SunZia Transmission - Trans. Owner Tariff Response to Show Cause Order EL26-71-
PDF page 1
4923-9080-5463.1November 16, 2026
E-TARIFF FILING
The Honorable Debbie-Anne A. Reese
Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, DC 20426
RE:
SunZia Transmission, LLC
Docket No. ER27-___-000
Amendments to Transmission Owner Tariff in Compliance with the Docket
No. EL26-71-000 Order to Show Cause
Dear Secretary Reese:
Pursuant to Section 205 of the Federal Power Act1 and Part 35 of the rules and regulations2 of the Federal Energy Regulatory Commission (“Commission”), the Commission’s Order Granting Rescission and Abeyance Requests3 and the Commission’s Order Instituting Proceeding Under Section 206 of the Federal Power Act,4 SunZia Transmission, LLC (“SunZia Transmission”) hereby tenders for filing amendments to its Transmission Owner Transmission Tariff (“TO Tariff”)5 to incorporate changes to those provisions of the TO Tariff necessary to track changes being made simultaneously by the California Independent System Operator Corporation (“CAISO”) to its Open Access Transmission Tariff (the “CAISO Tariff”) to facilitate the fast and reliable interconnection of new large loads and co-located loads to the CAISO-managed transmission system. The revisions to the SunZia Transmission TO Tariff are submitted and designated in accordance with Order No. 7146 and the Commission’s e-Tariff filing requirements.
1 16 U.S.C. § 824d (2021).2 18 C.F.R. Part 35 (2026).3 California Independent System Operator Corporation, et al., 196 FERC ¶ 61,131 (issued August 14, 2026).4 California Independent System Operator Corporation, et al., 195 FERC ¶ 61,214 (issued June 18, 2026) (the “Order to Show Cause”).5 SunZia Transmission, LLC, FERC Electric Tariff Volume 2. 6 Electronic Tariff Filings, Order No. 714, III FERC Stats. & Regs., Regs. Preambles ¶ 31,276 (2008).
PDF page 2
The Honorable Debbie-Anne A. ReeseNovember 16, 2026Page 2 of 74923-9080-5463.1
I. BACKGROUND
SunZia Transmission is an indirect, wholly-owned subsidiary of Pattern Energy Group LP and has developed, constructed and recently placed into commercial operation, an approximately 552-mile, bi-pole, high voltage, direct current (“HVDC”) 500 kV transmission line (the “Transmission System”) with a transmission capacity of 3,021 MW in New Mexico and Arizona that connects generation resources in the Southwest with markets and customers in California and Arizona.7 SunZia Transmission commenced construction of the Transmission System in 2023 and placed the Transmission System into commercial operations in April, 2026. The Transmission System has been developed as a merchant transmission project with negotiated rate authority contingent on the allocation of its transmission capacity pursuant to an open solicitation process reviewed and approved by the Commission.8
As a result, the entire capacity of the Transmission System is committed to two
Subscribers, SunZia Wind South LLC and SunZia Wind North LLC (collectively, the “SunZia Wind Companies”), both of which own and operate wind-powered electric generating facilities located in Lincoln, Torrance, and San Miguel Counties, New Mexico (the “SunZia Wind Projects”). SunZia Transmission will provide to the SunZia Wind Companies firm point-to- point transmission service for the entire rated capacity of the Transmission System over a thirty- year term9 from the Point of Receipt at the Pete Heinrich 345 kV AC Switchyard to the Point of Delivery at the Salt River Project Agricultural Improvement and Power District’s (“SRP”) Pinal Central 500 kV Substation pursuant to Amended and Restated Transmission Service Agreements
7 SunZia Transmission and the New Mexico Renewable Energy Transmission Authority (“RETA”) have entered into a lease arrangement pursuant to which RETA owns the physical assets of the Transmission System. SunZia Transmission and RETA are both responsible for the co-development of the Transmission System, while SunZia Transmission is responsible for the construction and financing of the Transmission System and is the owner of the capacity rights created by the Transmission System. RETA is a state authority established by the New Mexico legislature in 2007 and charged with implementing the New Mexico Renewable Energy Authority Transmission Act, NMSA 1978 § 62-16A-1, et seq. (the “Act”). As an authority or instrumentality of the State of New Mexico, RETA is not a “public utility” within the meaning of Section 201 of the FPA. See 16 U.S.C. § 824(f) (2019). Under the Act, RETA is authorized to plan, finance, develop and acquire transmission and storage projects (transmitting or storing at least 30% renewable energy) in order to promote the development of renewable energy in New Mexico. For purposes of this filing, SunZia Transmission is considered the Transmission Owner in interest of the Transmission System pursuant to the lease arrangement described above.8 Allocation of Capacity on New Merchant Transmission Projects and New Cost-Based, Participant-Funded Transmission Projects; Priority Rights to New Participant-Funded Transmission, 142 FERC ¶ 61,038, P 16 (2013), recon. den’d, 142 FERC ¶ 61,213 (2013). Capacity on the SunZia Transmission System has been allocated pursuant to two open solicitation processes both of which were filed with, reviewed and accepted by the Commission. See SunZia Transmission, LLC, 160 FERC ¶ 61,074 (2017); SunZia Transmission, LLC, 179 FERC ¶ 61,135 (2022).9 The initial thirty-year term commenced on July 30, 2026. Each of the SunZia Wind Companies has roll-over rights to continue service at the end of the initial term.
