ER27-518-000 · 2026-11-16 · LS Power Grid New York Corporation INew York Independent System Operator, Inc.
Exhibit No. GNY-103 to Hayes Testimony
PDF page 1
LS Power Grid New York | Proposed Charge Statement | For NYISO billing
Large Load Charge Statement
EXHIBIT NO. GNY-103 | UNPOPULATED EXAMPLE
Complete applicable sections separately for each Covered Upgrade and attach supporting calculations. Statement information
Complete before delivery
Statement number
[ ]
Statement date
[ ]
Revision number
[Original or revision number]
Issuer legal name
[ ]
Issuer contact name
[ ]
Issuer contact email
[ ]
Issuer contact phone
[ ]
NYISO recipient
[ ]
Eligible Customer copy recipient
[ ]
Eligible Customer legal name
[ ]
NYISO account or settlement identifier
[ ]
CRA identifier
[ ]
CRA effective date
[ ]
Large Load Facility identifier
[ ]
Rate Year
[ ]
First billing period
[Month and year]
Last billing period
[Month and year]
Statement purpose
[Annual projection or other charge or correction]
Prior statement identifier
[ID or none]
PDF page 2
LS Power Grid New York | Proposed Charge Statement | For NYISO billing
1 Annual Supplemental MTRC billing
Complete one calculation for each Covered Upgrade and provide a customer total.
The prior-period true-up is the customer-level Supplemental MTRC adjustment based on actual Qualifying Transmission Revenues, excluding prior-period adjustments already included in the billed comparison amount, and is calculated without interest. It excludes the ordinary formula-rate true-up and its interest, and unpaid balances already billed. This Charge Statement instructs billing; it does not establish cash receipts for the Annual Update. An unpaid invoice remains outstanding. Recovery of a collection shortfall through the RTFC or the ordinary formula-rate true-up does not create a second CRA charge or discharge the Eligible Customer’s unpaid invoice. Any later recovery is credited through the formula rate when received, without duplicating a previously recognized receipt.
Calculation
Covered Upgrade [ID]
Customer total
Applicable projected Annual
MTRC after proration
[A]
[Sum A]
Projected Qualifying
Transmission Revenues
[B]
[Sum B]
Projected Supplemental MTRC =
max(A − B, 0)
[C]
[Sum C]
Prior-period true-up signed
positive or negative
[D]
[Sum D]
Annual Supplemental MTRC to
bill = C + D
[E]
[Sum E]
Equal monthly installment = E ÷
12
[F]
[Sum F]
Billing instruction
Entry
First installment billing period
[Month and year]
Last installment billing period
[Month and year]
Number of monthly installments
[12]
Covered Upgrade identifier
[ ]
Monthly installment for this Covered Upgrade
[Amount]
Total monthly installment for all Covered Upgrades
[Amount]
Annual billing control total
[Monthly total × 12]
Annual Projection version
[ ]
Annual Projection calculation reference
[Worksheet and cell]
Schedule 5 calculation reference
[ ]
Reconciliation Statement identifier
[ID or none]
Prior-period adjustment source Rate Year
[Year or not applicable]
PDF page 3
LS Power Grid New York | Proposed Charge Statement | For NYISO billing
2 Other Large Load Charges
Complete separately for each additional charge and Covered Upgrade. Required charge detail
Entry
Charge type
[ ]
Authorizing CRA provision
[Section]
Covered Upgrade identifier
[ ]
Source Rate Year
[Year or not applicable]
Cost period start date
[Date or not applicable]
Cost period end date
[Date or not applicable]
Gross charge amount
[Amount]
Calculation reference
[ ]
Supporting schedule reference
[ ]
Contractual payable event
[ ]
Payable event date
[ ]
Requested billing period
[Month and year]
Prior Charge Statement identifier
[ID or none]
Prior invoice identifier
[ID or none]
Amount of this charge previously billed
[Amount]
Previously unbilled amount already satisfied by
payment
[Amount]
Previously unbilled amount already satisfied by
Applied Security Proceeds
[Amount]
Net incremental amount to bill
[Gross charge less previously billed amount less
previously unbilled amounts already satisfied]
3 Revised Charge Statement
Revision control
Entry
Superseded statement identifier
[ ]
Superseded statement date
[ ]
Covered Upgrade identifier
[ ]
First affected billing period
[Month and year]
Last affected billing period
[Month and year]
Previously instructed amount
[Amount]
Amount already billed
[Amount]
Corrected amount
[Amount]
Billing adjustment
[Corrected amount − previously instructed amount]
Replacement amount for each unbilled installment
[Amount]
Adjustment to amounts already billed
[Debit or credit amount]
Requested invoice for billed adjustment
[Billing period]
Reason for revision
[ ]
Supporting reference
[ ]
PDF page 4
LS Power Grid New York | Proposed Charge Statement | For NYISO billing
4 Review and delivery record
Control
Entry
Prepared by
[Name]
Preparer title
[ ]
Preparation date
[ ]
Preparer email
[ ]
Preparer phone
[ ]
Reviewed by
[Name]
Reviewer title
[ ]
Review date
[ ]
NYISO delivery recipient
[ ]
NYISO delivery date
[ ]
NYISO transmission reference
[ ]
Eligible Customer copy recipient
[ ]
Customer copy delivery date
[ ]
Customer copy transmission reference
[ ]
Upgrade calculation attachment
[Reference or not applicable]
Qualifying revenue forecast attachment
[Reference or not applicable]
Prior-period reconciliation attachment
[Reference or not applicable]
Other supporting attachment
[Reference or not applicable; repeat as needed]
This Charge Statement identifies amounts and billing periods under the applicable CRA and Rate Schedule 10 Large Load Provisions. The governing tariff and CRA control.