ER27-518-000 · 2026-11-16 · LS Power Grid New York Corporation INew York Independent System Operator, Inc.
Exhibit No. GNY-207 to Arzola Testimony
PDF page 1
6.10.7.2.2
LS Power Grid New York Corporation I Formula Rate Implementation
Protocols
The formula rate template (“Formula Rate Template” or “Template”) and the following procedures (“Protocols”) together comprise the filed rate (“Formula Rate”) of LS Power Grid New York Corporation I (“LSPG-NY”) for transmission revenue requirement determinations under the ISO OATT. LSPG-NY shall follow the instructions specified in the Formula Rate to annually calculate its actual net adjusted revenue requirement set forth at page 1, line 5 of the Template (“Net Adjusted Revenue Requirement”). The Net Adjusted Revenue Requirement shall be determined for January 1 to December 31 of a given calendar year (the “Rate Year”). The Formula Rate shall become effective for recovery of LSPG-NY’s Net Adjusted Revenue Requirement upon the effective date for incorporation into the ISO OATT through an appropriate filing with the Commission under Section 205 of the Federal Power Act (“FPA”). As used in these Protocols and the Formula Rate Template: (i) “Cost Recovery Agreement” or “CRA” means a Large Load Cost Recovery Agreement between LSPG-NY and an Eligible Customer entered into in the form established under the large load provisions of Rate Schedule 10 of the ISO OATT (“Rate Schedule 10 Large Load Provisions”); (ii) “Eligible Customer” has the meaning set forth in the ISO OATT and, when used with respect to a CRA, means the Eligible Customer that is a party to that CRA, including any Successor Eligible Customer; (iii) “Annual MTRC” means the annual Minimum Transmission Revenue Contribution for a Covered Upgrade, as defined in and calculated solely under the MTRC Calculation Template in the applicable CRA; (iv) “Qualifying Transmission Revenues” means the transmission revenues that count toward an Annual MTRC, as defined in and determined in accordance with the applicable CRA; (v) “Supplemental MTRC” means the amount, if any, by which an Annual MTRC exceeds the corresponding Qualifying
PDF page 2
Transmission Revenues, as determined under the applicable CRA; (vi) “Large Load CRA Revenue” means, for a Rate Year, the Projected Large Load CRA Revenue or the Actual Large Load CRA Revenue, as applicable, which shall be credited in the Formula Rate as set forth in the Template; (vii) “Projected Large Load CRA Revenue” means the Supplemental MTRC (including any prior-period true-up adjustment) projected to be billed under a CRA for the Rate Year and the Annual Termination Fee Remittances projected to be received for the Rate Year, and does not include expected collections of amounts unpaid in a prior Rate Year; and (viii) “Actual Large Load CRA Revenue” means the amounts LSPG-NY receives during the Rate Year under a CRA, consisting of Supplemental MTRC payments collected and remitted by the ISO, Applied Security Proceeds applied to a Supplemental MTRC obligation and remitted by the ISO, amounts LSPG-NY recovers directly from an Eligible Customer and applies to a Supplemental MTRC obligation, and Annual Termination Fee Remittances, whether the amount was billed in that Rate Year or an earlier Rate Year. Other capitalized terms used in these Protocols in connection with a CRA, including Actual Load Data, Annual Termination Fee Remittance, Applied Security Proceeds, Covered Upgrade, Large Load Charge, Large Load Customer, Large Load-Driven Upgrade, Large Load Facility, Load Forecast, MTRC Calculation Template, Required Operational Security, Successor Eligible Customer, Supplemental MTRC Receipts, Termination Fee, and Total Required Revenue Commitment, and the term “prior-period true-up adjustment,” have the meanings given in the applicable CRA. The Annual MTRC is determined solely under the applicable CRA and is not calculated under the Formula Rate; it is entered in the Template as set forth therein. Section 1.
Annual Projection
A. On or before September 30 preceding the first Rate Year and each subsequent Rate Year
PDF page 3
thereafter, LSPG-NY shall determine its projected Net Adjusted Revenue Requirement for the upcoming Rate Year in accordance with its Formula Rate (“Annual Projection”). The Annual Projection shall include the True-up Adjustment described and defined in Section 2, if applicable.
