Exhibit No. GNY-201 to Arzola Testimony
PDF page 1
6.10.7.2.1 LSPG-NY Formula Rate Template Index Rate Formula Template Utilizing FERC Form 1 Data Annual Transmission Revenue Requirement For the 12 months ended 12/31/____ LS Power Grid New York Corporation I Type of revenue requirement: enter "P" if projected or "A" if actual: - Enter the year to which the revenue requirement relates: - Appendix A Main body of the Formula Rate Attachment 1 Detail of the Revenue Credits Attachment 1a Large Load CRA Revenue (Supplemental MTRC and Annual Termination Fee Remittances) by Eligible Customer and Covered Upgrade Attachment 2 Monthly Plant and Accumulated Depreciation balances Attachment 2a Project Plant Detail Attachment 3 Cost Support Detail Attachment 4 Calculations showing the revenue requirement by Investment, including any Incentives, Attachment 5 True-Up calculations Attachment 6a-6d Detail of the Accumulated Deferred Income Tax Balances Attachment 7 Depreciation Rates Attachment 8 Annual Excess or Deficient Accumulated Deferred IncomeTaxes Worksheet
PDF page 2
LSPG-NY-501
Appendix A
Page 1 of 5
Formula Rate - Non-Levelized
Rate Formula Template
Utilizing FERC Form 1 Data
Annual Transmission Revenue Requirement
For the 12 months ended 12/31/____
LS Power Grid New York Corporation I
(1) (2)
(3) Line
Allocated
No.
Amount
1
GROSS REVENUE REQUIREMENT
(page 3, line 79)
12 months
$ -
REVENUE CREDITS
Total
Allocator
2
Total Revenue Credits
Attachment 1, line 6
-
TP
1.0000
-
3
Net Revenue Requirement
(line 1 minus line 2)
-
4
True-up Adjustment
(Attachment 5, line 3, col. G)
-
DA
1.00000
-
5
NET ADJUSTED REVENUE REQUIREMENT
(line 3 plus line 4)
$ -
LARGE LOAD CRA REVENUE (for NYISO billing and remittance) (Note R)
a1
Projected Supplemental MTRC for the Rate Year - active Eligible Customers (Attachment 1a, Column 6)
-
a2
Prior-period true-up adjustments (Attachment 1a, Column 7)
-
a
Supplemental MTRC to be billed by NYISO to Eligible Customers and remitted to LSPGNY (line a1 plus line a2; Attachment 1a, line 12)
-
b
Annual Termination Fee Remittances to be made by NYISO from funds held (Attachment 1a, line 13)
-
c
Total Large Load CRA Revenue (line a plus line b; Attachment 1, line 5a; included in line 2) -PDF page 3
LSPG-NY-501
Appendix A
Page 2 of 5
Formula Rate - Non-Levelized
Rate Formula Template
Utilizing FERC Form 1 Data
For the 12 months ended 12/31/____
LS Power Grid New York Corporation I
(1) (2)
(3)
(4) (5)
Transmission
Line
Source
Company Total
Allocator
(Col 3 times Col 4)
No.
RATE BASE:
GROSS PLANT IN SERVICE (Note A)
6
Production
(Attach 2, line 75)
-
NA
-
-
7
Transmission
(Attach 2, line 15)
-
TP
1.0000
-
8
Distribution
(Attach 2, line 30)
-
NA
-
-
9
General & Intangible
(Attach 2, lines 45 + 60)
-
W/S
1.0000
-
10
TOTAL GROSS PLANT (sum lines 6-9)
-
GP=
-
-
11
ACCUMULATED DEPRECIATION & AMORTIZATION (Note A) 12
Production
(Attach 2, line 151)
-
NA
-
-
13
Transmission
(Attach 2, line 91)
-
TP
1.0000
-
14
Distribution
(Attach 2, line 106)
-
NA
-
-
15
General & Intangible
(Attach 2, lines 121 + 136)
-
W/S
1.0000
-
16
TOTAL ACCUM. DEPRECIATION (sum lines 12-15)
-
-
17
NET ACQUISITION ADJUSTMENT
(Note B)
18
Transmission
(Attach 2, line 166)
-
DA
1.0000
-
19
TOTAL NET ACQUISITION ADJUSTMENT
-
-
20
NET PLANT IN SERVICE
21
Production
(line 6- line 12)
-
-
22
Transmission
(line 7- line 13)
-
-
23
Distribution
(line 8- line 14)
-
-
24
General & Intangible
(line 9- line 15)
-
-
25
TOTAL NET PLANT (sum lines 21-24)
-
NP=
-
-
26
ADJUSTMENTS TO RATE BASE
27
ADIT (Attach 6a proj., line 5, Column D or Attach 6c True-up - line 5, column D) (Note C)
-
TP
1.0000
-
28
Account No. 255 (enter negative) (Note D)
(Attach 3, line 169) (Note D)
-
NP
-
-
28a
Excess / Deficient Accumulated Deferred Income Taxes (Attach 8, line 29) (Note F)
-
TP
1.0000
-
29
Unamortized Lumpsum Lease Payment
Note G
-
DA
1.0000
-
30
Unfunded Reserves (enter negative)
Note H
-
DA
1.0000
-
31
Unamortized Regulatory Assets
(Attach 3, line 204, col. b) (Note I)
-
DA
1.0000
-
32
Unamortized Abandoned Plant
(Attach 3, line 204, col. c) (Note J)
-
DA
1.0000
-
33
TOTAL ADJUSTMENTS (sum lines 27-32)
-
-
34
LAND HELD FOR FUTURE USE
Company records
-
TP
1.0000
-
35
WORKING CAPITAL (Note K)
36
CWC
(1/8 * (Line 48 less Line 47a)
-
-
37
Materials & Supplies
(Attach 3, line 221, column c)
-
TP
1.0000
-
38
Prepayments (Account 165 - Note K)
(Attach 3, line 189, column b)
-
GP
-
-
39
TOTAL WORKING CAPITAL (sum lines 36-38)
-
-
40
RATE BASE (sum lines 25, 33, 34, & 39)
-
-
(If line 7>0, GP= line 10 column 5 / line 10 column 3. If line 7=0, GP=0)
(If line 19>0, NP= line 22, column 5 / line 22, column 3. If line 19=0, NP=0)PDF page 4
LSPG-NY-501
Appendix A
Page 3 of 5
Formula Rate - Non-Levelized
Rate Formula Template
Utilizing FERC Form 1 Data
For the 12 months ended 12/31/____
LS Power Grid New York Corporation I
(1) (2)
(3)
(4) (5)
Transmission
Source
Company Total
Allocator
(Col 3 times Col 4)
41
O&M
42
Transmission
321.112.b
-
TP=
1.0000
-
43
Less Account 565
321.96.b
-
TP=
1.0000
-
44
A&G
323.197.b
-
W/S
1.0000
-
45
Less EPRI & Reg. Comm. Exp. & Other Ad.
Note L, company records
-
DA
1.0000
-
46
Plus Transmission Related Reg. Comm. Exp.
Note L, company records
-
TP=
1.0000
-
47
Less Account 566
321.97.b
-
DA
1.0000
-
47a
Amortization of Regulatory Assets
company records
-
DA
1.0000
-
47b
Account 566 excluding amort. of Reg Assets
(line 47 less line 47a)
-
DA
1.0000
-
48
TOTAL O&M (sum lines 42, 44, 46, 47a, 47b less lines 43 & 45, 47) (Note L)
-
-
49
DEPRECIATION EXPENSE
50
Transmission
336.7.f (Note A)
-
TP
1.0000
-
51
General and Intangible
336.1.f + 336.10.f (Note A)
-
W/S
1.0000
-
52
Amortization of Abandoned Plant
(Attach 3, line 205, column c) (Note J)
-
DA
1.0000
-
53
Amortization of Acquisition Adjustment
(Attach 2, line 166)
-
DA
1.0000
-
54
TOTAL DEPRECIATION (Sum lines 50-52)
-
-
55
TAXES OTHER THAN INCOME TAXES (Note M)
56
LABOR RELATED
57
Payroll
263.l
-
W/S
1.0000
-
58
Highway and vehicle
263.l
-
W/S
1.0000
-
59
PLANT RELATED
60
Property
263.l
-
GP
-
-
61
Gross Receipts
263.l
-
GP
-
-
62
Other
263.l
-
GP
-
-
63
TOTAL OTHER TAXES (sum lines 57-62)
-
-
64
INCOME TAXES
65
T=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p))} = (Note E)
0.00%
66
CIT=(T/1-T) * (1-(WCLTD/R)) =
0.00%
67
where WCLTD=(line 96) and R= (line 99)
68
and FIT, SIT, p, & n are as given in footnote E. 69
1 / (1 - T) = (T from line 65)
-
70
Income Tax Calculation = line 66 * line 76
-
-
71
Investment Tax Credit Amortization Adjustment (Attachment 3, line 174) (Note D)
-
NP
-
-
72
Permanent Differences Tax Adjustment
(Attach 3, line 207 * line 65)
-
NP
-
-
73
Excess/Deficient Deferred Taxes Adjustment
Attach 8, line 58 (proj.), line 90 (actual) Note F
-
NP
-
-
74
Total Income Taxes
(Sum lines 72 to 73)
-
-
75
RETURN
76
[ Rate Base (line 40) * Rate of Return (line 99)]
-
-
77
Rev Requirement before Incentive Projects (sum lines 48, 54, 63, 74, 76)
-
-
78
Incentive Return and Income Tax and Competitive Bid Concessions for Projects
-
DA
1.0000
-
(Attach 4, line 67, cols. h, j & less p)
79
Total Revenue Requirement (sum lines 77 & 78)
-
-PDF page 5
LSPG-NY-501
Appendix A
Page 4 of 5
Formula Rate - Non-Levelized
Rate Formula Template
Utilizing FERC Form 1 Data
For the 12 months ended 12/31/____
LS Power Grid New York Corporation I
SUPPORTING CALCULATIONS AND NOTES
80
TRANSMISSION PLANT INCLUDED IN ISO RATES
81
Total transmission plant (line 7, column 3)
-
82
Less transmission plant excluded from ISO rates (Note N)
-
83
Less transmission plant included in OATT Ancillary Services (Note N)
-
84
Transmission plant included in ISO rates (line 81 less lines 82 & 83)
-
85
Percentage of transmission plant included in ISO Rates (line 84 divided by line 81) [If line 81 equal zero, enter 1) TP=
1.0000
86
WAGES & SALARY ALLOCATOR (W&S)
87
Form 1 Reference
$
TP
Allocation
88
Production
354.20.b
- -
-
89
Transmission
354.21.b
- 1.00
-
90
Distribution
354.23.b
- -
-
W&S Allocator
91
Other
354.24,25,26.b
- -
-
($ / Allocation)
92
Total (sum lines 88-91) [TP equals 1 if there are no wages & salaries]
-
-
=
1.0000
=
WS
93
RETURN (R) (Notes O and P)
94
95
$
%
Cost
Weighted
96
Long Term Debt
(Attach 3, line 229) (Note O)
-
100.00%
0.00%
0.00% =WCLTD
97
Preferred Stock
(Attach 3, line 230) (Note O)
-
0.00%
0.00%
0.00%
98
Common Stock
(Attach 3, line 231) (Note O, Note P)
-
0.00%
0.00%
0.00%
99
Total (sum lines 96-98)
-
0.00% =R
Development of Base Carrying charge and Summary of Incentive and Non-Incentive Investments
(a) (b)
(c) Source of Total Column
Total
100
Net Transmission Plant in Service
(Line 22 and Transmission CIACs)
-
-
-
101
Unamortized Abandoned Plant
(Line 32)
-
-
-
102
Project Specific Regulatory Assets
(Line 31)
-
-
-
103
Development of Base Carrying charge and Summary of Incentive and Non-Incentive Investments
-
104
Return and Taxes
(Lines 74 & 76)
-
105
Total Revenue Credits
-
106
Base Carrying Charge (used in Attach 4, Line 65)
(Line 104 - Line 105)/ Line 103
0.00%
Non-incentive
Investments from
Attachment 4 (Note
Q)
Incentive Investments
from Attachment 4
(Note Q)PDF page 6
LSPG-NY-501
Appendix A
Page 5 of 5
SUPPORTING CALCULATIONS AND NOTES
Formula Rate - Non-Levelized
Rate Formula Template
Utilizing FERC Form 1 Data
For the 12 months ended 12/31/____
LS Power Grid New York Corporation I
General Note: References to pages in this formulary rate are indicated as: (page#, line#, col.#)
References to data from FERC Form 1 are indicated as: #.y.x (page, line, column)
Note
Letter
A
Balances exclude Asset Retirement Costs.