PDF page 3
The Honorable Debbie-Anne A. ReeseNovember 16, 2026Page 3 of 74923-9080-5463.1
dated March 6, 2026 (the “TSAs”), both of which have been filed with and accepted for filing by the Commission.10
In addition, the SunZia Wind Companies have acquired 2,131 MW of long-term, firm point-to-point transmission service from the Pinal Central 500 kV Substation to the Palo Verde 500 kV Hub (which interconnects to the CAISO-controlled transmission system) through a number of transmission service agreements with SRP (1,500 MW), the Desert Southwest Region of the Western Area Power Administration (“WAPA”) (300 MW), and Tucson Electric Power Company (“TEP”) (331 MW) with initial terms ranging from five years to twenty years and, in each case with the SunZia Wind Companies having roll-over rights thereafter (collectively, the “Arizona Entitlements”).11 SunZia Transmission has obtained authorization from the SunZia Wind Companies to administer the Arizona Entitlements (subject at all times to each SunZia Wind Company’s right to use the Arizona Entitlements for the transmission of electricity to the Palo Verde Hub for the benefit of the SunZia Wind Projects) and to grant CAISO operational control of the Arizona Entitlements consistent with the Transmission Rights and Curtailment Instructions that will be provided by SunZia Transmission consistent with applicable terms and conditions of the WAPA, SRP and TEP tariffs and business practices.
On September 22, 2023, in Docket No. ER23-2917-000, the CAISO filed proposed revisions to the CAISO Open Access Transmission Tariff (the “CAISO Tariff”) to implement a Subscriber Participating Transmission Owner (“SPTO”) model to facilitate access by merchant and participant-funded projects located outside of California to the CAISO transmission system, furthering State and Federal goals of increasing access to out-of-state carbon-free generating resources. The Commission accepted the CAISO’s proposed tariff changes by order issued March 12, 2024.12 On January 14, 2024, SunZia Transmission applied to become an SPTO and, on May 23, 2024, the CAISO Board of Governors approved the SunZia Transmission application. As a result, when the Transmission System entered commercial operation in April 9, 2026, operational control of the Transmission System and the Arizona Entitlements was granted by SunZia Transmission to CAISO pursuant to the CAISO’s Transmission Control Agreement at which time the SunZia Transmission Open Access Transmission Tariff (“OATT”) was withdrawn.13 As a result, the CAISO Tariff now governs future transmission and interconnection service over the Transmission System (subject to the rights and obligations of
10 SunZia Transmission, LLC, Docket Nos. ER25-1636-000 and ER25-1637-000 (April 28, 2026) (unpublished letter order).11 The SunZia Wind Companies have the right under the transmission tariffs of WAPA, SRP and TEP to request a change in the Point of Delivery and/or Point of Receipt on either a firm or non-firm basis so that the transmission service is redirectable consistent with the terms of the tariffs and business practices of the three Arizona transmission providers. 12 California Independent System Operator Corporation, 186 FERC ¶ 61,177 (2024).13 SunZia Transmission, LLC, Docket No. ER26-2115-000 (June 4, 2026) (unpublished letter order). The SunZia Transmission OATT was filed on June 15, 2023 in Docket No. ER23-2146-000 and accepted for filing by the Commission by order issued October 20, 2023. SunZia Transmission, LLC, 185 FERC ¶ 61,052 (2023). As discussed in note 14 infra, the SunZia Transmission OATT was subsequently modified to address SunZia Transmission’s transition to SPTO status under the CAISO Tariff.