B. Posting and Notice of the Annual Projection. LSPG-NY shall cause its Annual Projection to be posted in both a Portable Document Format (PDF) and fully-functioning Excel format at a publicly accessible location on the ISO website. Such posting shall include (i) all inputs in sufficient detail to identify the components of LSPG-NY’s Annual Projections, and (ii) explanations of the bases for the projections and input data. If the date for making such posting of the Annual Projection should fall on a weekend or a holiday recognized by FERC, then the posting shall be made no later than the next business day. Within ten (10) days of posting the projected Net Adjusted Revenue Requirement, LSPG-NY shall provide notice of such posting to the Service List. As used in these protocolsProtocols, “Service List” shall mean (i) the email list of the ISO OATT Transmission Customers maintained by ISO; (ii) any state regulatory agency with rate jurisdiction over a public utility located within the ISO footprint; and (iii) any consumer advocate agency authorized by state law to review and contest the rates for any such public utility, provided such consumer advocate agency requests to be placed on the Service List and provides an email address to LSPG-NY; and (iv) each Eligible Customer that is a party to a CRA, each Large Load Customer under a CRA, and each Successor Eligible Customer under a CRA.
For the determination of the initial Rate Year’s projected Net Adjusted Revenue Requirement, balances for capital costs reflected in the Formula Rate Template that
PDF page 4
subsequently use a 13 month average will be divided by the number of months the Formula Rate is in effect to calculate the monthly projected cost of service to be collected each month of the first year. The remaining inputs used in the Formula Rate Template- will be developed in accordance with the Formula Rate Template.
C. Revisions to the Annual Projection. If LSPG-NY makes changes in the Annual Projection for a given Rate Year, LSPG-NY shall cause such revised Annual Projection to be promptly posted at a publicly accessible location on the ISO website and distribute notice to the Service List. Changes posted prior to October 31 of the preceding Rate Year, or the next business day if October 31 is not a business day, shall be reflected in the Annual Projection for the Rate Year; changes posted after that date will be reflected, as appropriate, in the True-up Adjustment for the Rate Year.
D. Review and Challenge of the Annual Projection. The Annual Projection, including the True-Up Adjustment, for each Rate Year shall be subject to review, challenge, true-up and refunds or surcharges with interest, to the extent and in the manner provided in these Protocols.
E. The projected Net Adjusted Revenue Requirement shall:
1. Include a workable, data-populated Formula Rate Template and underlying work papers in native format with all formulas and links intact;
2. Provide the formula rate calculations and all inputs thereto, as well as supporting documentation and work papers for data that are used in the projected Net Adjusted Revenue Requirement;
3. Provide sufficient information to enable interested persons to replicate the calculation of the projected Net Adjusted Revenue Requirement;
PDF page 5
4. Provide a work paper demonstrating compliance with the cost containment commitments set forth in the Formula Rate Template, which shall identify each Large Load-Driven Upgrade separately from any investment subject to such commitments;
5. With respect to any change in accounting that affects inputs to the formula rate or the resulting charges billed under the formula rate (“Accounting Change”): a. Identify any Accounting Changes, including:
i. the initial implementation of an accounting standard or policy;
ii. the initial implementation of accounting practices for unusual or unconventional items where FERC has not provided specific
accounting direction;
iii. correction of errors and prior period adjustments that impact the projected Net Adjusted Revenue Requirement calculation;
iv. the implementation of new estimation methods or policies that change prior estimates; and
v. changes to income tax elections;
b. Identify items included in the projected Net Adjusted Revenue Requirement at an amount other than on a historic cost basis (e.g., fair value adjustments);
c. Identify any reorganization or merger transaction during the previous year and explain the effect of the accounting for such transaction(s) on inputs to the projected Net Adjusted Revenue Requirement; and
d. Provide, for each item identified pursuant to items in Section 1.E.5.a-c of
PDF page 6
these Protocols, a narrative explanation of the individual impact of such changes on the projected Net Adjusted Revenue Requirement.
