application that requests Interconnection to the ISO Controlled Grid.

3.49 Interest.  Interest shall be calculated in accordance with the methodology specified for interest on refunds in the regulations of FERC at 18 C.F.R. §35.19(a)(2)(iii)(1996).  Interest on delinquent amounts shall be calculated from the due

PDF page 16

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

date of the bill to the date of payment.  When payments are made by mail, bills shall be considered as having been paid on the date of receipt.

3.50 Independent System Operator (“ISO”).  The California Independent System Operator Corporation, a state chartered, nonprofit corporation that controls the transmission facilities of all Participating TOs and dispatches certain Generating Units and Loads.

3.51 ISO ADR Procedures.  The procedures for resolution of disputes or differences set out in Section 13 of the ISO Tariff, as amended from time to time. 3.52 ISO Controlled Grid.  The system of transmission lines and associated facilities of the Participating TOs that have been placed under the ISO’s Operational Control. 3.53 ISO Protocols.  The rules, protocols, procedures and standards promulgated by the ISO (as amended from time to time) to be complied with by the ISO Scheduling Coordinators, Participating TOs and all other Market Participants in relation to the operation of the ISO Controlled Grid and the participation in the markets for Energy and Ancillary Services in accordance with the ISO Tariff.

3.54 ISO Tariff.  The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time.

3.55 Load.  An end-use device of an End-Use Customer that consumes power.  Load should not be confused with Demand, which is the measure of power that a Load receives or requires.

3.56 (Omitted)

PDF page 17

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

3.57 Local Furnishing Bond.  Tax-exempt bonds utilized to finance facilities for the local furnishing of electric energy, as described in section 142(f) of the Internal Revenue Code, 26 U.S.C. § 142(f).

3.58 Local Furnishing Participating TO.  Any Tax-Exempt Participating TO that owns facilities financed by Local Furnishing Bonds.

3.59 Local Publicly Owned Electric Utilities.  A municipality or municipal corporation operating as a public utility furnishing electric service, a municipal utility district furnishing electric service, a public utility district furnishing electric services, an irrigation district furnishing electric services, or a joint powers authority that includes one or more of these agencies and that owns Generation or transmission facilities, or furnishes electric services over its own or its members’ electric Distribution System. 3.60 Local Regulatory Authority.  The state or local governmental authority responsible for the regulation or oversight of a utility.

3.61 Local Reliability Criteria.  Reliability criteria established at the ISO Operations Date, unique to the transmission systems of each of the Participating TOs. 3.62 Low Voltage Access Charge.  The Access Charge applicable under Section 26.1 of the ISO Tariff to recover the Low Voltage Transmission Revenue Requirement of the Participating TO.

3.63 Low Voltage Existing Contracts Access Charge.  A charge for access to the ISO Controlled Grid under certain specified Existing Contracts to be paid by the Existing Contract holder to the Participating TO.  Such rate shall be calculated by dividing the Low Voltage Transmission Revenue Requirement applicable to wholesale customers by

PDF page 18

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

the sum of Edison’s twelve monthly retail system peak demands measured at the ISO Controlled Grid level, consistent with such revenue requirement.

3.64 Low Voltage Transmission Facility.  A transmission facility under the operational control of the ISO owned by the Participating TO or to which the Participating TO has an Entitlement that is represented by a Converted Right, which is not a High Voltage Transmission Facility, and supporting facilities, and the costs of which are not directly assigned to one or more specific customers.

3.65 Low Voltage Transmission Revenue Requirement.  The portion of the Participating TO's TRR associated with and allocable to the Participating TO's Low Voltage Transmission Facilities and Converted Rights associated with Low Voltage Transmission Facilities.

3.66 Low Voltage Wheeling Access Charge.  The Wheeling Access Charge associated with the recovery of the Participating TO's Low Voltage Transmission Revenue Requirement in accordance with Section 26.1 of the ISO Tariff. 3.67 Market Participant.  An entity, including a Scheduling Coordinator, who participates in the Energy marketplace through the buying, selling, transmission, or distribution of Energy or Ancillary Services into, out of, or through the ISO Controlled Grid.

3.68 MSS (Metered Subsystem).  A geographically contiguous system located within a single zone which has been operating as an electric utility for a number of years prior to the ISO Operations Date as a municipal utility, water district, irrigation district, State agency or Federal power administration subsumed within the ISO Control Area and encompassed by ISO certified revenue quality meters at each interface point with the

PDF page 19

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

ISO Controlled Grid and ISO certified revenue quality meters on all Generating Units or, if aggregated, each individual resource and Participating Load internal to the system, which is operated in accordance with a MSS agreement described in Section 4.9.1 of the ISO Tariff.

3.69 NERC.  The North American Electric Reliability Council or its successor. 3.70 (Omitted)

3.71 (Omitted)
3.72 New High Voltage Transmission Facility.  A High Voltage Transmission Facility of the Participating TO that enters service after the beginning of the transition period described in Section 4 of Schedule 3 of Appendix F of the ISO Tariff, or a capital addition made after the beginning of the transition period described in Section 4.2 of Schedule 3 of Appendix F of the ISO Tariff to an Existing High Voltage Transmission Facility.

3.73 New Participating TO.  A Participating TO that is not an Original Participating TO.

3.74 Non-Participating TO.  A TO that is not a party to the TCA or for the purposes of Section 16.1 of the ISO Tariff the holder of transmission service rights under an Existing Contract that is not a Participating TO.

3.75 Non-Spinning Reserve.   The portion of off-line generating capacity that is capable of being synchronized and ramping to a specified load in ten minutes (or load that is capable of being interrupted in ten minutes) and that is capable of running (or being interrupted) for at least two hours.

PDF page 20

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

3.76 Operational Control.  The rights of the ISO under the Transmission Control Agreement and the ISO Tariff to direct Participating TOs how to operate their transmission lines and facilities and other electric plant affecting the reliability of those lines and facilities for the purpose of affording comparable non-discriminatory transmission access and meeting Applicable Reliability Criteria.

3.77 Original Participating TO.  A Participating TO that was a Participating TO as of January 1, 2000.  The Original Participating TOs are Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company. 3.78 Participating TO.  A party to the TCA whose application under Section 2.2 of the TCA has been accepted and who has placed its transmission assets and Entitlements under the ISO’s Operational Control in accordance with the TCA.  A Participating TO may be an Original Participating TO or a New Participating TO.  For purposes of this TO Tariff, the Participating TO is Southern California Edison Company.