PDF page 4
The Honorable Debbie-Anne A. ReeseNovember 16, 2026Page 4 of 74923-9080-5463.1
SunZia Transmission to the SunZia Wind Companies, the customers that are funding the construction of the Transmission System through their obligation to make transmission capacity payments under the TSAs).14
On October 21, 2024, SunZia Transmission filed with the Commission its proposed TO
Tariff pursuant to which its transmission facilities and contractual entitlements would be placed under the operational control of CAISO and made available to provide transmission and interconnection service under the CAISO Tariff. By order issued April 17, 2025, the Commission accepted SunZia Transmission’s TO Tariff for filing, to become effective on the date on which operational control of the transmission facilities and contractual entitlements of SunZia Transmission is granted to CAISO.15 The Commission found that the rates, terms and conditions of the proposed TO Tariff had been shown to be just and reasonable with one exception – the rate design used to calculate the Non-Subscriber Usage Rates set forth in the TO Tariff. On that issue, the Commission found that the filing raised issues of material fact that cannot be resolved based on the record before the Commission.1614 During SunZia Transmission’s transition to SPTO status, SunZia Transmission and CAISO entered into an Applicant Participating Transmission Owner Agreement (the “APTOA”) pursuant to which the parties agreed that the CAISO Tariff govern requests for interconnection with and transmission service over the Transmission System. The APTOA was filed by CAISO with the Commission on July 5, 2024 in Docket No. ER24-2471- 000 and was accepted for filing by the Commission on September 3, 2024, and made effective on September 4, 2024. California Independent System Operator Corporation, 188 FERC ¶ 61,151 (2024). On July 8, 2024, in Docket No. ER24-2473-000, SunZia Transmission filed revisions to its OATT to amend Sections 17 and 18 to notify current and prospective customers that, upon the effective date of the APTOA, all requests for transmission or interconnection service on the Transmission System will be processed by CAISO in accordance with the CAISO Tariff. The SunZia Transmission OATT revisions were accepted for filing by the Commission on September 4, 2024, and to align with the APTOA, was made effective as of September 4, 2024. SunZia Transmission, LLC, Docket No. ER24-2473-000 (Sept. 4, 2024) (unpublished letter order).15 SunZia Transmission, LLC, Order Accepting and Suspending Proposed Tariff Revisions, Subject to Refund and Establishing Hearing and Settlement Judge Procedures,191 FERC ¶ 61,053 (2025) (the “April 17 Order”).16 April 17 Order at PP 54-55. SunZia Transmission and the active participants in the proceeding thereafter reached an uncontested settlement on the NSUR rate design issue as well as additional NSUR issues that resulted in the filing on August 18, 2025 of an Offer of Settlement and Settlement Agreement with the Commission that was supported by the Trial Staff (see Docket No. ER25-170-000, Initial Comments by Trial Staff Supporting Offer of Settlement and Settlement Agreement (Sept. 8, 2025)) and certified by the Settlement Judge (see SunZia Transmission, LLC, 193 FERC ¶ 61,003, Certification of Uncontested Offer of Settlement (Oct. 3, 2025)). The Commission approved the Offer of Settlement and Settlement Agreement by order issued January 26, 2026. SunZia Transmission, LLC, 194 FERC ¶ 61,069 (2026). Following the filing of the Offer of Settlement and Settlement Agreement and prior to Commission approval, the Commission granted the request for rehearing filed by three of the active participants and reversed its prior finding in the April 17 Order that the structuring of the NSUR based on the Commission-accepted Subscriber transmission rates is just and reasonable. SunZia Transmission, LLC, 193 FERC ¶ 61,176 (2025), reh’g req. dism’d, 194 FERC ¶ 61,140 (2026), appeal pending, SunZia Transmission, LLC v. Federal Energy Regulatory Commission, Case No. 26- 1067 (D.C. Cir.). Settlement negotiations on that issue among the active participants in the proceeding remain on-going.