6. Provide upgrade-specific work papers, organized by Eligible Customer, Large Load Facility, and Covered Upgrade, showing for each CRA the applicable Annual MTRC, forecast Qualifying Transmission Revenues, projected Supplemental MTRC, any prior-period true-up adjustment, the Annual Termination Fee Remittances scheduled to be remitted during the Rate Year, Total Required Revenue Commitment, Required Operational Security, and any unpaid Supplemental MTRC carried forward from a prior Rate Year (which is not included in Projected Large Load CRA Revenue), and reconciling those amounts to the Projected Large Load CRA Revenue, subject to Section 8 of these Protocols.
F. Joint Informational Meeting. Transmission Owners with transmission projects that utilize a regional or inter-regional cost sharing mechanism shall endeavor to hold a joint informational meeting to enable all interested parties to understand how those Transmission Owners are implementing their formula rates for cost recovery of such projects (“Joint Informational Meeting”). Notice of the Joint Informational Meeting, including the time, date, and location, shall be posted on the LSPG-NY website and distributed to the Service List no less than seven (7) days prior to such meeting, and the Transmission Owners shall provide remote access to Joint Informational Meetings to allow all interested parties the opportunity to remotely participate in such meetings. LSPG-NY will participate in Joint Informational Meetings once it begins development of a project for which costs are to be regionally or inter-regionally allocated.
PDF page 7
Section 2.
Calculation of True-Up Adjustment
A. LSPG-NY will calculate the amount of under-or-over-collection of its actual Net Revenue Requirement during the preceding Rate Year (“True-up Up Adjustment”) after the FERC Form No.1 data for that Rate Year has been filed with the Commission. The True-Up Adjustment shall be the sum of the True-Up Adjustment over/under recovery as determined in Section 2.B and the Interest on the True-Up Adjustment over/under recovery as determined in Section 2.C.
B. Calculation of the True-Up Adjustment. To determine any over or under recovery, LSPG- NY’s projected Net Revenue Requirement collected during the previous Rate Year will be compared to LSPG-NY’s actual Net Revenue Requirement for the previous Rate Year. LSPG-NY shall calculate its actual Net Revenue Requirement for the previous Rate Year in accordance with LSPG-NY’s Formula Rate and based upon: (i) LSPG-NY’s FERC Form No. 1 for that same Rate Year; (ii) any FERC orders specifically applicable to LSPG-NY’s calculation of its annual revenue requirement; (iii) the books and records of LSPG-NY (which shall be maintained consistent with the FERC Uniform System of Accounts (“USofA”)); (iv) FERC accounting policies and practices applicable to the calculation of annual revenue requirements under formula rates; and (v) any aspects of the ISO OATT and other governing documents that apply to the calculation of annual revenue requirements under individual transmission owner formula rates to determine any over-or-under-recovery. Notwithstanding anything to the contrary herein, if the initial year of this rate schedule is a partial year, the initial projected Net Revenue Requirement will be divided by the number of months the Formula Rate is in effect to calculate the monthly projected cost of service to be collected each month of the first year. Similarly,
PDF page 8
the actual Net Revenue Requirement will be divided by the number of months the rate is in effect to calculate the actual cost of service to be collected each month of the first year. The first True-up Adjustment will compare the projected Net Revenue Requirement billed and the actual Net Revenue Requirement for that initial Rate Year. In determining the over or under recovery under this Section 2.B, the actual Net Revenue Requirement for the previous Rate Year shall reflect the Actual Large Load CRA Revenue for that Rate Year in place of the Projected Large Load CRA Revenue reflected in the Annual Projection for that Rate Year, and any difference, including any difference resulting from a billed amount that is not received, shall be reconciled through the True-Up Adjustment, with interest calculated as provided in Section 2.C. A billed amount that is not received during the Rate Year is not included in Actual Large Load CRA Revenue and remains owed by the Eligible Customer; when that amount is later received, including through Applied Security Proceeds or amounts LSPG-NY recovers directly from an Eligible Customer, it shall be included in Actual Large Load CRA Revenue for the Rate Year in which it is received, and no amount shall be included more than once. This True-Up Adjustment is separate from the prior-period true-up adjustment of an Eligible Customer’s Supplemental MTRC under the applicable CRA, which is calculated without interest. Any previously credited amount that LSPG-NY returns to an Eligible Customer shall be reversed in the next practicable Annual Update and True-Up Adjustment.
