ER26-1479-002 · 2026-11-16 · PJM Interconnection, L.L.C.

Motion to Withdraw Filing and Terminate Docket in Deference to New Proceeding

PDF page 1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

PJM Interconnection, L.L.C.

)
Docket Nos. ER26-1479-002

MOTION TO WITHDRAW FILING AND TERMINATE PROCEEDING
IN DEFERENCE TO NEW DOCKET

Pursuant to Rule 212 of the Federal Energy Regulatory Commission’s
(“Commission”) Rules of Practice and Procedures,1 and section 35.17(a) of the Commission Rules and Regulations,2 PJM Interconnection, L.L.C. (“PJM”) moves to withdraw its August 17, 2026 filing in this proceeding (“August 17 Filing”),3 in which PJM proposed revisions to the PJM Open Access Transmission Tariff (“Tariff”) to comply with the Commission’s directives in its Order on Rehearing, Clarification, Compliance Filing, and Paper Hearing regarding the terms and conditions of service for Co-Location Arrangements (“Co-Location Compliance Order”).4

Good cause exists to grant this motion.  The Commission’s regulations permit a public utility to withdraw a pending rate filing that “has not become effective and upon which no Commission or delegated order has been issued.”5  That is the case here. PJM is submitting later today a filing pursuant to section 205 of the Federal Power Act (“FPA”),6 in which PJM will submit proposed Tariff revisions in response to the

1 18 C.F.R. § 385.212.
2 18 C.F.R. § 35.17.
3 PJM Interconnection, L.L.C., Compliance Filing of PJM Interconnection, L.L.C. in Response to Order on Rehearing, Clarification, Compliance Filing, and Paper Hearing in Docket Nos. EL25-49-002, et al., Docket No. ER26-1479-002 (Aug. 17, 2026).
4 PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026).
5 18 C.F.R. § 35.17(a).
6 16 U.S.C. § 824d.

PDF page 2

2
Commission’s directives in the Co-Location Compliance Order and the Commission’s show cause order concerning Large Loads that directed PJM to “address[] the integration of large loads that are not co-located with generation.”7  As part of that filing, PJM will resubmit the Tariff revisions proposed in the August 17 Filing because those revisions are interrelated with PJM’s holistic response to the Co-Location Compliance Order and Large Loads Order.  Because PJM’s filing later today will moot the August 17 Filing and Docket No. ER26-1479-002, they should be withdrawn and terminated.8

No party will be harmed by this withdrawal and termination because parties will have the opportunity to address the same proposed Tariff revisions (in some cases modified to align with the addition of provisions addressing Large Loads) in the new docket established for PJM’s upcoming filing on November 16, 2026.  Further, because the August 17 Filing was submitted as a compliance filing, the records from that filing cannot be ‘overtaken by events’ in the new FPA section 205 filing later today, which means the Commission would have to act on the August 17 Filing and the upcoming PJM filing in a new docket, despite the fact that the new filing will duplicate the Tariff revisions proposed in the August 17 Filing.  Withdrawing the August 17 Filing allows for more efficient and streamlined processing of PJM’s Co-Location- and Large Load-related proposed Tariff revisions.  PJM will file a notice once the Commission has established a docket for the PJM filing later today, to inform participants in this proceeding of the new docket that contains the Tariff revisions proposed in the August 17 Filing.

7 See PJM Interconnection, L.L.C., 195 FERC ¶ 61,211, at P 2 (2026) (“Large Loads Order”).
8 To be clear, PJM does not request withdrawal or termination of any filing or docket other than the August 17 Filing and Docket No. ER26-1479-002.

PDF page 3

3

For the reasons stated above, PJM requests that the Commission grant this motion to withdraw the August 17 Filing and terminate Docket No. ER26-1479-002. Respectfully submitted,

/s/ Wendy B. Warren
Mark J. Stanisz
Associate General Counsel
PJM Interconnection, L.L.C.
2750 Monroe Blvd.
Norristown, PA  19403-2429
(610) 666-4707
mark.stanisz@pjm.com

Craig Glazer
Vice President – Federal Government
Policy
PJM Interconnection, L.L.C.
1200 G Street, NW, Suite 600
Washington, DC
20005 (202) 423-4743
craig.glazer@pjm.com
        Wendy B. Warren
Ruth M. Porter
Wright & Talisman, P.C.
1200 G Street, NW, Suite 600
Washington, DC  20005-3898
202-393-1200 (phone)
202-393-1240 (fax)
warren@wrightlaw.com
porter@wrightlaw.com

Counsel for PJM Interconnection,
L.L.C.

November 16, 2026

PDF page 4

CERTIFICATE OF SERVICE

I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding.

Dated at Washington, D.C., this 16th day of November 2026.
/s/ Ruth M. Porter

Ruth M. Porter
Wright & Talisman, P.C.
1200 G Street, NW, Suite 600
Washington, DC  20005-3898
202-393-1200 (phone)
porter@wrightlaw.com

Attorney for PJM Interconnection,
L.L.C.