B
No Acquisition Adjustment will be recovered until a filing requesting recovery is submitted to and approved by FERC under FPA Section 205.
C
associated with asset or liability accounts excluded from rate base do not affect rate base, such as ADIT related to asset retirement obligations and certain tax-related regulatory assets or liabilities. To the extent that the normalization requirements apply to ADIT activity in the projected net revenue requirement calculation or the true-up adjustment calculation, the ADIT amounts are computed in accordance with the proration formula of Treasury regulation Section 1.167(l)-1(h)(6) with averaging in accordance with IRC Section 168(i)(9)(B). The remaining ADIT activity are averaged. Work papers supporting the ADIT calculations will be posted with each projected net revenue requirement and/or Annual True-Up and included in the annual Informational Filing submitted to the Commission.
D
Investment tax credit (ITC) is recorded in accordance with the deferral method of accounting and any normalization requirements that relate to the eligibility to claim the credit or the Credit (266.8.f) multiplied by the applicable tax gross-up factor.
E
The composite income tax rate (T) applicable to each Rate Year (including both Annual Projections and True-Up Adjustments) is based on the Federal income tax rate (FIT), the State income tax rate (SIT) and the percentage of federal income tax deductible for state income tax purposes (P). If the utility is taxed in more than one state, it must attach a work paper showing the name of each state and how the blended or composite SIT was computed.
Inputs Required:
Federal income tax rate (FIT) =
0.00%
Composite state income tax rate (SIT) =
0.00% (Attachment 3)
Percent of federal income tax deductible for state purposes (P) =
0.00%
For each Rate Year (including both Annual Projections and True-Up Adjustments) the statutory income tax rates utilized in the Formula Rate shall reflect the weighted average rates 181/365 and 184/365, respectively, for a non-leap year.
F
Upon enactment of changes in tax law, ADIT balances are re-measured and adjusted in the Company’s books of account, resulting in excess or deficient accumulated deferred income tax assets and liabilities. Such excess or deficient ADIT attributable to assets or liabilities reflected in ISO rates and subsequent recoverable or refundable amortization will be based upon tax records and be calculated and recorded in accordance with ASC 740 and any applicable normalization requirements of the taxing jurisdiction. For each re-measurement of deferred taxes, the amounts entered as Adjustments to Rate Base or a component of Income Taxes will be supported by work papers providing the balance for each taxing jurisdiction at the beginning and end of the year, amortization for the year and any other information required to support compliance with any applicable normalization requirements. G
In the event that transmission assets or right of ways involve a lumpsum upfront payment under a lease that qualifies as a capital lease, it will be amortized over the life of the lease to Account 567 and the unamortized balance will be included here. In the event such a lease involves monthly or annual payments, the payments will be booked to Account 567. H
Unfunded Reserves are customer contributed capital authorized by a regulatory agency. Balances, if any, will be supported by a workpaper.
No amounts shall be credited to accounts 228.1 through 228.4 unless authorized by a regulatory authority or authorities to be collected in a utility’s rates. I
Recovery of Regulatory Assets must be authorized by the Commission.
J
Unamortized Abandoned Plant and Amortization of Abandoned Plant will be zero until the Commission accepts or approves recovery of the cost of Abandoned Plant. K
Cash Working Capital assigned to transmission is transmission-allocated O&M minus the amortization of any Regulatory Asset, divided by eight.
Prepayments are the electric related prepayments booked to Account No. 165 and reported on Pages 110-111 line 57 in the Form 1.
L
Line 45 removes all EEI and EPRI research, development and demonstration expenses.
Line 46 reflects all Regulatory Commission Expenses directly related to transmission service, ISO filings, or transmission siting itemized at 351.h Line 42 or Line 44 and thus Line 48 shall include any NYISO charges other than penalties, including but not limited to administrative costs.
M
Includes only FICA, unemployment, highway, property, gross receipts, and other assessments charged in the current year.
N
Removes dollar amount of transmission plant included in the development of OATT ancillary services rates and generation
step-up facilities, which are deemed to included in OATT ancillary services. For these purposes, generation step-up
facilities are those facilities at a generator substation on which there is no through-flow when the generator is shut down.
O
In accordance with the Settlement Agreement in Docket No. ER 20-716 approved June 17, 2021, the Base Return on Equity shall be 9.65% and no change in ROE may be made absent a filing with FERC under FPA Section 205 or 206. P
A hypothetical capital structure of 47% debt and 53% equity will be used until the entire Marcy to New Scotland 345 kV Upgrade Project is placed in-service. After all facilities of the Marcy to New Scotland 345 kV Upgrade Project are placed in- service, the lesser of a 52% equity ratio or the actual equity ratio will be used.
Q
Non-incentive investments are investments without ROE incentives and incentive investments are investments with ROE incentives
R
The balances in Accounts 190, 281, 282 and 283 are allocated to transmission plant included in ISO rates based on company accounting records. Accumulated deferred income tax amounts recapture of the credit. The revenue requirement impact of any ITC amortization permitted to reduce income tax expense is determined as the amount of the Amortized Investment Tax actually in effect during the Rate Year. For example, if the statutory tax rate is 10% from January 1 through June 30, and 5% from July 1 through December 31, such rates would be weighted Line 45 removes EPRI Annual Membership Dues listed in Form 1 at 353.f, any EPRI Lobbying expenses included in line 42 of the template and all Regulatory Commission Expenses itemized at 351.h. Line 45 removes all advertising included in Account 930.1, except safety, education or out-reach related advertising.
Lines a1 through c are completed in the Annual Projection only. Line a is the projected Supplemental MTRC for the Rate Year (line a1) plus prior-period true-up adjustments (line a2); NYISO bills line a to active Eligible Customers in equal monthly installments during the Rate Year and remits the amounts it collects to LSPGNY. Line b is the Annual Termination Fee Remittances NYISO makes to LSPGNY during the Rate Year from funds it holds. Differences between the Supplemental MTRC billed and the Supplemental MTRC based on actual Qualifying Transmission Revenues are trued up, without interest, by Eligible Customer and Covered Upgrade on Attachment 5 and included in line a2 of a subsequent Annual Projection. In the Annual Update, lines a1 through c show zero, and Large Load CRA Revenue is the Actual Large Load CRA Revenue received during the Rate Year, recorded on Attachment 1, line 5a; any difference from the projected amount, including a billed amount that is not received, is reflected in the True-Up Adjustment.PDF page 7
Attachment 1 - Revenue Credit Workpaper*
LS Power Grid New York Corporation I
Account 454 - Rent from Electric Property (300.19.b)
Notes 1 & 3
1 Rent from FERC Form No. 1
-
Account 456 (including 456.1) (300.21.b and 300.22.b)
Notes 1 & 3
2 Other Electric Revenues (Note 2)
-
3 Professional Services
-
4 Revenues from Directly Assigned Transmission Facility Charges (Note 2)
-
5 Rent or Attachment Fees associated with Transmission Facilities
-
5a Large Load CRA Revenue - Supplemental MTRC and Annual Termination Fee Remittances (Note 4)
-
6 Total Revenue Credits
Sum lines 2-5a + line 1
-
Note 1
Note 2
If the facilities associated with the revenues are not included in the formula, the revenue is shown below, but not included in the total above.
Note 3
All Account 454, 456, and 456.1 Revenues must be itemized below and tie to FERC Form No. 1 cites set forth below.
Note 4
Line No.
1
Accounts 456 and 456.1 (300.21.b plus 300.22.b)
TOTAL
NY-ISO
Other 1
Other 2
1a
-
- - - -
…
- - - -
1x
- - - -
2
Large Load CRA Revenue recorded in Account 456 (Note 4)
- - - -
3
Total
- - - -
4
Less:
5
Revenue for Demands in Divisor
- - - -
6
Sub Total Revenue Credit
- - - -
7
Prior Period Adjustments
- - - -
8
Total (must tie to 300.21.b plus 300.22.b)
- - - -
9
Account 454 (300.19.b)
$
9a
-
-
9b
-
9c
-
9d
-
9e
-
9f
-
9g
-
…
9x
-
10
Total (must tie to 300.19.b)
-
All revenues booked to Account 454 that are derived from cost items classified as transmission-related will be included as a revenue credit. All revenues booked to Account 456 (includes 456.1) that are derived from cost items classified as transmission-related, and are not derived from rates under this transmission formula rate will be included as a revenue credit. Work papers will be included to properly classify revenues booked to these accounts to the transmission function. A breakdown of all Account 454 revenues by subaccount will be provided below, and will be used to derive the proper calculation of revenue credits. A breakdown of all Account 456 revenues by subaccount and customer will be provided and tabulated below, and will be used to develop the proper calculation of revenue credits. Line 5a is Large Load CRA Revenue from Attachment 1a. In an Annual Projection, it is the Projected Large Load CRA Revenue: the Supplemental MTRC NYISO bills to active Eligible Customers, including prior-period true-up adjustments, plus the Annual Termination Fee Remittances NYISO makes for terminated Eligible Customers (Attachment 1a, Column 8 total). In an Annual Update, it is the Actual Large Load CRA Revenue received by LSPGNY during the Rate Year (Attachment 1a, line 34): Supplemental MTRC payments collected and remitted by NYISO, Applied Security Proceeds remitted by NYISO, amounts recovered directly from an Eligible Customer, and Annual Termination Fee Remittances. A billed amount that is not received is not credited, and the resulting difference from the projected credit is reflected in the True-Up Adjustment; a later receipt is credited in the Rate Year in which it is received, and no amount is credited more than once. Line 2 below is the Large Load CRA Revenue recorded in Account 456; any difference from Line 5a is reconciled in the work papers required by Section 3.C.11 of the Protocols. Differences between the projected Supplemental MTRC and the amount based on actual Qualifying Transmission Revenues are trued up, without interest, for each Eligible Customer and Covered Upgrade on Attachment 5, Lines 14-23 (Supplemental MTRC True-Up by Eligible Customer and Covered Upgrade). Qualifying Transmission Revenues are not credited on Line 5a.PDF page 8
Attachment 1a - Supplemental MTRC
LS Power Grid New York Corporation I
Rate Year
-
Projected Large Load CRA Revenue for the Rate Year (Col. 8 total)
-
Line
Eligible Customer
Annual MTRC (Note A)
1
2
3
4
5
6
7
8
1
- - - - - - 2
- - - - - - 3
- - - - - - 4
- - - - - - 5
- - - - - - 6
- - - - - - 7
- - - - - - 8
- - - - - - 9
- - - - - - 10
- - - - - - 11
Total
- - - - -
12
Supplemental MTRC billed and remitted by NYISO - active Eligible Customers
-
13
Annual Termination Fee Remittances by NYISO - terminated Eligible Customers
-
Projected Qualifying Transmission Revenue Workpaper
Line
Eligible Customer
Covered Upgrade
Forecast Load (MW)
Billing Hours
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
Actual Large Load CRA Revenue Received - Annual Update (Note E)
Line
Eligible Customer
Covered Upgrade
(a) (b)
(c) (d)
(e) (f)
(g) (h)
24
-
- -
-
-
-
-
-
25
-
- -
-
-
-
-
-
26
-
- -
-
-
-
-
-
27
-
- -
-
-
-
-
-
28
-
- -
-
-
-
-
-
29
-
- -
-
-
-
-
-
30
-
- -
-
-
-
-
-
31
-
- -
-
-
-
-
-
32
-
- -
-
-
-
-
-
33
-
- -
-
-
-
-
-
34
Total
- - - - - - - - Notes
A
Column 5 shows the Annual MTRC for each Eligible Customer and Covered Upgrade under its CRA. Use the applicable partial-year amount.