3.79 Participation Agreement.  An agreement between a Participating TO and a Project Sponsor that specifies the terms and conditions under which the Participating TO will construct a transmission addition or upgrade on behalf of the Project Sponsor. 3.80 Physical Scheduling Plant.  A group of two or more related Generating Units, each of which is individually capable of producing Energy, but which either by physical necessity or operational design must be operated as if they were a single Generating Unit and any Generating Unit or Units containing related multiple generating components which meet one or more of the following criteria: i) multiple generating components are related by a common flow of fuel which cannot be interrupted without a substantial loss of efficiency of the combined output of all components; ii) the Energy

PDF page 21

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

production from one component necessarily causes Energy production from other components; iii) the operational arrangement of related multiple generating components determines the overall physical efficiency of the combined output of all components; iv) the level of coordination required to schedule individual generating components would cause the ISO to incur scheduling costs far in excess of the benefits of having scheduled such individual components separately; or v) metered output is available only for the combined output of related multiple generating components and separate generating component metering is either impractical or economically inefficient. 3.81 (Omitted)

3.82 Project Proponent.  A Market Participant or group of Market Participants that: (i) advocates a transmission addition or upgrade; (ii) is unwilling to pay the full cost of the proposed transmission addition and upgrade, and thus is not a Project Sponsor; and (iii) initiates proceedings under the ISO ADR Procedures to determine the need for the proposed transmission addition or upgrade.

3.83 Project Sponsor.  A Market Participant or group of Market Participants or a Participating TO that proposes the construction of a transmission addition or upgrade in accordance with Section 24 of the ISO Tariff.

3.84 Regional Transmission Group (“RTG”).  A voluntary organization approved by FERC and composed of transmission owners, transmission users, and other entities, organized to efficiently coordinate the planning, expansion and use of transmission on a regional and inter-regional basis.

3.85 Regulation.  The service provided either by Generating Units certified by the ISO as equipped and capable of responding to the ISO’s direct digital control (AGC) signals,

PDF page 22

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

or by System Resources that have been certified by the ISO as capable of delivering such service to the ISO Balancing Authority Area, in an upward and downward direction to match, on a Real-Time basis, Demand and resources, consistent with established Applicable Reliability Criteria.  Regulation is used to control the power output of electric generators within a prescribed area in response to a change in system frequency, tieline loading, or the relation of these to each other so as to maintain the target system frequency and/or the established Interchange with other Balancing Authority Areas within the predetermined Regulation Limits.  Regulation includes both the increase of output by a Generating Unit or System Resource (Regulation Up) and the decrease in output by a Generating Unit or System Resource (Regulation Down).  Regulation Up and Regulation Down are distinct capacity products, with separately stated requirements and ASMPs in each Settlement Period.

3.86 Reliability Criteria.  Pre-established criteria that are to be followed in order to maintain desired performance of the ISO Controlled Grid under contingency or steady state conditions.

3.87 Reliability Services.  Those services provided by the ISO:  1) that are deemed by the ISO as necessary to maintain reliable electric service in the ISO Control Area; and 2) whose costs are billed by the ISO to the Participating TO pursuant to the ISO Tariff.  Reliability Services include services obtained from:  Reliability Must-Run units; and generators committed pursuant to the ISO’s Exceptional Dispatch authority, which includes any costs of Exceptional Dispatches as well as any default costs allocated to the Participating TO resulting from its incurrence of Exceptional Dispatch costs pursuant to Section 11.29.17.2.1 of the CAISO Tariff.

PDF page 23

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

3.88 Reliability Upgrade.  The transmission facilities, other than Direct Assignment Facilities, beyond the first point of Interconnection necessary to interconnect a wholesale load safely and reliably to the ISO Controlled Grid, which would not have been necessary but for the Interconnection of a wholesale load, including network upgrades necessary to remedy short circuit or stability problems resulting from the interconnection of a wholesale load to the ISO Controlled Grid.  Reliability Upgrades also include, consistent with WECC practice, the facilities necessary to mitigate any adverse impact a wholesale load’s interconnection may have on a path’s WECC path rating.  Reliability Upgrades shall be specified in the Interconnection Agreement that governs Interconnection service to the wholesale load and shall be subject to FERC approval.

3.89 (Omitted).
3.90 Request for Expedited Interconnection Procedures.  A written request by which an applicant for Interconnection can request expedited processing of its Interconnection Application.

3.91 Scheduling Coordinator.  An entity certified by the ISO for the purposes of undertaking the functions specified in Section 4.5.3 of the ISO Tariff. 3.92 Scheduling Point.  A location at which the ISO Controlled Grid is connected, by a group of transmission paths for which a physical, non-simultaneous transmission capacity rating has been established for Congestion Management, to transmission facilities that are outside the ISO’s Operational Control.

PDF page 24

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

3.93 Spinning Reserve.  The portion of unloaded synchronized generating capacity that is immediately responsive to system frequency and that is capable of being loaded in ten minutes, and that is capable of running for at least two hours. 3.94 Standby Rate.  A rate assessed a Standby Service Customer by the Participating TO, as approved by the Local Regulatory Authority, or FERC, as applicable, for Standby Service which compensates the Participating TO, among other things, for costs of High Voltage Transmission Facilities.

3.95 Standby Service.  Service provided by the Participating TO which allows a Standby Service Customer, among other things, access to High Voltage Transmission Facilities for the delivery of backup power on an instantaneous basis to ensure that Energy may be reliably delivered to the Standby Service Customer in the event of an outage of a Generating Unit serving the customer's Load.

3.96 Standby Service Customer.  A retail End-Use Customer of the Participating TO that receives Standby Service and pays a Standby Rate.

3.97 Standby Transmission Revenue.  The transmission rate revenues associated with Standby Service collected by the Participating TO from those Standby Service Customers who are not billed for Standby Service on a Gross Load basis. 3.98 System Impact Study.  An engineering study conducted to determine whether a request for Interconnection to the ISO Controlled Grid would require new transmission additions, upgrades, or other mitigation measures.

3.99 System Impact Study Agreement.  An agreement between a Participating TO and an entity that has requested Interconnection to the Participating TO’s transmission

PDF page 25

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

system pursuant to which the entity requesting Interconnection agrees to reimburse the Participating TO for the cost of performing or reviewing a System Impact Study. 3.100 TO Tariff.  This Transmission Owner Tariff, as it may be amended or superseded.

3.101 Transition Charge.  A component of the Access Charge determined by the ISO and assessed the Participating TO along with the High Voltage Access Charge in accordance with Section 5.7 of Appendix F, Schedule 3 of the ISO Tariff. 3.102 Transmission Access Charge Balancing Account Adjustment ("TACBAA"). A mechanism established by the Participating TO which will ensure that the difference between (i) the actual charges by the ISO pursuant to Section 26.1.2 of the ISO Tariff for the High Voltage Access Charge and Transition Charge and (ii) the revenues disbursed by the ISO pursuant to Section 26.1.3 of the ISO Tariff are recovered from the Participating TO's End-Use Customers.

3.103 Transmission Control Agreement (“TCA”).  The agreement between the ISO and Participating TOs establishing the terms and conditions under which TOs will become Participating TOs and how the ISO and each Participating TO will discharge their respective duties and responsibilities, as may be modified from time to time. 3.104 Transmission Owner (“TO”).  An entity owning transmission facilities or having firm contractual rights to use transmission facilities.

3.105 Transmission Revenue Balancing Account Adjustment (“TRBAA”).  A mechanism established by the Participating TO which will ensure that all Transmission Revenue Credits and other credits specified in Sections 6 and 8 of Appendix F,

PDF page 26

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

Schedule 3 of the ISO Tariff, flow through to ISO Tariff and TO Tariff transmission customers.