C. Interest. Interest on any True-up Adjustment over/under recovery of the actual Net Revenue Requirement shall be calculated in accordance with the Formula Rate true-up worksheet.
Section 3.
Annual Update
PDF page 9
A. On or before June 30 following each Rate Year, LSPG-NY shall calculate its actual Net Adjusted Revenue Requirement including the True-up Adjustment, as described in Section 2, for each Rate Year (“Annual Update”).
B. Posting and Notice of the Annual Update. No later than June 30 following each Rate Year, LSPG-NY shall cause its Annual Update to be posted in both a PDF and fully functioning Excel format at a publicly accessible location on the ISO website. Within ten (10) days of such posting, LSPG-NY shall provide notice of such posting to the Service List. The date on which the last of the events listed in this Section 3.B occurs shall be that year’s “Publication Date.” If the date for making such posting of the Annual Update should fall on a weekend or a holiday recognized by FERC, then the posting shall be due the next business day. In addition, within ten (10) days of the Publication Date the Annual Update shall be submitted as an informational filing with the FERC.
C. The Annual Update for the Rate Year shall:
1. Include a workable data-populated Formula Rate Template and underlying work papers in native format with all formulas and links intact;
2. Be based on LSPG-NY’s FERC Form No. 1 for the prior calendar year;
3. Provide the formula rate calculations and all inputs thereto, as well as supporting documentation and work papers for data that are used in the Annual Update that are not otherwise available in FERC Form No. 1. It is the intent of the formula rate, including the supporting explanations and allocations described therein, that each input to the formula rate will be either taken directly from FERC Form No. 1 or reconcilable to FERC
Form No. 1 by the application of clearly identified and supported
PDF page 10
information. If the referenced form is superseded, the successor form(s) shall be utilized and supplemented as necessary to provide equivalent information as that provided in the superseded form. If the referenced form(s) is (are) discontinued, equivalent information as that provided in the discontinued form(s) shall be utilized;
4. Provide sufficient information to enable interested persons to replicate the calculation of the Annual Update results from FERC Form No. 1;
5. Provide a work paper demonstrating compliance with the cost containment commitments set forth in the Formula Rate Template, which shall identify each Large Load-Driven Upgrade separately from any investment subject to such commitments;
6. Identify payments, if any, to NYPA for operations and maintenance. To the extent there is any mark-up in the operations and maintenance costs incurred by NYPA and charged to LSPG-NY, LSPG-NY shall justify the mark-up as an appropriate expense to be recovered under the formula rate. ;
7. Identify any changes in the formula references (page and line numbers) to FERC
Form No. 1;
8. Identify all material adjustments made to the FERC Form No. 1 data in determining formula inputs, including relevant footnotes to FERC Form No. 1 and any adjustments not shown in FERC Form No. 1;
9. Provide underlying data for formula rate inputs that provide greater granularity than is required for FERC Form No. 1;
PDF page 11
10. With respect to any change in accounting that affects inputs to the formula rate or the resulting charges billed under the formula rate (“Accounting Change”): a. Identify any Accounting Changes, including:
i. the initial implementation of an accounting standard or policy;
ii. the initial implementation of accounting practices for unusual or unconventional items where FERC has not provided specific
accounting direction;
iii. correction of errors and prior period adjustments that impact the True-Up Adjustment calculation;
iv. the implementation of new estimation methods or policies that change prior estimates; and
v. changes to income tax elections;
b. Identify items included in the Annual Update at an amount other than on a historic cost basis (e.g., fair value adjustments);
c. Identify any reorganization or merger transaction during the previous year and explain the effect of the accounting for such transaction(s) on inputs to the Annual Update; and
d. Provide, for each item identified pursuant to items 3.C.910.a-c of these Protocols, a narrative explanation of the individual impact of such changes on the True-Up Adjustment.;