B
C
D
E
This worksheet calculates, by Eligible Customer and Covered Upgrade, Large Load CRA Revenue for the Rate Year. The Annual Minimum Transmission Revenue Contribution ("Annual MTRC") is the annual minimum transmission revenue an Eligible Customer commits to for a Covered Upgrade under its CRA; it is determined under the CRA and entered in this worksheet. The Supplemental MTRC is the amount by which the Annual MTRC exceeds Qualifying Transmission Revenues. Projected Large Load CRA Revenue is the Supplemental MTRC NYISO bills to active Eligible Customers, including prior-period true-up adjustments, plus the Annual Termination Fee Remittances NYISO makes for terminated Eligible Customers (Lines 1-13). Actual Large Load CRA Revenue is the amount LSPGNY receives during the Rate Year (Lines 24-34). In the Annual Projection, this worksheet uses projected Qualifying Transmission Revenues; in the Annual Update, it uses actual Qualifying Transmission Revenues to determine the actual Supplemental MTRC trued up on Attachment 5 (Notes B-D) and records the Actual Large Load CRA Revenue (Note E). Eligible Customer, CRA, Covered Upgrade, Annual MTRC, Supplemental MTRC, Qualifying Transmission Revenues, Annual Termination Fee Remittance, Applied Security Proceeds, Large Load CRA Revenue, Projected Large Load CRA Revenue, and Actual Large Load CRA Revenue have the meanings set forth in, or incorporated by reference in the Formula Rate Implementation Protocols
Covered Upgrade (Att
4, Col. (a))
Status (Active /
Terminated)
Projected Qualifying
Transmission Revenues (Lines
14-23)
Projected Supplemental
MTRC or Annual Termination
Fee Remittance (Note C)
Prior-Period True-Up
Adjustment (Note D)
Projected Supplemental
MTRC and Annual
Termination Fee Remittances
(Col. 6 + Col. 7)
Scheduled Annual
Termination Fee Remittance
— CRA Schedule 5
Transmission Rate
($/MWh)
Projected Qualifying
Transmission Revenues ($)
Opening Unpaid
Supplemental MTRC
Net Supplemental MTRC Billed
(including prior-period
adjustments; Note E)
Customer Payments
Collected and Remitted
by NYISO
Security Proceeds Received
from NYISO and Applied to
Supplemental MTRC
Direct Recoveries Received
and Applied to Supplemental
MTRC
Annual Termination Fee
Remittances Received
Actual Large Load CRA
Revenue (c)+(d)+(e)+(f)
Closing Unpaid Supplemental
MTRC (a)+(b)-(c)-(d)-(e)
NYISO bills each active Eligible Customer its projected Supplemental MTRC (Column 8) in equal monthly installments during the Rate Year. In the Annual Update, Column 6 and line 12 show the actual Supplemental MTRC based on actual Qualifying Transmission Revenues, and the Supplemental MTRC billed is trued up to that amount, without interest, on Attachment 5, Lines 14-23 (Supplemental MTRC True-Up by Eligible Customer and Covered Upgrade). That customer-level true-up is separate from the credit on Attachment 1, Line 5a, which in the Annual Update is the Actual Large Load CRA Revenue on line 34 (Note E). When an Eligible Customer terminates its CRA, NYISO holds the Termination Fee and makes an Annual Termination Fee Remittance to LSPGNY each year under the CRA.
For an active row, Column 6 equals Column 5 less Column 4, not less than zero; each Covered Upgrade is measured separately. For a terminated row, Column 6 equals the scheduled Annual Termination Fee Remittance entered in Column K from the Termination Fee Remittance Worksheet in Schedule 5 of the applicable CRA. That scheduled amount reflects applicable partial-year proration, is limited to the available Termination Fee Balance, and includes any residual balance and actual earnings required to be remitted with the final installment. Actual Annual Termination Fee Remittances received are recorded separately on Lines 24–34.
Column 7 is the true-up adjustment for the Eligible Customer and Covered Upgrade from Attachment 5, Lines 14-23 (Supplemental MTRC True-Up by Eligible Customer and Covered Upgrade). True-up adjustments for terminated Eligible Customers are addressed under the CRA. In the Annual Update, Column 7 is zero.
Lines 24-34 are completed in the Annual Update only. Record Supplemental MTRC billed, including prior-period adjustments, and amounts LSPGNY actually receives during the Rate Year for current- or prior-year bills: customer payments collected and remitted by NYISO (c); Security proceeds received from NYISO and applied to Supplemental MTRC obligations (d); direct recoveries received and applied to Supplemental MTRC obligations (e); and Annual Termination Fee Remittances received (f). Exclude construction-cost recoveries, unapplied Security, and the full Termination Fee held by NYISO; only annual termination remittances enter (f). Enter refunds of previously credited receipts as negative amounts in the original receipt category, supported by a receipt/refund workpaper. A Supplemental MTRC refund restores an unpaid balance only to the extent the underlying obligation remains due. If a refund corrects an overbilling, also enter the corresponding signed billing correction in (b); reconcile gross bills, corrections, and net billed amounts in the workpaper. Refunds in (f) reverse the termination-remittance credit without changing unpaid Supplemental MTRC. Column (g) credits net receipts on Attachment 1, Line 5a. Unreceived bills are not credited; differences from projected credits flow through the ordinary true-up with applicable interest. Later receipts are credited in the year received, once. Carry closing unpaid Supplemental MTRC (h) to opening balance (a) in the next Annual Update. Expected collections of prior-year unpaid amounts are excluded from Projected Large Load CRA Revenue.PDF page 9
Attachment 2 - Cost Support
LS Power Grid New York Corporation I Plant in Service Worksheet (Note 2)
1
Calculation of Transmission Plant In Service Source (Less ARO, see Note 1)
Year
Balance
2
December
p206.58.b
-
-
3
January
company records
-
-
4
February
company records
-
-
5
March
company records
-
-
6
April
company records
-
-
7
May
company records
-
-
8
June
company records
-
-
9
July
company records
-
-
10
August
company records
-
-
11
September
company records
-
-
12
October
company records
-
-
13
November
company records
-
-
14
December
p207.58.g
-
-
15
Transmission Plant In Service
(sum lines 2-14) /13
-
16
Calculation of Distribution Plant In Service Source (Less ARO, see Note 1)
17
December
p206.75.b
-
-
18
January
company records
-
-
19
February
company records
-
-
20
March
company records
-
-
21
April
company records
-
-
22
May
company records
-
-
23
June
company records
-
-
24
July
company records
-
-
25
August
company records
-
-
26
September
company records
-
-
27
October
company records
-
-
28
November
company records
-
-
29
December
p207.75.g
-
-
30
Distribution Plant In Service
(sum lines 17-29) /13
-PDF page 10
31
Calculation of Intangible Plant In Service Source (Less ARO, see Note 1)
32
December
p204.5.b
-
-
33
January
company records
-
-
34
February
company records
-
-
35
March
company records
-
-
36
April
company records
-
-
37
May
company records
-
-
38
June
company records
-
-
39
July
company records
-
-
40
August
company records
-
-
41
September
company records
-
-
42
October
company records
-
-
43
November
company records
-
-
44
December
p205.5.g
-
-
45
Intangible Plant In Service
(sum lines 32-44) /13
-
46
Calculation of General Plant In Service Source (Less ARO, see Note 1)
47
December
p206.99.b
-
-
48
January
company records
-
-
49
February
company records
-
-
50
March
company records
-
-
51
April
company records
-
-
52
May
company records
-
-
53
June
company records
-
-
54
July
company records
-
-
55
August
company records
-
-
56
September
company records
-
-
57
October
company records
-
-
58
November
company records
-
-
59
December
p207.99.g
-
-
60
General Plant In Service
(sum lines 47-59) /13
-
61
Calculation of Production Plant In Service Source (Less ARO, see Note 1)
62
December
p204.46b
-
-
63
January
company records
-
-
64
February
company records
-
-
65
March
company records
-
-
66
April
company records
-
-
67
May
company records
-
-
68
June
company records
-
-
69
July
company records
-
-
70
August
company records
-
-
71
September
company records
-
-
72
October
company records
-
-
73
November
company records
-
-
74
December
p205.46.g
-
-
75
Production Plant In Service
(sum lines 62-74) /13
-
76
Total Plant In Service
(sum lines 15, 30, 45, 60, & 75)
-PDF page 11
Accumulated Depreciation Worksheet
Appendix A Line #s, Descriptions, Notes, Form 1 Page #s and Instructions 77
Calculation of Transmission Accumulated Depreciation
Source (Less ARO, see Note 1)
Year
Balance
78
December
Prior year p219.25.c
-
-
79
January
company records
-
-
80
February
company records
-
-
81
March
company records
-
-
82
April
company records
-
-
83
May
company records
-
-
84
June
company records
-
-
85
July
company records
-
-
86
August
company records
-
-
87
September
company records
-
-
88
October
company records
-
-
89
November
company records
-
-
90
December
p219.25.c
-
-
91
Transmission Accumulated Depreciation
(sum lines 78-90) /13
-
92
Calculation of Distribution Accumulated Depreciation
Source (Less ARO, see Note 1)
93
December
Prior year p219.26.c
-
-
94
January
company records
-
-
95
February
company records
-
-
96
March
company records
-
-
97
April
company records
-
-
98
May
company records
-
-
99
June
company records
-
-
100
July
company records
-
-
101
August
company records
-
-
102
September
company records
-
-
103
October
company records
-
-
104
November
company records
-
-
105
December
p219.26.c
-
-
106
Distribution Accumulated Depreciation
(sum lines 93-105) /13
-PDF page 12
107
Calculation of Intangible Accumulated Amortization Source (Less ARO, see Note 1)
108
December
Prior year p200.21.c
-
-
109
January
company records
-
-
110
February
company records
-
-
111
March
company records
-
-
112
April
company records
-
-
113
May
company records
-
-
114
June
company records
-
-
115
July
company records
-
-
116
August
company records
-
-
117
September
company records
-
-
118
October
company records
-
-
119
November
company records
-
-
120
December
p200.21.c
-
-
121
Accumulated Intangible Amortization
(sum lines 108-120) /13
-
122
Calculation of General Accumulated Depreciation Source (Less ARO, see Note 1)
123
December
Prior year p219.28.c
-
-
124
January
company records
-
-
125
February
company records
-
-
126
March
company records
-
-
127
April
company records
-
-
128
May
company records
-
-
129
June
company records
-
-
130
July
company records
-
-
131
August
company records
-
-
132
September
company records
-
-
133
October
company records
-
-
134
November
company records
-
-
135
December
p219.28.c
-
-
136
Accumulated General Depreciation
(sum lines 123-135) /13
-
137
Calculation of Production Accumulated Depreciation Source (Less ARO, see Note 1)
138
December
p219.20.c to 24.c (prior year)
-
-
139
January
company records
-
-
140
February
company records
-
-
141
March
company records
-
-
142
April
company records
-
-
143
May
company records
-
-
144
June
company records
-
-
145
July
company records
-
-
146
August
company records
-
-
147
September
company records
-
-
148
October
company records
-
-
149
November
company records
-
-
150
December
p219.20.c to 24.c
-
-
151
Production Accumulated Depreciation
(sum lines 138-150) /13
-
152
Total Accumulated Depreciation and Amortization (sum lines 91, 106, 121, 136, & 151)
-PDF page 13
Acquisition Adjustment Worksheet
FERC 115 -
FERC 406 -
Calculation of Transmission Acquisition Adj.
Source
Year
FERC 114 - Balance
Accumulated Amortization
Net Balance
Amortization Exp
153
December
company records
-
- - - - 154
January
company records
-
- - - - 155
February
company records
-
- - - - 156
March
company records
-
- - - - 157
April
company records
-
- - - - 158
May
company records
-
- - - - 159
June
company records
-
- - - - 160
July
company records
-
- - - - 161
August
company records
-
- - - - 162
September
company records
-
- - - - 163
October
company records
-
- - - - 164
November
company records
-
- - - - 165
December
company records
-
- - - - 166
Transmission Acquisition Adj.