3.106 Transmission Revenue Credit.  The sum of:  1) the revenues received by the Participating TO from the ISO for Wheeling service, including EDAM Recoverable Revenue; (2) the difference between the costs incurred by the Participating TO associated with Existing Rights and the amount of such costs recovered by the Participating TO from the Existing Rights customers (“ETC Cost Differentials”); and (3) any additional appropriate amounts included in the ISO Tariff definition of Transmission Revenue Credit set forth in Appendix A of the CAISO Tariff ; and (4) any remaining Interconnection Financial Security under the TSRA that has been drawn down by Participating TO.

3.107 Transmission Revenue Requirement (“TRR”).  The TRR is the total annual authorized revenue requirements associated with transmission facilities and Entitlements turned over to the Operational Control of the ISO by the Participating TO, including the Projects under construction identified in Appendix VIII that are to be turned over to the Operational Control of the ISO upon completion.  The costs of any transmission facility turned over to the Operational Control of the ISO, including the costs of the Projects under construction identified in Appendix VIII that are to be turned over to the Operational Control of the ISO upon completion, shall be fully included in the Participating TO's TRR.  The TRR includes the costs of transmission facilities and Entitlements and deducts Transmission Revenue Credits; for wholesale purposes, credits for Standby Transmission Revenue; and the transmission revenue expected to

PDF page 27

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

be actually received by the Participating TO for Existing Rights and Converted Rights. The TRR is shown in Appendix I.

3.108 Uncontrollable Force.  Any act of God, labor disturbance, act of the public enemy, war, insurrection, riot, fire, storm, flood, earthquake, explosion, any curtailment, order, regulation or restriction imposed by governmental, military or lawfully established civilian authorities or any other cause beyond the reasonable control of the ISO or Market Participant which could not be avoided through the exercise of Good Utility Practice.

3.109 Usage Charge.  The amount of money, per 1 kW of scheduled flow, that the ISO charges a Scheduling Coordinator for use of a specific congested Inter-Zonal Interface during a given hour.

3.110 Utility Distribution Company (“UDC”).  An entity that owns a Distribution System for the delivery of Energy to and from the ISO Controlled Grid, and that provides regulated retail electric service to Eligible Customers, as well as regulated procurement service to those End-Use Customers who are not yet eligible for direct access, or who choose not to arrange services through another retailer.

3.111 Voltage Support.  Services provided by Generating Units or other equipment such as shunt capacitors, static var compensators, or synchronous condensers that are required to maintain established grid voltage criteria.  This service is required under normal or system emergency conditions.

3.112 Western Electricity Coordinating Council (“WECC”).  The Western Systems Coordinating Council or its successor.

PDF page 28

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

3.113 Wheeling Access Charge.  The charge assessed by the ISO that is paid by a Scheduling Coordinator for Wheeling in accordance with Section 26.1 of the ISO Tariff. Wheeling Access Charges shall not apply for Wheeling under a bundled non-economy Energy coordination agreement of a Participating TO executed prior to July 9, 1996. The Wheeling Access Charge may consist of a High Voltage Wheeling Access Charge and a Low Voltage Wheeling Access Charge.

3.114 Wheeling Out.  Except for Existing Rights exercised under an Existing Contract in accordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled Grid for the transmission of Energy from a Generating Unit located within the ISO Controlled Grid to serve a Load located outside the transmission and Distribution System of a Participating TO.

3.115 Wheeling Through.  Except for Existing Rights exercised under an Existing Contract in accordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled Grid for the transmission of Energy from a resource located outside the ISO Controlled Grid to serve a Load located outside the transmission and Distribution System of a Participating TO.

3.116 Wheeling.  Wheeling Out or Wheeling Through.
3.117 Wholesale Customer.  A person wishing to purchase Energy and Ancillary Services at a Bulk Supply Point or a Scheduling Point for resale.

3.118 Omitted.

PDF page 29

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

4.  Eligibility.
Wholesale tTransmission service over a Participating TO’s system shall be provided only to Eligible Customers who qualify for transmission service under the ISO Tariff. Any dispute as to whether a customer is eligible for wholesale transmission service shall be resolved by FERC and any dispute as to whether an End-Use Customer is eligible for retail transmission service or retail interconnection service under this TO Tariff shall be resolved by the Local Regulatory Authority.

PDF page 30

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

7.  Billing and Payment.
7.1  End-Users.
Billing and payment rules applicable to End-Users shall be pursuant to the then-current rules of the applicable Local Regulatory Authority and, as applicable, Appendix XV. 7.2  Wholesale Customers.

7.2.1 Billing Procedure.
7.2.1.1  Low Voltage Access Charge Revenues.  Within a reasonable time after the Participating TO receives from the ISO the monthly kilowatt-hours to which the Low Voltage Access Charge applies, the Participating TO shall submit an invoice to the applicable UDC, MSS or Scheduling Coordinator for the Low Voltage Access Charge billing.  The invoice shall be paid by the UDC, MSS, or Scheduling Coordinator within twenty days of receipt.  All payments shall be made in immediately available funds payable to the Participating TO, or by wire transfer to a bank named by the Participating TO.

7.2.1.2  Reliability Services Revenues.  The Participating TO shall submit an invoice to applicable Wheeling customers for billings under the Reliability Services Rate Schedule.  The invoice shall be paid by the Wheeling Customer within twenty days of receipt.  All payments shall be made in immediately available funds payable to the Participating TO, or by wire transfer to a bank named by the Participating TO. 7.2.2  Interest on Unpaid Balances.

Interest on any unpaid amounts (including amounts placed in escrow) shall be calculated in accordance with the methodology specified for interest on refunds in

PDF page 31

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

FERC’s regulations at 18 C.F.R. Section 35.19a(a)(2)(iii).  Interest on delinquent amounts shall be calculated from the due date of the bill to the date of payment.  When payments are made by mail, bills shall be considered as having been paid on the date of receipt by the Participating TO.

7.2.3  Default.
In the event the UDC, MSS, Scheduling Coordinator, or Wheeling Customer fails, for any reason other than a billing dispute as described below, to make payment to the Participating TO on or before the due date as described above, and such failure of payment is not corrected within 30 calendar days after the Participating TO notifies the applicable UDC, MSS, Scheduling Coordinator, or Wheeling Customer to cure such failure, a default by the UDC, MSS, Scheduling Coordinator, or Wheeling Customer shall be deemed to exist.  Upon the occurrence of a default, the Participating TO may initiate a proceeding with FERC (or the Local Regulatory Authority for a Local Publicly Owned Electric Utility) to terminate service but shall not terminate service until FERC, or the Local Regulatory Authority, as applicable, so approves any such request.  In the event of a billing dispute between the Participating TO and the UDC, MSS, Scheduling Coordinator, or Wheeling Customer, the Participating TO will continue to provide service under this TO Tariff as long as the applicable UDC, MSS, Scheduling Coordinator, or Wheeling Customer:  (i) continues to make all payments not in dispute, and (ii) pays into an independent escrow account the portion of the invoice in dispute, pending resolution of such dispute.  If the UDC, MSS, Scheduling Coordinator, or Wheeling Customer fails to meet these two requirements for continuation of service, then the Participating TO

PDF page 32

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

may provide notice to the UDC, MSS, Scheduling Coordinator, or Wheeling Customer of its intention to suspend service in sixty days, in accordance with FERC policy. 7.3  Wheeling and Usage Charge Revenues.