11. Provide work papers, organized by Eligible Customer, Large Load Facility, and Covered Upgrade, reconciling the Projected Large Load CRA Revenue for the Rate Year and the Actual Large Load CRA Revenue credited for the
PDF page 12
Rate Year to the applicable Annual MTRC, forecast and actual Qualifying Transmission Revenues, Supplemental MTRC billed, prior-period true-up adjustments, Supplemental MTRC payments collected and remitted by the ISO, Applied Security Proceeds, amounts recovered directly from an
Eligible Customer, Annual Termination Fee Remittances, refunds, and opening and closing unpaid Supplemental MTRC balances, reconciling the Actual Large Load CRA Revenue to the amounts recorded in LSPG-NY’s
FERC Form No. 1, and identifying the resulting difference reconciled through the True-Up Adjustment, subject to Section 8 of these Protocols; and
1112. Shall not seek to modify the Formula Rate and shall not be subject to challenge by any interested person seeking to modify the Formula Rate. (i.e., any modifications to the Formula Rate will require, as applicable, an FPA Section 205 or Section 206 filing or initiation of a Section 206 investigation).
D. Annual Update Meeting. No less than twenty (20) business days and no more than thirty
(30) business days after June 30, LSPG-NY shall hold an open meeting among interested persons (“Annual Update Meeting”) in order for LSPG-NY to explain its Annual Update and to provide interested persons an opportunity to seek information and clarifications regarding the Annual Update. No less than seven (7) days prior to such Annual Update Meeting, LSPG-NY shall cause notice to be posted on the ISO’s website of the time, date, and location of the Annual Update Meeting and LSPG-NY shall provide notice of such meeting to the Service List.
PDF page 13
E. Example – Timeline for 2022 Annual Update: On or before September 30, 2021, LSPG- NY will determine the projected Net Adjusted Revenue Requirement for the 2022 Rate Year, which is expected to be the first year that costs are recovered from Transmission Customers under the Formula Rate. LSPG-NY will post the Annual Projection for the 2022 Rate Year in accordance with Section 1 above. LSPG-NY will not determine a True- up Adjustment or post an Annual Update on June 30, 2022 if no costs have been recovered under the Formula Rate during 2021. On or before September 30, 2022, LSPG- NY will post the Annual Projection for the 2023 Rate Year. On or before June 30, 2023, LSPG-NY will post its first Annual Update, calculating the True-up Adjustment for the 2022 Rate Year determined pursuant to Section 2 above. Such True-up Adjustment will be reflected in the Annual Projection of the Net Adjusted Revenue Requirement for the 2024 Rate Year posted on or before September 30, 2023. The Annual Update posted on or before June 30, 2023 will be subject to the customer review and challenge procedures described in Sections 4 and 5 of these Protocols.
Section 4.
Annual Review Procedures
The Annual Update and Annual Projection for each Rate Year shall be subject to the following review procedures (“Annual Review Procedures”):
A. Information Request Deadline. interested Interested parties shall have up to one hundred twenty (120) calendar days after the Publication Date (unless such period is extended with the written consent of LSPG-NY or by FERC order) to serve reasonable information requests on LSPG-NY as described in Section 4.B.
B. Limitations on Scope. Such information and document requests shall be limited to what is necessary to determine: (1) the extent or effect of an Accounting Change; (2) whether
PDF page 14
the Annual Update or Annual Projection fails to include data properly recorded in accordance with these protocolsProtocols; (3) the proper application of the Formula Rate and procedures in these protocolsProtocols; (4) the accuracy of data and consistency with the formula rate of the calculations shown in the Annual Update or Annual Projection; (5) the prudence of actual costs and expenditures; (6) the effect of any change to the underlying Uniform System of Accounts or FERC Form No. 1; or (7) any other information that may reasonably have substantive effect on the calculation of the charge pursuant to the formula. The information and document requests shall not otherwise be directed to ascertaining whether the formula rate is just and reasonable.