(sum lines 153-165) /13
- - - - Note
1
Balances exclude Asset Retirement Costs.
2
For the initial rate year, capital balances that are typically based on a 13-month average will be divided by the number of months the rate is in effect.PDF page 14
Attachment 2a - Project Plant Detail Worksheet
LS Power Grid New York Corporation I
(1) (2)
(3) (4)
(5) (6)
(7) (8)
(9) (10)
(11) (12)
(13) (14)
(15) Project Name (Note A)
December
January
February
March
April
May
June
July
August
September
October
November
December
13-month average
1a
- - - - - - - - - - - - - - 1b
- - - - - - - - - - - - - - 1c
- - - - - - - - - - - - - - 1d
- - - - - - - - - - - - - - 1e
- - - - - - - - - - - - - - …
…
- - - - - - - - - - - - - - 1
Total Project Transmission Gross Plant
- - - - - - - - - - - - - -
(1) (2)
(3) (4)
(5) (6)
(7) (8)
(9) (10)
(11) (12)
(13) (14)
(15) Project Name
December
January
February
March
April
May
June
July
August
September
October
November
December
13-month average
2a
- - - - - - - - - - - - - - 2b
- - - - - - - - - - - - - - 2c
- - - - - - - - - - - - - - 2d
- - - - - - - - - - - - - - 2e
- - - - - - - - - - - - - - …
…
- - - - - - - - - - - - - - 2
Total Project Transmission Accumulated Depreciation
- - - - - - - - - - - - - -
(1) (2)
(3) (4)
(5) (6)
(7) (8)
(9) (10)
(11) (12)
(13) (14)
(15) Project Name
December
January
February
March
April
May
June
July
August
September
October
November
December
13-month average
3a
- - - - - - - - - - - - - - 3b
- - - - - - - - - - - - - - 3c
- - - - - - - - - - - - - - 3d
- - - - - - - - - - - - - - 3e
- - - - - - - - - - - - - - …
…
- - - - - - - - - - - - - - 3
Total Project Unamortized Regulatory Asset
- - - - - - - - - - - - - -
(1) (2)
(3) (4)
(5) (6)
(7) (8)
(9) (10)
(11) (12)
(13) (14)
(15) Project Name
December
January
February
March
April
May
June
July
August
September
October
November
December
13-month average
4a
- - - - - - - - - - - - - - 4b
- - - - - - - - - - - - - - 4c
- - - - - - - - - - - - - - 4d
- - - - - - - - - - - - - - 4e
- - - - - - - - - - - - - - …
…
- - - - - - - - - - - - - - 4
Total Project Unamortized Abandoned Plant
- - - - - - - - - - - - - -
(1) (2)
Project Name
5a
-
5b
-
5c
-
5d
-
5e
-
…
…
-
5
Total Project Transmission Net Plant
- Ties to Appendix A, Line 103
Note
A
Monthly balances are from company records. Project names entered in column (1) carry to Attachment 4, Column (a), and Attachment 5, Lines 2-2d. Project names entered on Attachment 1a, Column 2 and Lines 14-23, and on Attachment 5, Lines 14-23, Column B, must match the names entered here. B
Line 5 is used as each project's Net Investment on Attachment 4, Column (b); Line 1 is used as Gross Plant In Service on Attachment 4, Column (l).
Line
No.
Project
Transmission
Gross Plant (Note B)
Line
No.
Project
Transmission Accumulated
Depreciation
Line
No.
Project
Unamortized Regulatory Asset
Line
No.
Project
Unamortized Abandoned Plant
Line
No.
Project
Transmission
Net Plant (Note B)
13-month average
(Line 1 - Line 2 + Line 3 + Line 4)PDF page 15
Attachment 3 - Cost Support
LS Power Grid New York Corporation I
Numbering continues from Attachment 2
Beginning of Year
End of Year
Average Balance
167
Account No. 255 (enter negative)
267.8.h
- -
168
Portion of Unamortized ITC Not Reflected in Rate Base (enter negative)
- -
169
Portion of Unamortized ITC Reducing in Rate Base
- - -
Jurisdiction 1
Jurisdiction 2
Total
170
Investment Tax Credit Amortization (enter negative)
114.19.c
- -
171
ITC Amortization Not Permitted to Reduce Recoverable Tax Expense (enter negative)
- -
172
ITC Amortization Permitted to Reduce Recoverable Tax Expense
- -
173
Applicable Tax Gross-up Factor
- -
174
Investment Tax Credit Amortization Adjustment
- - -
175
Prepayments (Account 165)
A
B
(Prepayments exclude Prepaid Pension Assets)
Year
Balance
176
December
111.57.d
-
-
177
January
company records
-
-
178
February
company records
-
-
179
March
company records
-
-
180
April
company records
-
-
181
May
company records
-
-
182
June
company records
-
-
183
July
company records
-
-
184
August
company records
-
-
185
September
company records
-
-
186
October
company records
-
-
187
November
company records
-
-
188
December
111.57.c
-
-
189
Prepayments
(sum lines 176-188) /13
-
Reserves
189a
(b) (c)
(d) (e)
(f) (g)
(h) List of all Reserves
Amount
190
Reserve 1
- - - - - - 190a
Reserve 2
- - - - - - 190b
Reserve 3
- - - - - - 190c
Reserve 4
- - - - - - 190d
…
- - - - - - 190e
…
- - - - - - Total
-
Enter 1 if NOT in a
trust or reserved
account, enter zero (0)
if included in a trust or
reserved account
Enter 1 if the accrual account
is included in the formula rate,
enter (0) if O if the accrual
account is NOT included in the
formula rate
Enter the percentage paid
for by customers, less the
percent associated with
an offsetting liability on
the balance sheet
Allocation (Plant or Labor
Allocator)
Amount Allocated,
col. c x col. d x col. e
x col. f x col. g
All unfunded reserves will be listed above, specifically including (but not limited to) all subaccounts for FERC Account Nos. 228.1 through 228.4. "Unfunded reserve" is defined as an accrued balance (1) created and increased by debiting an expense which is included in this formula rate (column (e), using the same allocator in column (g) as used in the formula to allocate the amounts in the corresponding expense account) (2) in advance of an anticipated expenditure related to that expense (3) that is not deposited in a restricted account (e.g., set aside in an escrow account, see column (d)) with the earnings thereon retained within that account. Where a given reserve is only partially funded through accruals collected from customers, only the balance funded by customer collections shall serve as a rate base credit, see column (f). The source of monthly balance data is company records.PDF page 16
Month
Year
(a) (b)
(c) (d)
Note A
Note B
191
December
-
- -
192
January
-
- -
193
February
-
- -
194
March
-
- -
195
April
-
- -
196
May
-
- -
197
June
-
- -
198
July
-
- -
199
August
-
- -
200
September
-
- -
201
October
-
- -
202
November
-
- -
203
December
-
- -
204
Average of the 13 Monthly Balances
- -
205
Amortization Expense of Abandoned Plant
-
Multi-jurisdictional Workpaper
New York
State 2
State 3
State 4
State 5
Weighed Average
Income Tax Rates
Weighting
206
SIT=Composite State Income Tax Rate
0
SIT will include multiple state or local income tax rates, if applicable, weighted based on the apportionment methodologies of each jurisdiction and the number of days in the year that the rates are effective. 207
The Tax Effect of Permanent Differences captures the differences in the income taxes due under the Federal and State calculations and the income taxes calculated in Appendix A that are not the result of a timing difference. If any, a workpaper showing the calculation will be attached.
-
Materials & Supplies
Total
Note: for the projection, the prior year's actual balances will be used p227.16
p227.8
Form No.1 page
(a) (b)
c (col a+col b)
208
December
Column b
- - - 209
January
Company Records
- - - 210
February
Company Records
- - - 211
March
Company Records
- - - 212
April
Company Records
- - - 213
May
Company Records
- - - 214
June
Company Records
- - - 215
July
Company Records
- - - 216
August
Company Records
- - - 217
September
Company Records
- - - 218
October
Company Records
- - - 219
November
Company Records
- - - 220
December
Column c
- - - 221
Average
sum line 208 to 220 divided by 13
-
Notes
A
Recovery of regulatory assets requires authorization from the Commission. B
Recovery of abandoned plant is limited to any abandoned plant recovery authorized by FERC. Unamortized
Regulatory Asset
Unamortized Abandoned
Plant
Stores Expense
Undistributed
Transmission Materials &
SuppliesPDF page 17
Attachment 3 - Cost Support
COST OF CAPITAL
LS Power Grid New York Corporation I
RETURN ON RATE BASE ( R )
$
222
Long Term Interest (117, sum of 62.c through 67.c) (Note D)
-
223
Preferred Dividends (118.29c) (positive number)
-
224
Proprietary Capital (Line 25 (c))
-
225
Less Preferred Stock (Line 9)
-
226
Less Account 216.1 Undistributed Subsidiary Earnings (Line 25 (d))
-
227
Less Account 219 Accum. Other Comprehensive Income (Line 25 (e))
-
228
Common Stock
(Sum of Lines 224 through 227)
-
$
%
Cost
Weighted
229
Long Term Debt
Line 246 col (a), Note A and Appendix A Note P
-
100.00%
0.00%
0.00%
=WCLTD
230
Preferred Stock
Line 246 col (b), Note B and Appendix A Note P
-
0.00%
0.00%
0.00%
231
Common Stock
Line 228 col (b), Note C and Appendix A Notes O and P
-
0.00%
0.00%
0.00%
232
Total
(Sum of Lines 229 through 231)
-
0.00%
=R
(a) (b)
( c )
(d) ( e )
Monthly Balances for Capital Structure
233
December (Prior Year)
- - - - - 234
January
- - - - - 235
February
- - - - - 236
March
- - - - - 237
April
- - - - - 238
May
- - - - - 239
June
- - - - - 240
July
- - - - - 241
August
- - - - - 242
September
- - - - - 243
October
- - - - - 244
November
- - - - - 245
December
- - - - - 246
13-Month Average
- - - - - Notes
A
Long Term debt balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112, lines 18.c to 21.c, in the Form No. 1; the cost is calculated by dividing line 222 by the Long Term Debt balance on line 229. B
Preferred Stock balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112 line 3.c in the Form No. 1 C
Common Stock balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on Form 1 page 112 line 16.c less lines 3.c , 12.c, and 15.c D
Long-term interest will exclude any short-term interest included in FERC Account 430, Interest on Debt to Associated Companies Long Term Debt
(Note A)
Preferred Stock
(112.3.c)
Proprietary Capital
(112.16.c)
Undistributed Sub
Earnings 216.1
(112.12.c)
Accum Other
Comp. Income
219 (112.15.c)PDF page 18
LS Power Grid New York Corporation I
Project Worksheet
Attachment 4
For the 12 months ended 12/31/____
Utilizing Appendix A Data
The calculations below calculate that additional revenue requirement for 100 basis points of ROE and 1 percent change in the equity component of the capital structure. These amounts are then used to valuate the actual increase in revenue in the table below (starting on line 66) associated with the actual incentive authorized by the Commission The use of the 100 basis point calculations do not presume any particular incentive (i.e., 100 basis points) being granted by the Commission. Base ROE and Income Taxes Carrying Charge
Allocator
Result
1 Rate Base
-
2 BASE RETURN CALCULATION:
$
%
Cost
Weighted
3 Long Term Debt
(Appendix A, Line 96)
-
100.00%
0.00%
0.00%
4 Preferred Stock
(Appendix A, Line 97)
-
0.00%
-
0.00%
5 Common Stock
(Appendix A, Line 98)
-
0.00%
0.00%
0.00%
6 Total (sum lines 3-5)
-
0.00%
7 Return multiplied by Rate Base (line 1 * line 6)
-
8 INCOME TAXES
9 T=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)} = (Appendix A, line 65)
-
10 CIT=(T/1-T) * (1-(WCLTD/R)) =
-
11 where WCLTD=(line 3) and R= (line 6)
12 and FIT, SIT & p are as given in footnote E on Appendix A.