The ISO, pursuant to the ISO Tariff, shall pay to Participating TOs all Wheeling and Usage Charge revenues, excluding Usage Charge revenues payable to FTR Holders.

PDF page 33

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

8.  Obligation to Interconnect or Construct Transmission Expansions & Facility Upgrades.

8.1  Participating TO Obligation to Interconnect.
The Participating TO shall, at the request of a third party pursuant to Section 10, interconnect its system to the wholesale generation or wholesale load of such third party, or modify an existing wholesale Interconnection.  Interconnections under this TO Tariff shall be available to entities eligible to request Interconnection consistent with the provisions of Section 210(a) of the FPA.  Interconnections requested by entities or individuals that are not so eligible shall be governed by the Local Regulatory Authority. The procedures for Interconnections of wholesale generation to the ISO Controlled Grid shall be governed by the ISO Tariff, and if applicable, Appendix VII to the TO Tariff. Interconnections of Large Loads are governed by Appendix XV to the TO Tariff. 8.1.1  Interconnection to Transmission System.

Interconnection must be consistent with Good Utility Practice, in conformance with all Applicable Reliability Criteria, all applicable statutes, regulations, and ISO reliability criteria for the ISO Controlled Grid.  The Participating TO will not accommodate the Interconnection if doing so would impair system reliability, or would otherwise adversely affect the ability of the Participating TO to honor its Encumbrances existing as of the time a party submits its Interconnection Application.  The Participating TO shall identify any such adverse effect on its Encumbrances in the System Impact Study performed pursuant to Section 10.7.  To the extent the Participating TO determines that the

PDF page 34

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

Interconnection will have an adverse effect on Encumbrances, the party requesting Interconnection shall mitigate such adverse effect.

8.1.1.1  Letter Agreement.
Pursuant to Section 12 of Appendix DD of the ISO Tariff, prior to executing an Interconnection Agreement, a party seeking Interconnection may, in order to advance the implementation of its Interconnection, request, and the Participating TO shall offer the party, a Letter Agreement, a pro forma version of which is set forth in Appendix XIII to the TO Tariff, that authorizes the Participating TO to begin engineering, design, and procurement of long lead-time items, or construction necessary for the establishment of the Interconnection.  However, Participating TO shall not be obligated to offer a Letter Agreement if the party seeking Interconnection is in Dispute Resolution as a result of an allegation that the party seeking Interconnection has failed to meet any milestones or comply with any prerequisites specified in the ISO Tariff.  The Letter Agreement is an optional procedure.  The Letter Agreement shall provide for the party seeking Interconnection to pay the cost of all activities authorized by the party and to make advance payments or provide other satisfactory security for such costs. Following a party seeking Interconnection’s request for a Letter Agreement, the Participating TO shall prepare and tender to the party seeking Interconnection a draft Letter Agreement in the form of the Participating TO’s FERC-approved Letter Agreement as set forth in Appendix XIII to the TO Tariff, including draft exhibits that include the proposed scope of work, estimated costs, payments, financial security and milestones, as applicable.  The party seeking Interconnection shall provide written comments, or notification of no comments, to the draft exhibits within thirty (30)

PDF page 35

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

Calendar Days.  The Participating TO and the party seeking Interconnection shall negotiate concerning any disputed provisions of the exhibits to the draft Letter Agreement for not more than ninety (90) Calendar Days after the Participating TO tenders the draft Letter Agreement to the party seeking Interconnection.  If the party seeking Interconnection determines that negotiations are at an impasse, it may request termination of the negotiations at any time after tender of the draft Letter Agreement and request submission of the unexecuted Letter Agreement with FERC or initiate dispute resolution procedures pursuant to Section 14 of this TO Tariff.  If the party seeking Interconnection requests termination of the negotiations, but within ninety (90) Calendar Days after the Participating TO tenders the draft Letter Agreement to the party seeking Interconnection, fails to request either the filing of the unexecuted Letter Agreement or initiate dispute resolution procedures, it shall be deemed to have withdrawn its request for a Letter Agreement and the Participating TO shall have no further obligation to enter into a Letter Agreement, unless an extension is mutually agreed to by the parties.  The Participating TO shall provide to the party seeking Interconnection a final Letter Agreement within fifteen (15) Business Days after the completion of the negotiation process.

Following submission of the final Letter Agreement to the party seeking Interconnection, the party shall either: (i) execute two originals of the tendered Letter Agreement and return them to the Participating TO; or (ii) request in writing that the Participating TO file with FERC a Letter Agreement in unexecuted form.  As soon as practicable, but not later than ten (10) Business Days after receiving either the two executed originals of the tendered Letter Agreement (if it does not conform with a FERC-approved Letter

PDF page 36

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

Agreement) or the request to file an unexecuted Letter Agreement, the Participating TO shall file the Letter Agreement with FERC, together with its explanation of any matters as to which the party seeking Interconnection and the Participating TO disagree and support for the costs that the Participating TO proposes to charge to the party seeking Interconnection under the Letter Agreement.  An unexecuted Letter Agreement should contain terms and conditions deemed appropriate by the Participating TO for the Interconnection request.

If the party seeking Interconnection executes the final Letter Agreement, the Participating TO and the party seeking Interconnection shall perform their respective obligations in accordance with the terms of the Letter Agreement, subject to modification by FERC.  Upon submission of an unexecuted Letter Agreement, the party seeking Interconnection and the Participating TO shall promptly comply with the unexecuted Letter Agreement, subject to modification by FERC.8.1.2  Costs Associated with Interconnection.

Each party requesting Interconnection shall pay the costs of planning, installing, owning, operating, and maintaining any Direct Assignment Facilities and, if applicable, any Reliability Upgrades required to provide the requested Interconnection.  In addition, such party shall implement all existing operating procedures necessary to safely and reliably interconnect such party’s wholesale load to the facilities of the Participating TO and to ensure the ISO Controlled Grid’s conformance with the ISO Grid Planning Criteria, and shall bear all costs of implementing such operating procedures.  Any additional costs associated with accommodating the Interconnection shall be allocated

PDF page 37

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

in accordance with the cost responsibility methodology set forth in the ISO Tariff for transmission expansions or upgrades.