C. Responses to Information Requests. LSPG-NY shall make a good faith effort to respond to information and document requests within ten (10) business days of receipt of such requests. In the event an information request is not provided within 10 business days, the parties will mutually agree on an extension of the Review Period.
D. Public Availability of Information Requests and Responses. LSPG-NY will cause to be posted on the ISO website all information requests from interested parties and LSPG- NY’s response(s) to such requests; except, however, if responses to information and document requests include material deemed by LSPG-NY to be confidential information, such information will not be publicly posted but will be made available to requesting parties pursuant to a confidentiality agreement to be executed by LSPG-NY and the requesting party.
E. Privilege. LSPG-NY shall not claim that responses to information and document requests provided pursuant to these protocols Protocols are subject to any settlement privilege in any subsequent FERC proceeding addressing LSPG-NY’s Annual Update or
PDF page 15
Annual Projection.
Section 5.
Challenge Procedures
A. Informal Challenge Deadlines. interested persons shall have until the latest of one hundred fifty (150) calendar days after the Publication Date, thirty (30) calendar days after the receipt of all responses to timely submitted information requests (unless such period is extended with the written consent of LSPG-NY or by FERC order), or thirty
(30) calendar days after resolution of a dispute that does not result in the production of additional information (“Review Period”), to review the calculations and to notify LSPG- NY in writing of any specific challenges that fall within the parameters as defined in the Limitations on Scope in Section 5.G of these Protocols (“Informal Challenge”). Failure to pursue an issue through an Informal Challenge or to lodge a Formal Challenge regarding any issue as to a given Annual Update or Annual Projection shall bar pursuit of such issue with respect to that Annual Update or Annual Projection, but shall not bar pursuit of such issue or the lodging of a Formal Challenge as to such issue as it relates to a subsequent Annual Update or Annual Projection
B. Contents, Scope, and Response. An interested party submitting an Informal Challenge to LSPG-NY must specify the inputs, supporting explanations, allocations, calculations, or other information to which it objects, and provide an appropriate explanation and documents to support its challenge. LSPG-NY shall respond to any Informal Challenge within twenty (20) business days of notification of such challenge. LSPG-NY, and where applicable, the Transmission Provider, shall appoint a senior representative to work with the party that submitted the Informal Challenge (or its representative) toward a resolution of the challenge. If LSPG-NY disagrees with such challenge, LSPG-NY will
PDF page 16
provide the interested person(s) with an explanation supporting the inputs, supporting explanations, allocations, calculations, or other information.
C. Public Availability of Informal Challenges. LSPG-NY will cause to be posted at a publicly-accessible location on the ISO website all Informal Challenges from interested persons and LSPG-NY’s response(s) to such Informal Challenges; except, however, if Informal Challenges or responses to Informal Challenges include material deemed by LSPG-NY to be confidential information, such information will not be publicly posted but will be made available to requesting parties pursuant to a confidentiality agreement to be executed by LSPG-NY and the requesting party.
D. Remedies. Any changes or adjustments to the Annual Update or Annual Projection resulting from the Informal Challenge process that are agreed to by LSPG-NY will be reported in the informational filing required pursuant to Section 3 of these Protocols. Any such changes or adjustments agreed to by LSPG-NY on or before December 1 will be reflected in the projected Net Adjusted Revenue Requirement for the upcoming Rate Year. Any changes or adjustments agreed to by LSPG-NY after December 1 will be reflected in the following year’s Annual Update.
E. Formal Challenge Deadlines. Any interested persons may file a challenge with the FERC (“Formal Challenge”) contesting some action or inaction by LSPG-NY with respect to the Annual Update or Annual Projection, and shall do so no later than sixty (60) calendar days following the end of the Review Period (unless such date is extended with the written consent of LSPG-NY to continue efforts to resolve the Informal Challenge). A Formal Challenge shall be filed in the same docket as LSPG-NY’s informational filing discussed in Section 3 of these Protocols. LSPG-NY shall respond to the Formal Challenge by
PDF page 17
submitting any response to FERC within thirty (30) calendar days of the date of the filing of the Formal Challenge, and LSPG-NY shall serve on the filing party(ies) and the Service List by electronic service on the date of such filing. A party may not pursue a Formal Challenge on a specific issue if that party did not submit an Informal Challenge on the issue during the applicable Review Period.