PDF page 5
The Honorable Debbie-Anne A. ReeseNovember 16, 2026Page 5 of 74923-9080-5463.1
SunZia Transmission is in a unique position with respect to its compliance with the Commission’s directives in the Order to Show Cause for several reasons. First, SunZia Transmission does not directly serve load and, accordingly, there are no provisions in its TO Tariff that address the interconnection of the load to the SunZia Transmission System. As a result, the SunZia Transmission TO Tariff is silent with respect to load interconnections and there is no need to modify the Tariff to address the interconnection of large or co-located loads. Second, the SunZia Transmission System is not located within the service territory of a load serving participating transmission owner within the CAISO market that is subject to the Order to Show Cause and that will be submitting tariff changes in response to the Order to Show Cause. The SunZia Transmission System is embedded within the service territories of Arizona and New Mexico load-serving entities that are not subject to the Order to Show Cause or any of the other Orders to Show Cause issued to regional transmission operators or independent system operators throughout the country. Finally, Section 8 of the SunZia Transmission TO Tariff states that all requests for interconnection to the SunZia Transmission System must be directed in the first instance to CAISO with notice of such request being provided to SunZia Transmission. Thus, CAISO is responsible for managing the generator interconnection process for the SunZia Transmission System with SunZia Transmission supporting that process through the undertaking of studies on the impact of the interconnection on the System. Any changes to the generation interconnection process to facilitate the interconnection of co-located load to the transmission system must be set forth in the CAISO Tariff, in which case SunZia Transmission will propose conforming changes to its TO Tariff to remain consistent with the CAISO’s changes.
II. DESCRIPTION OF FILING
Consistent with the description above as to SunZia Transmission’s unique and limited role in the interconnection process overall, Section 8 of the TO Tariff has been amended to clarify that the CAISO Tariff will continue to control with respect to the interconnection of Generating Units, energy storage co-located with Large Load and Co-located Generating Units with Large Loads. In proposing these limited changes to its TO Tariff, SunZia Transmission reserves the right, following review of the proposed tariff changes filed by the other Participating Transmission Owners (“PTOs”) that are subject to the Commission’s Order to Show Cause, to amend this filing to propose additional changes to ensure consistency among all similarly- situated PTOs.
Finally, consistent with its comments made during the stakeholder process, SunZia Transmission continues to support the need to apply these enhanced Large Load interconnection procedures to Electrically Proximate Loads. CAISO has explained that the need for such changes within the CAISO footprint in California will be addressed following the submission of the Large Load compliance filing. SunZia Transmission supports the commencement of that effort as soon as possible because the value proposition and the question surrounding how to study the interconnection of electrically proximate large load and generation in tandem (similar to co-located load and generation) are unique when applied to the SunZia Transmission System in New Mexico and Arizona.
PDF page 6
The Honorable Debbie-Anne A. ReeseNovember 16, 2026Page 6 of 74923-9080-5463.1
III. ATTACHMENTS TO FILING
Included in this filing are the following documents:
1. This Transmittal Letter;
2. Clean version of the revised SunZia Transmission TO Tariff; and
3. Marked version of the revised SunZia Transmission TO Tariff, showing
changes against the currently-effective SunZia Transmission TO Tariff.17
IV. PROPOSED EFFECTIVE DATE
SunZia Transmission proposes an effective date of sixty days after the Commission issues an order on this compliance filing for the changes to its TO Tariff. A period of sixty days after the Commission approves this filing will allow enough time for SunZia Transmission to seamlessly transition to the new processes. Because a precise effective date is not known at this time, SunZia Transmission is submitting this filing with a 12/31/9998 effective date for the tariff records, and, if necessary, will make a compliance filing to apply the actual effective date once known.
V. COMMUNICATIONS
Correspondence and service regarding this filing should be sent to the following individual:
Robert L. Daileader
Nixon Peabody LLP
799 Ninth Street, Suite 500
Washington, DC 20001
(202) 288-2069
rdaileader@nixonpeabody.com
Cameron Yourkowski
Director, Regulatory Affairs & Markets
SunZia Transmission, LLC
1088 Sansome Street
San Francisco, CA 94111
(503) 432-0982
cameron.yourkowski@patternenergy.com
VI. CONCLUSION
In accordance with the foregoing, SunZia Transmission respectfully requests that the Commission accept the proposed revisions to its TO Tariff as just and reasonable and consistent with its obligations under the Order to Show Cause and grant an effective date of sixty days after the Commission’s order on this filing.
17 On April 10, 2026, SunZia Transmission filed in Docket No. ER25-170-005 a revised TO Tariff with the Commission with an April 9, 2026 effective date (the date on which operational control of the SunZia Transmission System was granted to CAISO) and incorporating the changes to the TO Tariff accepted by the Commission when it approved the Offer of Settlement on January 26, 2026. SunZia Transmission, LLC, 194 FERC ¶ 61,069 (2026). See note 16 supra.
PDF page 7
The Honorable Debbie-Anne A. ReeseNovember 16, 2026Page 7 of 74923-9080-5463.1
Please direct any questions regarding this filing to the undersigned counsel.
Respectfully submitted,
/S/ Robert L. Daileader
Robert L. Daileader
Counsel to SunZia Transmission LLC
Attachments