8.1.3  Interconnection Agreement.
Pursuant to Section 10.4, 10.7.1, or 10.9.1, a party requesting Interconnection shall request in writing that the Participating TO tender to such party an Interconnection Agreement that will be filed with FERC, or the Local Regulatory Authority, in the case of a Local Publicly Owned Electric Utility.  The Interconnection Agreement will include, without limitation, cost responsibilities and payment provisions for any engineering, equipment, construction, ownership, operation and maintenance costs for any Direct Assignment Facilities, any Reliability Upgrades, and for any other mitigation measures. For an Interconnection request to remain a Completed Interconnection Application, the party requesting the Interconnection shall execute the Interconnection Agreement and return it to the Participating TO within thirty (30) Business Days of receipt.  Alternatively, if an Eligible Customer requesting the Interconnection requests the Participating TO to file an unexecuted Interconnection Agreement and commits to abide by the terms, conditions, and cost assignments determined to be just and reasonable under the ISO ADR Procedures, including any determination by FERC or on appeal of a FERC determination in accordance with that process, the Participating TO shall promptly file an unexecuted Interconnection Agreement.  Provided, however, that if the ISO ADR Procedures concerns whether the requesting entity is an Eligible Customer, the Participating TO shall not be obligated to file an unexecuted Interconnection Agreement or commence construction of the Interconnection facilities or incur other costs under the Interconnection Agreement until a final order determining the just and reasonable rates,

PDF page 38

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

terms, and conditions for such Interconnection Agreement has been issued by the applicable court or regulatory authority.  The Interconnection Agreement will set forth a payment schedule that enables the Participating TO to recover its costs.  If the applicant elects not to execute the Interconnection Agreement and does not request the Participating TO to file an unexecuted Interconnection Agreement, its Completed Interconnection Application shall be deemed withdrawn, and the applicant shall reimburse to the Participating TO all costs reasonably incurred in processing the application not covered by any System Impact Study Agreement or Facilities Study Agreement.

8.1.4 Due Diligence to Construct.
The Participating TO shall use due diligence to construct, within a reasonable time, any Direct Assignment Facilities and any Reliability Upgrades that it is obligated to construct pursuant to this TO Tariff.  The Participating TO’s obligation to build will be subject to:

1) its ability, after making a good faith effort, to obtain any necessary approvals and property rights under applicable federal, state, and local laws; 2) the presence of a cost recovery mechanism with cost responsibility assigned in accordance with the ISO Tariff or applicable FERC precedent; and 3) a signed Interconnection Agreement or a signed Expedited Interconnection Agreement or, by mutual agreement of the parties, FERC acceptance for filing of an unexecuted Interconnection Agreement.

8.1.5  Energization.
The Participating TO shall not be obligated to energize, nor shall the wholesale load be entitled to have its interconnection to the ISO Controlled Grid energized, unless and until an Interconnection Agreement has been executed, or filed at FERC pursuant to

PDF page 39

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

Section 8.1.3, and becomes effective and such wholesale load has demonstrated to the ISO's reasonable satisfaction that it has complied with all of the requirements of the ISO Tariff and the requirements of this TO Tariff.

8.1.6  Coordination with ISO on Interconnection Requests.
The Participating TO shall coordinate with the ISO, pursuant to the provisions of the TCA, in developing Interconnection standards and guidelines for processing Interconnection requests under this TO Tariff.

8.2  Participating TO Obligation to Construct Transmission Expansions or Facility Upgrades.

The Participating TO shall be obligated to:  (1) perform System Impact or Facility Studies where the Project Sponsor or the ISO agrees to pay the study cost and specifies the project objectives to be achieved, and (2) build transmission additions and facility upgrades where the Participating TO is obligated to construct or expand facilities in accordance with and subject to the limitations of Section 24 of the ISO Tariff and this TO Tariff.

8.2.1  Obligation to Construct.
A Participating TO shall not be obligated to construct or expand transmission facilities or system upgrades unless and until the conditions stated in Section 9.2.1 hereof have been satisfied.

8.2.2  Local Furnishing Participating TO Obligation to Construct.
A Local Furnishing Participating TO shall not be obligated to construct or expand transmission facilities or system upgrades unless and until the conditions stated in Section 9.3.3 hereof have been satisfied.

PDF page 40

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

8.3  Request for FERC Deference Regarding Need Determination.
It is intended that FERC grant substantial deference to the factual determinations of the ISO, (including the ISO’s ADR Procedures), the CPUC, WECC, or RTG coordinated planning processes as to the need for or construction of a facility, the need for full cost recovery, and the allocation of costs.

PDF page 41

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

9.  Expansion Process.
9.1  Determination of Facilities.
A Participating TO shall perform a Facilities Study in accordance with this Section where (1) the Participating TO is obligated to construct or expand facilities in accordance with Section 24 of the ISO Tariff and this TO Tariff; (2) a Market Participant agrees to pay the costs of the Facilities Study and specifies the project objectives to be achieved in terms of increased capacity or reduced congestion; or (3) the Participating TO is required to perform a Facilities Study pursuant to the ISO Tariff. Eligible expansions on behalf of Large Loads are not governed by this Section 9 but are instead governed by Appendix XV to the TO Tariff.

9.1.1  Payment of Facilities Study’s Cost.
9.1.1.1  Market Participant to Pay for Facilities Study.
Where a Market Participant requests a Facilities Study and the need for the transmission addition or upgrade has not yet been established in accordance with the procedures established herein and the ISO Tariff, the Market Participant shall pay the cost of the Facilities Study.

9.1.1.2  Project Sponsor or Project Proponent to Pay for Facilities Study. Where the facilities to be added or upgraded have been determined to be needed in accordance with the procedures established herein and the ISO Tariff, the Project Sponsor, Project Proponent, or the ISO requesting the study shall pay the reasonable cost of the Facilities Study.  When the Participating TO is the Project Sponsor in accordance with the ISO Tariff, the costs of the Facilities Study shall be recovered through the Access Charges and transmission rates.

PDF page 42

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

9.1.1.3  Principal Beneficiaries to Pay for Facilities Study.
Where the facilities to be added or upgraded have been determined to be needed and the principal beneficiaries have been identified by the ISO or ISO ADR Procedures in accordance with the ISO Tariff, the Project Sponsor and the identified principal beneficiaries shall pay the reasonable cost of the Facilities Study, in such proportions as may be agreed, or, failing agreement, as determined in accordance with the ISO ADR Procedures.

9.1.2  Payment Procedure.
Where a Facilities Study is being conducted pursuant to this TO Tariff, the Participating TO shall, within thirty days of the receipt of all reasonably required information, tender to the Market Participant, Project Sponsor, Project Proponent, ISO, or identified principal beneficiaries, as the case may be, a Facilities Study Agreement that defines the scope, content, assumptions, and terms of reference for such study, the estimated time required to complete it, and such other provisions as the parties may reasonably require and pursuant to which such Market Participant, Project Sponsor, Project Proponent, the ISO, or identified principal beneficiaries agree to reimburse the Participating TO the reasonable cost of performing the required Facilities Study.  If the Market Participant, Project Sponsor, Project Proponent, the ISO, or identified principal beneficiaries, as the case may be, agree to the terms of the Facilities Study Agreement, they shall execute the Facilities Study Agreement and return it to the Participating TO within ten Business Days.  Alternatively, if the Market Participant, Project Sponsor, Project Proponent, the ISO, or identified principal beneficiaries, as the case may be, request the Participating TO to proceed with the Facilities Study and commit to abide by the terms, conditions,

PDF page 43

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

and cost assignments ultimately determined under the ISO ADR Procedures, including any determination by FERC or appeal of a FERC determination in accordance with that process, the Participating TO shall promptly proceed with the Facilities Study, and the parties shall submit the disputed terms for resolution under the ISO’s ADR Procedures. 9.1.3  Facilities Study Procedures.