13 1 / (1 - T) = (T from line 9)
-
14 Amortized Investment Tax Credit (266.8f) (enter negative)
-
15 Income Tax Calculation = line 10 * line 7 * (1-n)
-
-
16 ITC adjustment (line 13 * line 14) * (1-n)
-
NP
-
-
17 Total Income Taxes
(line 15 plus line 16)
-
-
18 Base Return and Income Taxes
Sum lines 7 and 17
-
19 Rate Base
Line 1
-
20 Return and Income Taxes at Base ROE
Line 18 / line 19
-PDF page 19
100 Basis Point Incentive ROE and Income Taxes Carrying Charge Attachment 4
Result
21 Rate Base
-
22 100 Basis Point Incentive Return impact on
$
%
Cost
Weighted
23 Long Term Debt
(line 3)
-
100.00%
0.00%
0.00%
24 Preferred Stock
(line 4)
-
0.00%
0.00%
0.00%
25 Common Stock
(line 5 plus 100 basis points)
-
0.00%
0.00%
0.00%
26 Total (sum lines 24-26)
-
0.00%
27 100 Basis Point Incentive Return multiplied by Rate Base (line 21 * line 26)
-
28 INCOME TAXES
29 T=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)} = (Appendix A, line 61)
-
30 CIT=(T/1-T) * (1-(WCLTD/R)) =
-
31 where WCLTD=(line 23) and R= (line 26)
32 and FIT, SIT & p are as given in footnote E on Appendix A. 33 1 / (1 - T) = (T from line 29)
-
34 Amortized Investment Tax Credit (line 14)
-
35 Income Tax Calculation = line 30 * line 27 * (1-n)
-
-
36 ITC adjustment (line 33 * line 34) * (1-n)
-
NP
-
-
37 Total Income Taxes
(line 35 plus line 36)
-
-
38 Return and Income Taxes with 100 basis point increase in ROE Sum lines 27 and 37
-
39 Rate Base
Line 21
-
40 Return and Income Taxes with 100 basis point increase in ROE Line 38 / line 39
-
41 Difference in Return and Income Taxes between Base ROE and 100 Basis Point Incentive Line 41- Line 20
-
Effect of 1% Increase in the Equity Ratio
Results
42 Rate Base
-
43 100 Basis Point Incentive Return
$
%
Cost
Weighted
44 Long Term Debt
(line 3 minus 1% in equity ratio)
-
0.00%
0.00%
0.00%
45 Preferred Stock
(line 4)
-
0.00%
0.00%
0.00%
46 Common Stock
(line 5 plus 1% in equity ratio))
-
0.00%
0.00%
0.00%
47 Total (sum lines 44-46)
-
0.00%
48 Line 47 x line 42
-
49 INCOME TAXES
50 T=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)} = (Appendix A, line 61)
-
51 CIT=(T/1-T) * (1-(WCLTD/R)) =
-
52 where WCLTD=(line 44) and R= (line 47)
53 and FIT, SIT & p are as given in footnote E on Appendix A. 54 1 / (1 - T) = (T from line 50)
-
55 Amortized Investment Tax Credit (line 14)
-
56 Income Tax Calculation = line 51 * line 48 * (1-n)
-
-
57 ITC adjustment (line 54 * line 55) * (1-n)
-
NP
-
-
58 Total Income Taxes
(line 56 plus line 57)
-
-
59 Return and Income Taxes with 1% Increase in the Equity Ratio Sum lines 48 and 58
-
60 Rate Base
Line 42
-
61 Return and Income Taxes with 1% Increase in the Equity Ratio Line 59 / line 60
-
62 Difference between Base ROE and 1% Increase in the Equity Ratio Line 61 - Line 20
-PDF page 20
63 Revenue Requirement per project including incentives
64 Expense Allocator
[Appendix A, lines 48 and 63, less Appendix A, line 47a (project specific) / Gross Transmission Plant In Service Column (l). If Gross Transmission Plant is zero, then the Expense Allocator should be zero] (Note B)
-
65 Base Carrying Charge
Appendix A, Line 106
-
The table below breaks out the total revenue requirement on Appendix A separately for each investment. The total of Column (q) must equal the amount shown on Appendix A, Line 3.
(a) (b)
(c) (d)
(e) (f)
(g) (h)
(i) (j)
(k) (l)
(m) (n)
(o) (p)
(q) Line Description
Net Investment (Note A) Line 41
66 - - 0.00%
- - -
- - - - -
-
66a - - 0.00%
- - -
- - - - -
-
66b - - 0.00%
- - -
- - - - -
-
66c - - 0.00%
- - -
- - - - -
-
66d - - 0.00%
- - -
- - - - -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
…
0.00%
- - -
- -
- -
-
0.00%
- - -
- -
- -
67 Total
$0
-
- -
$0
- - - - 68 Check Sum Appendix A Line 3
-
69 Difference (must be equal to zero)
-
Note:
A
Column (b), Net Investment includes the Net Plant In Service, unamortized regulatory assets, and unamortized abandoned plant. B
Column (l), Gross Plant in Service excludes Regulatory Assets, CWIP, and Abandoned Plant. C
Competitive Bid Concession, if any, will reflect outcome of competitive developer selection process and will be computed on a workpaper that will be provided as supporting documentation for each Annual Update and will be zero or a reduction to the revenue requirement. The amount in Column (p) above equals the amount by which the annual revenue requirement is reduced from the ceiling rate. D
Column (e), for each project with an incentive in column (e), note the docket No. in which FERC granted the incentive> Project
Docket No.
Note
ROE Authorized
by FERC (Note
D) ROE Base
(From Appendix
A, line 98)
Incentive %
Authorized by
FERC
Col (e) / .01 x Col
(f) Incentive $ (Col (b)
x Col (g)
Equity % in Capital
Structure (% above base
%, -% below base %)(1
equals 1%)
Impact of Equity
Component of Capital
Structure(Col (b) x (i) x
Line 62
Base Return and Tax (Line 65 x Col
(b) Gross Plant In
Service (Note B)
Expense Allocator
(line 64)
O&M, Taxes Other than
Income (Col.
(l) x Col. (m)
Depreciation/
Amortization Expense
Competitive Bid
Concession (Note
C) Total Revenues (Col.
(h) + (j) + (k) +(n) +
(o) -(p))PDF page 21
Attachment 5 - Example of True-Up Calculation
LS Power Grid New York Corporation I
Year
Annual True-Up Calculation
1
A
B
C
D
E
F
G
Actual
Net
Adjusted
Under/(Over)
Interest
Total True-Up
Project
Net Revenue
Collection
Income
Adjustment
Identification
Project Name
Requirement1
Revenue Received2
(C-D)
(Expense)
(E + F)
2
- - - - - - 2a
- - - - - - 2b
- - - - - - 2c
- - - - - - 2d
- - - - - -
- - - - - 3
Total
- - - - - FERC Refund Interest Rate
(a) (b)
(c) (d)
4
Interest Rate:
Quarter
Year
5
1st Qtr.
-
0.00%
6
2nd Qtr
-
0.00%
7
3rd Qtr
-
0.00%
8
4th Qtr
-
0.00%
9
1st Qtr
-
0.00%
10
2nd Qtr
-
0.00%
11
3rd Qtr
-
0.00%
12
Sum lines 5-11
0.00%
13
Avg. Monthly FERC Rate
Line 12 divided by 7
0.00%
Supplemental MTRC True-Up by Eligible Customer and Covered Upgrade (Note 5)
A
B
C
D
E
Eligible Customer
Covered Upgrade
Actual Supplemental MTRC
14
- - -
15
- - -
16
- - -
17
- - -
18
- - -
19
- - -
20
- - -
21
- - -
22
- - -
23
- - -
24
Total
- - -
Notes
1. From Attachment 4, Column (q) for the period being trued-up
2. The "revenue received" is the total amount of revenue distributed in the True-Up Year, excluding Large Load CRA Revenue on Attachment 1, Line 5a. The amounts do not include any true-ups or prior period adjustments and reflects any Competitive Bid Concessions
3. The Monthly Interest Rate shall be equal to the interest rate set forth on line 13 and be applied to the amount in Column E for a period of 24 months
4. The True-Up Adjustment is applied to each project pro rata based on its contribution to the Revenue Requirement shown in Attachment 4
Quarterly Interest Rate under
Section 35.19(a)
Supplemental
MTRC Billed
Excluding Prior-
Period True-Up
Adjustments
True-Up
Adjustment (D -
C) 5. Lines 14-23 (Supplemental MTRC True-Up by Eligible Customer and Covered Upgrade) compare Supplemental MTRC billed to each active Eligible Customer for each Covered Upgrade during the True-Up Year, EXCLUDING any prior-period true-up adjustment included in that billing, with Supplemental MTRC based on actual Qualifying Transmission Revenues from Attachment 1a, Column 6, in the Annual Update for that year. The difference, without interest, is included in Attachment 1a, Column 7. Nonpayment alone does not create another customer-level charge.PDF page 22
LS Power Grid New York Corporation I
Attachment 6a - Accumulated Deferred Income Taxes (ADIT) Proration and Averaging Worksheet
Projected Annual Transmission Revenue Requirement
For the 12 months ended 12/31/____
Line
No.
ADIT Account
Amount
1
190
- From line 25
2
281 (enter negative)
- From line 58
3
282 (enter negative)
- From line 91
4
283 (enter negative)
- From line 124
5
Total Projected ADIT
- Enter as negative Appendix A, page 2, line 27
6
Rate year =
-
7
Test period days after rates become effective
-
8
9
Note 2 - The components of the accumulated deferred income tax balances are detailed on Attachment 6b.