F. Contents of Formal Challenges. Formal Challenges shall be filed pursuant to these Protocols. All information and correspondence produced by LSPG-NY pursuant to these Protocols may be included in any Formal Challenge or other FERC proceeding relating to the Formula Rate, subject to any applicable confidentiality and Critical Energy Infrastructure Information restrictions. Formal Challenges shall be filed pursuant to these Protocols and shall satisfy all of the following requirements.
(1) A Formal Challenge shall:
(a) Clearly identify the action or inaction which is alleged to violate the filed Formula Rate Template or Protocols;
(b) Explain how the action or inaction violates the Formula Rate or Protocols;
(c) Set forth the business, commercial, economic or other issues presented by the action or inaction as such relate to or affect the party filing the Formal Challenge, including:
(i) the extent or effect of an Accounting Change;
(ii) whether the Annual Update or Annual Projection fails to include
data properly recorded in accordance with these Protocols;
(iii) the proper application of the Formula Rate and procedures in the Protocols;
PDF page 18
(iv) the accuracy of data and consistency with the formula rate of the charges shown in the Annual Update or Annual Projection;
(v) the prudence of actual costs and expenditures;
(vi) the effect of any change to the underlying Uniform System of Accounts or FERC Form 1; or
(vii) any other information that may reasonably have substantive effect on the calculation of the charge pursuant to the Formula Rate.
(d) Make a good faith effort to quantify the financial impact or burden (if any) created for the party filing the Formal Challenge as a result of the action or inaction;
(e) State whether the issues presented are pending in an existing Commission proceeding or a proceeding in any other forum in which the filing party is a party, and if so, provide an explanation why timely resolution cannot be achieved in that forum;
(f) State the specific relief or remedy requested, including any request for stay or extension of time, and the basis for that relief;
(g) Include all documents that support the facts in the Formal Challenge in possession of, or otherwise attainable by, the filing party, including, but not limited to, contracts and affidavits; and
(h) State whether the filing party utilized the Informal Challenge procedures described in these Protocols to dispute the action or inaction raised by the Formal Challenge, and, if not, describe why not.
(2) Service. Any person filing a Formal Challenge must serve a copy of the Formal
PDF page 19
Challenge on LSPG-NY. Service to LSPG-NY must be simultaneous with filing at the Commission. Simultaneous service can be accomplished by electronic mail in accordance with § 385.2010(f)(3) of FERC’s regulations, facsimile, express delivery, or messenger. The party filing the Formal Challenge shall serve the individual listed as the contact person on LSPG-NY’s Informational Filing required under Section 3 of these Protocols.
G. Limitations on Scope. Informal and Formal Challenges shall be limited to all issues that may be necessary to determine: (1) the extent or effect of an Accounting Change; (2) whether the Annual Update or Annual Projection fails to include data properly recorded in accordance with these Protocols; (3) the proper application of the formula rate and procedures in these Protocols; (4) the accuracy of data and consistency with the formula rate of the calculations shown in the Annual Update or Annual Projection; (5) the prudence of actual costs and expenditures; (6) LSPG-NY’s compliance with the cost containment commitments reflected in the Formula Rate; (7) the effect of any change to the underlying Uniform System of Accounts or FERC Form No. 1; or (8) any other information that may reasonably have substantive effect on the calculation of the charge pursuant to the formula.
H. Burden. In any Formal Challenge proceeding initiated by FERC concerning a given year’s Annual Update or Accounting Changes, LSPG-NY shall bear the burden, consistent with section 205 of the FPA, of proving that it has correctly applied the terms of the formula rate consistent with these Protocols, and that it followed the applicable requirements and procedures in these Protocols. Nothing herein is intended to alter the burdens applied by FERC with respect to prudence challenges.