Upon receipt of an executed Facilities Study Agreement or alternative request to proceed as provided for in Section 9.1.2, a copy of which has been provided to the ISO by the party requesting the Facilities Study, the Participating TO will use due diligence to complete the required Facilities Study within a sixty (60) day period.  If the Participating TO is unable to complete the Facilities Study in the allotted time period, the Participating TO shall notify the Market Participant and provide an estimate of the time needed to reach a final determination along with an explanation of the reasons that additional time is required to complete the study.  If additional time is required, the Participating TO will use best efforts to complete the study within 10 months, provided adequate information is provided by all the parties.

9.2  Obligation to Build.
9.2.1  Due Diligence to Construct.
Subject to Section 9.3.3 of this TO Tariff, the Participating TO shall use due diligence to construct, within a reasonable time, additions or upgrades to its transmission system that it is obligated to construct pursuant to the ISO Tariff and this TO Tariff. Alternatively, if a Market Participant requests the Participating TO to file an unexecuted Participation Agreement and commits to abide by the terms, conditions, and cost assignments determined to be just and reasonable under the ISO ADR Procedures,

PDF page 44

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

including any determination by FERC or on appeal of a FERC determination in accordance with that process, the Participating TO shall promptly file an unexecuted Participation Agreement.  Provided, however, that if the ISO ADR Procedures concerns whether the requesting entity is an Eligible Customer, the Participating TO shall not be obligated to file an unexecuted Participation Agreement or commence construction of the additions or upgrades or incur other costs under the Participation Agreement until a final order determining the just and reasonable rates, terms, and conditions for such Participation Agreement has been issued by the applicable court or regulatory authority. The Participating TO’s obligation to build will be subject to:  1) its ability, after making a good faith effort, to obtain the necessary approvals and property rights under applicable federal, state, and local laws; 2) the presence of a cost recovery mechanism with cost responsibility assigned in accordance with the ISO Tariff; and 3) a signed Participation Agreement.  The Participating TO will not construct or expand its existing or planned transmission system, if doing so would impair system reliability as determined through systems analysis based on the Applicable Reliability Criteria.

9.2.2  Delay in Construction or Expansion.
If any event occurs that will materially affect the time for completion of new facilities, or the ability to complete them, the Participating TO shall promptly notify:  (1) the Project Sponsor with regard to facilities determined to be needed; (2) the Parties to the Participation Agreement with regard to facilities determined to be needed pursuant to the ISO Tariff where principal beneficiaries were identified; and (3) the ISO.  In such circumstances, the Participating TO shall, within thirty days of notifying such Project Sponsor, Parties to the Participation Agreement, and the ISO of such delays, convene a

PDF page 45

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

technical meeting with such Project Sponsor, Parties to the Participation Agreement, and the ISO to discuss the circumstances which have arisen and evaluate any options available.  The Participating TO also shall make available to such Project Sponsor, Parties to the Participation Agreement, and the ISO, as the case may be, studies and work papers related to the cause and extent of the delay and the Participating TO’s ability to complete the new facilities, including all information that is in the possession of the Participating TO that is reasonably needed to evaluate the alternatives. 9.2.2.1  Alternatives to the Original Facility Additions.

If the review process of Section 9.2.2 determines that one or more alternatives exist to the originally planned construction project, the Participating TO shall present such alternatives for consideration to the Project Sponsor, Parties to the Participation Agreement, and the ISO, as the case may be.  If upon review of any alternatives, such Project Sponsor, the ISO, or Parties to the Participation Agreement wish to evaluate or to proceed with one of the alternative additions or upgrades, such Project Sponsor, the ISO, or Parties to the Participation Agreement may request that the Participating TO prepare a revised Facility Study pursuant to Sections 9.1.1, 9.1.2, and 9.1.3 of this TO Tariff.  In the event the Participating TO concludes that no reasonable alternative exists to the originally planned addition or upgrade and the Project Sponsor or Parties to the Participation Agreement or the ISO disagree, the dispute shall be resolved pursuant to the ISO ADR Procedure.

9.2.2.2  Refund Obligation for Unfinished Facility Additions.
If the Participating TO and the Project Sponsor, the ISO, or Parties to the Participation Agreement, as the case may be, mutually agree that no other reasonable alternatives

PDF page 46

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

exist, the obligation to construct the requested additions or upgrades shall terminate and any deposit not yet applied toward the expended project costs shall be returned with interest pursuant to FERC Regulation 35.19(a)(2)(iii).  However, the Project Sponsor and any identified principal beneficiaries, as the case may be, shall be responsible for all costs prudently incurred by the Participating TO through the time the construction was suspended.

9.3  Provisions Relating To Transmission Construction On the Systems Of Other TOs.

9.3.1  Responsibility for Third Party Additions.
A Participating TO shall not be responsible for making arrangements for any engineering, permitting, and construction of transmission or distribution facilities on the system(s) of any other entity or for obtaining any regulatory approval for such facilities. The Participating TO will undertake reasonable efforts through the coordinated planning process to assist in making such arrangements, including, without limitation, providing any information or data required by such other electric system pursuant to Good Utility Practice.

9.3.2  Coordination of Third-Party System Additions.
Where transmission additions or upgrades being built pursuant to the ISO Tariff require additions or upgrades on other systems, to the extent consistent with Section 9.3.3 of this TO Tariff, the Participating TO shall coordinate construction on its own system with the construction required by others.  The Participating TO, after consultation with the ISO, the Project Sponsor, and Parties to the Participation Agreement, as the case may be, may defer construction if the new transmission facilities on another system cannot

PDF page 47

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

be completed in a timely manner.  The Participating TO shall notify such Project Sponsor, Parties to the Participation Agreement, and the ISO, in writing of the basis for any decision to defer construction and the specific problems which must be resolved before it will initiate or resume construction of the new facilities.  Within forty Business Days of receiving written notification by the Participating TO of its intent to defer construction pursuant to this section, such Project Sponsor, Parties to the Participation Agreement, or the ISO may challenge the decision in accordance with the ISO ADR Procedure.