Note 1 - The computations on this workpaper average the projected annual activity of accumulated deferred income taxes. To the extent that the ADIT is subject to the normalization requirements, the proration rules of Treasury Regulation Sec. 1.167(l)-1(h)(6) and the consistency rules of IRC Section 168(i)(9)(B) are applied. Activity related to the portions of the account balances not subject to the proration requirement are averaged instead of prorated.PDF page 23
10
Account 190 - Accumulated Deferred Income Taxes
11
Beginning Balance
-
12
Less: Portion not related to transmission
-
13
Less: Portion not reflected in rate base
-
14
Subtotal: Portion reflected in rate base
Line 11 - line 12 - line 13
-
15
Less: Portion subject to proration
Line 29, Col. D
-
16
Portion subject to averaging
Line 14 - line 15
-
17
Ending Balance
-
18
Less: Portion not related to transmission
-
19
Less: Portion not reflected in rate base
-
20
Subtotal: Portion reflected in rate base
Line 17 - line 18 - line 19
-
21
Less: Portion subject to proration (before proration)
Line 41 Col. D
-
22
Portion subject to averaging (before averaging)
Line 20 - line 21
-
23
Ending balance of portion subject to proration (prorated)
Line 41 Col. H
-
24
Average balance of portion subject to averaging
(Line 16 + line 22) / 2
-
25
Amount reflected in rate base
Line 23 + line 24
- Enter on line 1
26
27
Account 190 - Accumulated Deferred Income Taxes
(a) (b)
(c) (d)
(e) (f)
(g) (h)
28
Month
Year
29
December 31,
-
NA -
NA
-
NA -
30
January
-
- -
0
- - - 31
February
-
- -
0
- - - 32
March
-
- -
0
- - - 33
April
-
- -
0
- - - 34
May
-
- -
0
- - - 35
June
-
- -
0
- - - 36
July
-
- -
0
- - - 37
August
-
- -
0
- - - 38
September
-
- -
0
- - - 39
October
-
- -
0
- - - 40
November
-
- -
0
- - - 41
December
-
- -
0
- - - 42
Total
-
Amount
debit / <credit>
Note 3 - Accumulated deferred income tax activity in account 190 subject to the proration rules relates to taxable contributions in aid of construction, net operating loss carryforwards, regulatory liabilities for excess deferred income taxes and any other amounts subject to the Section 168 or other normalization requirements. Forecasted Monthly
Activity
debit / <credit>
Forecasted Month-
end Balance
debit / <credit>
Days until End
of Test Period
Days in Test
Period
Prorated Forecasted
Monthly Activity
debit / <credit>
(c) X (e) X (f)
Forecasted Prorated
Month-end Balance
debit / <credit>
Prior Month Col. (h) +
Current Month Col. (g)PDF page 24
43
Account 281 - Accumulated Deferred Income Taxes
44
Beginning Balance
-
45
Less: Portion not related to transmission
-
46
Less: Portion not reflected in rate base
-
47
Subtotal: Portion reflected in rate base
Line 44 - line 45 - line 46
-
48
Less: Portion subject to proration
Line 62 Col. D
-
49
Portion subject to averaging
Line 47 - line 48
-
50
Ending Balance
-
51
Less: Portion not related to transmission
-
52
Less: Portion not reflected in rate base
-
53
Subtotal: Portion reflected in rate base
Line 50 - line 51 - line 52
-
54
Less: Portion subject to proration (before proration)
Line 74 Col. D
-
55
Portion subject to averaging (before averaging)
Line 53 - line 54
-
56
Ending balance of portion subject to proration (prorated)
Line 74 Col. H
-
57
Average balance of portion subject to averaging
(Line 49 + line 55) / 2
-
58
Amount reflected in rate base
Line 56 + line 57
- Enter on line 2
59
60
Account 281 - Accumulated Deferred Income Taxes
(a) (b)
(c) (d)
(e) (f)
(g) (h)
61
Month
Year
62
December 31,
-
NA -
NA
-
NA -
63
January
-
- -
0
- - - 64
February
-
- -
0
- - - 65
March
-
- -
0
- - - 66
April
-
- -
0
- - - 67
May
-
- -
0
- - - 68
June
-
- -
0
- - - 69
July
-
- -
0
- - - 70
August
-
- -
0
- - - 71
September
-
- -
0
- - - 72
October
-
- -
0
- - - 73
November
-
- -
0
- - - 74
December
-
- -
0
- - - 75
Total
-
Amount
debit / <credit>
Note 4 - Accumulated deferred income tax activity in account 281 subject to the proration rules relates differences between depreciation methods and lives for public utility property and any other amounts subject to the Section 168 or other normalization requirements. Forecasted Monthly
Activity
debit / <credit>
Forecasted Month-
end Balance
debit / <credit>
Days until End
of Test Period
Days in Test
Period
Prorated Forecasted
Monthly Activity
debit / <credit>
(c) X (e) X (f)
Forecasted Prorated
Month-end Balance
debit / <credit>
Prior Month Col. (h) +
Current Month Col. (g)PDF page 25
76
Account 282 - Accumulated Deferred Income Taxes
77
Beginning Balance
-
78
Less: Portion not related to transmission
-
79
Less: Portion not reflected in rate base
-
80
Subtotal: Portion reflected in rate base
Line 77 - line 78 - line 79
-
81
Less: Portion subject to proration
Line 95 Col. D
-
82
Portion subject to averaging
Line 80 - line 81
-
83
Ending Balance
-
84
Less: Portion not related to transmission
-
85
Less: Portion not reflected in rate base
-
86
Subtotal: Portion reflected in rate base
Line 78 - line 79 - line 80
-
87
Less: Portion subject to proration (before proration)
Line 107 Col. D
-
88
Portion subject to averaging (before averaging)
Line 81 - line 82
-
89
Ending balance of portion subject to proration (prorated)
Line 107 Col. H
-
90
Average balance of portion subject to averaging
(Line 82 + line 88) / 2
-
91
Amount reflected in rate base
Line 89 + line 90
- Enter on line 3
92
93
Account 282 - Accumulated Deferred Income Taxes
(a) (b)
(c) (d)
(e) (f)
(g) (h)
94
Month
Year
95
December 31,
-
NA -
NA
-
NA -
96
January
-
-
0
- - - 97
February
-
-
0
- - - 98
March
-
-
0
- - - 99
April
-
-
0
- - - 100
May
-
-
0
- - - 101
June
-
-
0
- - - 102
July
-
-
0
- - - 103
August
-
-
0
- - - 104
September
-
-
0
- - - 105
October
-
-
0
- - - 106
November
-
-
0
- - - 107
December
-
-
0
- - - 108
Total
-
Amount
debit / <credit>
Note 5 - Accumulated deferred income tax activity in account 282 subject to the proration rules relates differences between depreciation methods and lives for public utility property and any other amounts subject to the Section 168 or other normalization requirements. Forecasted Monthly
Activity
debit / <credit>
Forecasted Month-
end Balance
debit / <credit>
Days until End
of Test Period
Days in Test
Period
Prorated Forecasted
Monthly Activity
debit / <credit>
(c) X (e) X (f)
Forecasted Prorated
Month-end Balance
debit / <credit>
Prior Month Col. (h) +
Current Month Col. (g)PDF page 26
109
Account 283 - Accumulated Deferred Income Taxes
110
Beginning Balance
-
111
Less: Portion not related to transmission
-
112
Less: Portion not reflected in rate base
-
113
Subtotal: Portion reflected in rate base
Line 110 - line 111 - line 112
-
114
Less: Portion subject to proration
Line 128 Col. D
-
115
Portion subject to averaging
Line 113 - line 114
-
116
Ending Balance
-
117
Less: Portion not related to transmission
-
118
Less: Portion not reflected in rate base
-
119
Subtotal: Portion reflected in rate base
Line 111 - line 112 - line 113
-
120
Less: Portion subject to proration (before proration)
Line 135 Col. D
-
121
Portion subject to averaging (before averaging)
Line 114 - line 115
-
122
Ending balance of portion subject to proration (prorated)
Line 135 Col. H
-
123
Average balance of portion subject to averaging
(Line 110 + line 116) / 2
-
124
Amount reflected in rate base
Line 117 + line 118
- Enter on line 4
125
126
Account 283 - Accumulated Deferred Income Taxes
(a) (b)
(c) (d)
(e) (f)
(g) (h)
127
Month
Year
128
December 31,
-
NA -
NA
-
NA -
129
January
-
- -
0
- - - 130
February
-
- -
0
- - - 131
March
-
- -
0
- - - 132
April
-
- -
0
- - - 133
May
-
- -
0
- - - 134
June
-
- -
0
- - - 135
July
-
- -
0
- - - 136
August
-
- -
0
- - - 137
September
-
- -
0
- - - 138
October
-
- -
0
- - - 139
November
-
- -
0
- - - 140
December
-
- -
0
- - - 141
Total
-
Amount
debit / <credit>
Note 6 - Accumulated deferred income tax activity in account 283 subject to the proration rules relates differences between depreciation methods and lives for public utility property and any other amounts subject to the Section 168 or other normalization requirements. Forecasted Monthly
Activity
debit / <credit>
Forecasted Month-
end Balance
debit / <credit>
Days until End
of Test Period
Days in Test
Period
Prorated Forecasted
Monthly Activity
debit / <credit>
(c) X (e) X (f)
Forecasted Prorated
Month-end Balance
debit / <credit>
Prior Month Col. (h) +
Current Month Col. (g)PDF page 27
LS Power Grid New York Corporation I
Attachment 6b - Accumulated Deferred Income Taxes (ADIT) Detail Worksheet Projected Annual Transmission Revenue Requirement
For the 12 months ended 12/31/____
-
-
-
Composite income tax rate
0.00%
0.00%
0.00%
Explanation
Account 190 (+ = debit for DTA/DTL amounts)
Included in rate base and subject to proration
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Included in rate base but not subject to proration
Item 1
-
Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Excluded from rate base
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Total Temporary Differences - account 190
- - - Total DTA / <DTL> - account 190
- - - Account 281 (+ = debit for DTA/DTL amounts)
Included in rate base and subject to proration
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Included in rate base but not subject to proration
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Excluded from rate base
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Total Temporary Differences - account 281
- - - Total DTA / <DTL> - account 281
- - - Projected
amount -
beginning of
year
Projected
amount during
the year
Projected amount
- end of yearPDF page 28
Account 282 (+ = debit for DTA/DTL amounts)
Included in rate base and subject to proration
Tax depreciation
-
Book depreciation of tax basis
- - - Item 3
- - - Item 4
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Included in rate base but not subject to proration
Item 1
Item 2
-
Item 3
- - - Item 4
- - - Item 5
- - - Item 6
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Excluded from rate base
AFUDC-equity accrual
AFUDC-equity - book depreciation
Item 3
- - - Item 4
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Total Temporary Differences - account 282
- - - DTA / <DTL> - account 282
- - - Account 283 (+ = debit for DTA/DTL amounts)
Included in rate base and subject to proration
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Included in rate base but not subject to proration
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Excluded from rate base
Item 1
Item 2
Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Total Temporary Differences - account 283
- - - DTA / <DTL> - account 283
- - -PDF page 29
LS Power Grid New York Corporation I
Attachment 6c - Accumulated Deferred Income Taxes (ADIT) Proration and Averaging Worksheet
Actual Annual Transmission Revenue Requirement (True-up Adjustment)
For the 12 months ended 12/31/____
Line
No.
ADIT Account
Amount
1
190
- From line 25
2
281 (enter negative)
- From line 58
3
282 (enter negative)
- From line 91
4
283 (enter negative)
- From line 124
5
Total Projected ADIT
- Enter as negative Appendix A, page 2, line 27
6
Rate year =
-
7
Test period days after rates become effective
-
8
9
Note 2 - The components of the accumulated deferred income tax balances are detailed on Attachment 6d.
10
Account 190 - Accumulated Deferred Income Taxes
11
Beginning Balance
FF1 234.8.b
-
12
Less: Portion not related to transmission
-
13
Less: Portion not reflected in rate base
-
14
Subtotal: Portion reflected in rate base
Line 11 - line 12 - line 13
-
15
Less: Portion subject to proration
Line 29, Col. D
-
16
Portion subject to averaging
Line 14 - line 15
-
17
Ending Balance
FF1 234.8.c
-
18
Less: Portion not related to transmission
-
19
Less: Portion not reflected in rate base
-
20
Subtotal: Portion reflected in rate base
Line 17 - line 18 - line 19
-
21
Less: Portion subject to proration (before proration)
Line 41 Col. D
-
22
Portion subject to averaging (before averaging)
Line 20 - line 21
-
23
Ending balance of portion subject to proration (prorated)
Line 41 Col. H
-
24
Average balance of portion subject to averaging
(Line 16 + line 22) / 2
-
25
Amount reflected in rate base
Line 23 + line 24
- Enter on line 1
26
27
Account 190 - Accumulated Deferred Income Taxes
(a) (b)
(c) (d)
(e) (f)
(g) (h)
(i) (j)
(k) (l)
(m) (n)
28
Month
Year
Actual Monthly Activity
29
December 31,
-
NA -
NA
-
NA -
NA
NA
NA
NA
NA -
30
January
-
- -
0
- - -
- - - - - - 31
February
-
- -
0
- - -
- - - - - - 32
March
-
- -
0
- - -
- - - - - - 33
April
-
- -
0
- - -
- - - - - - 34
May
-
- -
0
- - -
- - - - - - 35
June
-
- -
0
- - -
- - - - - - 36
July
-
- -
0
- - -
- - - - - - 37
August
-
- -
0
- - -
- - - - - - 38
September
-
- -
0
- - -
- - - - - - 39
October
-
- -
0
- - -
- - - - - - 40
November
-
- -
0
- - -
- - - - - - 41
December
-
- -
0
- - -
- - - - - - 42
Total
-
- -
43
Account 281 - Accumulated Deferred Income Taxes
44
Beginning Balance
FF1 272.8.b
-
45
Less: Portion not related to transmission
-
46
Less: Portion not reflected in rate base
-
47
Subtotal: Portion reflected in rate base
Line 44 - line 45 - line 46
-
48
Less: Portion subject to proration
Line 62 Col. D
-
49
Portion subject to averaging
Line 47 - line 48
-
50
Ending Balance
FF1 273.8.k
-
51
Less: Portion not related to transmission
-
52
Less: Portion not reflected in rate base
-
53
Subtotal: Portion reflected in rate base
Line 50 - line 51 - line 52
-
54
Less: Portion subject to proration (before proration)
Line 74 Col. D
-
55
Portion subject to averaging (before averaging)
Line 53 - line 54
-
56
Ending balance of portion subject to proration (prorated)
Line 74 Col. H
-
57
Average balance of portion subject to averaging
(Line 49 + line 55) / 2
-
58
Amount reflected in rate base
Line 56 + line 57
- Enter on line 2
59
60
Account 281 - Accumulated Deferred Income Taxes
(a) (b)
(c) (d)
(e) (f)
(g) (h)
(i) (j)
(k) (l)
(m) (n)
61
Month
Year
Actual Monthly Activity
62
December 31,
-
NA -
NA
-
NA -
NA
NA
NA
NA
NA -
63
January
-
- -
0
- - -
- - - - - - 64
February
-
- -
0
- - -
- - - - - - 65
March
-
- -
0
- - -
- - - - - - 66
April
-
- -
0
- - -
- - - - - - 67
May
-
- -
0
- - -
- - - - - - 68
June
-
- -
0
- - -
- - - - - - 69
July
-
- -
0
- - -
- - - - - - 70
August
-
- -
0
- - -
- - - - - - 71
September
-
- -
0
- - -
- - - - - - 72
October
-
- -
0
- - -
- - - - - - 73
November
-
- -
0
- - -
- - - - - - 74
December
-
- -
0
- - -
- - - - - - 75
Total
-
- -
Note 1 - The computations on this workpaper average the actual annual activity of accumulated deferred income taxes. To the extent that the ADIT is subject to the normalization requirements, the proration rules of Treasury Regulation Sec. 1.167(l)-1(h)(6) and the consistency rules of IRC Section 168(i)(9)(B) are applied. Activity related to the portions of the account balances not subject to the proration requirement are averaged instead of prorated.