PDF page 20
I. Reservation of Rights under FPA Sections 205 and 206. Except as specifically provided in these Protocols and subject to terms of certain Offer of Settlement and Stipulations filed with FERC in setting LSPG-NY’s Formula Rate, nothing herein shall be deemed to limit in any way the right of LSPG-NY to file unilaterally, pursuant to Section 205 of the FPA and the regulations thereunder, to change the formula rate or any of its inputs (including, but not limited to, an application seeking changes to the Formula Rate or any of the stated value inputs requiring a Section 205 filing under these Protocols including, but not limited to, return on equity and depreciation rates), or the right of any interested persons of or the Commission to seek such changes pursuant to Section 206 of the FPA and the regulations thereunder.
J.
Any interested party seeking changes to the application of the formula rate due to a change in the Uniform System of Accounts or FERC Form No. 1, shall first raise the matter with LSPG-NY before pursuing a Formal Challenge.
Section 6.
Changes to the Annual Update or Annual Projection
Except as provided in Sections 4 and 5 of these Protocols, any changes to the data inputs, including but not limited to revisions to LSPG-NY’s FERC Form No. 1, or as the result of any FERC proceeding to consider the Annual Update or Annual Projection, or as a result of the procedures set forth herein, shall be incorporated into the formula rate and the charges produced by the formula rate in the Annual Projection for the next Rate Year. This reconciliation mechanism shall apply in lieu of mid-Rate Year adjustments. Interest on any refund or surcharge shall be calculated in accordance with the procedures outlined in these Protocols. Section 7.
Updates During Transmission Project Construction
LSPG-NY anticipates that it will undertake development activities prior to having an
PDF page 21
obligation for an informational filing related to its Annual Update or which are outside the scope of the annual transmission revenue requirement for a particular Rate Year. During the period of construction, on June 30 of each year or Rate Year as the case may be, LSPG-NY shall provide project cost updates to be included with its annual informational filing set forth in Section 3.B of these Protocols, information regarding any “Unforeseeable Costs” as that term is defined in the Offer of Settlement approved by the Commission in Docket No. ER20- 716-001, together with information demonstrating how such costs were determined to be Unforeseeable Costs. In addition, to the extent that there are any “Third Party Costs,” as such term is defined in the Offer of Settlement approved by the Commission in Docket No. ER20- 716-001, arising under clause (iii) of the definition of Third Party Costs as set forth in the Offer of Settlement approved by the Commission in Docket No. ER20-716-001, LSPG-NY will provide information on such Third Party Cost as part of project cost updates in its annual informational filing, including information demonstrating how such costs were determined to be Third Party Costs.
In addition to the project cost updates referenced above, within six months of placing the entire “Segment A Project,” as is defined in the Offer of Settlement approved by the Commission in Docket No. ER20-716-001, in service, LSPG-NY will provide an informational workpaper identifying the final assets owned by LSPG-NY and the NYPA respectively, the total ratebase of the assets, details including accounting entries of any transfers of assets that may have occurred between the parties that changed the ownership of any assets, the amount of any costs greater than the “Cost Cap” or less than the “Adjusted Cost Cap” as those terms are defined in the Offer of Settlement approved by the Commission in Docket No. ER20-716-001, as the case may be, and details on the operations and
PDF page 22
maintenance costs incurred to date.
Section 8.
Customer-Specific Information
Notwithstanding Sections 1.B and 3.B of these Protocols, information in the Annual Projection, Annual Update, or supporting work papers that is specific to an individual Eligible Customer, Large Load Customer, or CRA, including Load Forecasts, Actual Load Data, and documents provided under a CRA, shall be treated as confidential information, subject to any applicable confidentiality provisions of the ISO OATT, the applicable CRA, and any applicable confidentiality agreement. LSPG-NY shall post and file versions of the Annual Projection, the Annual Update, and the work papers required by Sections 1.E.6 and 3.C.11 of these Protocols that aggregate or redact such information, and shall make the unredacted information available to interested parties only pursuant to a confidentiality agreement as provided in Section 4.D of these Protocols, and to the Commission in accordance with its regulations.