9.3.3  Expansion by “Local Furnishing Participating TOs”.
Notwithstanding any other provision of this TO Tariff, prior to requesting that a Local Furnishing Participating TO construct or expand facilities, the ISO or Project Sponsor shall tender (or cause to be tendered) an application under Section 211 of the FPA requesting FERC to issue an order directing the Local Furnishing Participating TO to construct or expand facilities as necessary to provide transmission service as determined pursuant to the ISO Tariff.  Such Local Furnishing Participating TO shall thereafter, within ten Business Days of receiving a copy of the Section 211 application, waive its right to a request for service under Section 213(a) of the FPA and to the issuance of a proposed order under Section 212(c) of the FPA.  Upon receipt of a final order from FERC under Section 211 of the FPA that is no longer subject to rehearing or appeal, such Local Furnishing Participating TO shall construct or expand facilities to comply with that FERC order and shall transfer to the ISO Operational Control over the Local Furnishing Participating TO’s expanded transmission facilities in accordance with the ISO Tariff.

PDF page 48

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

10.  Interconnection Process.
10.1  Applicability.
All requests for Interconnection of wholesale load directly to the ISO Controlled Grid from parties eligible to request such Interconnection consistent with Section 210(a) of the FPA shall be processed pursuant to the provisions of this Section 10., except requests for interconnection on behalf of Large Loads to be located in the ISO BAA shall be subject to the procedures in Appendix XV of the TO Tariff.  All requests for Interconnection of wholesale generation directly to the ISO Controlled Grid shall be processed pursuant to the provisions of the ISO Tariff, and if applicable, Appendix VII of the TO Tariff. Requests for interconnection on behalf of Large Loads by retail transmission customers of Participating TO shall be subject to the procedures in Appendix XV of the TO Tariff and the Local Regulatory Authority, as applicable.

10.2  Applications.
A party requesting Interconnection shall submit a written Interconnection Application which provides the information required in Section 10.3 to the Participating TO and shall send a copy of the application to the ISO.  The Participating TO shall time-stamp the application to establish study priority.

10.3  Interconnection Application.
An Interconnection Application shall provide all of the information listed in 18 CFR § 2.20, including, but not limited to, the following:

(i)  The identity, address, telephone number, and facsimile number of the party requesting Interconnection;

PDF page 49

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

(ii)  The Interconnection point(s) to the ISO Controlled Grid contemplated by the applicant;

(iii)  The resultant (or new) maximum amount of Interconnection capacity;
(iv)  The proposed date for energizing the Interconnection and the term of the Interconnection service;

(v)  Such other information as the Participating TO reasonably requires to process the application.

In addition to the information specified above, the following information may also be provided in order to properly evaluate system conditions:

(vi)  The electrical location of the source of the power (if known) to be transmitted pursuant to the applicant’s request for Interconnection.  If the source of the power is not known, a system purchase will be assumed.

Within ten (10) Business Days after receipt of an Interconnection Application, the Participating TO shall determine whether the application is complete (“Completed Interconnection Application”).  Wherever possible, the Participating TO will attempt to remedy deficiencies in the Interconnection Application through informal communications with the applicant.  If such efforts are unsuccessful, the Participating TO shall return the Interconnection Application to the applicant.  The Participating TO will treat the information provided in the Interconnection Application, including the applicant’s identity, as confidential at the request of the applicant except to the extent that disclosure of this information is required by this TO Tariff, by regulatory or judicial order, for reliability purposes pursuant to Good Utility Practice, or pursuant to RTG or ISO transmission

PDF page 50

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

information sharing agreements.  The Participating TO shall treat this information consistent with the standards of conduct contained in Part 37 of FERC’s regulations. 10.4  Review of Completed Interconnection Application.

After receiving a Completed Interconnection Application, the Participating TO will determine on a non-discriminatory basis whether a System Impact Study is required. Whenever the Participating TO determines that a System Impact Study is not required and that neither Reliability Upgrades nor changes in existing operating procedures are required, the Participating TO shall notify the applicant within fifteen (15) Business Days of the Completed Application Date.  If the Interconnection can be accommodated without any Direct Assignment Facilities, then within thirty (30) Business Days of such notice from the Participating TO, the applicant shall request the Participating TO to tender to the applicant an Interconnection Agreement within thirty (30) Business Days of such request.  The Participating TO shall tender to the applicant an Interconnection Agreement as provided in Section 8.1.3.  If the Participating TO determines, upon the review of the Completed Interconnection Application, that Direct Assignment Facilities are required, the Participating TO shall tender to the applicant a Facilities Study Agreement within twenty (20) Business Days of the Completed Application Date and continue the interconnection process pursuant to Section 10.8.

10.5  Notice of Need for System Impact Study.
If the Participating TO determines that a System Impact Study is necessary to accommodate the requested Interconnection, the Participating TO shall so inform the applicant, as soon as practicable.  In such cases, the Participating TO shall within twenty (20) Business Days of receipt of a Completed Interconnection Application, tender

PDF page 51

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

a System Impact Study Agreement that defines the scope, content, assumptions and terms of reference for such study to be completed by the Participating TO; the estimated time required to complete it; and such other provisions as the parties may reasonably require, and pursuant to which the applicant shall agree to reimburse the Participating TO for the reasonable actual costs of performing the required System Impact Study.  A description of the Participating TO’s transmission assessment practices for completing a System Impact Study is provided in the Participating TO’s FERC Form 715.  For an Interconnection request to remain a Completed Interconnection Application, the applicant shall execute the System Impact Study Agreement and return it to the Participating TO within ten (10) Business Days together with payment for the reasonable estimated cost of performing the System Impact Study. Alternatively, if the applicant requests the Participating TO to proceed with the System Impact Study and commits to abide by the terms, conditions, and cost assignments ultimately determined under the ISO ADR Procedures, including any determination by FERC or appeal of a FERC determination in accordance with that process, the Participating TO shall promptly proceed with the System Impact Study provided that such request is accompanied by payment for the reasonable estimated cost of the System Impact Study, and the parties shall submit the disputed terms for resolution under the ISO’s ADR Procedures.  If the applicant elects not to execute a System Impact Study Agreement, and does not request that the Participating TO proceed with the System Impact Study, its application shall be deemed withdrawn, and the applicant shall reimburse to the Participating TO all costs reasonably incurred in processing the application.

PDF page 52

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

10.6  System Impact Study Cost Reimbursement and Agreement
10.6.1  Cost Reimbursement.
The System Impact Study Agreement shall clearly specify the charge, based on the Participating TO’s estimate of the cost and time for completion of the System Impact Study.  The charge shall not exceed the reasonable actual cost of the study.  In performing the System Impact Study, the Participating TO shall rely, to the extent reasonably practicable, on existing transmission planning studies.  The applicant will not be assessed a charge for such existing studies; however, the applicant will be responsible for the reasonable charges associated with any modifications to existing planning studies that are reasonably necessary to evaluate the impact of the applicant’s request.

10.6.2  Multiple Parties.
If multiple parties request Interconnection at the same location, the Participating TO may conduct a single System Impact Study.  The costs of that study shall be pro-rated among the parties requesting Interconnection.