Amount
debit / <credit>
Note 3 - Accumulated deferred income tax activity in account 190 subject to the proration rules relates to taxable contributions in aid of construction, net operating loss carryforwards, regulatory liabilities for excess deferred income taxes and any other amounts subject to the Section 168 or other normalization requirements.
Forecasted Monthly
Activity
debit / <credit>
Forecasted Month-
end Balance
debit / <credit>
Days until End
of Test Period
Days in Test
Period
Prorated Forecasted
Monthly Activity
debit / <credit>
(c) X (e) X (f)
Forecasted Prorated
Month-end Balance
debit / <credit>
Prior Month Col. (h) +
Current Month Col. (g)
Difference between
projected monthly and
actual monthly activity
(See Note 7.)
Preserve projected
proration when actual
monthly and projected
monthly activity are
either both increases or
decreases.
(See Note 8.)
Fifty percent of the
difference between
projected and actual activity
when actual and projected
activity are either both
increases or decreases.
(See Note 9.)
Fifty percent of actual
activity (Col I) when
projected activity is an
increase while actual
activity is a decrease OR
projected activity is a
decrease while actual
activity is an increase.
(See Note 10.)
Balance reflecting
proration or averaging
(See Note 11.)
Amount
debit / <credit>
Note 4 - Accumulated deferred income tax activity in account 281 subject to the proration rules relates differences between depreciation methods and lives for public utility property and any other amounts subject to the Section 168 or other normalization requirements.
Forecasted Monthly
Activity
debit / <credit>
Forecasted Month-
end Balance
debit / <credit>
Days until End
of Test Period
Days in Test
Period
Prorated Forecasted
Monthly Activity
debit / <credit>
(c) X (e) X (f)
Forecasted Prorated
Month-end Balance
debit / <credit>
Prior Month Col. (h) +
Current Month Col. (g)
Difference between
projected monthly and
actual monthly activity
(See Note 7.)
Preserve projected
proration when actual
monthly and projected
monthly activity are
either both increases or
decreases.
(See Note 8.)
Fifty percent of the
difference between
projected and actual activity
when actual and projected
activity are either both
increases or decreases.
(See Note 9.)
Fifty percent of actual
activity (Col I) when
projected activity is an
increase while actual
activity is a decrease OR
projected activity is a
decrease while actual
activity is an increase.
(See Note 10.)
Balance reflecting
proration or averaging
(See Note 11.)PDF page 30
76
Account 282 - Accumulated Deferred Income Taxes
77
Beginning Balance
FF1 274.2.b
-
78
Less: Portion not related to transmission
-
79
Less: Portion not reflected in rate base
-
80
Subtotal: Portion reflected in rate base
Line 77 - line 78 - line 79
-
81
Less: Portion subject to proration
Line 95 Col. D
-
82
Portion subject to averaging
Line 80 - line 81
-
83
Ending Balance
FF1 275.2.k
-
84
Less: Portion not related to transmission
-
85
Less: Portion not reflected in rate base
-
86
Subtotal: Portion reflected in rate base
Line 78 - line 79 - line 80
-
87
Less: Portion subject to proration (before proration)
Line 107 Col. D
-
88
Portion subject to averaging (before averaging)
Line 81 - line 82
-
89
Ending balance of portion subject to proration (prorated)
Line 107 Col. H
-
90
Average balance of portion subject to averaging
(Line 82 + line 88) / 2
-
91
Amount reflected in rate base
Line 89 + line 90
- Enter on line 3
92
93
Account 282 - Accumulated Deferred Income Taxes
(a) (b)
(c) (d)
(e) (f)
(g) (h)
(i) (j)
(k) (l)
(m) (n)
94
Month
Year
Actual Monthly Activity
95
December 31,
-
NA -
NA
-
NA -
NA
NA
NA
NA
NA -
96
January
-
- -
0
- - -
- - - - - - 97
February
-
- -
0
- - -
- - - - - - 98
March
-
- -
0
- - -
- - - - - - 99
April
-
- -
0
- - -
- - - - - - 100
May
-
- -
0
- - -
- - - - - - 101
June
-
- -
0
- - -
- - - - - - 102
July
-
- -
0
- - -
- - - - - - 103
August
-
- -
0
- - -
- - - - - - 104
September
-
- -
0
- - -
- - - - - - 105
October
-
- -
0
- - -
- - - - - - 106
November
-
- -
0
- - -
- - - - - - 107
December
-
- -
0
- - -
- - - - - - 108
Total
-
- -
109
Account 283 - Accumulated Deferred Income Taxes
110
Beginning Balance
FF1 276.9.b
-
111
Less: Portion not related to transmission
-
112
Less: Portion not reflected in rate base
-
113
Subtotal: Portion reflected in rate base
Line 110 - line 111 - line 112
-
114
Less: Portion subject to proration
Line 128 Col. D
-
115
Portion subject to averaging
Line 113 - line 114
-
116
Ending Balance
FF1 277.9.k
-
117
Less: Portion not related to transmission
-
118
Less: Portion not reflected in rate base
-
119
Subtotal: Portion reflected in rate base
Line 111 - line 112 - line 113
-
120
Less: Portion subject to proration (before proration)
Line 135 Col. D
-
121
Portion subject to averaging (before averaging)
Line 114 - line 115
-
122
Ending balance of portion subject to proration (prorated)
Line 135 Col. H
-
123
Average balance of portion subject to averaging
(Line 110 + line 116) / 2
-
124
Amount reflected in rate base
Line 117 + line 118
- Enter on line 4
125
126
Account 283 - Accumulated Deferred Income Taxes
(a) (b)
(c) (d)
(e) (f)
(g) (h)
(i) (j)
(k) (l)
(m) (n)
127
Month
Year
Actual Monthly Activity
128
December 31,
-
NA -
NA
-
NA -
NA
NA
NA
NA
NA -
129
January
-
- -
0
- - -
- - - - - - 130
February
-
- -
0
- - -
- - - - - - 131
March
-
- -
0
- - -
- - - - - - 132
April
-
- -
0
- - -
- - - - - - 133
May
-
- -
0
- - -
- - - - - - 134
June
-
- -
0
- - -
- - - - - - 135
July
-
- -
0
- - -
- - - - - - 136
August
-
- -
0
- - -
- - - - - - 137
September
-
- -
0
- - -
- - - - - - 138
October
-
- -
0
- - -
- - - - - - 139
November
-
- -
0
- - -
- - - - - - 140
December
-
- -
0
- - -
- - - - - - 141
Total
-
- -
142
143
144
145
146
Amount
debit / <credit>
Note 5 - Accumulated deferred income tax activity in account 282 subject to the proration rules relates differences between depreciation methods and lives for public utility property and any other amounts subject to the Section 168 or other normalization requirements.
Forecasted Monthly
Activity
debit / <credit>
Forecasted Month-
end Balance
debit / <credit>
Days until End
of Test Period
Days in Test
Period
Prorated Forecasted
Monthly Activity
debit / <credit>
(c) X (e) X (f)
Forecasted Prorated
Month-end Balance
debit / <credit>
Prior Month Col. (h) +
Current Month Col. (g)
Difference between
projected monthly and
actual monthly activity
(See Note 7.)
Preserve projected
proration when actual
monthly and projected
monthly activity are
either both increases or
decreases.
(See Note 8.)
Fifty percent of the
difference between
projected and actual activity
when actual and projected
activity are either both
increases or decreases.
(See Note 9.)
Fifty percent of actual
activity (Col I) when
projected activity is an
increase while actual
activity is a decrease OR
projected activity is a
decrease while actual
activity is an increase.
(See Note 10.)
Balance reflecting
proration or averaging
(See Note 11.)
Amount
debit / <credit>
Note 6 - Accumulated deferred income tax activity in account 283 subject to the proration rules relates differences between depreciation methods and lives for public utility property and any other amounts subject to the Section 168 or other normalization requirements.
Forecasted Monthly
Activity
debit / <credit>
Forecasted Month-
end Balance
debit / <credit>
Days until End
of Test Period
Days in Test
Period
Prorated Forecasted
Monthly Activity
debit / <credit>
(c) X (e) X (f)
Forecasted Prorated
Month-end Balance
debit / <credit>
Prior Month Col. (h) +
Current Month Col. (g)
Difference between
projected monthly and
actual monthly activity
(See Note 7.)
Preserve projected
proration when actual
monthly and projected
monthly activity are
either both increases or
decreases.
(See Note 8.)
Fifty percent of the
difference between
projected and actual activity
when actual and projected
activity are either both
increases or decreases.
(See Note 9.)
Fifty percent of actual
activity (Col I) when
projected activity is an
increase while actual
activity is a decrease OR
projected activity is a
decrease while actual
activity is an increase.
(See Note 10.)
Balance reflecting
proration or averaging
(See Note 11.)
Note 7 - Column J is the difference between actual monthly and projected monthly activity (Column I minus Column C). Specifically, if projected and actual activity are both positive, a negative in Column J represents over-projection (i.e., the amount of projected activity that did not occur) and a positive in Column J represents under-projection (i.e., the excess of actual activity over projected activity). If projected and actual activity are both negative, a negative in Column J represents under-projection (i.e., the excess of actual activity over projected activity) and a positive in Column J represents over-projection (i.e., the amount of projected activity that did not occur).
Note 8 - Column K preserves the effects of ADIT proration from the projected revenue requirement when actual monthly and projected monthly activity are either both increases or decreases. Specifically, if Column J indicates that ADIT activity was over-projected, enter Column G x [Column I / Column C]. If Column J indicates that ADIT activity was under- projected, enter the amount from Column G and complete Column L). In other situations, enter zero.
Note 9 - Column L applies when (1) Column J indicates that ADIT activity was under-projected AND (2) actual monthly and projected monthly activity are either both increases or both decreases. Enter 50 percent of the amount from Column J. In other situations, enter zero. The ADIT activity in column L is multiplied by 50 percent to reflect averaging of rate base to the extent that the proration requirement has not been applied to a portion of the monthly ADIT activity.