10.7  System Impact Study Procedures.
Upon receipt of an executed System Impact Study Agreement or initiation of the ISO ADR Procedures and receipt of payment for estimated study costs, the Participating TO will use due diligence to complete the required System Impact Study within a sixty (60) calendar day period.  The System Impact Study will identify whether any Direct Assignment Facilities or Reliability Upgrades are necessary, as well as whether any transmission additions or upgrades are necessary to serve a wholesale load.  The System Impact Study will also identify any adverse impact on Encumbrances existing as

PDF page 53

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

of the applicant’s Completed Application Date.  In the event that the Participating TO is unable to complete the required System Impact Study within such time period, it shall so notify the applicant, in writing, and provide an estimated completion date along with an explanation of the reasons why additional time is required to complete the required studies.  A copy of the completed System Impact Study and related work papers shall be made available to the applicant and the ISO.  The Participating TO will use the same due diligence in completing the System Impact Study for others as it uses when completing studies for its affiliated UDC load.  The Participating TO shall notify the applicant immediately upon completion of the System Impact Study.

10.7.1  Procedures Upon Completion of System Impact Study.
Within fifteen (15) Business Days of completion of the System Impact Study, the Participating TO shall notify the applicant whether the transmission system will be adequate to accommodate all of a request for Interconnection.  If no costs are likely to be incurred for any Direct Assignment Facilities, any Reliability Upgrades, or implementing any operating procedures, then within thirty (30) Business Days of receipt of the completed System Impact Study, the applicant shall request the Participating TO to tender an Interconnection Agreement within thirty (30) Business Days of such request.  The Participating TO shall tender to the applicant an Interconnection Agreement as provided in Section 8.1.3.  If costs are likely to be incurred to accommodate a request for Interconnection, the Participating TO shall tender to the applicant a Facilities Study Agreement pursuant to Section 10.8.

PDF page 54

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

10.8  Notice of Need for Facilities Study.
If a System Impact Study indicates that additions or upgrades to the ISO Controlled Grid are needed to satisfy an applicant’s request for Interconnection, the Participating TO shall, within fifteen (15) Business Days of the completion date of the System Impact Study tender to the applicant a Facilities Study Agreement that defines the scope, content, assumptions and terms of reference for such study; the estimated time required to complete the required study; and such other provisions as the parties may reasonably require, and pursuant to which the applicant agrees to reimburse the Participating TO for the reasonable actual costs of performing the required Facilities Study.   For an Interconnection request to remain a Completed Interconnection Application, the applicant shall execute the Facilities Study Agreement and return it to the Participating TO within ten (10) Business Days together with payment for the reasonable estimated cost of performing the Facilities Study.  Alternatively, if the applicant requests the Participating TO to proceed with the Facilities Study and commits to abide by the terms, conditions, and cost assignments ultimately determined under the ISO ADR Procedures, including any determination by FERC or appeal of a FERC determination in accordance with that process, the Participating TO shall promptly proceed with the Facilities Study provided that such request is accompanied by payment for the reasonable estimated cost of the Facilities Study, and the parties shall submit the disputed terms for resolution under the ISO ADR Procedures.  If the applicant elects not to execute a Facilities Study Agreement and does not request that the Participating TO proceed with the Facilities Study, its application shall be deemed withdrawn and the applicant shall reimburse to the Participating TO all costs reasonably

PDF page 55

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

incurred in processing the application not covered by the System Impact Study Agreement.

10.9  Facilities Study Procedures.
Upon receipt of an executed Facilities Study Agreement or initiation of the ISO ADR Procedures and receipt of payment for the estimated study costs, the Participating TO will use due diligence to complete the required Facilities Study within a sixty (60) calendar day period.  In the event that the Participating TO is unable to complete the required Facilities Study within such time period, it shall so notify the applicant, in writing, and provide an estimated completion date along with an explanation of the reasons why additional time is required to complete the required studies.  A copy of the completed Facilities Study shall be made available to the applicant.

10.9.1  Execution of Interconnection Agreement.
Within thirty (30) Business Days of receipt of the completed Facilities Study, the applicant shall request the Participating TO to tender an Interconnection Agreement within thirty (30) Business Days of such request.  The Participating TO shall tender to the applicant an Interconnection Agreement as provided in Section 8.1.3. 10.10  Partial Interim Service.

If the Participating TO determines that there will not be adequate transmission capability to satisfy the full amount requested in a Completed Interconnection Application, the Participating TO nonetheless shall be obligated to offer and provide the portion of the requested Interconnection that can be accommodated without any additional Direct Assignment Facilities or Reliability Upgrades.  However, the Participating TO shall not be obligated to provide the incremental amount of requested Interconnection that

PDF page 56

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

requires such additional facilities or upgrades until such facilities or upgrades have been placed in service.

10.11  Expedited Interconnection Procedures.
In lieu of the procedures set forth above, the applicant shall have the option to expedite the processing of its Completed Interconnection Application.  In order to exercise this option, the applicant shall submit in writing a Request for Expedited Interconnection Procedures to the Participating TO within ten (10) Business Days after receiving a copy of the System Impact Study for the proposed Interconnection.  Within ten (10) Business Days after receiving a Request for Expedited Procedures, the Participating TO shall tender an Expedited Interconnection Agreement that requires the applicant to compensate the Participating TO for all costs reasonably incurred pursuant to the terms of this TO Tariff for processing the Completed Interconnection Application and providing the requested Interconnection.  While the Participating TO agrees to provide the applicant with its best estimate of the costs of any needed Direct Assignment Facilities and, if applicable, Reliability Upgrades and other charges that may be incurred, unless otherwise agreed by the parties, such estimate shall not be binding and the applicant must agree in writing to compensate the Participating TO for all actual Interconnection costs reasonably incurred pursuant to the provisions of this TO Tariff.  The applicant shall execute and return such Expedited Interconnection Agreement within ten (10) Business Days of its receipt or the applicant's request for Interconnection will cease to be a Completed Interconnection Application and will be deemed terminated and withdrawn.  In that event, the applicant shall reimburse the Participating TO for all costs

PDF page 57

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

reasonably incurred in processing the application not covered by the terms of the System Impact Study Agreement.

PDF page 58

Southern California Edison Company

FERC Electric Tariff, Third Revised Volume No. 6

13.  Creditworthiness.
13.1  UDCs, MSSs, and Scheduling Coordinators Using the Participating TO's Low Voltage Transmission Facilities.

For the purpose of determining the ability of a UDC, MSS, and Scheduling Coordinator to meet its obligations related to service using the Participating TO's Low Voltage Transmission Facilities hereunder, the Participating TO may require reasonable credit review procedures for the UDC, MSS, or Scheduling Coordinator.  This review shall be made in accordance with standard commercial practices.  In addition, the Participating TO may require the UDC, MSS, or Scheduling Coordinator to provide and maintain in effect during the term of the service, an unconditional and irrevocable letter of credit as security to meet its responsibilities and obligations under this TO Tariff, or an alternative form of security proposed by the UDC, MSS, or Scheduling Coordinator and acceptable to the Participating TO, and consistent with commercial practices established by the Uniform Commercial Code, that protect the Participating TO against the risk of non- payment.

13.2  End-Users.
Creditworthiness rules applicable to End-Users shall be pursuant to the then-current rules of the applicable Local Regulatory Authority. and, as applicable, Appendix XV.