Note 10 - Column M applies when (1) projected monthly activity was an increase while actual monthly activity was a decrease OR (2) projected monthly activity was a decrease while actual monthly activity was an increase. Enter 50 percent of the amount of actual monthly activity (Col I). In other situations, enter zero. The ADIT activity in column M is multiplied by 50 percent to reflect averaging of rate base to the extent that the proration requirement has not been applied to a portion of the monthly ADIT activity. Note 11 - Column N is computed by adding the prorated monthly ADIT activity, if any, from Column K to the portion of monthly ADIT activity, if any, from Column L or M to the balance at the end of the prior month.PDF page 31
LS Power Grid New York Corporation I
Attachment 6d - Accumulated Deferred Income Taxes (ADIT) Detail Worksheet Actual Annual Transmission Revenue Requirement (True-up Adjustment) For the 12 months ended 12/31/____
-
-
-
Composite income tax rate
0.00%
0.00%
0.00%
Explanation
Account 190 (+ = debit for DTA/DTL amounts)
Included in rate base and subject to proration
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Included in rate base but not subject to proration Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Excluded from rate base
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Total Temporary Differences - account 190
- - - Total DTA / <DTL> - account 190
- - - Account 281 (+ = debit for DTA/DTL amounts)
Included in rate base and subject to proration
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Included in rate base but not subject to proration Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Excluded from rate base
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Total Temporary Differences - account 281
- - - Total DTA / <DTL> - account 281
- - - Amount -
beginning of
year
Amount during
the year
Amount - end of
yearPDF page 32
Account 282 (+ = debit for DTA/DTL amounts)
Included in rate base and subject to proration
Tax depreciation
- - - Book depreciation of tax basis
- - - Item 3
- - - Item 4
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Included in rate base but not subject to proration Item 1
- - - Item 2
- - - Item 3
- - - Item 4
- - - Item 5
- - - Item 6
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Excluded from rate base
AFUDC-equity accrual
- - - AFUDC-equity - book depreciation
- - - Item 3
- - - Item 4
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Total Temporary Differences - account 282
- - - DTA / <DTL> - account 282
- - - Account 283 (+ = debit for DTA/DTL amounts)
Included in rate base and subject to proration
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Included in rate base but not subject to proration Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Excluded from rate base
Item 1
- - - Item 2
- - - Subtotal of temporary differences
- - - DTA / <DTL> for such temporary differences
- - - Total Temporary Differences - account 283
- - - DTA / <DTL> - account 283
- - -PDF page 33
LS Power Grid New York Corporation I
Attachment 7 - Depreciation and Amortization Rates
For the 12 months ended 12/31/____
Line
Account Number
FERC Account
Rate (Annual)Percent
TRANSMISSION PLANT
(Note A)
1 350.2
Land Rights
1.43%
2 352
Structures and Improvements
1.60%
3 353
Station Equipment
2.06%
4 354
Towers and Fixtures
2.06%
5 355
Poles and Fixtures
2.06%
6 356
Overhead Conductor and Devices
2.06%
7 357
Underground Conduit
1.40%
8 358
Underground Conductor and Devices
1.75%
9 359
Roads and Trails
1.00%
GENERAL PLANT
10 390
Structures and Improvements
1.75%
11 391
Office Furniture & Equipment
12.50%
12 391.1
Computer Hardware
12.50%
13 392
Transportation Equipment
10.00%
14 393
Stores Equipment
12.50%
15 397
Communication Equipment
25.00%
INTANGIBLE PLANT
16 301
Organization
1.85%
17 302
Franchises and Consents
1.85%
18 303
Miscellaneous Intangible Plant / Computer Software
6.67%
19 303.1
Contributions in Aid of Construction
Note B
Notes
A
These depreciation rates shall stay in effect until changed pursuant to a Commission order emanating from an FPA Section 205 or Section 206 filing.
B
In the event a Contribution in Aid of Construction (CIAC) is made for a transmission facility, the transmission depreciation rates above will be weighted based on the relative amount of underlying plant booked to the accounts shown in lines 1-9 above and the weighted average depreciation rate will be used to amortize the CIAC. The life of a facility subject to a CIAC will be equivalent to the depreciation rate calculated above, i.e., 100% ÷ deprecation rate = life in years. The estimated life of the facility or rights associated with the facility will not change over the life of a CIAC without prior FERC approval.PDF page 34
LS Power Grid New York Corporation I
Worksheet - Annual Excess or Deficient Accumulated Deferred Income Taxes Worksheet
Annual Transmission Revenue Requirement
For the 12 months ended 12/31/____
Line No.
1
Purpose of worksheet
2
3
Description of changes in tax law
4
Note 1a - The composite tax rates used for the remeasurement of ADIT balances are:
5
6
Historical
New
7
Federal income tax rate
0%
0%
8
State income tax rate
0%
0%
9
Composite federal/state income tax rate
0%
0%
10
Tax gross-up factor
0.00000
0.00000
11
Note 1b - Describe change in tax law.
12
Summary of re-measurement of ADIT resulting from the 2017 decrease in federal income tax rate
13
(a) (b)
(c) (d)
(e) (f)
(g) (h)
(i) (j)
14
Account
15
190
-
16
281 (enter negative)
-
17
282 (enter negative)
-
18
283 (enter negative)
-
19
Total
- - - - - - - - - - - - - - -
-
20
Summary of entry related to ADIT affecting rate base
- -
-
- - - - - - - 21
Effect on rate base prior to re-measurement
-
-
22
Effect on rate base after re-measurement
-
-
-
-
-
23
The purposes of this portion of the worksheet are to:
- describe legislation resulting in remeasurement of ADIT accounts,
- explain how any ADIT accounts were re-measured,
- explain the excess or deficient ADIT contained therein,
- explain the accounting for any excess or deficient amounts in Accounts 182.3 (Other Regulatory Assets) and 254 (Other Regulatory Liabilities),
- reconcile the amounts of excess or deficient ADIT determined as a result of each specific change in tax law (i.e., unrecovered regulatory assets and unrefunded regulatory liabilities comprising the Rate Base Adjustment Mechanism) as of the beginning and end of the current test period,
- indicate whether each excess or deficient ADIT amount is protected (i.e., subject to the normalization rules) or unprotected (i.e., not subject to the normalization rules),
- indicate the amount of amortization of the excess or deficient ADIT returned or recovered through rates (i.e., the Income Tax Allowance Adjustment Mechanism) during the current period,
- indicate the accounts to which the excess or deficient ADIT are amortized,
- indicate the amortization period of the excess or deficient ADIT being returned or recovered through rates, and
- describe the method of amortization each excess or deficient ADIT amount.
Balance Prior to
Change in Law
Portion Affecting
Rate Base
Balance Re-
measured after
Change in Law
Portion Affecting
Rate Base Re-
measured after
Change in Law
Debit or <Credit>
to ADIT Affecting
Rate Base
Debit or <Credit>
to Account 182.3
Portion of Debit
or <Credit> to
Account 182.3
Affecting Rate
Base
Debit or <Credit>
to Account 254
Portion of Debit
or <Credit> to
Account 254
Affecting Rate
Base
ADIT on
Regulatory Asset
or Liability
Account 190 or
283
ADIT on
Regulatory Asset
or Liability
Affecting Rate
Base
Account 190 or
283
Debit or <Credit>
to Account 410.1
Debit or <Credit>
to Account 411.1
Debit or <Credit>
to Account 410.2
Debit or <Credit>
to Account 411.2
Note 2 - Explanation of how ADIT accounts are re-measured upon a change in income tax law
Deferred tax assets and liabilities are adjusted (re-measured) for the effect of the changes in tax law (including tax rates) in the period that the change is enacted. Adjustments are recorded in the appropriate deferred tax balance sheet accounts (Accounts 190, 281, 282 and 283) based on the nature of the temporary difference and the related classification requirements of the accounts. If as a result of action or expected action by a regulator, it is probable that the future increase or decrease in taxes payable due to the change in tax law or rates will be recovered from or returned to customers through future rates, a regulatory asset or liability is recognized in Account 182.3 (Other Regulatory Assets), or Account 254 (Other Regulatory Liabilities), as appropriate, for that probable future revenue or reduction in future revenue. Re-measurements of deferred tax balance sheet accounts may also result in re-measurements of tax-related regulatory assets or liabilities that had been recorded prior to the change in tax law. If is not probable that the future increase or decrease in taxes payable due to the change in tax law or rates will be recovered from or returned to customers through future rates, tax expense is recognized in Account 410.2 (Provision for Deferred Income Taxes, Other Income or Deductions) or tax benefit is recognized in Account 411.2 (Provision for Deferred Income Taxes-Credit, Other Income or Deductions), as appropriate.PDF page 35
24
Rate Base Adjustment Mechanism - Summary
25
Projected Revenue Requirement
Actual Revenue Requirement (True-up)
26
Account
Amount
Amount
27
182.3 (debit or <credit>)
28
254 (debit or <credit>)
29
Total Excess / Deficient ADIT
-
-
30
Rate Base Adjustment Mechanism - Reconciliation of Beginning and End of Test Period Balances - Projected
31
(a) (b)
(c) (d)
(e) (f)
(g) (h)
(i) (j)
32
Description (+ = debit, <> = credit)
Amortization period and method
33
Item 1
-
34
-
35
-
36
Item …
37
Total for account 182.3
- - - - -
38
Item 1
-
39
-
40
-
41
Item …
42
Total for account 254
- - - - -
43
Total excess or deficient ADIT
- - - - -
44
Income Tax Allowance Mechanism - Projected
45
(a) (b)
(c) (d)
(e) (f)
(g) (h)
(i) (j)
46
Description (+ = debit, <> = credit)
47
Item 1
- -
-
48
- -
-
49
- -
-
50
Item …
51
Total for account 182.3
- - - - - - - - 52
Item 1
-
-
-
53
-
-
-
54
-
-
-
55
Item …
56
Total for account 254
- - - - - - - - 57
Total amortization and offsetting entries
- - - - - - - - 58
-
59
60
Note
61
Note
62
Note
Balance at
Beginning of Year
-
Projected
Remeasurement
of ADIT -
Projected
(Note 3)
Annual
Amortization -
Projected
(Note 4)
Other
Adjustments -
Projected
(Note 5)
Balance at End of
Year -
Projected
(d)+(e)+(f)+(g)
Whether subject
to normalization
rules
(Note 6)
Annual
Amortization
from Table Above
Debit or <Credit>
to Account 410.1
Debit or <Credit>
to Account 411.1
Debit or <Credit>
to Account 410.2
Debit or <Credit>
to Account 411.2
Debit or <Credit>
to Account 190
Debit or <Credit>
to Account 283
NotePDF page 36
63
Rate Base Adjustment Mechanism - Reconciliation of Beginning and End of Test Period Balances - Actual
64
(a) (b)
(c) (d)
(e) (f)
(g) (h)
(i) (j)
65
Description (+ = debit, <> = credit)
Amortization period and method
66
Item 1
-
67
-
68
-
69
Item …
70
Total for account 182.3
- - - - -
71
Item 1
-
72
-
73
-
74
Item …
75
Total for account 254
- - - - -
76
Total excess or deficient ADIT
- - - - -
76
Income Tax Allowance Mechanism - Actual
77
(a) (b)
(c) (d)
(e) (f)
78
Description (+ = debit, <> = credit)
79
Item 1
-
80
-
81
-
82
Item …
83
Total for account 182.3
- - - - - - - - 84
Item 1
-
-
-
85
-
-
-
86
-
-
-
87
Item …
88
Total for account 254
- - - - - - - - 89
Total amortization and offsetting entries
- - - - - - - - 90
-
91
Note
92
Note
93
Note
94
Note
Balance at
Beginning of Year
-
Projected
Remeasurement
of ADIT -
Actual
(Note 7)
Annual
Amortization -
Actual
(Note 8)
Other
Adjustments -
Actual
(Note 9)
Balance at End of
Year -
Projected
(d)+(e)+(f)+(g)
Whether subject
to normalization
rules
(Note 10)
Annual
Amortization
Debit or <Credit>
to Account 410.1
Debit or <Credit>
to Account 411.1
Debit or <Credit>
to Account 410.2
Debit or <Credit>
to Account 411.2
Debit or <Credit>
to Account 190
Debit or <Credit>
to Account 283